SlideShare une entreprise Scribd logo
1  sur  12
Satish K
F-5
PRN - 15020441330
Credentials of the company
Hyderabad Pollution Controls Limited is now a 36 year old
company, briefly called POLCONS, engaged in design,
engineering, manufacture, supply, erection, testing and
commissioning of Industrial Air Pollution Control equipments
and Air Handling Systems.
This company was incorporated in the year 1978. In the last 36
Years Polcons have installed Hundreds of Ventilation Plants, and
Air Pollution Control Systems; in many Large Public Sector
Undertakings and many more Private enterprises.
 Axial Flow Fans: Industrial Axial Flow Fans
Industrial Axial Fans
 Centrifugal Fans
 Cyclones
 Pneumatic Conveying Units
 Bag Filters
 Air Washer Unit
 Cartridge Filter Dust Collector
 Man Coolers
 Industrial Fans
 Boiler ID Fans
 FD Fans
 ID Fans
PROJECTS LIST: (VENTILATION PACKAGES)
 BHEL – Ramachandrapuram-HYDERABAD Coil Winding Hall Pressurised Ventilation System
 MAHAGENCO-Bhusawal Thermal Power Station (2x500MW)
 MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-II
 MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-I
 NTPC-Kahalgaon Super Thermal Power Station (KSTPP) Unit-3;4&5 (3 X 500MW)
 UPRVUNL-Parichha Thermal Power Station (PTPS) Unit-3&4 (2 X 210MW)
 HPGCL-Tau Devilal Thermal Power Station (TDTPS) Unit-7&8 (2 X 250MW)
 RRVUNL-KotaThermal Power Station (KTPS) Stage-IV (1 X 195MW)
 RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-III (1 X 250MW)
 RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-II(2 X 250MW)
 MSEB-Khaperkheda Thermal Power Station Unit-3 & 4 (2 X 210MW)
 APSEB-Nagarjuna Sagar Power House (NSPH) Hydel Project Nalgonda
 APSEB-Lower Sileru Hydro Electric Scheme (LSHES) Mothugudem Khammam district,
 APSEB-Vijayawada Thermal Power Station (VTPS) Stage-III (2 X 210MW)
 APSEB-Kothagudem Thermal Power Station (KTPS) Stage-V (2 X 250MW)
 MSEB-Chandrapur Thermal Power Station (CTPS) Unit-7 (1X 500MW)
 APSEB-Rayalseema Thermal Power Project (RTPP) Stage-I (2 X 210MW)
 The discussion with Mr G Ravishankar, Director Operations,
POLCONS, Hyderabad revealed that the project erection is one
of the most critical phase in their entire operations.
 The huge sizes of their indusrtial Fans, their ducting and
the proper erection and fitment is highly critical of skill, practical
experience and strong understanding of Project Management.
 He emphasised the need for close interaction between
the users and the infrastructure developers and the capacity and
understanding to mitigate the risks while executing the project.
 The Company have installed a
large number of Cyclones in
various projects especially in
Thermal Power pllants and
Cement manufacturing
companies.
 Cyclones are most commonly
used equipment in dust
separation.
 The Cyclones are of remarkably
high efficiency where only few
milligrams of dust is escaping in
the exhaust air.
 High efficiency compile to
International Standards of
emission
 The discussion on the Project Completion and the Process
improvement has resulted in the following:-
o Complete understanding of the Project.
o The Factors that can delay or derail the Project.
o The Risk associated with the Factors.
o The Knowledge gained from the past on big
projects.
o Eliminate wasteful activities.
o Simplify the Process.
o The last and not the least ` THE COMMON SENCE’.
 The process improvement has resulted in:-
o 18% Cost Cutting on Project Costing.
o Better coordination with Suppliers.
o Timely supply of materials according to progress of
work, reduced inventory.
o Permanent staff reduction of 25%.
o Able survive stiff competetion.
o Could undertake Projects Abroad.
Km.ppt
Km.ppt

Contenu connexe

Tendances

Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineer
Chris Owen
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014
Umar Saeed
 

Tendances (11)

Experience Certificate
Experience CertificateExperience Certificate
Experience Certificate
 
Industrial engineering – case study
Industrial engineering – case studyIndustrial engineering – case study
Industrial engineering – case study
 
DNSTW SUBSTATION A
DNSTW SUBSTATION ADNSTW SUBSTATION A
DNSTW SUBSTATION A
 
DNSTW SUBSTATION C
DNSTW SUBSTATION CDNSTW SUBSTATION C
DNSTW SUBSTATION C
 
Solar Systems By Tecso Projects Limited, Vadodara
Solar Systems By Tecso Projects Limited, VadodaraSolar Systems By Tecso Projects Limited, Vadodara
Solar Systems By Tecso Projects Limited, Vadodara
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineer
 
DNSTW SUBSTATION B
DNSTW SUBSTATION BDNSTW SUBSTATION B
DNSTW SUBSTATION B
 
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., BengaluruAC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
AC And DC Geared Motors by Strategi Automation Solutions Pvt. Ltd., Bengaluru
 
DNSTW OCB
DNSTW OCBDNSTW OCB
DNSTW OCB
 
BHEL ,Varanasi Presentation Report
BHEL ,Varanasi Presentation ReportBHEL ,Varanasi Presentation Report
BHEL ,Varanasi Presentation Report
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014
 

En vedette

มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
Sasiporn Boonrod
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaper
Shannon Scheiwiller, MBA
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013
Ponex Zaza
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013
Ponex Zaza
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
Sasiporn Boonrod
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
Sasiporn Boonrod
 
Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02
Ponex Zaza
 

En vedette (14)

The Ecova Blueprint - Total Energy and Sustainabiliity Management
The Ecova Blueprint - Total Energy and Sustainabiliity Management The Ecova Blueprint - Total Energy and Sustainabiliity Management
The Ecova Blueprint - Total Energy and Sustainabiliity Management
 
For My Beloved Dad
For My Beloved DadFor My Beloved Dad
For My Beloved Dad
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaper
 
The sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaperThe sleeping giant_-_when_energy_prices_awake_whitepaper
The sleeping giant_-_when_energy_prices_awake_whitepaper
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013
 
Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013Gaji pp 22 tnh 2013
Gaji pp 22 tnh 2013
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
 
มหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดกมหาชาติหรือมหาเวสสันดรชาดก
มหาชาติหรือมหาเวสสันดรชาดก
 
71.KEY ACCOUNT MANAGEMENT
71.KEY ACCOUNT MANAGEMENT71.KEY ACCOUNT MANAGEMENT
71.KEY ACCOUNT MANAGEMENT
 
Presentacion alarmas inalambricas
Presentacion alarmas inalambricasPresentacion alarmas inalambricas
Presentacion alarmas inalambricas
 
Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02Strukturmenwa 120402032825-phpapp02
Strukturmenwa 120402032825-phpapp02
 
Penulisan laporan
Penulisan laporanPenulisan laporan
Penulisan laporan
 
70 START UP WHO SAID...YOU CAN'T DO IT?
70 START UP WHO SAID...YOU CAN'T DO IT?70 START UP WHO SAID...YOU CAN'T DO IT?
70 START UP WHO SAID...YOU CAN'T DO IT?
 

Similaire à Km.ppt

Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems Fze
Lalit Dhirmalani
 
INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1
Asis Banerjie
 
Industrial Placement Report
Industrial Placement ReportIndustrial Placement Report
Industrial Placement Report
Bhavishya Sehgal
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
prashant rai
 

Similaire à Km.ppt (20)

SahilResume
SahilResumeSahilResume
SahilResume
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resume
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Co Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems FzeCo Profile-Comfort Air Systems Fze
Co Profile-Comfort Air Systems Fze
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
 
INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1INVENTA-Machinery Group -2015 - B1
INVENTA-Machinery Group -2015 - B1
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Industrial Placement Report
Industrial Placement ReportIndustrial Placement Report
Industrial Placement Report
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 
Case Study: Office Complex Cooling
Case Study: Office Complex CoolingCase Study: Office Complex Cooling
Case Study: Office Complex Cooling
 
Case Study: Office Complex Cooling
Case Study: Office Complex CoolingCase Study: Office Complex Cooling
Case Study: Office Complex Cooling
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...Analysis of Various Cement grinding Systems with Respect to Power Consumption...
Analysis of Various Cement grinding Systems with Respect to Power Consumption...
 
Presented by Munjal Rangwala
Presented by Munjal RangwalaPresented by Munjal Rangwala
Presented by Munjal Rangwala
 
Muhammad asif cv may-2016
Muhammad asif cv     may-2016Muhammad asif cv     may-2016
Muhammad asif cv may-2016
 
Spacerolls.pdf
Spacerolls.pdfSpacerolls.pdf
Spacerolls.pdf
 
Analysis of 4 Way Catalytic Convertor with Pollutant Reduction Technique
Analysis of 4 Way Catalytic Convertor  with Pollutant Reduction TechniqueAnalysis of 4 Way Catalytic Convertor  with Pollutant Reduction Technique
Analysis of 4 Way Catalytic Convertor with Pollutant Reduction Technique
 

Dernier

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Dernier (16)

Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 

Km.ppt

  • 1. Satish K F-5 PRN - 15020441330
  • 2. Credentials of the company Hyderabad Pollution Controls Limited is now a 36 year old company, briefly called POLCONS, engaged in design, engineering, manufacture, supply, erection, testing and commissioning of Industrial Air Pollution Control equipments and Air Handling Systems. This company was incorporated in the year 1978. In the last 36 Years Polcons have installed Hundreds of Ventilation Plants, and Air Pollution Control Systems; in many Large Public Sector Undertakings and many more Private enterprises.
  • 3.  Axial Flow Fans: Industrial Axial Flow Fans Industrial Axial Fans  Centrifugal Fans  Cyclones  Pneumatic Conveying Units  Bag Filters  Air Washer Unit  Cartridge Filter Dust Collector  Man Coolers  Industrial Fans  Boiler ID Fans  FD Fans  ID Fans
  • 4.
  • 5.
  • 6. PROJECTS LIST: (VENTILATION PACKAGES)  BHEL – Ramachandrapuram-HYDERABAD Coil Winding Hall Pressurised Ventilation System  MAHAGENCO-Bhusawal Thermal Power Station (2x500MW)  MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-II  MAHAGENCO-New Parli TPP (1x250mw) & Paras TPS (1x250mw)-Unit-I  NTPC-Kahalgaon Super Thermal Power Station (KSTPP) Unit-3;4&5 (3 X 500MW)  UPRVUNL-Parichha Thermal Power Station (PTPS) Unit-3&4 (2 X 210MW)  HPGCL-Tau Devilal Thermal Power Station (TDTPS) Unit-7&8 (2 X 250MW)  RRVUNL-KotaThermal Power Station (KTPS) Stage-IV (1 X 195MW)  RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-III (1 X 250MW)  RRVUNL-Suratgarh Thermal Power Station (STPS) Stage-II(2 X 250MW)  MSEB-Khaperkheda Thermal Power Station Unit-3 & 4 (2 X 210MW)  APSEB-Nagarjuna Sagar Power House (NSPH) Hydel Project Nalgonda  APSEB-Lower Sileru Hydro Electric Scheme (LSHES) Mothugudem Khammam district,  APSEB-Vijayawada Thermal Power Station (VTPS) Stage-III (2 X 210MW)  APSEB-Kothagudem Thermal Power Station (KTPS) Stage-V (2 X 250MW)  MSEB-Chandrapur Thermal Power Station (CTPS) Unit-7 (1X 500MW)  APSEB-Rayalseema Thermal Power Project (RTPP) Stage-I (2 X 210MW)
  • 7.  The discussion with Mr G Ravishankar, Director Operations, POLCONS, Hyderabad revealed that the project erection is one of the most critical phase in their entire operations.  The huge sizes of their indusrtial Fans, their ducting and the proper erection and fitment is highly critical of skill, practical experience and strong understanding of Project Management.  He emphasised the need for close interaction between the users and the infrastructure developers and the capacity and understanding to mitigate the risks while executing the project.
  • 8.  The Company have installed a large number of Cyclones in various projects especially in Thermal Power pllants and Cement manufacturing companies.  Cyclones are most commonly used equipment in dust separation.  The Cyclones are of remarkably high efficiency where only few milligrams of dust is escaping in the exhaust air.  High efficiency compile to International Standards of emission
  • 9.  The discussion on the Project Completion and the Process improvement has resulted in the following:- o Complete understanding of the Project. o The Factors that can delay or derail the Project. o The Risk associated with the Factors. o The Knowledge gained from the past on big projects. o Eliminate wasteful activities. o Simplify the Process. o The last and not the least ` THE COMMON SENCE’.
  • 10.  The process improvement has resulted in:- o 18% Cost Cutting on Project Costing. o Better coordination with Suppliers. o Timely supply of materials according to progress of work, reduced inventory. o Permanent staff reduction of 25%. o Able survive stiff competetion. o Could undertake Projects Abroad.