SlideShare une entreprise Scribd logo
1  sur  30
Scope Definition
of
Ticketing Automation Bangladesh
TEAM – WILD SPIDER
Basic Concept of Scope Definition
• Objective & Motivation
• Existing System Design
• Requirement Analysis
• Feasibility Study
• Opportunity
• Future Scope
Our Objectives and Motivation
• A central portal to enjoy
the advantage of booking
tickets of any bus from
anywhere in Bangladesh.
• Anyone can book any bus
company ticket from our system
in the easiest way.
Lets have a look of todays ticketing
system!
Search option of source and
destination place
Dynamic jquery search helper
Calendar for select date easily
Red Box: Facility to know more about that bus company/coach details
Yellow Box: Facility to know bus condition ALONG WITH PHOTOS.
Green Box: Facility to know Departure time, boarding points (departure bus counters)
Blue Box: Facility to know How many seats are available in that bus/coach
Purple: Facility to know public rating of their services
Grey: Facility to know the fare and also the button to view seat condition.
The next part is to select the preferred seats. And from our system user will get
the perfect illustration.
After selecting the seats user will be in the confirmation page and need to
confirm their booking
Our payment system will include almost all possible payments in BD
including bkash.
Existing System Design
• As for as concerned to project its defined as the
system which presently we are using and the
proposed system is the new techniques
implemented to the existing project if any
mistake was happened.
Other Existing Systems
• paribahan.com
Complexity and error in the existing system
Existing System
Sign Up
Members
Search from place to
destination
No suggestion/
Pop up
See Available
coaches/Buses
No choices for
seat or view
Buy ticket
YES NO
Very easy
signup/Verification
and sign in
Almost all the
available payment
gateway
Mission and its implementation is not
same!
Requirement Analysis
• Fact Finding
• Development environment
• Operational environment
• Software and hardware
requirement
• Functional requirement
It will list out the minimum requirements required for the project to
have. Fact finding will discuss about the information gathered to
develop the system.
Fact Finding
• Research
• Background Research
• Interview
• Observation
Operational Environment
Development Environment
Software Requirement for
Development
• MYSQL server
• Microsoft Office Word
• PHP Hypertext Protocol
• Web Browser (All)
• HTML
• CSS
• JQUERY
• AJAX
• Notepad ++
• Paint
• CPANEL
• Printer driver
• Laptop Driver
• DBMS
• Internet Connection
• Localhost
• XAMPP/WAMPP
Hardware Requirement for
Development
• Printer
• Laptop
• Web Server
• Office room
• Network Switch
• Network Router
• Ethernet Cable
• UPS – Backup Facility
Functional Requirements
Feasibility Study
• Technical Feasibility
• Social and Operational
Feasibility
• Economic Feasibility
• Time Feasibility
Technical Feasibility
• Technical staff is needed for responsibility to this new system is to
take care of the server and the database for this new bus ticketing
system.
• If the system have any problem occur then technical staff will solve
the problem immediately so that will affect the business operation of
the company
• Since this is a new online system so we need to add computer, some
necessary of the hardware and software for running this new system
is needed.
Social and Operational Feasibility
• This new system is operationally feasible because it can be used
effectively in and in English after it has been developed.
• We will arrange technical training for staff and seminar for others.
It will provide more convenient for the customer in order to have
faith with the company.
• This system is designed in a simple way and meaningful for every
user to used it.
• Customer’s opinion is important because to develop a new system
that based on the user requirement to improve the performance and
increase the service for customer.
Economic Feasibility
Costing Analysis
Costing
Types
Quantity Unit Price Year 1 Year 2 Year 3
Hardware
Printer 4 15,000 60,000
Printer Cartridge 4 2,000 96,000 96,000 96,000
Computer 4 50,000 2,00,000
Ethernet Cable 1 4,000 4,000 4,000 4,000
Dongle 1 50,000 50,000
Internet 4 1,000 48,000 48,000 48,000
Software
Licensed OS 4 12,000 48,000
Anti Virus 4 2,000 8,000 8,000 8,000
Payment Gateway 1 30,000 30,000 30,000 30,000
Domain 5 5,000 5,000 5,000 5,000
Hosting Sarver 3 30,000 30,000 30,000 30,000
Human
Reasource
Delivery man/
System maintenance
Manager
20,000 100,000 (5) 200,000 (10) 4,00,000 (20)
Equipments
UPS 40,000 40,000
Furniture 1,50,000 1,50,00o
Total Cost 8,69,000 4,21,000 6,21,000
Benefits
Year 1:
Estimated bus company with us: 5
Estimated ticket sell per coach by our system: 15
So total ticket sales per day: 5*15 = 75
Total sales by our system (per day): 75*400=30000
Our Income: 30000 * 5% = 1500
Monthly Income: 1500*30 = 45000, yearly: 5,40,000
Expense for year 1: 8,69,000
Revenew for year 1: -3,29,000
Benefits
Year 2:
Estimated bus company with us: 10
Estimated ticket sell per coach by our system: 20
So total ticket sales per day: 10*20 = 200
Total sales by our system (per day): 200*400=80,000
Our Income: 80,000 * 5% = 4000
Monthly Income: 4000*30 = 1,20,000, yearly: 14,40,000
Expense for year 2: 4,21,000
Revenew for year 2: 10,19,000
Benefits
Year 3:
Estimated bus company with us: 15
Estimated ticket sell per coach by our system: 20
So total ticket sales per day: 15*20 = 300
Total sales by our system (per day): 300*400=120,000
Our Income: 120,000 * 5% = 6000
Monthly Income: 6000*30 = 1,80,000, yearly: 21,60,000
Expense for year 2: 6,21,000
Revenew for year 3: 15,39,000
Time Feasibility
Project Proposal – 3days
Project Specification – 7 days
Project Process, meeting & deliveries- 10 days
Analysis – 15 days
Design – 10 days
Coding- 90 days
Project Testing – 45 days
Final Documentation – 10 days
Total Time Required : 190 Days
Opportunity
• For Bangladesh online ticketing system can be able to
open a new door. Now Bangladesh is a developing
country by applying many technology.
• The traditional ticketing system of Bangladesh is a very
uncomfortable and weak process.
• sometimes it is caused of many problems which can be
reduced by online ticketing.
• In most of the festivals people have to face lots of
troubles. by providing this system corruption can be
taken under control.
• It can be said that it will very effective for Bangladesh.
Future Scope
• As mentioned above, although our system had been
completed but it is not perfect, we had planned to make
some enhancement in the future.
• We think that our system still has potential to grow.
Besides, we will include more functions and
introduce more widgets to the system. Like
▫ Mobile aps
▫ Mobile version
▫ Home Delivery
▫ Call Center Support
We also plan to enhance the interface so
that it looks more attractive and interactive.
Thank You!

Contenu connexe

Similaire à Scope definition of ticketing automation bangladesh

Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02
ISHA AHUJA
 
Customer relationship management
Customer relationship managementCustomer relationship management
Customer relationship management
Rohit Gupta
 
System Analysis And Design_FinalPPT_NirmishaK
System Analysis And Design_FinalPPT_NirmishaKSystem Analysis And Design_FinalPPT_NirmishaK
System Analysis And Design_FinalPPT_NirmishaK
Shehla Ghori
 
Flink Forward San Francisco 2018: David Reniz & Dahyr Vergara - "Real-time m...
Flink Forward San Francisco 2018:  David Reniz & Dahyr Vergara - "Real-time m...Flink Forward San Francisco 2018:  David Reniz & Dahyr Vergara - "Real-time m...
Flink Forward San Francisco 2018: David Reniz & Dahyr Vergara - "Real-time m...
Flink Forward
 

Similaire à Scope definition of ticketing automation bangladesh (20)

PBL2.0.pptx
PBL2.0.pptxPBL2.0.pptx
PBL2.0.pptx
 
PBL2.0.pptx
PBL2.0.pptxPBL2.0.pptx
PBL2.0.pptx
 
Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02
 
Waiting Lines & Simulation
Waiting Lines & SimulationWaiting Lines & Simulation
Waiting Lines & Simulation
 
Railway Reservation System - Requirement Engineering
Railway Reservation System - Requirement EngineeringRailway Reservation System - Requirement Engineering
Railway Reservation System - Requirement Engineering
 
wire&cable presentation.ppt
wire&cable presentation.pptwire&cable presentation.ppt
wire&cable presentation.ppt
 
wire&cable presentation.ppt
wire&cable presentation.pptwire&cable presentation.ppt
wire&cable presentation.ppt
 
PROJECT.ppt (6).pptx
PROJECT.ppt (6).pptxPROJECT.ppt (6).pptx
PROJECT.ppt (6).pptx
 
Presentation.pdf
Presentation.pdfPresentation.pdf
Presentation.pdf
 
Railway Reservation System - Requirement Engineering
Railway Reservation System - Requirement EngineeringRailway Reservation System - Requirement Engineering
Railway Reservation System - Requirement Engineering
 
Customer relationship management
Customer relationship managementCustomer relationship management
Customer relationship management
 
When Data Visualizations and Data Imports Just Don’t Work
When Data Visualizations and Data Imports Just Don’t WorkWhen Data Visualizations and Data Imports Just Don’t Work
When Data Visualizations and Data Imports Just Don’t Work
 
HR management system
HR management systemHR management system
HR management system
 
bus reservation.pptx
bus reservation.pptxbus reservation.pptx
bus reservation.pptx
 
Starboard Solutions - 3PL
Starboard Solutions - 3PLStarboard Solutions - 3PL
Starboard Solutions - 3PL
 
System Analysis And Design_FinalPPT_NirmishaK
System Analysis And Design_FinalPPT_NirmishaKSystem Analysis And Design_FinalPPT_NirmishaK
System Analysis And Design_FinalPPT_NirmishaK
 
Online reservation application
Online reservation applicationOnline reservation application
Online reservation application
 
ClearCost Introduction 2015
ClearCost Introduction 2015ClearCost Introduction 2015
ClearCost Introduction 2015
 
E Commerce: Its role and development
E Commerce: Its role and developmentE Commerce: Its role and development
E Commerce: Its role and development
 
Flink Forward San Francisco 2018: David Reniz & Dahyr Vergara - "Real-time m...
Flink Forward San Francisco 2018:  David Reniz & Dahyr Vergara - "Real-time m...Flink Forward San Francisco 2018:  David Reniz & Dahyr Vergara - "Real-time m...
Flink Forward San Francisco 2018: David Reniz & Dahyr Vergara - "Real-time m...
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Dernier (20)

Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 

Scope definition of ticketing automation bangladesh

  • 1. Scope Definition of Ticketing Automation Bangladesh TEAM – WILD SPIDER
  • 2. Basic Concept of Scope Definition • Objective & Motivation • Existing System Design • Requirement Analysis • Feasibility Study • Opportunity • Future Scope
  • 3. Our Objectives and Motivation • A central portal to enjoy the advantage of booking tickets of any bus from anywhere in Bangladesh. • Anyone can book any bus company ticket from our system in the easiest way.
  • 4. Lets have a look of todays ticketing system!
  • 5. Search option of source and destination place
  • 7. Calendar for select date easily
  • 8. Red Box: Facility to know more about that bus company/coach details Yellow Box: Facility to know bus condition ALONG WITH PHOTOS. Green Box: Facility to know Departure time, boarding points (departure bus counters) Blue Box: Facility to know How many seats are available in that bus/coach Purple: Facility to know public rating of their services Grey: Facility to know the fare and also the button to view seat condition. The next part is to select the preferred seats. And from our system user will get the perfect illustration. After selecting the seats user will be in the confirmation page and need to confirm their booking Our payment system will include almost all possible payments in BD including bkash.
  • 9. Existing System Design • As for as concerned to project its defined as the system which presently we are using and the proposed system is the new techniques implemented to the existing project if any mistake was happened.
  • 10. Other Existing Systems • paribahan.com
  • 11. Complexity and error in the existing system Existing System Sign Up Members Search from place to destination No suggestion/ Pop up See Available coaches/Buses No choices for seat or view Buy ticket YES NO Very easy signup/Verification and sign in Almost all the available payment gateway
  • 12. Mission and its implementation is not same!
  • 13. Requirement Analysis • Fact Finding • Development environment • Operational environment • Software and hardware requirement • Functional requirement It will list out the minimum requirements required for the project to have. Fact finding will discuss about the information gathered to develop the system.
  • 14. Fact Finding • Research • Background Research • Interview • Observation
  • 17. Software Requirement for Development • MYSQL server • Microsoft Office Word • PHP Hypertext Protocol • Web Browser (All) • HTML • CSS • JQUERY • AJAX • Notepad ++ • Paint • CPANEL • Printer driver • Laptop Driver • DBMS • Internet Connection • Localhost • XAMPP/WAMPP
  • 18. Hardware Requirement for Development • Printer • Laptop • Web Server • Office room • Network Switch • Network Router • Ethernet Cable • UPS – Backup Facility
  • 20. Feasibility Study • Technical Feasibility • Social and Operational Feasibility • Economic Feasibility • Time Feasibility
  • 21. Technical Feasibility • Technical staff is needed for responsibility to this new system is to take care of the server and the database for this new bus ticketing system. • If the system have any problem occur then technical staff will solve the problem immediately so that will affect the business operation of the company • Since this is a new online system so we need to add computer, some necessary of the hardware and software for running this new system is needed.
  • 22. Social and Operational Feasibility • This new system is operationally feasible because it can be used effectively in and in English after it has been developed. • We will arrange technical training for staff and seminar for others. It will provide more convenient for the customer in order to have faith with the company. • This system is designed in a simple way and meaningful for every user to used it. • Customer’s opinion is important because to develop a new system that based on the user requirement to improve the performance and increase the service for customer.
  • 23. Economic Feasibility Costing Analysis Costing Types Quantity Unit Price Year 1 Year 2 Year 3 Hardware Printer 4 15,000 60,000 Printer Cartridge 4 2,000 96,000 96,000 96,000 Computer 4 50,000 2,00,000 Ethernet Cable 1 4,000 4,000 4,000 4,000 Dongle 1 50,000 50,000 Internet 4 1,000 48,000 48,000 48,000 Software Licensed OS 4 12,000 48,000 Anti Virus 4 2,000 8,000 8,000 8,000 Payment Gateway 1 30,000 30,000 30,000 30,000 Domain 5 5,000 5,000 5,000 5,000 Hosting Sarver 3 30,000 30,000 30,000 30,000 Human Reasource Delivery man/ System maintenance Manager 20,000 100,000 (5) 200,000 (10) 4,00,000 (20) Equipments UPS 40,000 40,000 Furniture 1,50,000 1,50,00o Total Cost 8,69,000 4,21,000 6,21,000
  • 24. Benefits Year 1: Estimated bus company with us: 5 Estimated ticket sell per coach by our system: 15 So total ticket sales per day: 5*15 = 75 Total sales by our system (per day): 75*400=30000 Our Income: 30000 * 5% = 1500 Monthly Income: 1500*30 = 45000, yearly: 5,40,000 Expense for year 1: 8,69,000 Revenew for year 1: -3,29,000
  • 25. Benefits Year 2: Estimated bus company with us: 10 Estimated ticket sell per coach by our system: 20 So total ticket sales per day: 10*20 = 200 Total sales by our system (per day): 200*400=80,000 Our Income: 80,000 * 5% = 4000 Monthly Income: 4000*30 = 1,20,000, yearly: 14,40,000 Expense for year 2: 4,21,000 Revenew for year 2: 10,19,000
  • 26. Benefits Year 3: Estimated bus company with us: 15 Estimated ticket sell per coach by our system: 20 So total ticket sales per day: 15*20 = 300 Total sales by our system (per day): 300*400=120,000 Our Income: 120,000 * 5% = 6000 Monthly Income: 6000*30 = 1,80,000, yearly: 21,60,000 Expense for year 2: 6,21,000 Revenew for year 3: 15,39,000
  • 27. Time Feasibility Project Proposal – 3days Project Specification – 7 days Project Process, meeting & deliveries- 10 days Analysis – 15 days Design – 10 days Coding- 90 days Project Testing – 45 days Final Documentation – 10 days Total Time Required : 190 Days
  • 28. Opportunity • For Bangladesh online ticketing system can be able to open a new door. Now Bangladesh is a developing country by applying many technology. • The traditional ticketing system of Bangladesh is a very uncomfortable and weak process. • sometimes it is caused of many problems which can be reduced by online ticketing. • In most of the festivals people have to face lots of troubles. by providing this system corruption can be taken under control. • It can be said that it will very effective for Bangladesh.
  • 29. Future Scope • As mentioned above, although our system had been completed but it is not perfect, we had planned to make some enhancement in the future. • We think that our system still has potential to grow. Besides, we will include more functions and introduce more widgets to the system. Like ▫ Mobile aps ▫ Mobile version ▫ Home Delivery ▫ Call Center Support We also plan to enhance the interface so that it looks more attractive and interactive.