Lean Systems by  Sashi.Prabhu
Lean Systems The ability to make  exactly   what the  customer  wants as they  order  it.
Benefits:  Tangible  &  Intangible ,[object Object],[object Object],[object Object],[object Object],[object Object],0   100 Lead Time Reduction Productivity Increase WIP Reduction Quality Improvement Space Utilization
Time & Cost Relationship “ The longer an article is in the process of manufacture and the more it is moved about,  the greater its ultimate cost.” --Henry Ford, 1926
History of Lean ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
“Lean Thinking” ,[object Object],[object Object],[object Object],[object Object]
Definition of Waste ,[object Object],[object Object],[object Object],[object Object]
Value Added  vs. Non-value Added ,[object Object],[object Object],[object Object]
Total Order Lead Time Breakdown Value Added Ratio   = 0  1  2  3  4  5 Elapsed  Time Value Added Time Elapsed Time VA NVA
Value Added Ratio Calculation Value Added Ratio   = 5 VA NVA 1.1 5.3 = 20.7 % 0  1  2  3  4  5 Elapsed  Time
The Eight Process Wastes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eight Service Industry Wastes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Lean Toolbox
5 S’s Campaign ,[object Object],[object Object],[object Object],[object Object],[object Object]
With an Organized Workplace : ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Quick Changeover Traditional setup and large batches Setup Run Quick change and small batches Externalized & Streamlined Tasks
Why Reduce Set-ups? Remember:  nothing is being produced! So, set-up time is   Non Value Added Setups need to be  eliminated, integrated, or simplified
“Pull” Production versus “Push” Push: Schedule-based Pull: Consumption-based
Pull   Systems - Advantages ,[object Object],[object Object],[object Object],[object Object]
Total Productive Maintenance ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Overall Equipment Effectiveness DOWNTIME Breakdowns Changeovers Adjustments SPEED Stoppages Slow-downs DEFECTS Process Defects Reduced Yields
Types of Poka Yoke Devices ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Summary:  Poka-Yoke… ,[object Object],[object Object],[object Object],[object Object]
Functional Layout Interrupted product flow Unbalanced operations Large batches Longer time to complete Complex material handling  -
Cellular Workplaces FG RM Includes Every Step Source Inspection Point of Use Storage Flexible Output Reduced Lot Size Simplified Handling Visual Goals & Metrics
Original Office Layout
Cellular Office Layout
Value Stream Mapping
Value Stream Map Supplier I  20 Days Driver 2/Month Daily Customer Assemble  C/T=15sec  C/O=15-50min  Uptime=100% Package  C/T=190sec  C/O=10min  Uptime=90% Test  C/T=45sec  C/O=20-70min  Uptime=80% I Total Cycle = 250 Seconds, and Total Lead = 29 Days Production  Control Orders Shop  Orders Ship  Schedule Daily  Priorities 60-Day  Forecast Weekly  Orders 4 Days I 5 Days 20 Days 4 Days 5 Days 15 Sec 45 Sec 190 Sec
Future State Goals Reduce  non-value added  activities Reduce  lead time Reduce  inventory  (especially WIP) Increase  throughput  (capacity) Reduced  batches  sizes Improve overall  productivity
Keys to Success ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],55
Share the mutual benefits of ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Thanks very much

Contenu connexe

Tendances

just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhu
sashi prabhu
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
Romains Bos, PMP, MBA
 

Tendances (16)

What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean startup
Lean startupLean startup
Lean startup
 
Lean Process and Production
Lean Process and ProductionLean Process and Production
Lean Process and Production
 
UCSD Class: Lean Office
UCSD Class: Lean OfficeUCSD Class: Lean Office
UCSD Class: Lean Office
 
Lean innovation - Basic principles of Lean
Lean innovation - Basic principles of LeanLean innovation - Basic principles of Lean
Lean innovation - Basic principles of Lean
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy
 
Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...Application of value stream mapping for reduction of cycle time in machining ...
Application of value stream mapping for reduction of cycle time in machining ...
 
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh AroraValue Stream Mapping Training - ADDVALUE - Nilesh Arora
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
 
J i-t
J i-tJ i-t
J i-t
 
just-in-time-by-sashi-prabhu
 just-in-time-by-sashi-prabhu just-in-time-by-sashi-prabhu
just-in-time-by-sashi-prabhu
 
The quest of one-piece-flow in IT by Pierre Masai, Toyota Motor Europe
The quest of one-piece-flow in IT by Pierre Masai, Toyota Motor EuropeThe quest of one-piece-flow in IT by Pierre Masai, Toyota Motor Europe
The quest of one-piece-flow in IT by Pierre Masai, Toyota Motor Europe
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 

En vedette

TAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap StyleTAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap Style
Meg Weber
 
Chapter 9 Creating Brand Equity
Chapter 9 Creating Brand EquityChapter 9 Creating Brand Equity
Chapter 9 Creating Brand Equity
Diarta
 
A simple formula for becoming Lean, Agile and unlocking high performance teams
A simple formula for becoming Lean, Agile and unlocking high performance teamsA simple formula for becoming Lean, Agile and unlocking high performance teams
A simple formula for becoming Lean, Agile and unlocking high performance teams
Rowan Bunning
 
Good Design is Honest: Cognitive Science to UX Design Principles
Good Design is Honest: Cognitive Science to UX Design PrinciplesGood Design is Honest: Cognitive Science to UX Design Principles
Good Design is Honest: Cognitive Science to UX Design Principles
William Evans
 

En vedette (20)

Profile raising: the power of your brand
Profile raising: the power of your brandProfile raising: the power of your brand
Profile raising: the power of your brand
 
Introducing The Lean Startup
Introducing The Lean StartupIntroducing The Lean Startup
Introducing The Lean Startup
 
Lean for Business
Lean for BusinessLean for Business
Lean for Business
 
The Secret of Lean
The Secret of LeanThe Secret of Lean
The Secret of Lean
 
TAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap StyleTAG Luncheon: Lean: FastCap Style
TAG Luncheon: Lean: FastCap Style
 
Simple Lean Training
Simple  Lean TrainingSimple  Lean Training
Simple Lean Training
 
Lean Business Plan:
Lean Business Plan:Lean Business Plan:
Lean Business Plan:
 
Chapter 9 Creating Brand Equity
Chapter 9 Creating Brand EquityChapter 9 Creating Brand Equity
Chapter 9 Creating Brand Equity
 
All Customers are Not Alike: Gaining a 360 Degree View
All Customers are Not Alike: Gaining a 360 Degree ViewAll Customers are Not Alike: Gaining a 360 Degree View
All Customers are Not Alike: Gaining a 360 Degree View
 
An Introduction to the Lean Business Model
An Introduction to the Lean Business ModelAn Introduction to the Lean Business Model
An Introduction to the Lean Business Model
 
Scaling Lean: Principles over Process
Scaling Lean: Principles over ProcessScaling Lean: Principles over Process
Scaling Lean: Principles over Process
 
A simple formula for becoming Lean, Agile and unlocking high performance teams
A simple formula for becoming Lean, Agile and unlocking high performance teamsA simple formula for becoming Lean, Agile and unlocking high performance teams
A simple formula for becoming Lean, Agile and unlocking high performance teams
 
Parryware - Brand Management
Parryware - Brand ManagementParryware - Brand Management
Parryware - Brand Management
 
Growing a Brand. Growing a Team.
Growing a Brand. Growing a Team.Growing a Brand. Growing a Team.
Growing a Brand. Growing a Team.
 
Trends In Garment Decoration
Trends In Garment DecorationTrends In Garment Decoration
Trends In Garment Decoration
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Good Design is Honest: Cognitive Science to UX Design Principles
Good Design is Honest: Cognitive Science to UX Design PrinciplesGood Design is Honest: Cognitive Science to UX Design Principles
Good Design is Honest: Cognitive Science to UX Design Principles
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 

Similaire à lean-simple-solutions

Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
Session 8
Session 8Session 8
Session 8
thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
thangv
 

Similaire à lean-simple-solutions (20)

Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Kaizen
KaizenKaizen
Kaizen
 
Chapter.1 just in time
Chapter.1 just in timeChapter.1 just in time
Chapter.1 just in time
 
Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industry
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Joe Moleski, Master Black Belt Lean Sigma Philosophy
Joe Moleski, Master Black Belt Lean Sigma PhilosophyJoe Moleski, Master Black Belt Lean Sigma Philosophy
Joe Moleski, Master Black Belt Lean Sigma Philosophy
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
Jit
JitJit
Jit
 
Understanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdfUnderstanding and concept Lean cheat sheet.pdf
Understanding and concept Lean cheat sheet.pdf
 

Dernier

Dernier (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

lean-simple-solutions

  • 1. Lean Systems by Sashi.Prabhu
  • 2. Lean Systems The ability to make exactly what the customer wants as they order it.
  • 3.
  • 4. Time & Cost Relationship “ The longer an article is in the process of manufacture and the more it is moved about, the greater its ultimate cost.” --Henry Ford, 1926
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. Total Order Lead Time Breakdown Value Added Ratio = 0 1 2 3 4 5 Elapsed Time Value Added Time Elapsed Time VA NVA
  • 10. Value Added Ratio Calculation Value Added Ratio = 5 VA NVA 1.1 5.3 = 20.7 % 0 1 2 3 4 5 Elapsed Time
  • 11.
  • 12.
  • 14.
  • 15.
  • 16. Quick Changeover Traditional setup and large batches Setup Run Quick change and small batches Externalized & Streamlined Tasks
  • 17. Why Reduce Set-ups? Remember: nothing is being produced! So, set-up time is Non Value Added Setups need to be eliminated, integrated, or simplified
  • 18. “Pull” Production versus “Push” Push: Schedule-based Pull: Consumption-based
  • 19.
  • 20.
  • 21. Overall Equipment Effectiveness DOWNTIME Breakdowns Changeovers Adjustments SPEED Stoppages Slow-downs DEFECTS Process Defects Reduced Yields
  • 22.
  • 23.
  • 24. Functional Layout Interrupted product flow Unbalanced operations Large batches Longer time to complete Complex material handling -
  • 25. Cellular Workplaces FG RM Includes Every Step Source Inspection Point of Use Storage Flexible Output Reduced Lot Size Simplified Handling Visual Goals & Metrics
  • 29. Value Stream Map Supplier I 20 Days Driver 2/Month Daily Customer Assemble C/T=15sec C/O=15-50min Uptime=100% Package C/T=190sec C/O=10min Uptime=90% Test C/T=45sec C/O=20-70min Uptime=80% I Total Cycle = 250 Seconds, and Total Lead = 29 Days Production Control Orders Shop Orders Ship Schedule Daily Priorities 60-Day Forecast Weekly Orders 4 Days I 5 Days 20 Days 4 Days 5 Days 15 Sec 45 Sec 190 Sec
  • 30. Future State Goals Reduce non-value added activities Reduce lead time Reduce inventory (especially WIP) Increase throughput (capacity) Reduced batches sizes Improve overall productivity
  • 31.
  • 32.

Notes de l'éditeur

  1. Describe… This represents a 20% ratio, nationally, the ratio is commonly 5-10 % depending upon which industry we’re analyzing. Next, let’s look at the Wastes that are clogging the arteries of the factory operations
  2. Describe… This represents a 20% ratio, nationally, the ratio is commonly 5-10 % depending upon which industry we’re analyzing. Next, let’s look at the Wastes that are clogging the arteries of the factory operations
  3. Overproduce—Slow down the machine, off the shelf (got to stock the shelf) Waiting—downtime, balance, changeover, Transport—physical relocation eliminates most if not all.
  4. Now, Push is the alternative, but since we have that now, let’s discuss PULL PRODUCTION SYSTEMS
  5. Overproduce—Slow down the machine, off the shelf (got to stock the shelf) Waiting—downtime, balance, changeover, Transport—physical relocation eliminates most if not all.
  6. Slide - PUSH VS. PULL A concept or topic that is always mentioned as part of Lean or associated with Lean, is this idea of a Pull System. So now I’d like to talk a little about what we mean by a pull system versus a push system. I have a few slides to go over this push versus pull idea; however, I feel that this title page kind of explains it all. In push production you make large batches and push them through the place to the next process. In pull production, you pull a controlled amount of WIP through the process. The operations are physically linked. ASK: Can anyone here relate to this fellow here? (Reference the PUSH view)
  7. Looks pretty well organized until we introduce the product into the mix…. CLK Now it looks about right— What do you see now that wasn’t apparent at first????
  8. Okay, here's the equipment layout that a Cell Design Kaizen Team. A U-shaped flow cycles from the Raw Material (RM) through the 8 Work-stations to the Finished Goods (FG). The cell works in a counter-clockwise U-shaped flow The next step is to populate the cell with raw materials, components, drums of coolant & cleaners. All in labeled containers. Now, we need access aisles all around the cell for material replenishment, equipment servicing and quicker changeovers. Main aisles on both ends of the cell allow for material flow and personnel flow between cells. We've right-sized the material containers, so we eventually run out of raw materials and the green diamond represents a Kanban Post that will play a vital role in material replenishment Now, the blue bin runs empty--no more parts--what happens next???? This rack on the backside of the cell contains a second set of components in a second set of labeled and right-sized containers. So the operator simply walks the side-aisle to the rack, picks up a new container of parts and puts it in the work-station But how do we get it replenished again?? Put the empty labeled bin on the Kanban Post and the Material Clerk who circulates throughout the shop will take the empty back and refill it before the backup container can be emptied....
  9. Okay, here's the equipment layout that a Cell Design Kaizen Team. A U-shaped flow cycles from the Raw Material (RM) through the 8 Work-stations to the Finished Goods (FG). The cell works in a counter-clockwise U-shaped flow The next step is to populate the cell with raw materials, components, drums of coolant & cleaners. All in labeled containers. Now, we need access aisles all around the cell for material replenishment, equipment servicing and quicker changeovers. Main aisles on both ends of the cell allow for material flow and personnel flow between cells. We've right-sized the material containers, so we eventually run out of raw materials and the green diamond represents a Kanban Post that will play a vital role in material replenishment Now, the blue bin runs empty--no more parts--what happens next???? This rack on the backside of the cell contains a second set of components in a second set of labeled and right-sized containers. So the operator simply walks the side-aisle to the rack, picks up a new container of parts and puts it in the work-station But how do we get it replenished again?? Put the empty labeled bin on the Kanban Post and the Material Clerk who circulates throughout the shop will take the empty back and refill it before the backup container can be emptied....
  10. Okay, here's the equipment layout that a Cell Design Kaizen Team. A U-shaped flow cycles from the Raw Material (RM) through the 8 Work-stations to the Finished Goods (FG). The cell works in a counter-clockwise U-shaped flow The next step is to populate the cell with raw materials, components, drums of coolant & cleaners. All in labeled containers. Now, we need access aisles all around the cell for material replenishment, equipment servicing and quicker changeovers. Main aisles on both ends of the cell allow for material flow and personnel flow between cells. We've right-sized the material containers, so we eventually run out of raw materials and the green diamond represents a Kanban Post that will play a vital role in material replenishment Now, the blue bin runs empty--no more parts--what happens next???? This rack on the backside of the cell contains a second set of components in a second set of labeled and right-sized containers. So the operator simply walks the side-aisle to the rack, picks up a new container of parts and puts it in the work-station But how do we get it replenished again?? Put the empty labeled bin on the Kanban Post and the Material Clerk who circulates throughout the shop will take the empty back and refill it before the backup container can be emptied....
  11. Now, Push is the alternative, but since we have that now, let’s discuss PULL PRODUCTION SYSTEMS
  12. Current Demand = 200,000/yr = 833/day Available Time = 1 Shift = 433m = 25,800s Takt Time = Avail Time/#units/day = 25,800s/833 units = 31 sec