The Distribution Management System Network Model
The Cornerstone of a Successful DMS Implementation
Michael B. Johnson, PE
Project Director Grid Solution
Duke Energy
Tom Christopher
VP, Global Customer Relations, Smart Grid IT
Schneider Electric
1
February 5, 2015
Distribution Network Model (DNM)
Key Points
 Confidence in DNM is crucial to achieving optimized results
 Getting the DNM right can make or break a project
 DNM requires integration with GIS, OMS, SCADA and CIS
 Requires stakeholder engagement and change management
 Real time State Estimation (SE) has been commissioned at
Duke Energy as part of the DSDR Carolinas Project
2
Duke Energy
 Electric Customers: 7.1 Million
 Gas Customers: 500,000
 Market Cap: $49 Billion
 Employees: 29,250
 Service Territory: 104,000 sq mi
 Generation Capacity: 49,600 MW
 Transmission Lines: 32,000 mi
 Distribution Lines: 250,200 mi
Duke Energy International operates 4,300 MW’s
of generation
3
Duke Energy Progress & DSDR
(Distribution System Demand Response)
4
•Deployed on entire distribution
grid
•Controllable load: 8,400 MWs peak
•315 substations
•1,150 feeders
•1.5 million customers
•34,000 square miles of service area
Duke Energy Progress Statistics
The DSDR Business Case
5
Resource
Planning
Generation TransmissionSystem Operations
/ Dispatch
Fuel /
Purchased Power
Customer
Optimizing the Energy Value Chain
Distribution
Investment in
T&D eliminated
the need to build
235 MWs of new
peaking plants
DSDR Principles of Operation
6
Existing
Flattened Profile after feeder conditioning
Lower
Regulatory
Limit
Upper
Regulatory
Limit
• Flattened profile allows greater voltage reduction
• Dynamically lower voltage to regulatory limit
o
DMS network model used to maximize voltage reduction over time
o
Each regulating zone and each phase is optimized independently
Lower Voltage to Reduce MWs
Feeder
Voltage
Feeder Distance
A Typical DSDR Load Shape
Begin DSDR at 3:00 pm, Finish at 6:00 pm
7
DNM Accuracy Affects Performance
8
DMN accuracy can substantially impact how
much risk you take when moving voltage to the
regulatory limit
0.5 Volt range of error
could affect DSDR
benefit by 15%!
• Integrate with multiple business applications
• “Feed the DMS beast” both with real-time information and historical information
• Fast real-time feedback from the field is key to optimizing the system
Integrations Needed
9
CIS
Report
Analysi
s
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
20122008 2009 2010 2011
PLAN & DESIGN DSDR
CONDITION 1,100 FEEDERS to DSDR STANDARDS (MV Network)
INSTALL SUBSTATION ELECTRONICS and
CONTROLS (360 subs)
INSTALL FEEDER CONTROL DEVICES
(7800 devices)
OPTIMIZE SECONDARIES (LV Network)
COMMISSION EACH SUB
INSTALL DMS
Phase 1
Upgrade Legacy
DSCADA
MW OPTIMIZATION
BUILD IT and TELECOMMUNICATIONS INFRASTRUCTURE
High Level Project Plan
10
2013 2014
1 2 3 4 1 2 3 4
INSTALL DMS
Phase 2
COMMISSION EACH FUNCTION
DESIGN MODEL, INTEGRATE DATA
Approx 10 man-years
were needed to
achieve good DNM
Quality
Build Initial DNM
 Need a cross functional team
 IT (Architecture, Reporting, Support)
 Business SMEs (Control Room Operators, Engineers)
 Vendor
 Develop substation one line diagrams for DMS
 Validate data in the field – phasing, wire size, transformers
 Replace erroneous data – transformer pole number
 Add missing data – regulator tap position, low voltage network
 Add customer load profiles, CVR ratios
 Data import process will generate many errors to be cleaned!
11
How do you Measure Model Quality?
 Capture the delta between state estimation results and actual
data from sensors
 Create boundaries for good results, i.e.
 Voltage <2% difference
 Reactive Power < 600 kvar difference
 Track performance of each sensor point over time
 Track performance of each feeder/substation over time
12
Track DNM Quality over Time
13
Commission SE and Closed Loop Functions
14
Software Project to
Upgrade DSCADA and
Place DMS in
Production
Iterative Process
to Commission
SE and DSDR
Stakeholders Maintain DNM Accuracy
 The DNM brings lots of change to the control room!
 Integration with OMS model is crucial to maintaining accuracy
 Requires real-time data flows between OMS and DMS
 Processes in the control room must be changed
 Switching, restoration, power factor management, etc.
 Maintain status of breakers, reclosers, switches in real time
 Grid Technicians monitor status of devices in real time
 Perform initial troubleshooting
 Maintain high availability of regulators, sensors, capacitors
15
DNM Requires Focus from the Whole
Organization
 Process changes are needed from many stakeholders to ensure data
is managed well
 Work Order Design, Construction, GIS Techs, Engineering, IT
 Because many organizations are affected the timeline will be longer
than you’d like
 Start process development early and include change management
resources
 You should assume that bad/missing data will happen:
 Improve processes
 OR correct it during model import process
 OR your DMS will manage it in real time
16
Real Time Data is Used to Improve State Estimation
17
Switch
Router
Distribution Feeder
Cap Bank
Recloser
(Sensor data)
VR
Regulator
S
Sensor
DSDR Substation
Cap Bank
SEL
Feeder
Breaker
S
Voltage
Regulato
r
VRC
Gateway
Telecom
Cabinet
PQ Meter
• Each Sensor sends status and analog data to DMS in 10 to 60
second intervals
• Real Power, Reactive Power, Voltage and Current
• Tap Position, Switch Status
• 3,500 Regulators
• 2,800 Line Capacitors
• 1,500 MV sensors
• 800 Reclosers
• 3,000 LV sensors
Sensor
Real Time Data is Used to Improve State Estimation
18
• SCADA database has approx. 400,000 points
• 90,000 of those points are used by State Estimation
• 30,000 points – Voltage
• 15,000 points – Current
• 18,000 points – Real Power
• 18,000 points – Reactive Power
• 8,000 points – Power Factor
• That’s an average of 4 to 5 sensing locations per feeder
which typically serves > 1,000 customers
• When DSDR is not active, DSE and optimization
algorithms operate every 15 to 25 minutes
Conclusions
 The DNM was crucial to our effort to provide 310 MW
 Confidence in DNM quality was achieved through:
 Dedicated project resources were used to build initial model
 Real time data from sensors in the field
 Integration with GIS, OMS, SCADA and CIS
 DMS functions must assume the DNM is not perfect!
 Measure model quality over time
 Stakeholders must be engaged throughout the process
 Implement process change to keep the DNM accurate
 Implement change management to keep everyone informed
 Commission the network in stages to reduce impact to the control
room
19
20
Michael B. Johnson, PE
MichaelB.Johnson@duke-energy.com
Tom Christopher
tom.christopher@schneider-electric.com

Contenu connexe

Tendances

Distributech 2015 taking interoperability to the next level
Distributech 2015   taking interoperability to the next levelDistributech 2015   taking interoperability to the next level
Distributech 2015 taking interoperability to the next levelSchneider Electric
 
Process Automation - The Future
Process Automation  - The FutureProcess Automation  - The Future
Process Automation - The FutureSchneider Electric
 
Maximize your business and machine performance
Maximize your business and machine performanceMaximize your business and machine performance
Maximize your business and machine performanceSchneider Electric
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overviewSchneider Electric
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)Schneider Electric
 
A New Language for Specifying Modular Data Centers
A New Language for Specifying Modular Data CentersA New Language for Specifying Modular Data Centers
A New Language for Specifying Modular Data CentersSchneider Electric
 
[Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management [Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management Schneider Electric
 
Measurement validation peak load reduction
Measurement validation peak load reductionMeasurement validation peak load reduction
Measurement validation peak load reductionSchneider Electric
 
Underground Self-Healing Solution
Underground Self-Healing Solution Underground Self-Healing Solution
Underground Self-Healing Solution Schneider Electric
 
Schneider electric automationcom pes ppt
Schneider electric   automationcom pes pptSchneider electric   automationcom pes ppt
Schneider electric automationcom pes pptSharon Smith
 
Advanced Weather Systems for Mining Operations
Advanced Weather Systems for Mining OperationsAdvanced Weather Systems for Mining Operations
Advanced Weather Systems for Mining OperationsSchneider Electric
 
[Webinar Slides] Advanced distribution management system integration of renew...
[Webinar Slides] Advanced distribution management system integration of renew...[Webinar Slides] Advanced distribution management system integration of renew...
[Webinar Slides] Advanced distribution management system integration of renew...Schneider Electric
 
Bringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind PowerBringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind PowerSchneider Electric
 
Modicon M580 MUCH MORE then a PLC…the first ePAC!
Modicon M580 MUCH MORE then a PLC…the first ePAC!Modicon M580 MUCH MORE then a PLC…the first ePAC!
Modicon M580 MUCH MORE then a PLC…the first ePAC!Schneider Electric
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...Schneider Electric
 
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...Schneider Electric
 
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...Schneider Electric
 

Tendances (20)

Distributech 2015 taking interoperability to the next level
Distributech 2015   taking interoperability to the next levelDistributech 2015   taking interoperability to the next level
Distributech 2015 taking interoperability to the next level
 
Process Automation - The Future
Process Automation  - The FutureProcess Automation  - The Future
Process Automation - The Future
 
Maximize your business and machine performance
Maximize your business and machine performanceMaximize your business and machine performance
Maximize your business and machine performance
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overview
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)
 
AccuSine pfv+
AccuSine pfv+ AccuSine pfv+
AccuSine pfv+
 
Small hydro solutions
Small hydro solutionsSmall hydro solutions
Small hydro solutions
 
A New Language for Specifying Modular Data Centers
A New Language for Specifying Modular Data CentersA New Language for Specifying Modular Data Centers
A New Language for Specifying Modular Data Centers
 
[Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management [Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management
 
Measurement validation peak load reduction
Measurement validation peak load reductionMeasurement validation peak load reduction
Measurement validation peak load reduction
 
SEI Smart City Offers Catalogue
SEI Smart City Offers CatalogueSEI Smart City Offers Catalogue
SEI Smart City Offers Catalogue
 
Underground Self-Healing Solution
Underground Self-Healing Solution Underground Self-Healing Solution
Underground Self-Healing Solution
 
Schneider electric automationcom pes ppt
Schneider electric   automationcom pes pptSchneider electric   automationcom pes ppt
Schneider electric automationcom pes ppt
 
Advanced Weather Systems for Mining Operations
Advanced Weather Systems for Mining OperationsAdvanced Weather Systems for Mining Operations
Advanced Weather Systems for Mining Operations
 
[Webinar Slides] Advanced distribution management system integration of renew...
[Webinar Slides] Advanced distribution management system integration of renew...[Webinar Slides] Advanced distribution management system integration of renew...
[Webinar Slides] Advanced distribution management system integration of renew...
 
Bringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind PowerBringing Sustainable Efficiency to Wind Power
Bringing Sustainable Efficiency to Wind Power
 
Modicon M580 MUCH MORE then a PLC…the first ePAC!
Modicon M580 MUCH MORE then a PLC…the first ePAC!Modicon M580 MUCH MORE then a PLC…the first ePAC!
Modicon M580 MUCH MORE then a PLC…the first ePAC!
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
 
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
Application Note: Maintenance Decision Support System (MDSS) for Winter Road ...
 
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
Practical Options for Deploying IT Equipment in Small Server Rooms and Branch...
 

Similaire à Dtech 2015 the distribution management system network model

SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitorashwini reliserv
 
Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...
Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...
Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...Society of Women Engineers
 
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...IRJET Journal
 
IRJET- PLC Based Intelligent Control of Substation
IRJET- PLC Based Intelligent Control of SubstationIRJET- PLC Based Intelligent Control of Substation
IRJET- PLC Based Intelligent Control of SubstationIRJET Journal
 
Smart metering-system
Smart metering-systemSmart metering-system
Smart metering-systemNIT MEGHALAYA
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxsurangagw
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfSmritiGarg21
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm udaypallyreddy
 
7 kt 7km pac measuring devices
7 kt 7km pac measuring devices7 kt 7km pac measuring devices
7 kt 7km pac measuring deviceslogenatech
 
Day7_SGT_Distributed Management System.pdf
Day7_SGT_Distributed Management System.pdfDay7_SGT_Distributed Management System.pdf
Day7_SGT_Distributed Management System.pdfdebidasimohanty1
 
AUTOMATIC METER READING SYSTEMS
AUTOMATIC METER READING SYSTEMSAUTOMATIC METER READING SYSTEMS
AUTOMATIC METER READING SYSTEMSDivya Yennam
 
Tutorials - History Evolution and Future of SCADA.pdf
Tutorials - History Evolution and Future of SCADA.pdfTutorials - History Evolution and Future of SCADA.pdf
Tutorials - History Evolution and Future of SCADA.pdfWesamAwad3
 
The efficacy and challenges of scada an smart grid integration
The efficacy and challenges of scada an smart grid integrationThe efficacy and challenges of scada an smart grid integration
The efficacy and challenges of scada an smart grid integrationFaizal Faizi
 
20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptxSumitRajput83
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfbayu162365
 
EasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdfEasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdfShantieHarunAlRosyid
 
Scada For G Mgt
Scada For G MgtScada For G Mgt
Scada For G MgtAnil Patil
 

Similaire à Dtech 2015 the distribution management system network model (20)

SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitor
 
Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...
Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...
Smart Grid – What’s in it for me? Customer Benefits and Engineering Career Op...
 
Engineering the Smart Grid
Engineering the Smart GridEngineering the Smart Grid
Engineering the Smart Grid
 
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...
 
IRJET- PLC Based Intelligent Control of Substation
IRJET- PLC Based Intelligent Control of SubstationIRJET- PLC Based Intelligent Control of Substation
IRJET- PLC Based Intelligent Control of Substation
 
Smart metering-system
Smart metering-systemSmart metering-system
Smart metering-system
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm
 
7 kt 7km pac measuring devices
7 kt 7km pac measuring devices7 kt 7km pac measuring devices
7 kt 7km pac measuring devices
 
Day7_SGT_Distributed Management System.pdf
Day7_SGT_Distributed Management System.pdfDay7_SGT_Distributed Management System.pdf
Day7_SGT_Distributed Management System.pdf
 
AUTOMATIC METER READING SYSTEMS
AUTOMATIC METER READING SYSTEMSAUTOMATIC METER READING SYSTEMS
AUTOMATIC METER READING SYSTEMS
 
Tutorials - History Evolution and Future of SCADA.pdf
Tutorials - History Evolution and Future of SCADA.pdfTutorials - History Evolution and Future of SCADA.pdf
Tutorials - History Evolution and Future of SCADA.pdf
 
The efficacy and challenges of scada an smart grid integration
The efficacy and challenges of scada an smart grid integrationThe efficacy and challenges of scada an smart grid integration
The efficacy and challenges of scada an smart grid integration
 
20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
 
EasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdfEasergyT300_Catalog_NRJED314621EN_022018.pdf
EasergyT300_Catalog_NRJED314621EN_022018.pdf
 
Scada For G Mgt
Scada For G MgtScada For G Mgt
Scada For G Mgt
 
Multilin™ Intelligent Line Monitoring System
Multilin™ Intelligent Line Monitoring SystemMultilin™ Intelligent Line Monitoring System
Multilin™ Intelligent Line Monitoring System
 
Smart grids
Smart gridsSmart grids
Smart grids
 

Plus de Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

Plus de Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Dernier

Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfOverkill Security
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 

Dernier (20)

Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 

Dtech 2015 the distribution management system network model

  • 1. The Distribution Management System Network Model The Cornerstone of a Successful DMS Implementation Michael B. Johnson, PE Project Director Grid Solution Duke Energy Tom Christopher VP, Global Customer Relations, Smart Grid IT Schneider Electric 1 February 5, 2015
  • 2. Distribution Network Model (DNM) Key Points  Confidence in DNM is crucial to achieving optimized results  Getting the DNM right can make or break a project  DNM requires integration with GIS, OMS, SCADA and CIS  Requires stakeholder engagement and change management  Real time State Estimation (SE) has been commissioned at Duke Energy as part of the DSDR Carolinas Project 2
  • 3. Duke Energy  Electric Customers: 7.1 Million  Gas Customers: 500,000  Market Cap: $49 Billion  Employees: 29,250  Service Territory: 104,000 sq mi  Generation Capacity: 49,600 MW  Transmission Lines: 32,000 mi  Distribution Lines: 250,200 mi Duke Energy International operates 4,300 MW’s of generation 3
  • 4. Duke Energy Progress & DSDR (Distribution System Demand Response) 4 •Deployed on entire distribution grid •Controllable load: 8,400 MWs peak •315 substations •1,150 feeders •1.5 million customers •34,000 square miles of service area Duke Energy Progress Statistics
  • 5. The DSDR Business Case 5 Resource Planning Generation TransmissionSystem Operations / Dispatch Fuel / Purchased Power Customer Optimizing the Energy Value Chain Distribution Investment in T&D eliminated the need to build 235 MWs of new peaking plants
  • 6. DSDR Principles of Operation 6 Existing Flattened Profile after feeder conditioning Lower Regulatory Limit Upper Regulatory Limit • Flattened profile allows greater voltage reduction • Dynamically lower voltage to regulatory limit o DMS network model used to maximize voltage reduction over time o Each regulating zone and each phase is optimized independently Lower Voltage to Reduce MWs Feeder Voltage Feeder Distance
  • 7. A Typical DSDR Load Shape Begin DSDR at 3:00 pm, Finish at 6:00 pm 7
  • 8. DNM Accuracy Affects Performance 8 DMN accuracy can substantially impact how much risk you take when moving voltage to the regulatory limit 0.5 Volt range of error could affect DSDR benefit by 15%!
  • 9. • Integrate with multiple business applications • “Feed the DMS beast” both with real-time information and historical information • Fast real-time feedback from the field is key to optimizing the system Integrations Needed 9 CIS Report Analysi s
  • 10. 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 20122008 2009 2010 2011 PLAN & DESIGN DSDR CONDITION 1,100 FEEDERS to DSDR STANDARDS (MV Network) INSTALL SUBSTATION ELECTRONICS and CONTROLS (360 subs) INSTALL FEEDER CONTROL DEVICES (7800 devices) OPTIMIZE SECONDARIES (LV Network) COMMISSION EACH SUB INSTALL DMS Phase 1 Upgrade Legacy DSCADA MW OPTIMIZATION BUILD IT and TELECOMMUNICATIONS INFRASTRUCTURE High Level Project Plan 10 2013 2014 1 2 3 4 1 2 3 4 INSTALL DMS Phase 2 COMMISSION EACH FUNCTION DESIGN MODEL, INTEGRATE DATA Approx 10 man-years were needed to achieve good DNM Quality
  • 11. Build Initial DNM  Need a cross functional team  IT (Architecture, Reporting, Support)  Business SMEs (Control Room Operators, Engineers)  Vendor  Develop substation one line diagrams for DMS  Validate data in the field – phasing, wire size, transformers  Replace erroneous data – transformer pole number  Add missing data – regulator tap position, low voltage network  Add customer load profiles, CVR ratios  Data import process will generate many errors to be cleaned! 11
  • 12. How do you Measure Model Quality?  Capture the delta between state estimation results and actual data from sensors  Create boundaries for good results, i.e.  Voltage <2% difference  Reactive Power < 600 kvar difference  Track performance of each sensor point over time  Track performance of each feeder/substation over time 12
  • 13. Track DNM Quality over Time 13
  • 14. Commission SE and Closed Loop Functions 14 Software Project to Upgrade DSCADA and Place DMS in Production Iterative Process to Commission SE and DSDR
  • 15. Stakeholders Maintain DNM Accuracy  The DNM brings lots of change to the control room!  Integration with OMS model is crucial to maintaining accuracy  Requires real-time data flows between OMS and DMS  Processes in the control room must be changed  Switching, restoration, power factor management, etc.  Maintain status of breakers, reclosers, switches in real time  Grid Technicians monitor status of devices in real time  Perform initial troubleshooting  Maintain high availability of regulators, sensors, capacitors 15
  • 16. DNM Requires Focus from the Whole Organization  Process changes are needed from many stakeholders to ensure data is managed well  Work Order Design, Construction, GIS Techs, Engineering, IT  Because many organizations are affected the timeline will be longer than you’d like  Start process development early and include change management resources  You should assume that bad/missing data will happen:  Improve processes  OR correct it during model import process  OR your DMS will manage it in real time 16
  • 17. Real Time Data is Used to Improve State Estimation 17 Switch Router Distribution Feeder Cap Bank Recloser (Sensor data) VR Regulator S Sensor DSDR Substation Cap Bank SEL Feeder Breaker S Voltage Regulato r VRC Gateway Telecom Cabinet PQ Meter • Each Sensor sends status and analog data to DMS in 10 to 60 second intervals • Real Power, Reactive Power, Voltage and Current • Tap Position, Switch Status • 3,500 Regulators • 2,800 Line Capacitors • 1,500 MV sensors • 800 Reclosers • 3,000 LV sensors Sensor
  • 18. Real Time Data is Used to Improve State Estimation 18 • SCADA database has approx. 400,000 points • 90,000 of those points are used by State Estimation • 30,000 points – Voltage • 15,000 points – Current • 18,000 points – Real Power • 18,000 points – Reactive Power • 8,000 points – Power Factor • That’s an average of 4 to 5 sensing locations per feeder which typically serves > 1,000 customers • When DSDR is not active, DSE and optimization algorithms operate every 15 to 25 minutes
  • 19. Conclusions  The DNM was crucial to our effort to provide 310 MW  Confidence in DNM quality was achieved through:  Dedicated project resources were used to build initial model  Real time data from sensors in the field  Integration with GIS, OMS, SCADA and CIS  DMS functions must assume the DNM is not perfect!  Measure model quality over time  Stakeholders must be engaged throughout the process  Implement process change to keep the DNM accurate  Implement change management to keep everyone informed  Commission the network in stages to reduce impact to the control room 19
  • 20. 20 Michael B. Johnson, PE MichaelB.Johnson@duke-energy.com Tom Christopher tom.christopher@schneider-electric.com