Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 1
Supplier name: Tanhasin Socks Co. Ltd.
Site country: Bangladesh.
Site name: Tanhasin Socks Co. Ltd.
Parent Company name (of the site): None
SMETA Audit Type: 2–Pillar 4–Pillar
Date of Audit 08-Dec-2016
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 2
Audit Company Name:
AsiaInspection Limited
Report Owner: Tanhasin Socks Co. Ltd.
Sedex Company Reference:
(only available on Sedex System)
ZC: 131577160
Sedex Site Reference:
(only available on Sedex System)
ZS: 131577222
Audit Conducted By
Commercial Purchaser
NGO Retailer
Trade Union Brand Owner
Multi–stakeholder Combined Audit (select all that apply)
Auditor Reference Number:
(If applicable)
Mohammad Galib Hossain (Lead Auditor SA8000, ISO 9001,
ISO 14001 & OHSAS 18001)
Saima Sharmin (Lead Auditor ISO 9001 & ISO 14001)
SMETA Declaration
I declare that the audit underpinning the following report was conducted in accordance with SMETA Best Practice Guidance and
SMETA Measurement Criteria.
Any exceptions to this must be recorded here (e.g. different sample size):
Auditor Name(s) (please list all including all interviewers):
Lead auditor: Mohammad Galib Hossain
Team auditor: Saima Sharmin ,
Interviewers: Saima Sharmin .
Date: 08-Dec-2016
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 3
Non–Compliance Table
Issue
(please click on the issue title to go direct to
the appropriate audit results by clause)
Area of Non–Conformity
(Only check box when there is a non–conformity,
and only in the box/es where the non–conformity
can be found)
Record the number
of issues by line*:
ETI Base
Code
Local Law
Additional
Elements
(i.e. not part
of ETI code )
NC Obs GE
0 Management systems and code
implementation
2
1 Employment Freely Chosen
2 Freedom of Association 1
3 Safety and Hygienic Conditions 2
4 Child Labour
5 Wages and Benefits
6 Working Hours
7 Discrimination
8 Regular Employment
8A Sub–Contracting and
Home working
9 Harsh or Inhumane Treatment
10A Entitlement to Work
10B2 Environment 2–Pillar
10B4 Environment 4–Pillar
10C Business Ethics
*Please note the table above records the total number of Non compliances (NC), Observations (Obs) and Good
Examples (GE). This gives the reviewer an indication of problem areas but does not detail severities of each issue
– Reviewers need to check audit results by clause.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 4
Summary of Findings
Summary of main findings: (positive and negative)
(Please give a short summary of the main findings per clause)
The factory does not engage any forced or bonded labour. According to Bangladesh Law, prison labour is not acceptable and this facility did not
engage prison labour. Factory also does not keep any original documents from the workers, confirmed by workers interview and documents
review. Workers are free to leave their employer at any time by giving required notices.
Factory has established a social responsibility team, represented by the workers and factory top management. Moreover, complaint boxes have
been placed inside the factory to ventilate worker’s grievance. A Selected worker Participation Committee has been formed for workers.
Factory has arranged fire fighting equipment’s, first aid facility, drinking water facility and adequate toilets for the male and female workers and
necessary safety trainings for the workers as per legal requirement. Fire fighting training was not given to workers as per law. Electrical
equipment found in safe condition.
Factory does not engage below 18 years and no child or young worker has been identified during audit. Factory checks the age before
recruitment by the doctor and maintains age related documents in the workers’ personnel files.
Factory is giving minimum wage and other benefits as per local law. Workers are receiving wages on time also workers are receiving overtime
allowance at premium rate. Factory only engages workers for overtime work when there is an urgency of shipment and when the work load is
high. Workers are getting day off on Friday as weekly holiday. Factory maintains time records through electronic time keeping record.
Nothing identified by the documents verification and also nothing reported by the interviewed workers as discrimination. The payrolls and
overtime records do not show any discriminatory incidents. Factory does not engage any worker through ‘Subcontractor of Labour’ and no
immigrant workers have been engaged by the factory.
Md. Jillur Rahman – Manager (Admin & Account) is responsible to look after the health and safety issue. Moreover, a health & safety committee
is also available here.
Factory does not engage any home workers and reportedly get approval from the customer when they subcontract any order. No apprenticeship
programme has been implemented in factory.
Negative findings:
0: Managements system and Code Implementation: 1- It was noted through document review and management interview that following
certificates expired on June 30, 2016: (i) Export Promotion Bureau (EPB). (ii) Trade License.
0: Managements system and Code Implementation: 2- It was noted through document review and management interview that Utility Building,
Warehouse building and Dining & Doctor room area were not included in the fire license.
2: Freedom of Association: 1 -The selection criteria of the participation committee were not correctly established as stipulated in the
Bangladesh Labour Act- 2006, Section 205 (6), amendment on July 22, 2013, Section 58. E.g. the Participation Committee was formed by
selection instead of election.
3: Working Conditions are Safe and Hygienic: 1- It was noted through document review and management interview that the factory was yet to
conduct fire safety training for the recommended percentage among workers, e.g., 18% workers to be covered as per law but no employee has
been covered so far, thus not Complying with section 55(14) of the Bangladesh Labour Law 2015.
3: Working Conditions are Safe and Hygienic: 2- Through document review it was observed that factory has no Generator certificate, which
violates the Bangladesh Energy Regulatory Commission Act, 2003; section 27 & 28. Noted that company has applied to the concerned authority
for getting the certificate.
Observations:
Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 5
Audit Details
Audit Details
A: Report #: R-us7-16421807
B: Time in and time out
(SMETA Best Practice Guidance and
Measurement Criteria recommends 9.00–17.00
hrs. if any different please state why in the
SMETA declaration )
Day 1 Time in: 9.30
am
Day 1 Time out: 2.15
pm
Day 2 Time in:
Day 2 Time out:
Day 3 Time in:
Day 3 Time out:
C: Number of Auditor Days Used:
(number of auditor x number of days)
2 auditors in 1 day
D: Audit type: Full Initial
Periodic
Full Follow–up
Partial Follow–Up
Partial Other – Define
E: Was the audit announced? (AAG
recommends a window of three weeks for semi–
announced, this gives optimum results)
Announced
Semi – announced: Window detail: weeks
Unannounced
F: Was the Sedex SAQ available for
review?
Yes
No
If No, why not?
(Examples would be, site has not completed
SAQ, site has not been asked to complete the
SAQ.)
Not Applicable
G: Any conflicting information SAQ/Pre-
Audit Info to Audit findings?
Yes
No
If Yes, please capture detail in appropriate audit by clause
H: Auditor name(s) and role(s): Mohammad Galib Hossain (LA), Saima Sharmin (A).
I: Report written by: Mohammad Galib Hossain (LA)
J: Report reviewed by: Lalit Gupta
K: Report issue date: 10-Dec-2016
L: Supplier name: Tanhasin Socks Co. Ltd.
M: Site name: Tanhasin Socks Co. Ltd.
N: Site country: Bangladesh.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 6
O: Site contact and job title: Md. Faruque Hossain – General Manager
P: Site address:
(Please include full address)
Madhabpur, Purbapara, 1 No.Ward, Gazipur City Corporation,
Gazipur, Bangladesh
GPS Location: 24°0'25.032'' N, 90°15'42.111'' E
Site phone: + 880 1799911128
Site fax: Nil
Site e–mail: faruque@tscl.com.bd
Q: Applicable business and other legally
required licence numbers:
for example, business license no, and
liability insurance
1. Certificate of incorporation: C-116980 / 14, issued on 7th July
2014.
2. Fire License No: Dhaka/25197/2015 issued by Bangladesh Fire
Service & Civil Defence Authority which is valid till June 30, 2017.
3. Fire Insurance: IIBL/TNB/FC-058/09/2016, issued by Islami
Insurance Company Limited which is valid till 22nd September, 2017.
4. Factory License: 17479/Gazipur, bearing catagory ‘ C’ issued by
Bangladesh Govt which is valid till June 30, 2017.
5. Membership: Reg # 6067 Valid till 24th February 2016 issued by
BGMEA
6. Export Registration Certificate: R0143081, issued by
Government of Bangladesh and valid till 30th June 2017
7. Import Registration Certificate: BA 128013, issued by
Government of Bangladesh and valid till 30th June 2017
8. VAT Registration Certificate: 18071045192 issued by
government authority.
9. Tax Identification No.: 326437176529 issued by government
authority.
10. Bond License: 1765 / CUS-SBW/2016 this is valid till 16th May
2018.
R: Products/Activities at site, for example,
garment manufacture, electricals, toys,
grower
All types of Socks, Tights and Wrist Band.
S: Audit results reviewed with site
management?
Yes
T: Who signed and agreed CAPR
(Name and job title)
Md. Faruque Hossain – General Manager
U: Did the person who signed the CAPR
have authority to implement changes?
Yes
V: Present at closing meeting (Please state
name and position, including any
workers/union reps/worker reps):
1. Md. Faruque Hossain – General Manager
2. Abu Hena Mostafa Kamal – Merchandinsing Manager
3. Polash Kumer Biswas – Production Manager
4. Md. Jillur Rahman – Manager (Admin & Account)
5. Md. Mahabur Alam – Knitting Operator (Member of Participation
Committee).
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 7
W: What form of worker representation /
union is there on site?
Union (name)
Worker Committee
Other (specify)
None
X: Are any workers covered by Collective
Bargaining Agreement (CBA)
Yes No
Y: Previous audit date: 18th September 2016
Z: Previous audit type: SMETA 2–
pillar
SMETA 4–
pillar
Other
Full Initial
Periodic
Full Follow–Up
Audit
Partial Follow–
Up
Partial Other*
*If other, please define: BSCI
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 8
Audit Scope/Actual Results
Criteria Local Law
(Please state legal
requirement)
Actual at the
Site
(Record site results
against the law)
Is this part of a
Collective
Bargaining
Agreement?
A: Standard/Contracted work hours:
(Maximum legal and actual required working hours excluding
overtime, please state if possible per day, week and month)
Legal maximum:
48 hours / week
48 hours / Week Yes
No
B: Legal Overtime hours:
(Maximum legal and actual overtime hours, please state if
possible per day, week and month)
Legal maximum:
12 Hours / Week
12 Hours / Week Yes
No
C: Legal age of employment:
(Minimum legal and actual minimum age at site)
Legal minimum:
18 Years
18 Years
D: Legal minimum wage for standard/contracted hours:
(Minimum legal and actual minimum wage at site, please
state if possible per hr, day, week and month)
Legal minimum:
BDT. 5300.00/
Month
BDT. 5300.00 /
Month
Yes
No
E: Legal minimum overtime wage:
(Minimum legal and actual minimum overtime wage at site,
please state if possible per hr ,day, week and month)
Legal minimum:
Double of the basic
as premium rate.
Double of the basic
as premium rate.
Yes
No
Audit Scope
(Please select the code and additional requirements that were audited against during this audit)
2–Pillar Audit
10B4: Environment 4–Pillar
10C: Business Ethics
All groups of workers are included in the scope of this audit such as; Direct employees, Casual
and agency workers, Workers employed by service providers such as security and catering
staff as well as workers supplied by other contractors.
Note: The main focus of this ethical audit is on the ETI Base Code and local law. The additional elements will not be audited in
such depth or scope, but the audit process will still highlight any specific issues.
This report provides a summary of the findings and other applicable information found/gathered during the social audit
conducted on the above date only and does not officially confirm or certify compliance with any legal regulations or industry
standards. The social audit process requires that information be gathered and considered from records review, worker
interviews, management interviews and visual observation. More information is gathered during the social audit process than is
provided here. The audit process is a sampling exercise only and does not guarantee that the audited site prior, during or post–
audit, are in full compliance with the Code being audited against. The provisions of this Code constitute minimum and not
maximum standards and this Code should not be used to prevent companies from exceeding these standards. Companies
applying this Code are expected to comply with national and other applicable laws and where the provisions of law and this
Code address the same subject, to apply that provision which affords the greater protection. The ownership of this report
remains with the party who has paid for the audit. Release permission must be provided by the owner prior to release to any
third parties.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 9
Audit Overview
Audit Overview
Management Worker Representatives
Audit attendance Senior management Worker Committee
representatives
Union representatives
A: Present at the opening meeting? Yes No Yes No Yes No
B: Present at the audit? Yes No Yes No Yes No
C: Present at the closing meeting? Yes No Yes No Yes No
D: If Worker Representatives were not
present please explain reasons why
(only complete if no worker reps present)
Workers participant committee was present.
E: If Union Representatives were not
present please explain reasons why:
(only complete if no union reps present)
No union, it’s not a mandatory requirement by the government law.
F: Site description:
(Include size, location and age of site. Also
include structure and number of buildings)
1. Audit Scope Description:
Tanhasin Socks Co. Ltd. is a legally registered as a private limited
company which started its operations since 2016 in the location
Madhabpur, Purbapara, 1 No. Ward, Gazipur City Corporation,
Gazipur, Bangladesh
GPS Location: 24°0'25.032'' N, 90°15'42.111'' E
The company engaged in the manufacturing of All types of Socks,
Tights & Wrist Band. The main production processes are listed as
follows:
Raw Material Store> Knitting> Linking>Finishing> Packing > Export.
Total production capacity of the factory is Socks 3, 50,000 pcs, Tights
50,000 pcs per month.
A total of 97 employees are currently working in the factory, which
includes 34 female employees and 63 male employees. The factory
comprises of total 20,036 square feet as per fire license. The factory
building construction quality was found be good as there was no
visible defects identified during the audit.
In view of the facilities, the factory is established in one 2 storied re-
enforced concrete building and three 1 storied buildings.
The main production building (2 storied re-enforced concrete building)
is approved by local authority LGED, but other buildings are not
included in the approval yet. Factory Layout Plan approved from
factory department for all its floors and operations.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 10
Production
Building no
Description Remark, if any
Building 1: 4
storied
Ground Floor
Knitting Section, Linking Section,
Finishing Section, Iron Section and
Packing Section.
Floor 1 Office Room, Free space.
Roof top Vacant
Building 2: 1
storied
Accessories store, Finished goods
store and bonded warehouse.
Building 3: 1
storied
Generator area, compressor area,
electrical sub-station and
transformer.
Building 4: 1
storied
Doctors Room and Dining Room
Is this a
shared
building?
No shared
building
observed,
whole
premises
occupied by
this company.
2. Audit process introduction:
The audit was carried out by 2 auditors in one day who arrived on the
factory at 09:30 am on 8
th
December - 2016 and an opening meeting
was held with Md. Faruque Hossain – General Manager; Abu Hena
Mostafa Kamal – Merchandinsing Manager; Polash Kumer Biswas –
Production Manager; Md. Jillur Rahman – Manager (Admin &
Account); Md. Mahabur Alam – Knitting Operator (Member of
Participation Committee). Confidentiality of all information was
guaranteed. Documents and information required were requested.
A tour of the production sites was conducted after the opening
meeting which was accompanied by factory management. Interviews
were conducted in a secluded place away from management office
area. Conducted documentation check; legal compliance status
review; personnel department & training documents check; Sedex
general & social requirements, Sedex Self-Assessment Questionnaire
verification; wage calculation; Purchase & Stores checking; and
checked the environment side.
At the end of the day, a closing meeting was held to discuss various
concerns with. Md. Faruque Hossain – General Manager; Abu Hena
Mostafa Kamal – Merchandinsing Manager; Polash Kumer Biswas –
Production Manager; Md. Jillur Rahman – Manager (Admin &
Account); Md. Mahabur Alam – Knitting Operator ( Member of
Participation Committee).
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 11
Negative and positive Points:
The top management was cooperative during the entire audit and
expressed commitment to work on audit findings.
G: Site function: Agent
Factory Processing/Manufacturer
Finished Product Supplier
Grower
Homeworker
Labour Provider
Pack House
Primary Producer
Service Provider
Sub–Contractor
H: Month(s) of peak season:
(if applicable)
January to June
I: Process overview:
(Include products being produced, main operations, number of production lines, main equipment used)
The company engaged in the manufacturing of All Socks, Tights & Wrist Band.
Production Process: Raw Material Store > Knitting > Finishing > Packing > Export.
Production Capacity: 3,60,000 pair per month.
Number of Production Line: 5 Nos.
List of Main Equipment Used:
1. Knitting Machine – 50
2. Linking Machine - 5
3. Steam Boarding Machine - 1
4. Sewing Machine - 5
5. Generator – 1
6. Compressor - 1
J: Attitude of workers:
(Include their attitude to management, workplace and the interview process. Both positive and negative information should be
included) Note: Do not document any information that could put workers at risk
Workers are comfortable with the working condition. Workers were selected by the auditors at random from different work
process covering different sex and age groups. The interview was conducted in a private place without the presence of any
representative from the management.
K: Attitude of workers committee/union reps:
(Include their attitude to management, workplace and the interview process. Both positive and negative information should be
included) Note: Do not document any information that could put workers at risk
Participation Committee was formed. No negative attitude shown by the Participation Committee members.
L: Attitude of managers:
(Include attitude to audit, and audit process. Both positive and negative information should be included)
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 12
The management was supportive to the audit process. They have cooperated in all aspects during the audit process. No
negative attitude shown by the managers.
Key Information
Key Information
(click on the key information title to go to appropriate section of the report)
A: Do all workers (including migrant workers)
have contracts of employment/employment
agreements?
(Go to clause 8 – Regular Employment)
Yes
No
B: Are maximum standard/contracted
working hours clearly defined in
contract/employment agreements?
(Go to clause 8 – Regular Employment)
Yes
No
C: Were appropriate records available to
verify hours of work and wages?
(Go to clause 5 – Living Wage)
Yes
No
D: Were any inconsistencies found?
(if yes describe nature)
(Go to Wages Table)
Yes Poor record keeping
No Isolated incident
Repeated occurrence
E: For the lowest paid production workers,
are wages paid for standard/contracted
hours (excluding overtime) below or above
the legal minimum?
(Go to clause 5 – Living Wage)
Wages found: Please indicate the breakdown of workforce
according to earnings:
Below legal
min
Meet
Above
____% of workforce earning under min wage
____55% of workforce earning min wage
____45% of workforce earning above min wage
F: % of piece rate workers:
(if applicable)
No piece rated worker found.
G: Do the standard/contracted hours stated
in a contract/employment agreement exceed
the law or 48 hours per week?
(Go to clause 6 – Working hours)
Yes
No
H: If yes, what are the standard/contracted
hours per week as stated in the
contract/employment agreement?
(Go to clause 6 – Working hours)
_____ hrs/week Approx. ____% of ALL workers on these contacted
hours
I: Combined hours (standard/contracted plus
overtime = total hours) over 60 per week
found?
(Go to Working Hours Analysis)
Yes
No
J: Are workers provided with 1 day off in Yes (1 day of in every 7 day period which is Friday)
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 13
every 7-day-period, or 2 in 14-day-period
(where the law allows)?
No
If ‘No’, please explain:
K: Are the correct legal overtime premiums
paid?
(Go to Wages Table)
Yes
No
N/A – there is no legal requirement to OT premium
L: Please state what actual OT is paid.
(As a percentage of the workers standard rate)
(Go to Working Hours Analysis)
Please give details of overtime premium as a % of standard wages:
0%
1% – 115%
116% – 124%
125% – 199%
200%+
Please give details:
M: Is there any night production work at the
site?
Yes
No
N: % of workers living in site provided
accommodation (if applicable):
No accommodation provided by this factory.
O: Age of youngest worker found:
(Go to clause 4 – Child labour)
Age of youngest workers found 18 years 10 months and 8 days on day the of
her joining, the date of her joining was 16
th
Aug 2016 and birth day was 12
nd
Mar 1998.
P: Workers under 18 subject to hazardous
work assignments?
(Go to clause 3 – Health and Safety)
Yes
No
% of under 18’s at this site (of total workers) None
Q: What form of worker representation/union
is there on site?
(Go to clause 2 – Freedom of Association)
Union (name)
Worker Committee (Participation Committee)
Other (specify)
None
R: Is it a legal requirement to have a union?
(Go to clause 2 – Freedom of Association)
Yes
No
S: Is It a legal requirement to have a workers
committee?
(Go to clause 2 – Freedom of Association)
Yes
No
T: Is there any other form of effective
worker/management communication
channel? (Other than union/worker committee)
(Go to clause 2 – Freedom of Association)
Yes
No
Describe: Participation Committee/complain Box.
U: Are there any External Processes?
(Go to clause 8A – Sub–contracting and Home
working)
Sub–Contracting
Homeworking
Other External Process
No external processes
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 14
Management Systems
Management Systems:
A: Nationality of Management Bangladeshi.
B: Gender breakdown of Management +
Supervisors (Include as one combined group)
Male: __63__ %
Female:__34___ %
C: Majority nationality of workers Bangladeshi
D: Number of workers leaving in last 12
months as a % of average total number of
workers on site over the year (annual worker
turnover)
___2_ %
E: Were accurate records shown at the first
request?
Yes
No
F: If No, why not? NA
G: In the last 12 months, has the site been
subject to any fines/prosecutions for non–
compliance to any regulations?
Yes
No
Please describe:
H: Do policies and/or procedures exist that
reduce the risk of forced labour, child labour,
discrimination, harassment & abuse?
Yes
No
Please describe: Company has established all relevant policies &
procedures.
I: If Yes, is there evidence (an indication) of
effective implementation? Please give
details.
Attached
J: Have managers and workers received
training in the standards for forced labour,
child labour, discrimination, harassment &
abuse?
Yes
No
Please describe: Company has conducted training based on the yearly
routine.
K: If Yes, is there evidence (an indication)
that training has been effective e.g. training
records etc.? Please give details
Training records were available and attached.
L: Are there published, anonymous and/or
open channels available for reporting any
violations of Labour standards and H&S or
any other grievances to a 3rd
party?
Yes
No
Please describe: Labour Court, Buyer’s, and Trade Union
M: If Yes, are workers aware of these
channels? Please give details.
Buyer’s representative visit factory frequently, workers are known about the
Trade Union office nearby factory.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 15
N: Have health and safety risks been
identified e.g. through internal audits, formal
risk analysis process, worker involvement
etc.?
Yes
No
Please describe: Risk assessment for different process within the facility has
been conducted.
O: If Yes, has effective action been taken to
reduce or eliminate these risks?
The risk assessment has been displayed in all relevant areas; workers are
trained regularly on these work related risks.
P: Are accidents recorded? Yes
No
Please describe: Minor injury record was found by the company.
Q: Has the auditor made a simple calculation
to compare capacity with workers’ work load
in order to identify possible unrecorded work
hours?
Yes
No
Please describe: Auditors reviewed the production planning and calculated
the required working hours for the workers which was found satisfactory.
R: Does the site have all required land rights
licenses and permissions (see SMETA
Measurement Criteria)?
Yes. All legal license & additional license found by the company.
S; Does the site have any internationally
recognised system certifications e.g. ISO
9000, 14000, OHSAS 18000, SA8000 (or
other social audits).
Please detail (Number and date).
BSCI - 18
th
September 2016
ISO 9001:2015 – 10
th
September 2016
T: Is there a Human Resources
manager/department?
If Yes, please detail.
Yes
No
Please describe: There is 03 employees in the HR team.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 16
Worker Analysis
Worker Analysis
Local Migrant
Total
Permanent Temporary Agency Permanent Temporary Agency
Home
workers
Worker numbers –
male
63 0 0 0 0 0 0 63
Worker numbers –
female
34 0 0 0 0 0 0 34
Total 97 0 0 0 0 0 0 97
Number of Workers
interviewed
10 0 0 0 0 0 0 10
Contractors:
(Individuals supplying workers to site with the workers paid by contractors, not by site)
A: Any contractors on site?
Yes
No
B: If Yes, how many workers supplied by
contractors
Not Applicable
C: Are all contractor workers paid
according to law?
Yes
No, Not Applicable
If Yes, Please give evidence for contractor
workers being paid according to law:
Not Applicable
Migrant Workers:
(Please see SMETA Best Practice Guidance and Measurement Criteria for definitions of migrant workers)
D: Originating
Locations/Countries:
No migrant workers.
E: Type of work undertaken by
migrant workers :
Not Applicable
F: Were migrant workers
recruited through an agency?
If yes, please give details.
Yes
No
Please describe: Not Applicable
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 17
If Yes, is there a contract with
the agency? Provide details of
agencies and contractual
arrangements including any
fees lodged during the
recruitment process.
Not Applicable
G: Does the site have a system
for checking labour standards
of agencies?
If yes, please give details.
Yes
No
Please describe: Not Applicable
H: Percentage of migrant
workers in company provided
accommodation:
No migrant worker in the factory.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 18
Audit Results by Clause
0: Management systems and Code Implementation
0: Managements system and Code Implementation
(click here to return to NC Table)
0.1 Suppliers are expected to implement and maintain systems for delivering compliance to this Code.
0.2 Suppliers shall appoint a senior member of management who shall be responsible for compliance with the
Code.
0.3 Suppliers are expected to communicate this Code to all employees.
0.4 Suppliers should communicate this code to their own suppliers and, where reasonably practicable, extend the
principles of this Ethical Code through their supply chain.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to
understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant
procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any
documentary or verbal evidence shown to support the systems.
Current systems: Factory has defined its own code of conduct including all terms of ETI Code., code has been displayed in
local language on company notice boards.
Evidence examined – to support system description (Documents examined & relevant
comments. Include renewal/expiry date where appropriate): Company appointed a member of Senior
Management Md. Faruque Hossain – General Manager who is responsible for compliance with the code.
Company has not communicated the code with all employees within the company through training and also with suppliers by
providing the copy of this code and collects their consent of reasonably practice of the code and extend of this ethical code
through their supply chain.
Non–compliance:
1. Description of non–compliance: It was noted through document review and
management interview that following certificates expired on June 30, 2016: (i) Export
Promotion Bureau (EPB). (ii) Trade License.
NC against ETI NC against Local Law:
Local law and/or ETI requirement: It is issued by Government office.
Recommended corrective action: It is recommended that company should obtain
EPB certificate and Trade License. Md. Faruque Hossain – General Manager is responsible
to look after the code and legal compliance issues.
2. Description of non–compliance: It was noted through document review and
management interview that Utility Building, Warehouse building and Dining & Doctor
room area were not included in the fire license.
NC against ETI NC against Local Law:
Local law and/or ETI requirement: Section 4 of Bangladesh Gazette, published on
6th
March 2003.
Objective evidence
observed:
Document review and
Management interview
Objective evidence
observed:
Document review and
Management interview
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 19
Recommended corrective action: It is recommended that company should include
all area in the fire license. Md. Faruque Hossain – General Manager is responsible to look
after the code and legal compliance issues.
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective evidence
observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 20
1: Employment is Freely Chosen
(Click here to return to NC–table)
ETI
1.1 There is no forced, bonded or involuntary prison labour.
1.2 Workers are not required to lodge “deposits” or their identity papers with their employer and are free
to leave their employer after reasonable notice.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company has defined “Forced Labor Policy” stated that company has not appointed any forced, bonded
and involuntary prison labor and it is strictly prohibited in the company.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): Company appointed a member of Senior Management Md. Faruque Hossain –
General Manager who is responsible for compliance with the code.
A person seeking employment in the facility is required to send signed application form to HR Department. After the recruitment
procedure has been completed and if the applicant has been selected for a job, he/she, at the time of appointment, is given an
appointment letter where he/she has to provide a declaration that he/she is joining the factory at his/her own free will without
any undue pressure from anybody. This declaration forms a part of the contract and every employee has to sign before
acceptance of the job. The hiring staffs also inform each newcomer that he/she is under no compulsion to join the company and
is also free to leave after complying with the company regulations as per the terms of the appointment letter. Verified during
worker interviews. Workers are aware about forced labor policy. Security guards only posted at locations where needed for
security purposes. Security forces are employed only for guarding the property and personnel of the company. During the facility
visit, no exaggerated security measures or logistics were noticed. Security guard found aware about job responsibility.
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 21
Good Examples observed:
Description of Good Example (GE): Nil Objective evidence
observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 22
: Freedom of Association and Right to Collective Bargaining are Respected
2: Freedom of Association and Right to Collective Bargaining are Respected
(Click here to return to NC–table)
(Click here to return to Key Information)
ETI
2.1 Workers, without distinction, have the right to join or form trade unions of their own choosing and to bargain
collectively.
2.2 The employer adopts an open attitude towards the activities of trade unions and their organisational activities.
2.3 Workers’ representatives are not discriminated against and have access to carry out their representative
functions in the workplace.
2.4 Where the right to freedom of association and collective bargaining is restricted under law, the employer
facilitates, and does not hinder, the development of parallel means for independent and free association and
bargaining.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company has established Freedom of Association and Right to Collective Bargaining policy. No trade
union has been formed by the workers of the company. Company has established Participation Committee by selection instead
of election.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): Workers are free to join or form the trade union, no restriction has been
imposed to the workers from the management. Nothing identified through policy verification and no negative evidence identified
through interview. Moreover, factory has formed a Participation Committee amongst the workers. The worker’s representatives
are not discriminated in any manner and have the access to carry out their representative functions in the workplace which was
confirmed through interview. Compliant box has also been installed inside the toilet area by the factory management to get to
know the workers grievances. Factory complaints boxes have been last opened on 27.08.2016 in presence of Md. Faruque
Hossain – General Manager
Non–compliance:
1. Description of non–compliance: The selection criteria of the participation
committee were not correctly established as stipulated in the Bangladesh Labour
law- 2006, Section 205 (6), amendment on July 22, 2013, Section 58. e.g. the
Participation Committee was formed by selection instead of election.
NC against ETI NC against Local Law
Local law and/or ETI requirement: : Bangladesh Labour law- 2006, Section 205
(6), amendment on July 22, 2013, Section 58. & ETI 2.4.
Recommended corrective action: It is recommended that company should form
participation committee according to law. Md. Faruque Hossain – General Manager is
responsible to look after the code and legal compliance issues.
Objective evidence
observed:
Document review and
Management interview
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 23
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
A: Name of union and union
representative, if applicable:
Not applicable. Is there evidence of free elections?
Yes No N/A
B: If no union what is parallel means of
consultation with workers e.g. worker
committees?
PC (Participation Committee) Is there evidence of free elections?
Yes No N/A
C: Were worker representatives/union
representatives interviewed
Yes No
If Yes, please state how many:1
D: State any evidence that
union/workers committee is effective?
Specify date of last meeting; topics covered;
how minutes were communicated etc.
All workers were found aware about the PC. Records were available.
E: Are any workers covered by
Collective Bargaining Agreement (CBA)
Yes No
F: If Yes what percentage by trade
Union/worker representation
__0__% workers covered by
Union CBA
__0__% workers covered by worker
rep CBA
G: If Yes, does the Collective
Bargaining Agreement (CBA) include
rates of pay
Yes
No, Not applicable
Good Examples observed:
Description of Good Example (GE): Nil Objective evidence
observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 24
3: Working Conditions are Safe and Hygienic
(Click here to return to NC–table)
(Click here to return to Key Information)
ETI
3.1 A safe and hygienic working environment shall be provided, bearing in mind the prevailing knowledge of the
industry and of any specific hazards. Adequate steps shall be taken to prevent accidents and injury to health
arising out of, associated with, or occurring in the course of work, by minimising, so far as is reasonably
practicable, the causes of hazards inherent in the working environment.
3.2 Workers shall receive regular and recorded Health & Safety training, and such training shall be repeated for
new or reassigned workers.
3.3 Access to clean toilet facilities and to potable water, and, if appropriate, sanitary facilities for food storage shall
be provided.
3.4 Accommodation, where provided, shall be clean, safe, and meet the basic needs of the workers.
3.5 The company observing the code shall assign responsibility for Health & Safety to a senior management
representative.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company has established occupational health & safety policy as fulfilled the mandatory law. All relevant
certificates, permits, licenses etc. applicable to the nature of activities being carried out in the facility are being maintained by
the management.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): During the factory tour it was observed that the facility is following the
applicable laws and regulations regarding health & safety and ensuring a safe and hazard free workplace. Emergency fire
exists, fire extinguishers, fire hoses, other fire fighting appliances, first aid boxes, personal protective equipment etc. were found
in proper places and adequate quantities.
Management maintains an accident/injury register to record, the accidents/injuries are analysed and investigated to find out the
root cause for taking corrective actions.
Facility is providing all applicable PPE’s such as mask, gloves, ear plugs etc.
Facility has a program and materials to train relevant individuals, including all individuals responsible for the supervision of
workers, on all of the relevant occupational safety and health issues.
All the machine guards are available. Machines are maintained in good condition and relevant maintenance records were
sighted. All the electrical installations like switchgear, transformer, and electrical distribution board are also well maintained with
their checklist.
The factory is well maintained, the layout and other facilities are well designed and help in ensuring safe work place. Company
has defined a detailed policy for health and safety. There is a committee named Health and Safety committee is continuously
monitoring the operation level. Safety program is documented and is reviewed by Health & Safety Committee. Detailed fire plan
is also documented explaining the roles of various teams.
Total number of first aid staff is 6 for 3 first aid boxes. List of first aid staff available. Photograph of all first aid staff displayed
with all first aid boxes. Last training conducted by Dr. Ashrafuzzaman Sarkar on 13th
November -2016 and total number of
participant was 8. Topic of the training was first aid kits and first aid treatment.
All first aid employees found trained internally and documented training record available, workers found aware about first aid
employees. Photograph of two first aid employees are also displayed with each first aid box.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 25
Company has provided training on health, safety and hygiene and found records of the trainings during the documents review.
They also provided induction training for the new workers and repeated training for the reassigned workers.
Factory has no dormitory facility for its staff and workers.
Factory has no provided fire safety training .
All fire extinguishers were found clearly identified and access was not blocked. All fire extinguishers marked &
inspected regularly. Total number of fire extinguishers in the facility is 9 (CO2 = 2, ABC = 7), number of Hose Pipe
is 03. Factory conducts fire drill. Last fire drill date was on 10th
August 2016.
All the emergency exits were identified by battery backup illuminated emergency exit signs and exits routes were found free and
unobstructed. All the exits routes, staircases are also adequately illuminated by external power source emergency lights.
Company has gone through a test of drinking water based on WHO standard and Bangladesh standard of Drinking water from
ICDDRB, a non-government organization on 21
st
September 2016.
Toilets were well maintained, company has full time cleaners who are responsible to clean on regular basis. A monitoring
checklist is also maintained to ensure that toilets are always in serviceable condition. Total number of toilets is 10 (female: 4,
Male: 6). As per legal requirement number of toilets does comply for workers.
Electrician has the competency certificate.
Non–compliance:
1. Description of non–compliance: It was noted through document review and
management interview that the factory was yet to conduct fire safety training for the
recommended percentage among workers, e.g., 18% workers to be covered as per
law but no employee has been covered so far, thus not Complying with section 55(14)
of the Bangladesh Labour Law 2015.
NC against ETI NC against Local Law
Local law and/or ETI requirement : It is issued by Government office.Required by
Bangladesh Labour Law 2015 section 55(14) & ETI 3.2
Recommended corrective action: Company should arrange fire safety training for
it’s employees. Md. Faruque Hossain – General Manager is responsible to look after the code
and legal compliance issues.
2. Description of non–compliance: Through document review it was observed that
factory has no Generator certificate, which violates the Bangladesh Energy Regulatory
Commission Act, 2003; section 27 & 28. Noted that company has applied to the
concerned authority for getting the certificate.
NC against ETI NC against Local Law
Local law and/or ETI requirement: It is issued by Government. Required by
Bangladesh Energy Regulatory Commission Act, 2003; section 27 & 28 & ETI 3.1.
Recommended corrective action: It is recommended to obtain Generator certificate
from concerned authority. Md. Faruque Hossain – General Manager is responsible to look
after the code and legal compliance issues.
Objective evidence
observed:
Document review and
Management interview
Document review and
Management interview
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 26
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 27
4: Child Labour Shall Not Be Used
(Click here to return to NC–table)
(Click here to return to Key Information)
ETI
4.1 There shall be no new recruitment of child labour.
4.2 Companies shall develop or participate in and contribute to policies and programmes which provide for the
transition of any child found to be performing child labour to enable her or him to attend and remain in quality
education until no longer a child.
4.3 Children and young persons under 18 shall not be employed at night or in hazardous conditions.
4.4 These policies and procedures shall conform to the provisions of the relevant ILO Standards.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company has well defined policy for child labour conforming local and ILO standards what describes that
they are not employing any child labour.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): During audit no child labour found or suspected. They are going through an age
verification test by the registered doctor before employing any worker and the proof of age (copy of National ID Card, birth
Certificate, Chairman or Commissioner Certificate, and Blood Group Report) are kept in the personal file. Employees’
personal files with National Identity card/ Birth certificate copies were available for review,10 sample records were
selected to check details.
During the plant visit, it was observed that the entire employees appeared to be above the age of 18 years. In addition, any
young looking employee noticed on the floor was included in the list of interviews and a subsequent verification and review was
conducted.
As per the local law anyone under 18 years of age is a child and they are not employing any child at any circumstances. No
child labour found during the audit.
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 28
5: Living Wages are Paid
(Click here to return to NC–table)
(Click here to return to Key information)
ETI
5.1 Wages and benefits paid for a standard working week meet, at a minimum, national legal standards or industry
benchmark standards, whichever is higher. In any event wages should always be enough to meet basic needs and
to provide some discretionary income.
5.2 All workers shall be provided with written and understandable information about their employment conditions in
respect to wages before they enter employment and about the particulars of their wages for the pay period
concerned each time that they are paid.
5.3 Deductions from wages as a disciplinary measure shall not be permitted nor shall any deductions from wages
not provided for by national law be permitted without the expressed permission of the worker concerned. All
disciplinary measures should be recorded.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company established a minimum wages policy & procedure. They have provided appointment letter with
all the particulars of wages in local language. Company is maintaining wage sheet for each pay period. Company is providing
pay slip along with the payment for each month. Company is providing living wages for all workers according to their respective
grade. Workers are also provided with all the social benefits like sick leave, maternity leave with pay, social insurance etc.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): The management provides induction as well as periodic training to all workers
on factory compensation policy and trains them to calculate their wages correctly. All the relevant details in native language
have been included in the employees’ handbook for worker reference. The factory management has also posted them
prominently on the notice boards. Company has defined disciplinary action policy and deduction policy. Both are in line with the
national law. The wage calculated monthly basis, company pays the salary within 7
th
working days of the following month.
Payslip given to workers for each management. Overtime payment also given within 7
th
working days together with the monthly
salary.
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Objective evidence
observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 29
Comments: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Wages analysis:
Wages analysis:
(Click here to return to Key Information)
A: Sample Size Checked
(State number of worker records checked and from
which weeks/months – should be current, peak and
random/low. Please see SMETA Best Practice
Guidance and Measurement Criteria)
10 workers payroll records were reviewed for the month of January 2016,
June 2016 & October 2016.
B: Are there different legal minimum wage
grades? If Yes, please specify all.
Yes
No
If Yes, please give details:
Grade 1 – BDT 1,3000 (Basic 8500+House Rent 40%
of basic BDT 3,400+Medical Allowance BDT 250+
Transportation 200 +Food allowance BDT 650)
Grade 2 – BDT 10,900 (Basic 7000+House Rent 40%
of basic BDT 2,800+Medical Allowance BDT
250+Transportation 200 + Food allowance BDT 650)
Grade 3 – BDT 6,805 (Basic 4075+House Rent 40%
of basic BDT 1,630+Medical Allowance BDT
250+Transportation 200 + Food allowance BDT 650)
Grade 4 – BDT 6,420 (Basic 3800+House Rent 40%
of basic BDT 1,520+Medical Allowance BDT
250+Transportation 200 + Food allowance BDT 650)
Grade 5 – BDT 6,042 (Basic 3530+House Rent 40%
of basic BDT 1,412+Medical Allowance BDT
250+Transportation 200 + Food allowance BDT 650)
Grade 6 – BDT 5,678 (Basic 3270+House Rent 40%
of basic BDT 1,308+Medical Allowance BDT
250+Transportation 200 + Food allowance BDT 650)
Grade 7 – BDT 5,300 (Basic 3000+House Rent 40%
of basic BDT 1,200+Medical Allowance BDT
250+Transportation 200 + Food allowance BDT 650
The effective date of the minimum wages is 1st
Dec 2013.
C: If there are different legal minimum grades,
are all workers graded correctly?
Yes
No
N/A
If No, please give details:
D: What deductions are required by law e.g.
social insurance? Please state all types:
Revenue stamp / Unauthorized absent.
E: Have all of these deductions been made?
Please list all deductions that have/have not
Yes
No
If Yes, Please list all deductions that have been
made: Unauthorized absent & revenue stamp for
government rules.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 30
been made. If No, please give details on any deductions
which have not been made: Company does not
deduct for revenue stamp, it is paid by company
itself.
F: Industry norm for this region:
(please include time period e.g. hour/week/month)
Same as specified by local labor law.
Wages table
Wages table
(Click here to return to Key information)
Worker Type
Process Operator
(Lowest paid)
Process Operator
(Average paid)
Process Operator
(Highest paid)
Select from individual worker records one worker from, lowest, average and highest wages and populate the
boxes. Ensure comparison is made for same pay period and only uses full–time workers. See SMETA Best
Practice Guidance and Measurement Criteria for completing this:
A: Pay period:
(State month selected)
September 2016 September 2016 September 2016
B: Anonymous Employee
Reference/Dept.
Md.Yasin Mia,
Asst.Operator,Knitting
department.ID TSCL-
1157
Pabitro Kumar Roy,
Sr.Operator, Knitting
department.ID TSCL-
1111
Md.Yamen Mia,
Operator, Knitting
department.ID TSCL-
1113
C: Employee Gender Male Male Male
D: Contracted/Standard
working hours:
(excluding OT – please include
time period e.g.
hour/week/month)
208 hours / month 208 hours / month 208 hours / month
E: Contracted /Standard
work pay rate:
(excluding OT – please include
time period e.g.
hour/week/month)
BDT 5,500 / month BDT 9,000 / month BDT 10,900 / month
F: Standard day overtime –
hours:
(please include time period e.g.
hour/week/month)
00 00 00
G: Standard day overtime –
wage:
(please include time period e.g.
hour/week/month)
00 00 00
H: Rest day overtime –
hours: (please include time
period e.g. hour/week/month)
00 00 00
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 31
I: Rest day overtime – wage:
(please include time period e.g.
hour/week/month)
00 00 00
J: Statutory Holiday overtime
– hours:
(please include time period e.g.
hour/week/month)
00 00 00
K: Statutory holiday OT –
wages:
(please include time period e.g.
hour/week/month)
00 00 00
L: Total overtime hours:
(please include time period e.g.
hour/week/month)
00 00 00
M: Incentives/Bonus/
Allowances etc.:
(please include time period e.g.
hour/week/month)
House Rent = 1257
Medical Allowances = 250
Food Allowance = 650
Conveyance = 200
House Rent = 2257
Medical Allowances = 250
Food Allowance = 650
Conveyance = 200
House Rent = 2800
Medical Allowances = 250
Food Allowance = 650
Conveyance = 200
N: Gross wages:
(please include time period e.g.
hour/week/month)
BDT 5,500/Month BDT 9,000/Month BDT 10,900/Month
O: Social insurance and
other deductions; please list
which and amount.
00 00 00
P: Actual wage paid after
deduction:
(please include time period e.g.
hour/week/month)
BDT 5,500/Month BDT 9,000/Month BDT 10,900/Month
Comments:
(Please state here any specific reasons/circumstances that explain the lowest and highest gross wages)
Q: Is there a defined living wage:
This is not normally minimum legal
wage. If answered Yes please state
amount and source of info:
Please see SMETA Best Practice
Guidance and Measurement Criteria.
Yes
No
Please specify amount/time period:
R: Are workers paid in a timely
manner in line with local law?
Yes
No
S: Is there evidence that equal rates
are being paid for equal work:
Yes
No
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 32
Details: wages records shown equal rates are being paid for equal work.
T: How are workers paid: Cash
Cheque
Bank Transfer
Other
If other explain:
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 33
6: Working Hours are not Excessive
(Click here to return to NC–table)
(Click here to return to Key Information)
ETI
6.1 Working hours must comply with national laws, collective agreements, and the provisions of 6.2 to 6.6 below,
whichever affords the greater protection for workers. Sub–clauses 6.2 to 6.6 are based on international labour
standards.
6.2 Working hours, excluding overtime, shall be defined by contract, and shall not exceed 48 hours per week.
6.3 All overtime shall be voluntary. Overtime shall be used responsibly, taking into account all the following: the
extent, frequency and hours worked by individual workers and the workforce as a whole. It shall not be used to
replace regular employment. Overtime shall always be compensated at a premium rate, which is recommended to
be not less than 125% of the regular rate of pay.
6.4 The total hours worked in any 7 day period shall not exceed 60 hours, except where covered by clause 6.5
below.
6.5 Working hours may exceed 60 hours in any 7 day period only in exceptional circumstances where all of the
following are met:
– this is allowed by national law;
– this is allowed by a collective agreement freely negotiated with a workers’ organisation representing a
significant portion of the workforce;
– appropriate safeguards are taken to protect the workers’ health and safety; and
– The employer can demonstrate that exceptional circumstances apply such as unexpected production
peaks, accidents or emergencies.
6.6 Workers shall be provided with at least one day off in every 7 day period or, where allowed by national law, 2
days off in every 14 day period.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company has defined policy on working hours and communicated for the all workers.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): Company policy conforms to both local laws and industry standards in terms of
working hours. The policy has clearly defined that the overtime work is completely voluntary and any worker can leave the
premises after regular working hours without prior permission. Local law allows 48 hours regular work in a week and maximum
12 hours over time weekly. Factory works 8 hours as normal working hour. One day off is given in 7 days period that is Friday.
At the time of hiring, all new recruits are informed about the legal requirements and the limitations on the
working hours, both regular and overtime, by providing induction training on the policies and procedures
of the facility.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 34
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
orking hours analysis
Working hours analysis
Please include time period e.g. hour/week/month
(Go back to Key information)
Systems & Processes
A. What timekeeping systems are
used: time card etc.
Describe: Attendance and work timings (including OT) are recorded through
manual time card system.
B: Sample Size Checked
(State number of worker records
checked and from which
weeks/months and type – should be
current, peak and random/low: See
SMETA Best Practice Guidance and
Measurement Criteria)
10 workers time keeping records were reviewed for the month of January 2016,
June 2016 & October 2016.
C: Do ALL workers have
contracts/employment agreements?
Yes
No
If NO, state which type of workers do NOT have
contracts/employment agreements:
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 35
D: Are standard/contracted working
hours defined in all
contracts/employment agreements?
Yes
No
If NO, please state which type of workers NOT standard
hours have defined in contracts/employment agreements.
E: Are there any other types of
contracts/employment agreements
used?
Yes
No
If YES, Please complete as appropriate:
0 hrs Part time Variable hrs Other
If “Other”, Please define:
Standard/Contracted Hours worked
F: Do standard/contracted standard
hours ever exceed the law or 48
hours per week?
Yes
No
If YES give details and comparison (local law/48 hrs
week)
G: What are the actual
standard/contracted hours worked in
sample (State per week/month)
Highest hours: 48 Hours/week
Lowest hours: 48 Hours/week
H: Any local waivers/local law or
permissions which allow
averaging/annualised hours for this
site?
Yes
No
If YES, Please give details
Overtime Hours
I: Actual overtime hours worked in
sample (State per day/week/month)
Highest OT
hours:
Nil
Lowest OT
hours:
Nil
J: Range of overtime hours over all
workers/or as large a sample as
possible. (State per week/month and
details)
Nil
K: Approximate percentage of
workers on highest overtime hours
___% (Approx.) (10 workers time keeping & payroll records were reviewed for the
month of October 2016)
L: Is overtime voluntary? Yes
No
Conflicting
Please detail evidence e.g. Wording of
contract/employment agreement/handbook/worker
interviews/refusal arrangements:
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 36
Information Worker interview
Overtime Premiums
M: Is overtime paid at a premium? Yes
No
Please give details of normal day overtime premium as a
% of standard wages:
0% 1 –
115%
116 –
124%
125 –
149%
150 –
199%
200%+
Any other comments: Company has a policy to pay overtime
al double of the basic wage as per local law requirement;
however there is no overtime hour worked by the employee.
N: ETI Code requires a prevailing
standard to give greatest worker
protection.
If a site pays less than 125% OT
premium and this is allowed under
local law, are there other
considerations? Please complete the
boxes where relevant. Multi select is
possible.
No
Consolidated pay (May be standard wages above minimum legal wage, with
no/low overtime premium)
Collective Bargaining agreements
Other
Please explain any checked boxes in N above e.g. detail of consolidated
pay CBA or Other.
Company has a policy to pay overtime al double of the basic wage as per local law
requirement; however there is no overtime hour worked by the employee.
Rest Days
O: Are workers provided with 1 day
off in every 7–day–period, or 2 in 14–
day–period (where the law allows)?
Yes
No
Maximum number of days worked without a day off (in
sample):
Friday is weekly holiday
Total Hours
P: Range of total hours:
(Quote highest and lowest please include
time period e.g. hour/week/month)
Highest total
hours
No working hours found in rest days
Lowest total
hours
No working hours found in rest days
R: If more than 60 total hours per
week and this is legally allowed, are
there other considerations? Please
complete the boxes where relevant.
Multi select is possible.
Overtime is voluntary
Onsite Collective bargaining allows 60+ hours/week
Safeguards are in place to protect worker’s health and safety
Site can demonstrate exceptional circumstances
Other reasons
Please explain any checked boxes in R above
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 37
Worker interview confirmed that overtime is voluntary.
Comments:
(please state here any specific reasons/circumstances that explain the highest working hours)
Highest working hours were identified within legal limit.
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 38
7: No Discrimination is practiced
7: No Discrimination is Practiced
(Click here to return to NC–table)
ETI
7.1 There is no discrimination in hiring, compensation, access to training, promotion, termination or retirement
based on race, caste, national origin, religion, age, disability, gender, marital status, sexual orientation, union
membership or political affiliation.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems:
They have defined a policy of non-discrimination in hiring, compensation, promotion, termination, access to training, increment
based on race, caste, national origin, religion, age, gender, gender, marital status, sexual orientation or membership in any
union or political affiliation.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): This policy is well communicated through the notice board. Regular training
programs are arranged to train relevant individuals such as management staff, supervisory personnel and Admin & Compliance
staff on the anti-discrimination policy and practices of the facility. The training materials prepared by responsible persons were
reviewed and found appropriate.
Companies have system in place to complaint against any discriminatory behaviour in confidential manner and have the system
to handle the grievances if occurred. During the worker interview no such comments raised related to discrimination
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 39
8: Regular Employment Is Provided
(Click here to return to NC–table)
(Click here to return to Key Information)
ETI
8.1 To every extent possible work performed must be on the basis of recognised employment relationship
established through national law and practice.
8.2 Obligations to employees under labour or social security laws and regulations arising from the regular
employment relationship shall not be avoided through the use of labour–only contracting, sub–contracting, or
home–working arrangements, or through apprenticeship schemes where there is no real intent to impart skills or
provide regular employment, nor shall any such obligations be avoided through the excessive use of fixed–term
contracts of employment.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems:
Company has established policy & procedure for regular employment.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): Company is employing workers as permanent basis; they appoint
workers on monthly salary based. Company provides appointment letter to the workers and service book
maintained as the job contract and keeping the duplicate copy of that appointment letter in the personal file.
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 40
8A: Sub–Contracting and Home working
(Click here to return to NC–table)
(Click here to return to Key Information)
8A.1. There should be no sub–contracting unless previously agreed with the main client.
8A.2. Systems and processes should be in place to manage sub–contracting, homeworking and external
processing.
Note to auditor on homeworking:
Report on whether it is direct or via agents. How many workers, relationship with site and what control systems are
in place.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company does not have any subcontractor, though they have documented sub-contracting policy.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): Currently company is not using any sub-contractors & no home working is in
practice.
If any processes are sub–contracted – please populate below boxes
Process Subcontracted Process 1 Process 2
Name of factory
Address
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 41
Summary of sub–contracting – if applicable
Summary of sub–contracting – if applicable
A: If sub–contractors are used, is
there evidence this has been agreed
with the main client?
Yes
No
If Yes, summarise details:
B: Number of sub–
contractors/agents used
C: Is there a site policy on sub–
contracting?
Yes
No
If Yes, summarise details:
D: What checks are in place to
ensure no child labour is being used
and work is safe?
E: What processes are sub–
contracted?
Summary of homeworking – if applicable
F: If homeworking is being used, is
there evidence this has been agreed
with the main client?
Yes
No
If Yes, summarise details:
G: Number of homeworkers Male: Female: Total:
H: Are homeworkers employed direct
or through agents?
Directly
Through Agents
I: If through agents, number of
agents
J: Is there a site policy on
homeworking?
Yes
No
K: How does site ensure worker
hours and pay meet local laws for
homeworkers?
L: What processes are carried out by
homeworkers?
M: Are written agreements in place
for homeworkers that include regular
employment?
Yes
No
N: Are full records available at the
site?
Yes
No
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 42
9: No Harsh or Inhumane Treatment is allowed
9: No Harsh or Inhumane Treatment is Allowed
(Click here to return to NC–table)
ETI
9.1 Physical abuse or discipline, the threat of physical abuse, sexual or other harassment and verbal abuse or
other forms of intimidation shall be prohibited.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is
/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems:
Company has policy against harassment and abuse what clearly described that none is allowed to physical abuse, sexual or
any other harassment or verbal abuse to any other employees.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate):
Company has a system in place to confidentially complain against any harassment or abuse without any threats of retaliatory
action. Company is providing awareness on regular basis on the company policy of harassment and abuse.
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
10 Ament to Work and Immigration
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 43
10. Other Issue areas: 10 A: Entitlement to Work and Immigration
(Click here to return to NC–table)
Additional Elements
10A1 Only workers with a legal right to work shall be employed or used by the supplier.
10A2 All workers, including employment agency staff, must be validated by the supplier for their legal right to work
by reviewing original documentation.
10A3 Employment agencies must only supply workers registered with them.
10A4 The supplier shall implement processes to enable adequate control over agencies with regards the above
points and related legislation.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who
is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: No immigrant worker was found recruited by factory.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate):
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 44
10. Other issue areas 10 B 2: Environment 2–pillar
(Click here to return to NC–table)
To be completed for a 2–Pillar SMETA Audit, and remove the following page which is 10B4 environment 4 pillar
10B2. 1 Suppliers must comply with the requirements of local and international laws and regulations including
having necessary permits.
10B2. 2 The supplier should be aware of and comply with their end clients’ environmental requirements.
Note for auditors and readers, This is not a full environmental assessment but a check on basic systems and
management approach.
Current Systems and Evidence Examined
To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and
record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is
/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to
support the systems.
Current systems: Company has established the environmental policy, since factory is doing cut to pack, no environmental
license is required as per local regulation.
Evidence examined – to support system description (Documents examined & relevant comments. Include
renewal/expiry date where appropriate): As per local law, the company does not require environmental permits as the
factory has no processes which generate hazardous waste to the environment.
Factory does not use or emit any harmful substances which can cause severe damage to the nature. Environmental is available
in the factory.
Non–compliance:
1. Description of non–compliance: Nil
NC against ETI NC against Local Law: Nil
Local law and/or ETI requirement: Nil
Recommended corrective action: Nil
Objective evidence
observed: Nil
Observation:
Description of observation: Nil
Local law or ETI requirement: Nil
Comments: Nil
Objective evidence
observed: Nil
Good Examples observed:
Description of Good Example (GE): Nil Objective Evidence
Observed: Nil
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 45
Worker Interview Summary
Worker Interview Summary
Worker Interview Summary
A: Were workers aware of the audit? Yes
No
B: Were workers aware of the code? Yes
No
C: Number of group interviews:
(Please specify number and size of
groups. Please see SMETA Best
Practice Guidance and Measurement
Criteria)
1 group of 4 each
D: Number of individual interviews
(Please see SMETA Best Practice
Guidance and Measurement Criteria)
Male: 2 Female: 4
E: Total number of interviewed
workers
(Please see SMETA Best Practice
Guidance and Measurement Criteria)
Male: 6 Female: 4
F: Interviews were done in private
and the confidentiality of the
interview process was
communicated to the workers?
Yes
No
G: In general, what was the attitude
of the workers towards their
workplace?
Favourable
Non–favourable
Indifferent
H: What was the most common
worker complaint?
No complaint raised by the worker in the interview process.
I: What did the workers like the most
about working at this site?
In time salary; good behavior of supervisors; flexible leave policy; good and clean
working environment
J: Any additional comment(s)
regarding interviews:
During the interview it was noted that the workers in the factory are happy to the
management. They have a good communication between workers and
management through workers participation committee.
K: Attitude of workers to hours
worked:
Workers are comfortable with the working condition. Workers have been selected
by the auditors at random from different work process covering different sex and
age groups. The interview was conducted in a private place without the presence of
any representative from the management.
Agency Worker
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 46
Agency Workers (if applicable)
(workers sourced from a local agent who are not directly paid by the site)
A: Number of agencies used
(average):
Not applicable.
And names if available:
B: Were agency workers’
age/pay/hours included within scope
of this audit
Yes
No
C: Were sufficient documents for
agency workers available for review?
Yes
No
Other findings
Other Findings Outside the Scope of the Code
No other finding was observed.
Community Benefits
(Please list below any specific community benefits that the site management stated that they were involved in, for example, HIV
programme, education, sports facilities)
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 47
Photo Form
1. GPS Map 2. GPS Location 3. Front View of Factory
4. Factory Name 5. Security Post 6. Emergency Evacuation Plan
7. Emergency Contact Number 8. Stair 9. Emergency Exit sign
10. Warehouse 11. Knitting Section 12. Finishing Section
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 48
13. Iron Section 14. Packing Section 15. Fire Alarm Switch
16. Fire Alarm 17. Fire Plat Form 18. Fire Extinguisher
19. Fire Extinguisher Refilled Date 20. Fire Hose rill 21. Smoke Detector
22. P A System 23. Emergency Light 24. Medical Staff
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 49
25. Medical Bed 26. First Aid Box at Production Floor 27. Medicine Expire Date
28. Drinking Water 29. Dining Room 30. Front of Toilet
31. Inside of Toilet 32. Policy Board 33. Notice Board
34. Electric Sub-Station 35. Generator Room 36. Risk Assessment
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 50
37. Grievance Box 38. Factory Licences 39. Fire License
40. Fire Insurance 41. Membership Certificate 42. ERC
43. IRC 44. TIN 45. Vat
46. Drinking Water Test Report 47. Leave Register 48. Accident Register
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 51
49. Grievance Register 50. Worker’s Appointment Letter 51. Worker’s Age Verification Record
52. Forced Labour Policy 53. Child Labour Policy 54. Anti-Harassment Policy
55. Discrimination Policy 56. Leave Policy 57. Recruitment Policy
58. Disciplinary Policy 59. Freedom of Accession Policy 60. Termination Policy
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 52
61. Fire Safety Training 62. Fire Safety Training 63. PPE Training
64. PPE Training 65. Health & Safety Training 66. Health & Safety Training
67. Fire Drill 68. Fire Drill 69. Fire Drill
70. Salary Record 71. Salary Record 72. Salary Record
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 53
73. Pay Slip 74. Pay Slip 75. Pay Slip
76. Time Keeping Record 77. Time Keeping Record 78. Time Keeping Record
79. Attendance of Opening Meeting 80. Signed Code Of Conduct 81. Signed Acknowledgement
None None
82. Signed CAP
Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 54
Your feedback on your experience of the SMETA audit you have observed is extremely valuable.
It will help to make improvements to future versions.
You can leave feedback by following the appropriate link to our questionnaire:
Click here for A & AB members:
http://www.surveymonkey.com/s.aspx?sm=riPsbE0PQ52ehCo3lnq5Iw_3d_3d
Click here for B members:
http://www.surveymonkey.com/s.aspx?sm=d3vYsCe48fre69DRgIY_2brg_3d_3d

Contenu connexe

Tendances

ISO 9001:2015 Introduction & Awareness Training
ISO  9001:2015 Introduction & Awareness Training ISO  9001:2015 Introduction & Awareness Training
ISO 9001:2015 Introduction & Awareness Training Sadanand Borade
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)Mizan Rahman
 
ISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDFISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDFmohammad riyaz
 
ISO 14001 life cycle assessment
ISO 14001 life cycle assessmentISO 14001 life cycle assessment
ISO 14001 life cycle assessmentCaroline Geoghegan
 
Why Social Compliance, Sustainability & Traceability Matter
Why Social Compliance, Sustainability & Traceability MatterWhy Social Compliance, Sustainability & Traceability Matter
Why Social Compliance, Sustainability & Traceability MatterDorien Mouthaan
 
Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2adly al-saafin
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptxMoolRaj3
 
Procedure identification and traceability
Procedure   identification and traceabilityProcedure   identification and traceability
Procedure identification and traceabilityWilliam Laride
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safetyPrudhvi raj
 
Social compliance issues in the apparel sector of Bangladesh
Social compliance issues in the apparel sector of BangladeshSocial compliance issues in the apparel sector of Bangladesh
Social compliance issues in the apparel sector of BangladeshAzmir Latif Beg
 
ISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clausesISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clausesshree
 
SEDEX Certification Documents kit
SEDEX Certification Documents kit SEDEX Certification Documents kit
SEDEX Certification Documents kit Global Manager Group
 

Tendances (20)

Context of the organization
Context of the organizationContext of the organization
Context of the organization
 
GOTS and OeKO-Tex
GOTS and OeKO-TexGOTS and OeKO-Tex
GOTS and OeKO-Tex
 
ISO 9001:2015 Introduction & Awareness Training
ISO  9001:2015 Introduction & Awareness Training ISO  9001:2015 Introduction & Awareness Training
ISO 9001:2015 Introduction & Awareness Training
 
MRM - Management Review Meeting Presentation
MRM - Management Review Meeting PresentationMRM - Management Review Meeting Presentation
MRM - Management Review Meeting Presentation
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
Water cooler monthly
Water cooler monthlyWater cooler monthly
Water cooler monthly
 
ISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDFISO 9001 LEAD AUDITOR ( QMS ).PDF
ISO 9001 LEAD AUDITOR ( QMS ).PDF
 
ISO 14001 life cycle assessment
ISO 14001 life cycle assessmentISO 14001 life cycle assessment
ISO 14001 life cycle assessment
 
Safety Management System
Safety Management SystemSafety Management System
Safety Management System
 
Why Social Compliance, Sustainability & Traceability Matter
Why Social Compliance, Sustainability & Traceability MatterWhy Social Compliance, Sustainability & Traceability Matter
Why Social Compliance, Sustainability & Traceability Matter
 
Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
 
Vehicle plant daily inspection log
Vehicle plant daily inspection logVehicle plant daily inspection log
Vehicle plant daily inspection log
 
Procedure identification and traceability
Procedure   identification and traceabilityProcedure   identification and traceability
Procedure identification and traceability
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
Social compliance issues in the apparel sector of Bangladesh
Social compliance issues in the apparel sector of BangladeshSocial compliance issues in the apparel sector of Bangladesh
Social compliance issues in the apparel sector of Bangladesh
 
ISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clausesISO QMS 9001: 2015 clauses
ISO QMS 9001: 2015 clauses
 
Managing ISO Certification Audits
Managing ISO Certification AuditsManaging ISO Certification Audits
Managing ISO Certification Audits
 
SEDEX Certification Documents kit
SEDEX Certification Documents kit SEDEX Certification Documents kit
SEDEX Certification Documents kit
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 

Similaire à Sedex

Bsci summary auditreport
Bsci summary auditreportBsci summary auditreport
Bsci summary auditreportCandy Li
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Manoj Dnyanmothe
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReportFion Ray
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReportjenny wong
 
Domijump BSCI certificate
Domijump BSCI certificateDomijump BSCI certificate
Domijump BSCI certificateDan wang
 
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...Samson Lu
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReportJimmy Lin
 
Quanzhou guanghui bags co., ltd BSCI summary audit report
Quanzhou guanghui bags co., ltd BSCI summary audit reportQuanzhou guanghui bags co., ltd BSCI summary audit report
Quanzhou guanghui bags co., ltd BSCI summary audit reportAngelo Chen
 
Disney Official Audit Report Issued by Intertek march-14-2017
Disney Official Audit Report Issued by Intertek march-14-2017Disney Official Audit Report Issued by Intertek march-14-2017
Disney Official Audit Report Issued by Intertek march-14-2017SOHOBUCKS CO.,LIMITED
 
BSCI Audit Report Haoshun
BSCI Audit Report HaoshunBSCI Audit Report Haoshun
BSCI Audit Report HaoshunSimon .
 
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORYBSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORYkevin feng
 
IDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit ReportIDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit ReportSam Arora
 
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...Samson Lu
 
Esprit apparels ltd 2015 - BSCI Audit report
Esprit apparels ltd  2015 - BSCI Audit reportEsprit apparels ltd  2015 - BSCI Audit report
Esprit apparels ltd 2015 - BSCI Audit reportKhalid Latif
 
FUSHENG BSCI CERTIFICATE
FUSHENG BSCI CERTIFICATE FUSHENG BSCI CERTIFICATE
FUSHENG BSCI CERTIFICATE Simon LEE
 
BSCI证书
BSCI证书BSCI证书
BSCI证书妮 安
 
WCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVCWCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVCNick Yang
 

Similaire à Sedex (20)

Bsci summary auditreport
Bsci summary auditreportBsci summary auditreport
Bsci summary auditreport
 
Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015Smeta_Audit_Report_of_Omkar_Corporation-2015
Smeta_Audit_Report_of_Omkar_Corporation-2015
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
UMS BSCI Report 2016
UMS BSCI Report 2016UMS BSCI Report 2016
UMS BSCI Report 2016
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
Domijump BSCI certificate
Domijump BSCI certificateDomijump BSCI certificate
Domijump BSCI certificate
 
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial Report ...
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
Quanzhou guanghui bags co., ltd BSCI summary audit report
Quanzhou guanghui bags co., ltd BSCI summary audit reportQuanzhou guanghui bags co., ltd BSCI summary audit report
Quanzhou guanghui bags co., ltd BSCI summary audit report
 
Disney Official Audit Report Issued by Intertek march-14-2017
Disney Official Audit Report Issued by Intertek march-14-2017Disney Official Audit Report Issued by Intertek march-14-2017
Disney Official Audit Report Issued by Intertek march-14-2017
 
BSCI Audit Report Haoshun
BSCI Audit Report HaoshunBSCI Audit Report Haoshun
BSCI Audit Report Haoshun
 
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORYBSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
BSCI CERTIFICATE OF MANCHENG QINGSHAN STONE FACTORY
 
IDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit ReportIDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit Report
 
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
4771 Sedex Zhongshan Detron Display Products Co., Ltd (SMETA) Initial CAPR Ma...
 
Esprit apparels ltd 2015 - BSCI Audit report
Esprit apparels ltd  2015 - BSCI Audit reportEsprit apparels ltd  2015 - BSCI Audit report
Esprit apparels ltd 2015 - BSCI Audit report
 
FUSHENG BSCI CERTIFICATE
FUSHENG BSCI CERTIFICATE FUSHENG BSCI CERTIFICATE
FUSHENG BSCI CERTIFICATE
 
SummaryAuditReport
SummaryAuditReportSummaryAuditReport
SummaryAuditReport
 
amfori BSCI.pdf
amfori BSCI.pdfamfori BSCI.pdf
amfori BSCI.pdf
 
BSCI证书
BSCI证书BSCI证书
BSCI证书
 
WCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVCWCA_STD_2-173854-20141009132021 from QVC
WCA_STD_2-173854-20141009132021 from QVC
 

Dernier

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 

Dernier (20)

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 

Sedex

  • 1. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 1 Supplier name: Tanhasin Socks Co. Ltd. Site country: Bangladesh. Site name: Tanhasin Socks Co. Ltd. Parent Company name (of the site): None SMETA Audit Type: 2–Pillar 4–Pillar Date of Audit 08-Dec-2016
  • 2. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 2 Audit Company Name: AsiaInspection Limited Report Owner: Tanhasin Socks Co. Ltd. Sedex Company Reference: (only available on Sedex System) ZC: 131577160 Sedex Site Reference: (only available on Sedex System) ZS: 131577222 Audit Conducted By Commercial Purchaser NGO Retailer Trade Union Brand Owner Multi–stakeholder Combined Audit (select all that apply) Auditor Reference Number: (If applicable) Mohammad Galib Hossain (Lead Auditor SA8000, ISO 9001, ISO 14001 & OHSAS 18001) Saima Sharmin (Lead Auditor ISO 9001 & ISO 14001) SMETA Declaration I declare that the audit underpinning the following report was conducted in accordance with SMETA Best Practice Guidance and SMETA Measurement Criteria. Any exceptions to this must be recorded here (e.g. different sample size): Auditor Name(s) (please list all including all interviewers): Lead auditor: Mohammad Galib Hossain Team auditor: Saima Sharmin , Interviewers: Saima Sharmin . Date: 08-Dec-2016
  • 3. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 3 Non–Compliance Table Issue (please click on the issue title to go direct to the appropriate audit results by clause) Area of Non–Conformity (Only check box when there is a non–conformity, and only in the box/es where the non–conformity can be found) Record the number of issues by line*: ETI Base Code Local Law Additional Elements (i.e. not part of ETI code ) NC Obs GE 0 Management systems and code implementation 2 1 Employment Freely Chosen 2 Freedom of Association 1 3 Safety and Hygienic Conditions 2 4 Child Labour 5 Wages and Benefits 6 Working Hours 7 Discrimination 8 Regular Employment 8A Sub–Contracting and Home working 9 Harsh or Inhumane Treatment 10A Entitlement to Work 10B2 Environment 2–Pillar 10B4 Environment 4–Pillar 10C Business Ethics *Please note the table above records the total number of Non compliances (NC), Observations (Obs) and Good Examples (GE). This gives the reviewer an indication of problem areas but does not detail severities of each issue – Reviewers need to check audit results by clause.
  • 4. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 4 Summary of Findings Summary of main findings: (positive and negative) (Please give a short summary of the main findings per clause) The factory does not engage any forced or bonded labour. According to Bangladesh Law, prison labour is not acceptable and this facility did not engage prison labour. Factory also does not keep any original documents from the workers, confirmed by workers interview and documents review. Workers are free to leave their employer at any time by giving required notices. Factory has established a social responsibility team, represented by the workers and factory top management. Moreover, complaint boxes have been placed inside the factory to ventilate worker’s grievance. A Selected worker Participation Committee has been formed for workers. Factory has arranged fire fighting equipment’s, first aid facility, drinking water facility and adequate toilets for the male and female workers and necessary safety trainings for the workers as per legal requirement. Fire fighting training was not given to workers as per law. Electrical equipment found in safe condition. Factory does not engage below 18 years and no child or young worker has been identified during audit. Factory checks the age before recruitment by the doctor and maintains age related documents in the workers’ personnel files. Factory is giving minimum wage and other benefits as per local law. Workers are receiving wages on time also workers are receiving overtime allowance at premium rate. Factory only engages workers for overtime work when there is an urgency of shipment and when the work load is high. Workers are getting day off on Friday as weekly holiday. Factory maintains time records through electronic time keeping record. Nothing identified by the documents verification and also nothing reported by the interviewed workers as discrimination. The payrolls and overtime records do not show any discriminatory incidents. Factory does not engage any worker through ‘Subcontractor of Labour’ and no immigrant workers have been engaged by the factory. Md. Jillur Rahman – Manager (Admin & Account) is responsible to look after the health and safety issue. Moreover, a health & safety committee is also available here. Factory does not engage any home workers and reportedly get approval from the customer when they subcontract any order. No apprenticeship programme has been implemented in factory. Negative findings: 0: Managements system and Code Implementation: 1- It was noted through document review and management interview that following certificates expired on June 30, 2016: (i) Export Promotion Bureau (EPB). (ii) Trade License. 0: Managements system and Code Implementation: 2- It was noted through document review and management interview that Utility Building, Warehouse building and Dining & Doctor room area were not included in the fire license. 2: Freedom of Association: 1 -The selection criteria of the participation committee were not correctly established as stipulated in the Bangladesh Labour Act- 2006, Section 205 (6), amendment on July 22, 2013, Section 58. E.g. the Participation Committee was formed by selection instead of election. 3: Working Conditions are Safe and Hygienic: 1- It was noted through document review and management interview that the factory was yet to conduct fire safety training for the recommended percentage among workers, e.g., 18% workers to be covered as per law but no employee has been covered so far, thus not Complying with section 55(14) of the Bangladesh Labour Law 2015. 3: Working Conditions are Safe and Hygienic: 2- Through document review it was observed that factory has no Generator certificate, which violates the Bangladesh Energy Regulatory Commission Act, 2003; section 27 & 28. Noted that company has applied to the concerned authority for getting the certificate. Observations: Nil
  • 5. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 5 Audit Details Audit Details A: Report #: R-us7-16421807 B: Time in and time out (SMETA Best Practice Guidance and Measurement Criteria recommends 9.00–17.00 hrs. if any different please state why in the SMETA declaration ) Day 1 Time in: 9.30 am Day 1 Time out: 2.15 pm Day 2 Time in: Day 2 Time out: Day 3 Time in: Day 3 Time out: C: Number of Auditor Days Used: (number of auditor x number of days) 2 auditors in 1 day D: Audit type: Full Initial Periodic Full Follow–up Partial Follow–Up Partial Other – Define E: Was the audit announced? (AAG recommends a window of three weeks for semi– announced, this gives optimum results) Announced Semi – announced: Window detail: weeks Unannounced F: Was the Sedex SAQ available for review? Yes No If No, why not? (Examples would be, site has not completed SAQ, site has not been asked to complete the SAQ.) Not Applicable G: Any conflicting information SAQ/Pre- Audit Info to Audit findings? Yes No If Yes, please capture detail in appropriate audit by clause H: Auditor name(s) and role(s): Mohammad Galib Hossain (LA), Saima Sharmin (A). I: Report written by: Mohammad Galib Hossain (LA) J: Report reviewed by: Lalit Gupta K: Report issue date: 10-Dec-2016 L: Supplier name: Tanhasin Socks Co. Ltd. M: Site name: Tanhasin Socks Co. Ltd. N: Site country: Bangladesh.
  • 6. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 6 O: Site contact and job title: Md. Faruque Hossain – General Manager P: Site address: (Please include full address) Madhabpur, Purbapara, 1 No.Ward, Gazipur City Corporation, Gazipur, Bangladesh GPS Location: 24°0'25.032'' N, 90°15'42.111'' E Site phone: + 880 1799911128 Site fax: Nil Site e–mail: faruque@tscl.com.bd Q: Applicable business and other legally required licence numbers: for example, business license no, and liability insurance 1. Certificate of incorporation: C-116980 / 14, issued on 7th July 2014. 2. Fire License No: Dhaka/25197/2015 issued by Bangladesh Fire Service & Civil Defence Authority which is valid till June 30, 2017. 3. Fire Insurance: IIBL/TNB/FC-058/09/2016, issued by Islami Insurance Company Limited which is valid till 22nd September, 2017. 4. Factory License: 17479/Gazipur, bearing catagory ‘ C’ issued by Bangladesh Govt which is valid till June 30, 2017. 5. Membership: Reg # 6067 Valid till 24th February 2016 issued by BGMEA 6. Export Registration Certificate: R0143081, issued by Government of Bangladesh and valid till 30th June 2017 7. Import Registration Certificate: BA 128013, issued by Government of Bangladesh and valid till 30th June 2017 8. VAT Registration Certificate: 18071045192 issued by government authority. 9. Tax Identification No.: 326437176529 issued by government authority. 10. Bond License: 1765 / CUS-SBW/2016 this is valid till 16th May 2018. R: Products/Activities at site, for example, garment manufacture, electricals, toys, grower All types of Socks, Tights and Wrist Band. S: Audit results reviewed with site management? Yes T: Who signed and agreed CAPR (Name and job title) Md. Faruque Hossain – General Manager U: Did the person who signed the CAPR have authority to implement changes? Yes V: Present at closing meeting (Please state name and position, including any workers/union reps/worker reps): 1. Md. Faruque Hossain – General Manager 2. Abu Hena Mostafa Kamal – Merchandinsing Manager 3. Polash Kumer Biswas – Production Manager 4. Md. Jillur Rahman – Manager (Admin & Account) 5. Md. Mahabur Alam – Knitting Operator (Member of Participation Committee).
  • 7. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 7 W: What form of worker representation / union is there on site? Union (name) Worker Committee Other (specify) None X: Are any workers covered by Collective Bargaining Agreement (CBA) Yes No Y: Previous audit date: 18th September 2016 Z: Previous audit type: SMETA 2– pillar SMETA 4– pillar Other Full Initial Periodic Full Follow–Up Audit Partial Follow– Up Partial Other* *If other, please define: BSCI
  • 8. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 8 Audit Scope/Actual Results Criteria Local Law (Please state legal requirement) Actual at the Site (Record site results against the law) Is this part of a Collective Bargaining Agreement? A: Standard/Contracted work hours: (Maximum legal and actual required working hours excluding overtime, please state if possible per day, week and month) Legal maximum: 48 hours / week 48 hours / Week Yes No B: Legal Overtime hours: (Maximum legal and actual overtime hours, please state if possible per day, week and month) Legal maximum: 12 Hours / Week 12 Hours / Week Yes No C: Legal age of employment: (Minimum legal and actual minimum age at site) Legal minimum: 18 Years 18 Years D: Legal minimum wage for standard/contracted hours: (Minimum legal and actual minimum wage at site, please state if possible per hr, day, week and month) Legal minimum: BDT. 5300.00/ Month BDT. 5300.00 / Month Yes No E: Legal minimum overtime wage: (Minimum legal and actual minimum overtime wage at site, please state if possible per hr ,day, week and month) Legal minimum: Double of the basic as premium rate. Double of the basic as premium rate. Yes No Audit Scope (Please select the code and additional requirements that were audited against during this audit) 2–Pillar Audit 10B4: Environment 4–Pillar 10C: Business Ethics All groups of workers are included in the scope of this audit such as; Direct employees, Casual and agency workers, Workers employed by service providers such as security and catering staff as well as workers supplied by other contractors. Note: The main focus of this ethical audit is on the ETI Base Code and local law. The additional elements will not be audited in such depth or scope, but the audit process will still highlight any specific issues. This report provides a summary of the findings and other applicable information found/gathered during the social audit conducted on the above date only and does not officially confirm or certify compliance with any legal regulations or industry standards. The social audit process requires that information be gathered and considered from records review, worker interviews, management interviews and visual observation. More information is gathered during the social audit process than is provided here. The audit process is a sampling exercise only and does not guarantee that the audited site prior, during or post– audit, are in full compliance with the Code being audited against. The provisions of this Code constitute minimum and not maximum standards and this Code should not be used to prevent companies from exceeding these standards. Companies applying this Code are expected to comply with national and other applicable laws and where the provisions of law and this Code address the same subject, to apply that provision which affords the greater protection. The ownership of this report remains with the party who has paid for the audit. Release permission must be provided by the owner prior to release to any third parties.
  • 9. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 9 Audit Overview Audit Overview Management Worker Representatives Audit attendance Senior management Worker Committee representatives Union representatives A: Present at the opening meeting? Yes No Yes No Yes No B: Present at the audit? Yes No Yes No Yes No C: Present at the closing meeting? Yes No Yes No Yes No D: If Worker Representatives were not present please explain reasons why (only complete if no worker reps present) Workers participant committee was present. E: If Union Representatives were not present please explain reasons why: (only complete if no union reps present) No union, it’s not a mandatory requirement by the government law. F: Site description: (Include size, location and age of site. Also include structure and number of buildings) 1. Audit Scope Description: Tanhasin Socks Co. Ltd. is a legally registered as a private limited company which started its operations since 2016 in the location Madhabpur, Purbapara, 1 No. Ward, Gazipur City Corporation, Gazipur, Bangladesh GPS Location: 24°0'25.032'' N, 90°15'42.111'' E The company engaged in the manufacturing of All types of Socks, Tights & Wrist Band. The main production processes are listed as follows: Raw Material Store> Knitting> Linking>Finishing> Packing > Export. Total production capacity of the factory is Socks 3, 50,000 pcs, Tights 50,000 pcs per month. A total of 97 employees are currently working in the factory, which includes 34 female employees and 63 male employees. The factory comprises of total 20,036 square feet as per fire license. The factory building construction quality was found be good as there was no visible defects identified during the audit. In view of the facilities, the factory is established in one 2 storied re- enforced concrete building and three 1 storied buildings. The main production building (2 storied re-enforced concrete building) is approved by local authority LGED, but other buildings are not included in the approval yet. Factory Layout Plan approved from factory department for all its floors and operations.
  • 10. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 10 Production Building no Description Remark, if any Building 1: 4 storied Ground Floor Knitting Section, Linking Section, Finishing Section, Iron Section and Packing Section. Floor 1 Office Room, Free space. Roof top Vacant Building 2: 1 storied Accessories store, Finished goods store and bonded warehouse. Building 3: 1 storied Generator area, compressor area, electrical sub-station and transformer. Building 4: 1 storied Doctors Room and Dining Room Is this a shared building? No shared building observed, whole premises occupied by this company. 2. Audit process introduction: The audit was carried out by 2 auditors in one day who arrived on the factory at 09:30 am on 8 th December - 2016 and an opening meeting was held with Md. Faruque Hossain – General Manager; Abu Hena Mostafa Kamal – Merchandinsing Manager; Polash Kumer Biswas – Production Manager; Md. Jillur Rahman – Manager (Admin & Account); Md. Mahabur Alam – Knitting Operator (Member of Participation Committee). Confidentiality of all information was guaranteed. Documents and information required were requested. A tour of the production sites was conducted after the opening meeting which was accompanied by factory management. Interviews were conducted in a secluded place away from management office area. Conducted documentation check; legal compliance status review; personnel department & training documents check; Sedex general & social requirements, Sedex Self-Assessment Questionnaire verification; wage calculation; Purchase & Stores checking; and checked the environment side. At the end of the day, a closing meeting was held to discuss various concerns with. Md. Faruque Hossain – General Manager; Abu Hena Mostafa Kamal – Merchandinsing Manager; Polash Kumer Biswas – Production Manager; Md. Jillur Rahman – Manager (Admin & Account); Md. Mahabur Alam – Knitting Operator ( Member of Participation Committee).
  • 11. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 11 Negative and positive Points: The top management was cooperative during the entire audit and expressed commitment to work on audit findings. G: Site function: Agent Factory Processing/Manufacturer Finished Product Supplier Grower Homeworker Labour Provider Pack House Primary Producer Service Provider Sub–Contractor H: Month(s) of peak season: (if applicable) January to June I: Process overview: (Include products being produced, main operations, number of production lines, main equipment used) The company engaged in the manufacturing of All Socks, Tights & Wrist Band. Production Process: Raw Material Store > Knitting > Finishing > Packing > Export. Production Capacity: 3,60,000 pair per month. Number of Production Line: 5 Nos. List of Main Equipment Used: 1. Knitting Machine – 50 2. Linking Machine - 5 3. Steam Boarding Machine - 1 4. Sewing Machine - 5 5. Generator – 1 6. Compressor - 1 J: Attitude of workers: (Include their attitude to management, workplace and the interview process. Both positive and negative information should be included) Note: Do not document any information that could put workers at risk Workers are comfortable with the working condition. Workers were selected by the auditors at random from different work process covering different sex and age groups. The interview was conducted in a private place without the presence of any representative from the management. K: Attitude of workers committee/union reps: (Include their attitude to management, workplace and the interview process. Both positive and negative information should be included) Note: Do not document any information that could put workers at risk Participation Committee was formed. No negative attitude shown by the Participation Committee members. L: Attitude of managers: (Include attitude to audit, and audit process. Both positive and negative information should be included)
  • 12. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 12 The management was supportive to the audit process. They have cooperated in all aspects during the audit process. No negative attitude shown by the managers. Key Information Key Information (click on the key information title to go to appropriate section of the report) A: Do all workers (including migrant workers) have contracts of employment/employment agreements? (Go to clause 8 – Regular Employment) Yes No B: Are maximum standard/contracted working hours clearly defined in contract/employment agreements? (Go to clause 8 – Regular Employment) Yes No C: Were appropriate records available to verify hours of work and wages? (Go to clause 5 – Living Wage) Yes No D: Were any inconsistencies found? (if yes describe nature) (Go to Wages Table) Yes Poor record keeping No Isolated incident Repeated occurrence E: For the lowest paid production workers, are wages paid for standard/contracted hours (excluding overtime) below or above the legal minimum? (Go to clause 5 – Living Wage) Wages found: Please indicate the breakdown of workforce according to earnings: Below legal min Meet Above ____% of workforce earning under min wage ____55% of workforce earning min wage ____45% of workforce earning above min wage F: % of piece rate workers: (if applicable) No piece rated worker found. G: Do the standard/contracted hours stated in a contract/employment agreement exceed the law or 48 hours per week? (Go to clause 6 – Working hours) Yes No H: If yes, what are the standard/contracted hours per week as stated in the contract/employment agreement? (Go to clause 6 – Working hours) _____ hrs/week Approx. ____% of ALL workers on these contacted hours I: Combined hours (standard/contracted plus overtime = total hours) over 60 per week found? (Go to Working Hours Analysis) Yes No J: Are workers provided with 1 day off in Yes (1 day of in every 7 day period which is Friday)
  • 13. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 13 every 7-day-period, or 2 in 14-day-period (where the law allows)? No If ‘No’, please explain: K: Are the correct legal overtime premiums paid? (Go to Wages Table) Yes No N/A – there is no legal requirement to OT premium L: Please state what actual OT is paid. (As a percentage of the workers standard rate) (Go to Working Hours Analysis) Please give details of overtime premium as a % of standard wages: 0% 1% – 115% 116% – 124% 125% – 199% 200%+ Please give details: M: Is there any night production work at the site? Yes No N: % of workers living in site provided accommodation (if applicable): No accommodation provided by this factory. O: Age of youngest worker found: (Go to clause 4 – Child labour) Age of youngest workers found 18 years 10 months and 8 days on day the of her joining, the date of her joining was 16 th Aug 2016 and birth day was 12 nd Mar 1998. P: Workers under 18 subject to hazardous work assignments? (Go to clause 3 – Health and Safety) Yes No % of under 18’s at this site (of total workers) None Q: What form of worker representation/union is there on site? (Go to clause 2 – Freedom of Association) Union (name) Worker Committee (Participation Committee) Other (specify) None R: Is it a legal requirement to have a union? (Go to clause 2 – Freedom of Association) Yes No S: Is It a legal requirement to have a workers committee? (Go to clause 2 – Freedom of Association) Yes No T: Is there any other form of effective worker/management communication channel? (Other than union/worker committee) (Go to clause 2 – Freedom of Association) Yes No Describe: Participation Committee/complain Box. U: Are there any External Processes? (Go to clause 8A – Sub–contracting and Home working) Sub–Contracting Homeworking Other External Process No external processes
  • 14. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 14 Management Systems Management Systems: A: Nationality of Management Bangladeshi. B: Gender breakdown of Management + Supervisors (Include as one combined group) Male: __63__ % Female:__34___ % C: Majority nationality of workers Bangladeshi D: Number of workers leaving in last 12 months as a % of average total number of workers on site over the year (annual worker turnover) ___2_ % E: Were accurate records shown at the first request? Yes No F: If No, why not? NA G: In the last 12 months, has the site been subject to any fines/prosecutions for non– compliance to any regulations? Yes No Please describe: H: Do policies and/or procedures exist that reduce the risk of forced labour, child labour, discrimination, harassment & abuse? Yes No Please describe: Company has established all relevant policies & procedures. I: If Yes, is there evidence (an indication) of effective implementation? Please give details. Attached J: Have managers and workers received training in the standards for forced labour, child labour, discrimination, harassment & abuse? Yes No Please describe: Company has conducted training based on the yearly routine. K: If Yes, is there evidence (an indication) that training has been effective e.g. training records etc.? Please give details Training records were available and attached. L: Are there published, anonymous and/or open channels available for reporting any violations of Labour standards and H&S or any other grievances to a 3rd party? Yes No Please describe: Labour Court, Buyer’s, and Trade Union M: If Yes, are workers aware of these channels? Please give details. Buyer’s representative visit factory frequently, workers are known about the Trade Union office nearby factory.
  • 15. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 15 N: Have health and safety risks been identified e.g. through internal audits, formal risk analysis process, worker involvement etc.? Yes No Please describe: Risk assessment for different process within the facility has been conducted. O: If Yes, has effective action been taken to reduce or eliminate these risks? The risk assessment has been displayed in all relevant areas; workers are trained regularly on these work related risks. P: Are accidents recorded? Yes No Please describe: Minor injury record was found by the company. Q: Has the auditor made a simple calculation to compare capacity with workers’ work load in order to identify possible unrecorded work hours? Yes No Please describe: Auditors reviewed the production planning and calculated the required working hours for the workers which was found satisfactory. R: Does the site have all required land rights licenses and permissions (see SMETA Measurement Criteria)? Yes. All legal license & additional license found by the company. S; Does the site have any internationally recognised system certifications e.g. ISO 9000, 14000, OHSAS 18000, SA8000 (or other social audits). Please detail (Number and date). BSCI - 18 th September 2016 ISO 9001:2015 – 10 th September 2016 T: Is there a Human Resources manager/department? If Yes, please detail. Yes No Please describe: There is 03 employees in the HR team.
  • 16. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 16 Worker Analysis Worker Analysis Local Migrant Total Permanent Temporary Agency Permanent Temporary Agency Home workers Worker numbers – male 63 0 0 0 0 0 0 63 Worker numbers – female 34 0 0 0 0 0 0 34 Total 97 0 0 0 0 0 0 97 Number of Workers interviewed 10 0 0 0 0 0 0 10 Contractors: (Individuals supplying workers to site with the workers paid by contractors, not by site) A: Any contractors on site? Yes No B: If Yes, how many workers supplied by contractors Not Applicable C: Are all contractor workers paid according to law? Yes No, Not Applicable If Yes, Please give evidence for contractor workers being paid according to law: Not Applicable Migrant Workers: (Please see SMETA Best Practice Guidance and Measurement Criteria for definitions of migrant workers) D: Originating Locations/Countries: No migrant workers. E: Type of work undertaken by migrant workers : Not Applicable F: Were migrant workers recruited through an agency? If yes, please give details. Yes No Please describe: Not Applicable
  • 17. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 17 If Yes, is there a contract with the agency? Provide details of agencies and contractual arrangements including any fees lodged during the recruitment process. Not Applicable G: Does the site have a system for checking labour standards of agencies? If yes, please give details. Yes No Please describe: Not Applicable H: Percentage of migrant workers in company provided accommodation: No migrant worker in the factory.
  • 18. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 18 Audit Results by Clause 0: Management systems and Code Implementation 0: Managements system and Code Implementation (click here to return to NC Table) 0.1 Suppliers are expected to implement and maintain systems for delivering compliance to this Code. 0.2 Suppliers shall appoint a senior member of management who shall be responsible for compliance with the Code. 0.3 Suppliers are expected to communicate this Code to all employees. 0.4 Suppliers should communicate this code to their own suppliers and, where reasonably practicable, extend the principles of this Ethical Code through their supply chain. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Factory has defined its own code of conduct including all terms of ETI Code., code has been displayed in local language on company notice boards. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Company appointed a member of Senior Management Md. Faruque Hossain – General Manager who is responsible for compliance with the code. Company has not communicated the code with all employees within the company through training and also with suppliers by providing the copy of this code and collects their consent of reasonably practice of the code and extend of this ethical code through their supply chain. Non–compliance: 1. Description of non–compliance: It was noted through document review and management interview that following certificates expired on June 30, 2016: (i) Export Promotion Bureau (EPB). (ii) Trade License. NC against ETI NC against Local Law: Local law and/or ETI requirement: It is issued by Government office. Recommended corrective action: It is recommended that company should obtain EPB certificate and Trade License. Md. Faruque Hossain – General Manager is responsible to look after the code and legal compliance issues. 2. Description of non–compliance: It was noted through document review and management interview that Utility Building, Warehouse building and Dining & Doctor room area were not included in the fire license. NC against ETI NC against Local Law: Local law and/or ETI requirement: Section 4 of Bangladesh Gazette, published on 6th March 2003. Objective evidence observed: Document review and Management interview Objective evidence observed: Document review and Management interview
  • 19. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 19 Recommended corrective action: It is recommended that company should include all area in the fire license. Md. Faruque Hossain – General Manager is responsible to look after the code and legal compliance issues. Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective evidence observed: Nil
  • 20. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 20 1: Employment is Freely Chosen (Click here to return to NC–table) ETI 1.1 There is no forced, bonded or involuntary prison labour. 1.2 Workers are not required to lodge “deposits” or their identity papers with their employer and are free to leave their employer after reasonable notice. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has defined “Forced Labor Policy” stated that company has not appointed any forced, bonded and involuntary prison labor and it is strictly prohibited in the company. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Company appointed a member of Senior Management Md. Faruque Hossain – General Manager who is responsible for compliance with the code. A person seeking employment in the facility is required to send signed application form to HR Department. After the recruitment procedure has been completed and if the applicant has been selected for a job, he/she, at the time of appointment, is given an appointment letter where he/she has to provide a declaration that he/she is joining the factory at his/her own free will without any undue pressure from anybody. This declaration forms a part of the contract and every employee has to sign before acceptance of the job. The hiring staffs also inform each newcomer that he/she is under no compulsion to join the company and is also free to leave after complying with the company regulations as per the terms of the appointment letter. Verified during worker interviews. Workers are aware about forced labor policy. Security guards only posted at locations where needed for security purposes. Security forces are employed only for guarding the property and personnel of the company. During the facility visit, no exaggerated security measures or logistics were noticed. Security guard found aware about job responsibility. Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil
  • 21. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 21 Good Examples observed: Description of Good Example (GE): Nil Objective evidence observed: Nil
  • 22. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 22 : Freedom of Association and Right to Collective Bargaining are Respected 2: Freedom of Association and Right to Collective Bargaining are Respected (Click here to return to NC–table) (Click here to return to Key Information) ETI 2.1 Workers, without distinction, have the right to join or form trade unions of their own choosing and to bargain collectively. 2.2 The employer adopts an open attitude towards the activities of trade unions and their organisational activities. 2.3 Workers’ representatives are not discriminated against and have access to carry out their representative functions in the workplace. 2.4 Where the right to freedom of association and collective bargaining is restricted under law, the employer facilitates, and does not hinder, the development of parallel means for independent and free association and bargaining. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has established Freedom of Association and Right to Collective Bargaining policy. No trade union has been formed by the workers of the company. Company has established Participation Committee by selection instead of election. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Workers are free to join or form the trade union, no restriction has been imposed to the workers from the management. Nothing identified through policy verification and no negative evidence identified through interview. Moreover, factory has formed a Participation Committee amongst the workers. The worker’s representatives are not discriminated in any manner and have the access to carry out their representative functions in the workplace which was confirmed through interview. Compliant box has also been installed inside the toilet area by the factory management to get to know the workers grievances. Factory complaints boxes have been last opened on 27.08.2016 in presence of Md. Faruque Hossain – General Manager Non–compliance: 1. Description of non–compliance: The selection criteria of the participation committee were not correctly established as stipulated in the Bangladesh Labour law- 2006, Section 205 (6), amendment on July 22, 2013, Section 58. e.g. the Participation Committee was formed by selection instead of election. NC against ETI NC against Local Law Local law and/or ETI requirement: : Bangladesh Labour law- 2006, Section 205 (6), amendment on July 22, 2013, Section 58. & ETI 2.4. Recommended corrective action: It is recommended that company should form participation committee according to law. Md. Faruque Hossain – General Manager is responsible to look after the code and legal compliance issues. Objective evidence observed: Document review and Management interview
  • 23. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 23 Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil A: Name of union and union representative, if applicable: Not applicable. Is there evidence of free elections? Yes No N/A B: If no union what is parallel means of consultation with workers e.g. worker committees? PC (Participation Committee) Is there evidence of free elections? Yes No N/A C: Were worker representatives/union representatives interviewed Yes No If Yes, please state how many:1 D: State any evidence that union/workers committee is effective? Specify date of last meeting; topics covered; how minutes were communicated etc. All workers were found aware about the PC. Records were available. E: Are any workers covered by Collective Bargaining Agreement (CBA) Yes No F: If Yes what percentage by trade Union/worker representation __0__% workers covered by Union CBA __0__% workers covered by worker rep CBA G: If Yes, does the Collective Bargaining Agreement (CBA) include rates of pay Yes No, Not applicable Good Examples observed: Description of Good Example (GE): Nil Objective evidence observed: Nil
  • 24. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 24 3: Working Conditions are Safe and Hygienic (Click here to return to NC–table) (Click here to return to Key Information) ETI 3.1 A safe and hygienic working environment shall be provided, bearing in mind the prevailing knowledge of the industry and of any specific hazards. Adequate steps shall be taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimising, so far as is reasonably practicable, the causes of hazards inherent in the working environment. 3.2 Workers shall receive regular and recorded Health & Safety training, and such training shall be repeated for new or reassigned workers. 3.3 Access to clean toilet facilities and to potable water, and, if appropriate, sanitary facilities for food storage shall be provided. 3.4 Accommodation, where provided, shall be clean, safe, and meet the basic needs of the workers. 3.5 The company observing the code shall assign responsibility for Health & Safety to a senior management representative. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has established occupational health & safety policy as fulfilled the mandatory law. All relevant certificates, permits, licenses etc. applicable to the nature of activities being carried out in the facility are being maintained by the management. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): During the factory tour it was observed that the facility is following the applicable laws and regulations regarding health & safety and ensuring a safe and hazard free workplace. Emergency fire exists, fire extinguishers, fire hoses, other fire fighting appliances, first aid boxes, personal protective equipment etc. were found in proper places and adequate quantities. Management maintains an accident/injury register to record, the accidents/injuries are analysed and investigated to find out the root cause for taking corrective actions. Facility is providing all applicable PPE’s such as mask, gloves, ear plugs etc. Facility has a program and materials to train relevant individuals, including all individuals responsible for the supervision of workers, on all of the relevant occupational safety and health issues. All the machine guards are available. Machines are maintained in good condition and relevant maintenance records were sighted. All the electrical installations like switchgear, transformer, and electrical distribution board are also well maintained with their checklist. The factory is well maintained, the layout and other facilities are well designed and help in ensuring safe work place. Company has defined a detailed policy for health and safety. There is a committee named Health and Safety committee is continuously monitoring the operation level. Safety program is documented and is reviewed by Health & Safety Committee. Detailed fire plan is also documented explaining the roles of various teams. Total number of first aid staff is 6 for 3 first aid boxes. List of first aid staff available. Photograph of all first aid staff displayed with all first aid boxes. Last training conducted by Dr. Ashrafuzzaman Sarkar on 13th November -2016 and total number of participant was 8. Topic of the training was first aid kits and first aid treatment. All first aid employees found trained internally and documented training record available, workers found aware about first aid employees. Photograph of two first aid employees are also displayed with each first aid box.
  • 25. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 25 Company has provided training on health, safety and hygiene and found records of the trainings during the documents review. They also provided induction training for the new workers and repeated training for the reassigned workers. Factory has no dormitory facility for its staff and workers. Factory has no provided fire safety training . All fire extinguishers were found clearly identified and access was not blocked. All fire extinguishers marked & inspected regularly. Total number of fire extinguishers in the facility is 9 (CO2 = 2, ABC = 7), number of Hose Pipe is 03. Factory conducts fire drill. Last fire drill date was on 10th August 2016. All the emergency exits were identified by battery backup illuminated emergency exit signs and exits routes were found free and unobstructed. All the exits routes, staircases are also adequately illuminated by external power source emergency lights. Company has gone through a test of drinking water based on WHO standard and Bangladesh standard of Drinking water from ICDDRB, a non-government organization on 21 st September 2016. Toilets were well maintained, company has full time cleaners who are responsible to clean on regular basis. A monitoring checklist is also maintained to ensure that toilets are always in serviceable condition. Total number of toilets is 10 (female: 4, Male: 6). As per legal requirement number of toilets does comply for workers. Electrician has the competency certificate. Non–compliance: 1. Description of non–compliance: It was noted through document review and management interview that the factory was yet to conduct fire safety training for the recommended percentage among workers, e.g., 18% workers to be covered as per law but no employee has been covered so far, thus not Complying with section 55(14) of the Bangladesh Labour Law 2015. NC against ETI NC against Local Law Local law and/or ETI requirement : It is issued by Government office.Required by Bangladesh Labour Law 2015 section 55(14) & ETI 3.2 Recommended corrective action: Company should arrange fire safety training for it’s employees. Md. Faruque Hossain – General Manager is responsible to look after the code and legal compliance issues. 2. Description of non–compliance: Through document review it was observed that factory has no Generator certificate, which violates the Bangladesh Energy Regulatory Commission Act, 2003; section 27 & 28. Noted that company has applied to the concerned authority for getting the certificate. NC against ETI NC against Local Law Local law and/or ETI requirement: It is issued by Government. Required by Bangladesh Energy Regulatory Commission Act, 2003; section 27 & 28 & ETI 3.1. Recommended corrective action: It is recommended to obtain Generator certificate from concerned authority. Md. Faruque Hossain – General Manager is responsible to look after the code and legal compliance issues. Objective evidence observed: Document review and Management interview Document review and Management interview
  • 26. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 26 Observation: Description of observation: Nil Local law or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 27. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 27 4: Child Labour Shall Not Be Used (Click here to return to NC–table) (Click here to return to Key Information) ETI 4.1 There shall be no new recruitment of child labour. 4.2 Companies shall develop or participate in and contribute to policies and programmes which provide for the transition of any child found to be performing child labour to enable her or him to attend and remain in quality education until no longer a child. 4.3 Children and young persons under 18 shall not be employed at night or in hazardous conditions. 4.4 These policies and procedures shall conform to the provisions of the relevant ILO Standards. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has well defined policy for child labour conforming local and ILO standards what describes that they are not employing any child labour. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): During audit no child labour found or suspected. They are going through an age verification test by the registered doctor before employing any worker and the proof of age (copy of National ID Card, birth Certificate, Chairman or Commissioner Certificate, and Blood Group Report) are kept in the personal file. Employees’ personal files with National Identity card/ Birth certificate copies were available for review,10 sample records were selected to check details. During the plant visit, it was observed that the entire employees appeared to be above the age of 18 years. In addition, any young looking employee noticed on the floor was included in the list of interviews and a subsequent verification and review was conducted. As per the local law anyone under 18 years of age is a child and they are not employing any child at any circumstances. No child labour found during the audit. Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 28. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 28 5: Living Wages are Paid (Click here to return to NC–table) (Click here to return to Key information) ETI 5.1 Wages and benefits paid for a standard working week meet, at a minimum, national legal standards or industry benchmark standards, whichever is higher. In any event wages should always be enough to meet basic needs and to provide some discretionary income. 5.2 All workers shall be provided with written and understandable information about their employment conditions in respect to wages before they enter employment and about the particulars of their wages for the pay period concerned each time that they are paid. 5.3 Deductions from wages as a disciplinary measure shall not be permitted nor shall any deductions from wages not provided for by national law be permitted without the expressed permission of the worker concerned. All disciplinary measures should be recorded. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company established a minimum wages policy & procedure. They have provided appointment letter with all the particulars of wages in local language. Company is maintaining wage sheet for each pay period. Company is providing pay slip along with the payment for each month. Company is providing living wages for all workers according to their respective grade. Workers are also provided with all the social benefits like sick leave, maternity leave with pay, social insurance etc. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): The management provides induction as well as periodic training to all workers on factory compensation policy and trains them to calculate their wages correctly. All the relevant details in native language have been included in the employees’ handbook for worker reference. The factory management has also posted them prominently on the notice boards. Company has defined disciplinary action policy and deduction policy. Both are in line with the national law. The wage calculated monthly basis, company pays the salary within 7 th working days of the following month. Payslip given to workers for each management. Overtime payment also given within 7 th working days together with the monthly salary. Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Objective evidence observed: Nil
  • 29. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 29 Comments: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil Wages analysis: Wages analysis: (Click here to return to Key Information) A: Sample Size Checked (State number of worker records checked and from which weeks/months – should be current, peak and random/low. Please see SMETA Best Practice Guidance and Measurement Criteria) 10 workers payroll records were reviewed for the month of January 2016, June 2016 & October 2016. B: Are there different legal minimum wage grades? If Yes, please specify all. Yes No If Yes, please give details: Grade 1 – BDT 1,3000 (Basic 8500+House Rent 40% of basic BDT 3,400+Medical Allowance BDT 250+ Transportation 200 +Food allowance BDT 650) Grade 2 – BDT 10,900 (Basic 7000+House Rent 40% of basic BDT 2,800+Medical Allowance BDT 250+Transportation 200 + Food allowance BDT 650) Grade 3 – BDT 6,805 (Basic 4075+House Rent 40% of basic BDT 1,630+Medical Allowance BDT 250+Transportation 200 + Food allowance BDT 650) Grade 4 – BDT 6,420 (Basic 3800+House Rent 40% of basic BDT 1,520+Medical Allowance BDT 250+Transportation 200 + Food allowance BDT 650) Grade 5 – BDT 6,042 (Basic 3530+House Rent 40% of basic BDT 1,412+Medical Allowance BDT 250+Transportation 200 + Food allowance BDT 650) Grade 6 – BDT 5,678 (Basic 3270+House Rent 40% of basic BDT 1,308+Medical Allowance BDT 250+Transportation 200 + Food allowance BDT 650) Grade 7 – BDT 5,300 (Basic 3000+House Rent 40% of basic BDT 1,200+Medical Allowance BDT 250+Transportation 200 + Food allowance BDT 650 The effective date of the minimum wages is 1st Dec 2013. C: If there are different legal minimum grades, are all workers graded correctly? Yes No N/A If No, please give details: D: What deductions are required by law e.g. social insurance? Please state all types: Revenue stamp / Unauthorized absent. E: Have all of these deductions been made? Please list all deductions that have/have not Yes No If Yes, Please list all deductions that have been made: Unauthorized absent & revenue stamp for government rules.
  • 30. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 30 been made. If No, please give details on any deductions which have not been made: Company does not deduct for revenue stamp, it is paid by company itself. F: Industry norm for this region: (please include time period e.g. hour/week/month) Same as specified by local labor law. Wages table Wages table (Click here to return to Key information) Worker Type Process Operator (Lowest paid) Process Operator (Average paid) Process Operator (Highest paid) Select from individual worker records one worker from, lowest, average and highest wages and populate the boxes. Ensure comparison is made for same pay period and only uses full–time workers. See SMETA Best Practice Guidance and Measurement Criteria for completing this: A: Pay period: (State month selected) September 2016 September 2016 September 2016 B: Anonymous Employee Reference/Dept. Md.Yasin Mia, Asst.Operator,Knitting department.ID TSCL- 1157 Pabitro Kumar Roy, Sr.Operator, Knitting department.ID TSCL- 1111 Md.Yamen Mia, Operator, Knitting department.ID TSCL- 1113 C: Employee Gender Male Male Male D: Contracted/Standard working hours: (excluding OT – please include time period e.g. hour/week/month) 208 hours / month 208 hours / month 208 hours / month E: Contracted /Standard work pay rate: (excluding OT – please include time period e.g. hour/week/month) BDT 5,500 / month BDT 9,000 / month BDT 10,900 / month F: Standard day overtime – hours: (please include time period e.g. hour/week/month) 00 00 00 G: Standard day overtime – wage: (please include time period e.g. hour/week/month) 00 00 00 H: Rest day overtime – hours: (please include time period e.g. hour/week/month) 00 00 00
  • 31. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 31 I: Rest day overtime – wage: (please include time period e.g. hour/week/month) 00 00 00 J: Statutory Holiday overtime – hours: (please include time period e.g. hour/week/month) 00 00 00 K: Statutory holiday OT – wages: (please include time period e.g. hour/week/month) 00 00 00 L: Total overtime hours: (please include time period e.g. hour/week/month) 00 00 00 M: Incentives/Bonus/ Allowances etc.: (please include time period e.g. hour/week/month) House Rent = 1257 Medical Allowances = 250 Food Allowance = 650 Conveyance = 200 House Rent = 2257 Medical Allowances = 250 Food Allowance = 650 Conveyance = 200 House Rent = 2800 Medical Allowances = 250 Food Allowance = 650 Conveyance = 200 N: Gross wages: (please include time period e.g. hour/week/month) BDT 5,500/Month BDT 9,000/Month BDT 10,900/Month O: Social insurance and other deductions; please list which and amount. 00 00 00 P: Actual wage paid after deduction: (please include time period e.g. hour/week/month) BDT 5,500/Month BDT 9,000/Month BDT 10,900/Month Comments: (Please state here any specific reasons/circumstances that explain the lowest and highest gross wages) Q: Is there a defined living wage: This is not normally minimum legal wage. If answered Yes please state amount and source of info: Please see SMETA Best Practice Guidance and Measurement Criteria. Yes No Please specify amount/time period: R: Are workers paid in a timely manner in line with local law? Yes No S: Is there evidence that equal rates are being paid for equal work: Yes No
  • 32. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 32 Details: wages records shown equal rates are being paid for equal work. T: How are workers paid: Cash Cheque Bank Transfer Other If other explain:
  • 33. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 33 6: Working Hours are not Excessive (Click here to return to NC–table) (Click here to return to Key Information) ETI 6.1 Working hours must comply with national laws, collective agreements, and the provisions of 6.2 to 6.6 below, whichever affords the greater protection for workers. Sub–clauses 6.2 to 6.6 are based on international labour standards. 6.2 Working hours, excluding overtime, shall be defined by contract, and shall not exceed 48 hours per week. 6.3 All overtime shall be voluntary. Overtime shall be used responsibly, taking into account all the following: the extent, frequency and hours worked by individual workers and the workforce as a whole. It shall not be used to replace regular employment. Overtime shall always be compensated at a premium rate, which is recommended to be not less than 125% of the regular rate of pay. 6.4 The total hours worked in any 7 day period shall not exceed 60 hours, except where covered by clause 6.5 below. 6.5 Working hours may exceed 60 hours in any 7 day period only in exceptional circumstances where all of the following are met: – this is allowed by national law; – this is allowed by a collective agreement freely negotiated with a workers’ organisation representing a significant portion of the workforce; – appropriate safeguards are taken to protect the workers’ health and safety; and – The employer can demonstrate that exceptional circumstances apply such as unexpected production peaks, accidents or emergencies. 6.6 Workers shall be provided with at least one day off in every 7 day period or, where allowed by national law, 2 days off in every 14 day period. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has defined policy on working hours and communicated for the all workers. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Company policy conforms to both local laws and industry standards in terms of working hours. The policy has clearly defined that the overtime work is completely voluntary and any worker can leave the premises after regular working hours without prior permission. Local law allows 48 hours regular work in a week and maximum 12 hours over time weekly. Factory works 8 hours as normal working hour. One day off is given in 7 days period that is Friday. At the time of hiring, all new recruits are informed about the legal requirements and the limitations on the working hours, both regular and overtime, by providing induction training on the policies and procedures of the facility.
  • 34. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 34 Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil orking hours analysis Working hours analysis Please include time period e.g. hour/week/month (Go back to Key information) Systems & Processes A. What timekeeping systems are used: time card etc. Describe: Attendance and work timings (including OT) are recorded through manual time card system. B: Sample Size Checked (State number of worker records checked and from which weeks/months and type – should be current, peak and random/low: See SMETA Best Practice Guidance and Measurement Criteria) 10 workers time keeping records were reviewed for the month of January 2016, June 2016 & October 2016. C: Do ALL workers have contracts/employment agreements? Yes No If NO, state which type of workers do NOT have contracts/employment agreements:
  • 35. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 35 D: Are standard/contracted working hours defined in all contracts/employment agreements? Yes No If NO, please state which type of workers NOT standard hours have defined in contracts/employment agreements. E: Are there any other types of contracts/employment agreements used? Yes No If YES, Please complete as appropriate: 0 hrs Part time Variable hrs Other If “Other”, Please define: Standard/Contracted Hours worked F: Do standard/contracted standard hours ever exceed the law or 48 hours per week? Yes No If YES give details and comparison (local law/48 hrs week) G: What are the actual standard/contracted hours worked in sample (State per week/month) Highest hours: 48 Hours/week Lowest hours: 48 Hours/week H: Any local waivers/local law or permissions which allow averaging/annualised hours for this site? Yes No If YES, Please give details Overtime Hours I: Actual overtime hours worked in sample (State per day/week/month) Highest OT hours: Nil Lowest OT hours: Nil J: Range of overtime hours over all workers/or as large a sample as possible. (State per week/month and details) Nil K: Approximate percentage of workers on highest overtime hours ___% (Approx.) (10 workers time keeping & payroll records were reviewed for the month of October 2016) L: Is overtime voluntary? Yes No Conflicting Please detail evidence e.g. Wording of contract/employment agreement/handbook/worker interviews/refusal arrangements:
  • 36. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 36 Information Worker interview Overtime Premiums M: Is overtime paid at a premium? Yes No Please give details of normal day overtime premium as a % of standard wages: 0% 1 – 115% 116 – 124% 125 – 149% 150 – 199% 200%+ Any other comments: Company has a policy to pay overtime al double of the basic wage as per local law requirement; however there is no overtime hour worked by the employee. N: ETI Code requires a prevailing standard to give greatest worker protection. If a site pays less than 125% OT premium and this is allowed under local law, are there other considerations? Please complete the boxes where relevant. Multi select is possible. No Consolidated pay (May be standard wages above minimum legal wage, with no/low overtime premium) Collective Bargaining agreements Other Please explain any checked boxes in N above e.g. detail of consolidated pay CBA or Other. Company has a policy to pay overtime al double of the basic wage as per local law requirement; however there is no overtime hour worked by the employee. Rest Days O: Are workers provided with 1 day off in every 7–day–period, or 2 in 14– day–period (where the law allows)? Yes No Maximum number of days worked without a day off (in sample): Friday is weekly holiday Total Hours P: Range of total hours: (Quote highest and lowest please include time period e.g. hour/week/month) Highest total hours No working hours found in rest days Lowest total hours No working hours found in rest days R: If more than 60 total hours per week and this is legally allowed, are there other considerations? Please complete the boxes where relevant. Multi select is possible. Overtime is voluntary Onsite Collective bargaining allows 60+ hours/week Safeguards are in place to protect worker’s health and safety Site can demonstrate exceptional circumstances Other reasons Please explain any checked boxes in R above
  • 37. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 37 Worker interview confirmed that overtime is voluntary. Comments: (please state here any specific reasons/circumstances that explain the highest working hours) Highest working hours were identified within legal limit.
  • 38. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 38 7: No Discrimination is practiced 7: No Discrimination is Practiced (Click here to return to NC–table) ETI 7.1 There is no discrimination in hiring, compensation, access to training, promotion, termination or retirement based on race, caste, national origin, religion, age, disability, gender, marital status, sexual orientation, union membership or political affiliation. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: They have defined a policy of non-discrimination in hiring, compensation, promotion, termination, access to training, increment based on race, caste, national origin, religion, age, gender, gender, marital status, sexual orientation or membership in any union or political affiliation. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): This policy is well communicated through the notice board. Regular training programs are arranged to train relevant individuals such as management staff, supervisory personnel and Admin & Compliance staff on the anti-discrimination policy and practices of the facility. The training materials prepared by responsible persons were reviewed and found appropriate. Companies have system in place to complaint against any discriminatory behaviour in confidential manner and have the system to handle the grievances if occurred. During the worker interview no such comments raised related to discrimination Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 39. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 39 8: Regular Employment Is Provided (Click here to return to NC–table) (Click here to return to Key Information) ETI 8.1 To every extent possible work performed must be on the basis of recognised employment relationship established through national law and practice. 8.2 Obligations to employees under labour or social security laws and regulations arising from the regular employment relationship shall not be avoided through the use of labour–only contracting, sub–contracting, or home–working arrangements, or through apprenticeship schemes where there is no real intent to impart skills or provide regular employment, nor shall any such obligations be avoided through the excessive use of fixed–term contracts of employment. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has established policy & procedure for regular employment. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Company is employing workers as permanent basis; they appoint workers on monthly salary based. Company provides appointment letter to the workers and service book maintained as the job contract and keeping the duplicate copy of that appointment letter in the personal file. Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 40. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 40 8A: Sub–Contracting and Home working (Click here to return to NC–table) (Click here to return to Key Information) 8A.1. There should be no sub–contracting unless previously agreed with the main client. 8A.2. Systems and processes should be in place to manage sub–contracting, homeworking and external processing. Note to auditor on homeworking: Report on whether it is direct or via agents. How many workers, relationship with site and what control systems are in place. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company does not have any subcontractor, though they have documented sub-contracting policy. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Currently company is not using any sub-contractors & no home working is in practice. If any processes are sub–contracted – please populate below boxes Process Subcontracted Process 1 Process 2 Name of factory Address Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 41. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 41 Summary of sub–contracting – if applicable Summary of sub–contracting – if applicable A: If sub–contractors are used, is there evidence this has been agreed with the main client? Yes No If Yes, summarise details: B: Number of sub– contractors/agents used C: Is there a site policy on sub– contracting? Yes No If Yes, summarise details: D: What checks are in place to ensure no child labour is being used and work is safe? E: What processes are sub– contracted? Summary of homeworking – if applicable F: If homeworking is being used, is there evidence this has been agreed with the main client? Yes No If Yes, summarise details: G: Number of homeworkers Male: Female: Total: H: Are homeworkers employed direct or through agents? Directly Through Agents I: If through agents, number of agents J: Is there a site policy on homeworking? Yes No K: How does site ensure worker hours and pay meet local laws for homeworkers? L: What processes are carried out by homeworkers? M: Are written agreements in place for homeworkers that include regular employment? Yes No N: Are full records available at the site? Yes No
  • 42. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 42 9: No Harsh or Inhumane Treatment is allowed 9: No Harsh or Inhumane Treatment is Allowed (Click here to return to NC–table) ETI 9.1 Physical abuse or discipline, the threat of physical abuse, sexual or other harassment and verbal abuse or other forms of intimidation shall be prohibited. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is /are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has policy against harassment and abuse what clearly described that none is allowed to physical abuse, sexual or any other harassment or verbal abuse to any other employees. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Company has a system in place to confidentially complain against any harassment or abuse without any threats of retaliatory action. Company is providing awareness on regular basis on the company policy of harassment and abuse. Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil 10 Ament to Work and Immigration
  • 43. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 43 10. Other Issue areas: 10 A: Entitlement to Work and Immigration (Click here to return to NC–table) Additional Elements 10A1 Only workers with a legal right to work shall be employed or used by the supplier. 10A2 All workers, including employment agency staff, must be validated by the supplier for their legal right to work by reviewing original documentation. 10A3 Employment agencies must only supply workers registered with them. 10A4 The supplier shall implement processes to enable adequate control over agencies with regards the above points and related legislation. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is/are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: No immigrant worker was found recruited by factory. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 44. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 44 10. Other issue areas 10 B 2: Environment 2–pillar (Click here to return to NC–table) To be completed for a 2–Pillar SMETA Audit, and remove the following page which is 10B4 environment 4 pillar 10B2. 1 Suppliers must comply with the requirements of local and international laws and regulations including having necessary permits. 10B2. 2 The supplier should be aware of and comply with their end clients’ environmental requirements. Note for auditors and readers, This is not a full environmental assessment but a check on basic systems and management approach. Current Systems and Evidence Examined To complete ‘current systems’ Auditors examine policies and written procedures in conjunction with relevant managers, to understand, and record what controls and processes are currently in place e.g. record what policies are in place, what relevant procedures are carried out, who is /are responsible for the management of this item of the code. Evidence checked should detail any documentary or verbal evidence shown to support the systems. Current systems: Company has established the environmental policy, since factory is doing cut to pack, no environmental license is required as per local regulation. Evidence examined – to support system description (Documents examined & relevant comments. Include renewal/expiry date where appropriate): As per local law, the company does not require environmental permits as the factory has no processes which generate hazardous waste to the environment. Factory does not use or emit any harmful substances which can cause severe damage to the nature. Environmental is available in the factory. Non–compliance: 1. Description of non–compliance: Nil NC against ETI NC against Local Law: Nil Local law and/or ETI requirement: Nil Recommended corrective action: Nil Objective evidence observed: Nil Observation: Description of observation: Nil Local law or ETI requirement: Nil Comments: Nil Objective evidence observed: Nil Good Examples observed: Description of Good Example (GE): Nil Objective Evidence Observed: Nil
  • 45. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 45 Worker Interview Summary Worker Interview Summary Worker Interview Summary A: Were workers aware of the audit? Yes No B: Were workers aware of the code? Yes No C: Number of group interviews: (Please specify number and size of groups. Please see SMETA Best Practice Guidance and Measurement Criteria) 1 group of 4 each D: Number of individual interviews (Please see SMETA Best Practice Guidance and Measurement Criteria) Male: 2 Female: 4 E: Total number of interviewed workers (Please see SMETA Best Practice Guidance and Measurement Criteria) Male: 6 Female: 4 F: Interviews were done in private and the confidentiality of the interview process was communicated to the workers? Yes No G: In general, what was the attitude of the workers towards their workplace? Favourable Non–favourable Indifferent H: What was the most common worker complaint? No complaint raised by the worker in the interview process. I: What did the workers like the most about working at this site? In time salary; good behavior of supervisors; flexible leave policy; good and clean working environment J: Any additional comment(s) regarding interviews: During the interview it was noted that the workers in the factory are happy to the management. They have a good communication between workers and management through workers participation committee. K: Attitude of workers to hours worked: Workers are comfortable with the working condition. Workers have been selected by the auditors at random from different work process covering different sex and age groups. The interview was conducted in a private place without the presence of any representative from the management. Agency Worker
  • 46. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 46 Agency Workers (if applicable) (workers sourced from a local agent who are not directly paid by the site) A: Number of agencies used (average): Not applicable. And names if available: B: Were agency workers’ age/pay/hours included within scope of this audit Yes No C: Were sufficient documents for agency workers available for review? Yes No Other findings Other Findings Outside the Scope of the Code No other finding was observed. Community Benefits (Please list below any specific community benefits that the site management stated that they were involved in, for example, HIV programme, education, sports facilities)
  • 47. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 47 Photo Form 1. GPS Map 2. GPS Location 3. Front View of Factory 4. Factory Name 5. Security Post 6. Emergency Evacuation Plan 7. Emergency Contact Number 8. Stair 9. Emergency Exit sign 10. Warehouse 11. Knitting Section 12. Finishing Section
  • 48. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 48 13. Iron Section 14. Packing Section 15. Fire Alarm Switch 16. Fire Alarm 17. Fire Plat Form 18. Fire Extinguisher 19. Fire Extinguisher Refilled Date 20. Fire Hose rill 21. Smoke Detector 22. P A System 23. Emergency Light 24. Medical Staff
  • 49. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 49 25. Medical Bed 26. First Aid Box at Production Floor 27. Medicine Expire Date 28. Drinking Water 29. Dining Room 30. Front of Toilet 31. Inside of Toilet 32. Policy Board 33. Notice Board 34. Electric Sub-Station 35. Generator Room 36. Risk Assessment
  • 50. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 50 37. Grievance Box 38. Factory Licences 39. Fire License 40. Fire Insurance 41. Membership Certificate 42. ERC 43. IRC 44. TIN 45. Vat 46. Drinking Water Test Report 47. Leave Register 48. Accident Register
  • 51. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 51 49. Grievance Register 50. Worker’s Appointment Letter 51. Worker’s Age Verification Record 52. Forced Labour Policy 53. Child Labour Policy 54. Anti-Harassment Policy 55. Discrimination Policy 56. Leave Policy 57. Recruitment Policy 58. Disciplinary Policy 59. Freedom of Accession Policy 60. Termination Policy
  • 52. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 52 61. Fire Safety Training 62. Fire Safety Training 63. PPE Training 64. PPE Training 65. Health & Safety Training 66. Health & Safety Training 67. Fire Drill 68. Fire Drill 69. Fire Drill 70. Salary Record 71. Salary Record 72. Salary Record
  • 53. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 53 73. Pay Slip 74. Pay Slip 75. Pay Slip 76. Time Keeping Record 77. Time Keeping Record 78. Time Keeping Record 79. Attendance of Opening Meeting 80. Signed Code Of Conduct 81. Signed Acknowledgement None None 82. Signed CAP
  • 54. Audit company: Asiainspection Report reference: R-us7-16421807 Date: 08/Dec/2016 54 Your feedback on your experience of the SMETA audit you have observed is extremely valuable. It will help to make improvements to future versions. You can leave feedback by following the appropriate link to our questionnaire: Click here for A & AB members: http://www.surveymonkey.com/s.aspx?sm=riPsbE0PQ52ehCo3lnq5Iw_3d_3d Click here for B members: http://www.surveymonkey.com/s.aspx?sm=d3vYsCe48fre69DRgIY_2brg_3d_3d