SlideShare une entreprise Scribd logo
1  sur  2
Smart Grid Solutions


Dakota Electric Association
Solutions to streamline GIS, design and outage management processes




 PROJECT AT A GLANCE
 Project Type
 Operational utility solutions

 Location
 Farmington, Minnesota

 Number of Members
 More than 100,000

 Applications
 Integration of GIS-based processes makes
 existing circuits and proposed circuits
 available in the same system so operations
 staff can work in parallel with the designers
 rather than in succession                             Dakota Electric Association (DEA) is a member-owned, not-for-profit electric
                                                       utility serving more than 100,000 members — making it the second largest
 Software Implemented
                                                       electric cooperative in Minnesota and among the 25 largest electric distribution
 ArcFM™ Enterprise GIS                                 cooperatives in the United States.
 Designer
 Responder Outage Management System                    Dakota Electric purchases wholesale electricity from Great River Energy, a
                                                       generation and transmission cooperative in Maple Grove, Minn., and distributes
 CUSTOMER BENEFITS                                     electricity to homes, businesses and farms in parts of Dakota, Goodhue, Scott
                                                       and Rice counties.
 • Model, design and manage critical infrastructure
 • Highly configurable
                                                       In 2011, the NRECA’s Reliability Benchmark Group (RBG) determination of System
 • Easily adapted for multiple uses                    Average Interruption Duration Index (SAIDI), a measure of an electric cooperative’s
 • Proactively identify needed repairs and            service reliability, ranked Dakota Electric as the country’s sixth most reliable
  replacements well in advance                         cooperative and a reliability leader in the state of Minnesota.

                                                       Challenges
                                                       Targeting optimum customer service and maintaining its superior reliability ranking,
                                                       Dakota Electric staff was spending hours each day on manual processes to




Make the most of your energy                                    SM
Smart Grid Solutions               Dakota Electric Association




     “By integrating the connectivity and switching, we eliminate the
     intermediate paper phase and the errors associated with that translation
     process. And, we’ve probably saved more than $5,000 annually in copy
     paper costs alone.”
     Leonard Jewell, Dakota Electric technical systems manager




compile design information from hard copy records,                for network connectivity that supports this in-line
developing switch orders and building circuits to                 switching capability.
support the legacy OMS. This time-consuming
process was due to lack of a unified solution to                  Less paper. “By integrating the connectivity and
manage design, asset management and                               switching, we eliminate the intermediate paper
operations functions from a single network model.                 phase and the errors associated with that translation
“It was not an efficient process,” explained Leonard              process,” said Jewell. “And, we’ve probably
Jewell, Dakota Electric technical systems manager.                saved more than $5,000 annually in copy paper
“We wanted a system that used a centralized                       costs alone.”
network geodatabase.”
                                                                  Information at hand. The cooperative also relies on
Solution                                                          Responder extensively for restorative switching to
Dakota Electric’s migration to Schneider Electric’s               minimize time and resources. Jewell emphasized that
ArcFM™ Enterprise GIS in late 2009 was driven by                  the application automatically documents outage time
the Responder Outage Management System (OMS)                      and specific customers affected by an outage. This
based on ArcFM GIS. Responder OMS received high                   accounting is important not only for reports required
user acceptance during evaluation at Dakota Electric              by the state PUC but also for helping the cooperative
because it was comparable in functionality and ‘look              continuously evaluate its customer service.
and feel’ to the legacy OMS. More importantly, it
integrated completely with the ArcFM GIS database                 An integration framework. ArcFM GIS
and Feeder Manager Circuit Management tools. This                 demonstrated further enterprise benefits by making
product suite presented the unified solution Dakota               up-to-date information available for the utility’s work
Electric was looking for to streamline its GIS, design            management system and accounting and customer
and outage management processes.                                  service processes.

To take advantage of the opportunity to integrate                 Extensibility. Dakota Electric’s implementation of
network design capabilities, Dakota Electric added                the Schneider Electric solution is a work in progress.
the Designer graphic design solution — also based                 Dakota Electric continues to develop and add tools
on ArcFM GIS.                                                     allowing it to maximize utility of its single and uniform
                                                                  network model for the enterprise.
The Bottom Line
                                                                  Supports planning. Dakota Electric anticipates using
“Let’s do it once.” Jewell explained how the
                                                                  Responder for outage simulation in the near future,
integration of GIS-based processes makes existing
                                                                                                                                                                    ©2012 Schneider Electric. All rights reserved.



                                                                  allowing the cooperative to prepare restoration plans
circuits and proposed circuits available in the same
                                                                  and further support its customer service goals.
system; Dakota Electric operations staff to work in
parallel with the designers rather than in succession.
“The network we define, Responder can switch,
transformer by transformer, to keep customers live
during the cable replacement process.” He noted that
the ArcFM Feeder Manager tool is the unheralded
workhorse, providing the highly stable platform



Schneider Electric USA, Inc. 4701 Royal Vista Circle, Fort Collins, CO 80528   Telephone: 1-866-537-1091   Fax: 1-970-223-5577   www.schneider-electric.com/us

                                                                                                                                                        June 2012

Contenu connexe

Tendances

Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
Schneider Electric
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
Schneider Electric
 

Tendances (20)

Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
 
[Case study] Jackson Energy Authority: Aligning solutions into one product suite
[Case study] Jackson Energy Authority: Aligning solutions into one product suite[Case study] Jackson Energy Authority: Aligning solutions into one product suite
[Case study] Jackson Energy Authority: Aligning solutions into one product suite
 
Integrated Facility Sub Systems
Integrated Facility Sub SystemsIntegrated Facility Sub Systems
Integrated Facility Sub Systems
 
[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages
 
[Case study] Intermountain Rural Electric Association: Improving the quality ...
[Case study] Intermountain Rural Electric Association: Improving the quality ...[Case study] Intermountain Rural Electric Association: Improving the quality ...
[Case study] Intermountain Rural Electric Association: Improving the quality ...
 
Demand Response: The Key to a Competitive Facility
Demand Response: The Key to a Competitive FacilityDemand Response: The Key to a Competitive Facility
Demand Response: The Key to a Competitive Facility
 
[Case study] Truckee Donner Public Utility District
[Case study] Truckee Donner Public Utility District [Case study] Truckee Donner Public Utility District
[Case study] Truckee Donner Public Utility District
 
ARC White paper: Schneider Electric Introduces First ePAC, Combines PAC with...
ARC White paper:  Schneider Electric Introduces First ePAC, Combines PAC with...ARC White paper:  Schneider Electric Introduces First ePAC, Combines PAC with...
ARC White paper: Schneider Electric Introduces First ePAC, Combines PAC with...
 
[Case study] Benton Public Utility District: Reducing labor costs while impro...
[Case study] Benton Public Utility District: Reducing labor costs while impro...[Case study] Benton Public Utility District: Reducing labor costs while impro...
[Case study] Benton Public Utility District: Reducing labor costs while impro...
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handling
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centers
 
AccuSine pfv+
AccuSine pfv+ AccuSine pfv+
AccuSine pfv+
 
A New Language for Specifying Modular Data Centers
A New Language for Specifying Modular Data CentersA New Language for Specifying Modular Data Centers
A New Language for Specifying Modular Data Centers
 
[Case study] Kissimmee Utility Authority: Best compilation of products from o...
[Case study] Kissimmee Utility Authority: Best compilation of products from o...[Case study] Kissimmee Utility Authority: Best compilation of products from o...
[Case study] Kissimmee Utility Authority: Best compilation of products from o...
 
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
[Case study] Maine Fiber: Smart Grid solution offers precise GIS capabilities...
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
 
The metals and mining industry
The metals and mining industryThe metals and mining industry
The metals and mining industry
 
[Webinar Slides] Advanced distribution management system integration of renew...
[Webinar Slides] Advanced distribution management system integration of renew...[Webinar Slides] Advanced distribution management system integration of renew...
[Webinar Slides] Advanced distribution management system integration of renew...
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
 
Smart grid technologies across the globe
Smart grid technologies across the globeSmart grid technologies across the globe
Smart grid technologies across the globe
 

Similaire à [Case study] Dakota Electric Association: Solutions to streamline GIS, design and outage management processes

CloudFuzion solutions for the Smart Grid
CloudFuzion solutions for the Smart GridCloudFuzion solutions for the Smart Grid
CloudFuzion solutions for the Smart Grid
CloudFuzion
 
Keith Larkin Resume
Keith Larkin ResumeKeith Larkin Resume
Keith Larkin Resume
larkink
 
X.DAYS Service Provider Pitch Interlaken Swiss
X.DAYS Service Provider Pitch Interlaken SwissX.DAYS Service Provider Pitch Interlaken Swiss
X.DAYS Service Provider Pitch Interlaken Swiss
Ruud van Zutphen ⛅️
 
A survey paper on an improved scheduling algorithm for task offloading on cloud
A survey paper on an improved scheduling algorithm for task offloading on cloudA survey paper on an improved scheduling algorithm for task offloading on cloud
A survey paper on an improved scheduling algorithm for task offloading on cloud
Aditya Tornekar
 
Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...
Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...
Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...
aectnet
 

Similaire à [Case study] Dakota Electric Association: Solutions to streamline GIS, design and outage management processes (20)

CloudFuzion solutions for the Smart Grid
CloudFuzion solutions for the Smart GridCloudFuzion solutions for the Smart Grid
CloudFuzion solutions for the Smart Grid
 
[Case study] DONG Energy: Improving the bottom line and getting better data q...
[Case study] DONG Energy: Improving the bottom line and getting better data q...[Case study] DONG Energy: Improving the bottom line and getting better data q...
[Case study] DONG Energy: Improving the bottom line and getting better data q...
 
Smart grid'
Smart grid'Smart grid'
Smart grid'
 
Unlocking the microgrid for data centers
Unlocking the microgrid for data centersUnlocking the microgrid for data centers
Unlocking the microgrid for data centers
 
Electrical system design- Increasing productivity with the right tool
Electrical system design- Increasing productivity with the right toolElectrical system design- Increasing productivity with the right tool
Electrical system design- Increasing productivity with the right tool
 
G-SLAM:OPTIMIZING ENERGY EFFIIENCY IN CLOUD
G-SLAM:OPTIMIZING ENERGY EFFIIENCY IN CLOUDG-SLAM:OPTIMIZING ENERGY EFFIIENCY IN CLOUD
G-SLAM:OPTIMIZING ENERGY EFFIIENCY IN CLOUD
 
CIsco Energy Efficient Data Center
CIsco Energy Efficient Data CenterCIsco Energy Efficient Data Center
CIsco Energy Efficient Data Center
 
Calient data center presentation Fall 2015
Calient data center presentation Fall 2015Calient data center presentation Fall 2015
Calient data center presentation Fall 2015
 
Calient data center c suite presentation 07152015
Calient data center c suite presentation 07152015Calient data center c suite presentation 07152015
Calient data center c suite presentation 07152015
 
Keith Larkin Resume
Keith Larkin ResumeKeith Larkin Resume
Keith Larkin Resume
 
X.DAYS Service Provider Pitch Interlaken Swiss
X.DAYS Service Provider Pitch Interlaken SwissX.DAYS Service Provider Pitch Interlaken Swiss
X.DAYS Service Provider Pitch Interlaken Swiss
 
Demand Side management of smart grid using IoT
Demand Side management of smart grid using IoTDemand Side management of smart grid using IoT
Demand Side management of smart grid using IoT
 
1293702-1578722-diegoramos-1.pptx
1293702-1578722-diegoramos-1.pptx1293702-1578722-diegoramos-1.pptx
1293702-1578722-diegoramos-1.pptx
 
Energy efficient resource allocation in cloud computing
Energy efficient resource allocation in cloud computingEnergy efficient resource allocation in cloud computing
Energy efficient resource allocation in cloud computing
 
A survey paper on an improved scheduling algorithm for task offloading on cloud
A survey paper on an improved scheduling algorithm for task offloading on cloudA survey paper on an improved scheduling algorithm for task offloading on cloud
A survey paper on an improved scheduling algorithm for task offloading on cloud
 
Assessment to Delegate the Task to Cloud for Increasing Energy Efficiency of ...
Assessment to Delegate the Task to Cloud for Increasing Energy Efficiency of ...Assessment to Delegate the Task to Cloud for Increasing Energy Efficiency of ...
Assessment to Delegate the Task to Cloud for Increasing Energy Efficiency of ...
 
Energy efficient resource allocation007
Energy efficient resource allocation007Energy efficient resource allocation007
Energy efficient resource allocation007
 
Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...
Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...
Houston's Smart Grid: Transforming the Future of Electric Distribution & Ener...
 
CA Nimsoft ecoMeter
CA Nimsoft ecoMeterCA Nimsoft ecoMeter
CA Nimsoft ecoMeter
 
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
 

Plus de Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
Schneider Electric
 

Plus de Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Dernier

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

[Case study] Dakota Electric Association: Solutions to streamline GIS, design and outage management processes

  • 1. Smart Grid Solutions Dakota Electric Association Solutions to streamline GIS, design and outage management processes PROJECT AT A GLANCE Project Type Operational utility solutions Location Farmington, Minnesota Number of Members More than 100,000 Applications Integration of GIS-based processes makes existing circuits and proposed circuits available in the same system so operations staff can work in parallel with the designers rather than in succession Dakota Electric Association (DEA) is a member-owned, not-for-profit electric utility serving more than 100,000 members — making it the second largest Software Implemented electric cooperative in Minnesota and among the 25 largest electric distribution ArcFM™ Enterprise GIS cooperatives in the United States. Designer Responder Outage Management System Dakota Electric purchases wholesale electricity from Great River Energy, a generation and transmission cooperative in Maple Grove, Minn., and distributes CUSTOMER BENEFITS electricity to homes, businesses and farms in parts of Dakota, Goodhue, Scott and Rice counties. • Model, design and manage critical infrastructure • Highly configurable In 2011, the NRECA’s Reliability Benchmark Group (RBG) determination of System • Easily adapted for multiple uses Average Interruption Duration Index (SAIDI), a measure of an electric cooperative’s • Proactively identify needed repairs and service reliability, ranked Dakota Electric as the country’s sixth most reliable replacements well in advance cooperative and a reliability leader in the state of Minnesota. Challenges Targeting optimum customer service and maintaining its superior reliability ranking, Dakota Electric staff was spending hours each day on manual processes to Make the most of your energy SM
  • 2. Smart Grid Solutions Dakota Electric Association “By integrating the connectivity and switching, we eliminate the intermediate paper phase and the errors associated with that translation process. And, we’ve probably saved more than $5,000 annually in copy paper costs alone.” Leonard Jewell, Dakota Electric technical systems manager compile design information from hard copy records, for network connectivity that supports this in-line developing switch orders and building circuits to switching capability. support the legacy OMS. This time-consuming process was due to lack of a unified solution to Less paper. “By integrating the connectivity and manage design, asset management and switching, we eliminate the intermediate paper operations functions from a single network model. phase and the errors associated with that translation “It was not an efficient process,” explained Leonard process,” said Jewell. “And, we’ve probably Jewell, Dakota Electric technical systems manager. saved more than $5,000 annually in copy paper “We wanted a system that used a centralized costs alone.” network geodatabase.” Information at hand. The cooperative also relies on Solution Responder extensively for restorative switching to Dakota Electric’s migration to Schneider Electric’s minimize time and resources. Jewell emphasized that ArcFM™ Enterprise GIS in late 2009 was driven by the application automatically documents outage time the Responder Outage Management System (OMS) and specific customers affected by an outage. This based on ArcFM GIS. Responder OMS received high accounting is important not only for reports required user acceptance during evaluation at Dakota Electric by the state PUC but also for helping the cooperative because it was comparable in functionality and ‘look continuously evaluate its customer service. and feel’ to the legacy OMS. More importantly, it integrated completely with the ArcFM GIS database An integration framework. ArcFM GIS and Feeder Manager Circuit Management tools. This demonstrated further enterprise benefits by making product suite presented the unified solution Dakota up-to-date information available for the utility’s work Electric was looking for to streamline its GIS, design management system and accounting and customer and outage management processes. service processes. To take advantage of the opportunity to integrate Extensibility. Dakota Electric’s implementation of network design capabilities, Dakota Electric added the Schneider Electric solution is a work in progress. the Designer graphic design solution — also based Dakota Electric continues to develop and add tools on ArcFM GIS. allowing it to maximize utility of its single and uniform network model for the enterprise. The Bottom Line Supports planning. Dakota Electric anticipates using “Let’s do it once.” Jewell explained how the Responder for outage simulation in the near future, integration of GIS-based processes makes existing ©2012 Schneider Electric. All rights reserved. allowing the cooperative to prepare restoration plans circuits and proposed circuits available in the same and further support its customer service goals. system; Dakota Electric operations staff to work in parallel with the designers rather than in succession. “The network we define, Responder can switch, transformer by transformer, to keep customers live during the cable replacement process.” He noted that the ArcFM Feeder Manager tool is the unheralded workhorse, providing the highly stable platform Schneider Electric USA, Inc. 4701 Royal Vista Circle, Fort Collins, CO 80528 Telephone: 1-866-537-1091 Fax: 1-970-223-5577 www.schneider-electric.com/us June 2012