SlideShare une entreprise Scribd logo
1  sur  6
R ShankaraiahR Shankaraiah
Phone: +91 – 9177222380Phone: +91 – 9177222380 (M)(M)
Email: rsatyashankar1960Email: rsatyashankar1960@gmail.com@gmail.com
Professional Synopsis
 A dynamic professional with about 32+ years of rich experience in Project Planning & Management,
Erection & Commissioning, Operations & Maintenance and Man Management of Large Power
Transmission & Distribution Projects.
 Presently working with KEC International Limited (Projects Execution, Co-ordination and
Management – EPCM Projects) As General Manager –Country Manager for Libya
 A project planner with expertise in planning, executing and spearheading various erection,
commissioning of EPC projects for reputed clients in compliance to international quality standards.
 Deft in managing operations involving resource planning, optimum utilization, in-process inspection,
team building and co-ordination with internal departments.
 Proficiency in operations and maintenance of various equipments for reducing downtime & enhancing
operational effectiveness of equipment.
 Bachelors Degree in Engineering (B.E. – Electrical); Member (M.I.E.) - The Institution of
Engineers India.
 Excellent communication & interpersonal skills with strong analytical, team building, problem solving
and organizational abilities.
Organizational Experience
(32+ Years)
Since Jun’08 KEC International Limited (Largest International
Power Transmission Company) – General Manager – Country Manager for
Libya, Tunisia & in Saudi Arabia (Eastern Province)
Aug’91 – Jun’08 Power Grid Corporation of India Limited – Chief Manager
Dec’85 – Aug’91 National Thermal Power Corporation Limited (NTPC) – Senior Engineer
Nov’83 – Dec’85 Neyveli Lignite Corporation Limited – Assistant Executive Engineer
May’83 – Nov’83 Hyderabad Allwyn Limited – Graduate Engineer
Key Achievements/Awards:
1) Excellence in Achieving MOU target Award to POWERGRID from MOP, Govt. of India for
Establishment of Korba-Budipadar Inter Regional Transmission System ahead of schedule
2) Silver Shield Award to POWERGRID from Hon’ble President of India for Establishing Raichur
-Gooty Transmission system under SRSS-III ahead of schedule
3) New project of Saudi Arabia(Eastern Province) – KEC Management/Mc Kinsey – Consultant for
Project Eagle - acknowledged/appreciated as the world record for casting of first foundation
within 5 months of signing the contract
Growth Path
May’83 – Nov’83 As Graduate Engineer – Hyderabad Allwyn Ltd.
Nov’83 – Dec’85 - As Asst. Executive Engineer - NLC
Dec’85 – Aug’91 - As Senior Engineer - NTPC
Aug’91 – Jun’08 - As Chief Manager - POWERGRID
Jun’08 Onwards As General Manager – Country Manager - KEC
Key Tasks Handled Across the Tenures
 Project Planning & Management
o Monitoring and executing various erection, commissioning of Power projects with respect to
budgeted cost, demand forecasts, time over-runs to ensure timely execution of projects. All the
Projects undertaken have been completed well ahead of the schedules avoiding cost over runs and
reducing the Project cost significantly
o Conducting cost benefit analysis of the projects including feasibility studies, assessment of the
requirements, adaptation, interface and commissioning.
o Arbitration and Dispute Redressal
o Activities include Civil, Mechanical & Electrical Engg.
 Erection & Commissioning
o Anchoring on-site erection & commissioning of various 400 KV Power Transmission
Lines & Sub-Stations etc. ensuring effective resource utilization to maximize the output.
o Installation and commissioning of various equipments as well as conducting tests &
inspections to ensure operational effectiveness.
o Reviewing engineering drawings, technical specifications, cost estimates for installation
& commission of the equipment; reviewing & analyzing contractor's change order proposals &
submittals.
 Operations & Maintenance
o Planning and effecting predictive & preventive maintenance / repair schedules for the
equipments to increase machine up time and reliability.
o Coordinating material / spare parts planning related activities encompassing
identification of vendors, requirement specification & offer evaluation.
 Man Management
o Managing a massive work force of 500+ strong Team in Tripoli, Libya, 200+
strong Team in Tunisia
o Directing, leading and motivating workforce; imparting continuous on job the training for
accomplishing greater operational effectiveness/ efficiency.
o Working on succession planning of the workforce, appraising the member’s performance &
providing feedback.
o Resolving interpersonal issues & working towards a harmonious work environment.
Noteworthy Milestones
General Manager – Country Manager - for KEC Libya & Tunisia Projects; Team Leader &
Facilitator for startup and acceleration of new Projects in Saudi Arabia
1) 400 KV D/C & S/C Transmission Lines in Libya– 115 Million Euro – Most Difficult
Project in Libya – 6 Lines commissioned and Acceptance Certificates received from the Client
– 6 Lines are under progress (pending due to unrest/security situation in Libya). 30 Mn. USD
Justifiable Claim made on the Client on A/C of QV, Idling, Direct & Indirect loss due to civil
war in Libya
2) 400 KV S/C Khoms – GMMR I line in Libya – 90 Million USD – Project completed and
contract closed
3) 220 KV D/C & S/C Libya – Tunisia Interconnector in Libya – 25 Million USD – Project
completed and contract closed
4) 150 KV – 400 KV Transmission Lines in Tunisia - 96 Million USD – Project completed,
Acceptance Certificates received from the Client
5) 235 KV, 400 KV Transmission Lines & S/S in Saudi Arabia (Eastern Province) – 178 Million
USD - Most Complicated Project in Saudi - World record created in KEC by casting first
foundation within 5 months from signing the contract by streamlining/squeezing the
processes
Distinctively constructed and functioned as:
- As General Manager for Saudi Arabia (Eastern Province) - Project of 230 KV & 400 KV Transmission
Lines in Dammam Area. Created world record in KEC for casting first foundation within 5 months of
signing the contract. Excellent sales & margins achieved for F.Y. 2014-15. Project under progress.
- As G.M./Country Manager for Tunisia – Project of 150 KV to 400 KV Transmission Lines. Project
commissioned within the schedule and PAC/FAC received.
- As G.M./Country Manager for Libya – Project of 400 KV D/C & S/C Transmission Lines (6
Lines commissioned) and 6 Lines under execution (pending due to unrest/security
situation in Libya. Justifiable Claim made for 30 Mn. USD on A/C of QV, Idling, Direct &
Indirect loss due to civil war in Libya.
- As Country Manager for Libya – Project of 400 KV Khoms – GMMR I Transmission Line (540 Kms)
commissioned, FAC received and contract closed.
- As Country Manager for Libya – Project of 220 KV D/C & S/C Libya – Tunisia Inter Country
Interconnector commissioned, FAC received and contract closed.
- Project Head for construction of 400 KV D/C, Quad Conductor RAICHUR-GOOTY Inter State
Transmission Line (160 Kms) and 400 KV Switchyards at Raichur KPCL & Gooty POWERGRID 400
KV Sub-Stations. Commissioned ahead of the schedule by 10 months
- Project Head for construction of 400 KV S/C, HYDERABAD – KURNOOL – GOOTY Transmission Line
(310 Kms) and 400 KV Switchyards at Kurnool APTRANSCO & Gooty POWERGRID 400 KV Sub-
Stations ahead of the schedule by 5 months. This includes Pile Foundations for Tungabhadra River
Crossing.
- Execution Co-ordination of 500 KV HVDC Talcher – Kolar, 2000MW, 1300 Kms Bi-Pole Project
(Southern Region -1 portion).
- Project Head for construction of 400 KV Switchyard in NTPC Korba Korba-Raipur 400KV
Transmission Line.
- Survey, preparation of project report, Bill of Quantities & Cost Estimate for Administrative approval
for 500 KV HVDC Line from Ibb Valley (Orissa) – Jaipur (Rajasthan), 400 KV D/C AC Raipur –
Rourkela line and 765 KV AC Bilaspur – Jabalpur Line.
- Project Head for construction of 220 KV Korba(M.P.) – Budipadar(Orissa) Transmission Line (200
Kms) and Switchyard at Korba (MPEB) East Switchyard as East-West Inter-connector (Inter-
Regional Link) completed within 5 months.
- Station Head for 400 KV JABALPUR Sub-Station (Most important Grid Sub-Station of Western
Region) and connected lines (650 Kms) to NTPC, VSTPP Vindhyachal and Itarsi.
- Project Head for the construction of 400KV D/C Jabalpur-Itarsi Transmission Line (250 Kms) (Ckt.
III & IV) commissioned ahead of the schedule by 6 months.
- Project Head for the construction of 400 KV Bhadrawathi (Chandrapur) Sub- Station – right from
Land Acquisition to Construction & Commissioning under KSTPP, Korba Stage II – Largest S/S in
Western Region with 2 x 500 MW HVDC Back to Back Station
S/S extension for Chandrapur – Ramagundam Lines under CTP Scheme
S/S extension works in Chandrapur (MSEB) Super Thermal Power Station
- Execution Co-ordination & Commssioning of all 400 KV Lines & Sub-Stations under KSTPP Stage I,
Stage II, VSTPP Stage I, Stage I additional in Western Region and under Ramagundam Stage III &
System Strengthening in Southern region.
- Incharge for Construction, Commissioning, Operation & Maintenance of 220 KV Sub-Station in
Neyveli
- Incharge for Construction of 220 KV D/C Line from NLC Thermal Station II – Mines II
- Incharge for Maintenance & Establishment of 66 KV S/S & Dedicated Transmission Lines of
Hyderabad Allwyn and Refrigeration Plant Maintenance and Factory Electrical Systems
 Significantly contributed as Incharge in the operations & maintenance of 400 KV
Transmission Lines & Sub-Stations. 400 KV Lines & Sub-Stations associated with
evacuation of power from Korba, Vindhyachal and Ramagundam Super Thermal Power
Stations.
Emergency Restoration System:
 Having Experience in use of Emergency Restoration System during tower collapses and disaster
management and restoration of normal system in least possible time. Restoration works done in BCPP-
BALCO, Jabalpur-Itarsi & Bhilai-Chandrapur Lines.
 Efficiently rendered consultancy services to:
- BCPP-BALCO 220 KV line & Switchyard (Balco Captive Power Plant)
- 400 KV NTPC KSTPP, Korba Switchyard
- 400 KV MPEB Switchyard at Korba (West)
- 220 KV MPEB Switchyard at Korba (East)
- 400 KV MPEB Switchyard at Bhilai
- 400 KV MSEB Switchyard at Koradi/Nagpur & Chandrapur
- APTRANSCO, Kurnool/Hyderabad
- KPTCL, KPCL Raichur/Bangalore
Other Project Planning, Co-coordinating and Management Functions:
 Performed a vital role in Planning, monitoring, expediting of execution, Testing & Commissioning of all
the TL Projects across the region and Field Quality/Safety Inspection/Education to Engineers of all
Transmission Line and Sub-Station Projects in Western Region & Southern Regions
 Standing faculty for training TL & S/S Engineers of POWERGRID in Construction, Erection, Testing &
Commissioning of 400 KV Lines & Sub-Stations
 Survey, Preparation of Feasibility Reports, BOQs for all newly envisaged Transmission Line Projects in
Western Region & Southern Region – 1 which includes 220 KV, 400KV, 765KV AC and 500 KV HVDC
Lines & Sub-Stations
 Co-ordination with State and Central Govt. Authorities, State Electricity Boards and Local Bodies,
Farmers, Public & Public Representatives in Western & Southern Regions.
 Conducting Public Consultation Meetings with Farmers/Land owners in association with Revenue
Officials to create confidence in Compensation and Rehabilitation Policies and Procedures of the
Company
 Co-Ordination with Forest Officials and Ministry of Forests and Environment for Forest Clearances in line
with Forest Conservation Act etc.
 Co-ordination with Power & Telecommunication Co-ordination Committee (PTCC) for approval for
energisation of new lines.
 Co-ordination with Railway Authorities for Railway Crossing Approvals.
 Co-ordination with Central/State Labour Authorities & Commercial Tax Authorities.
Qualifications
Main Qualifications:
1978- 1983 (Regular) - Bachelors Degree in Engineering (B.E) – Electrical - passed in
First Class with Distinction – from - University College of
Engineering, Osmania University Campus, Hyderabad.
Other Qualifications/Memberships:
1995 - Member, Institution of Engineers - from - The Institution of Engineers, India.
Personal Details
Date of Birth : 1st
January 1960
Residential Address (Permanent) : H.No. 3-18-87, Pragathi Nagar, Ramanthapur, Hyderabad
– 500013, Telangana, India.
 Performed a vital role in Planning, monitoring, expediting of execution, Testing & Commissioning of all
the TL Projects across the region and Field Quality/Safety Inspection/Education to Engineers of all
Transmission Line and Sub-Station Projects in Western Region & Southern Regions
 Standing faculty for training TL & S/S Engineers of POWERGRID in Construction, Erection, Testing &
Commissioning of 400 KV Lines & Sub-Stations
 Survey, Preparation of Feasibility Reports, BOQs for all newly envisaged Transmission Line Projects in
Western Region & Southern Region – 1 which includes 220 KV, 400KV, 765KV AC and 500 KV HVDC
Lines & Sub-Stations
 Co-ordination with State and Central Govt. Authorities, State Electricity Boards and Local Bodies,
Farmers, Public & Public Representatives in Western & Southern Regions.
 Conducting Public Consultation Meetings with Farmers/Land owners in association with Revenue
Officials to create confidence in Compensation and Rehabilitation Policies and Procedures of the
Company
 Co-Ordination with Forest Officials and Ministry of Forests and Environment for Forest Clearances in line
with Forest Conservation Act etc.
 Co-ordination with Power & Telecommunication Co-ordination Committee (PTCC) for approval for
energisation of new lines.
 Co-ordination with Railway Authorities for Railway Crossing Approvals.
 Co-ordination with Central/State Labour Authorities & Commercial Tax Authorities.
Qualifications
Main Qualifications:
1978- 1983 (Regular) - Bachelors Degree in Engineering (B.E) – Electrical - passed in
First Class with Distinction – from - University College of
Engineering, Osmania University Campus, Hyderabad.
Other Qualifications/Memberships:
1995 - Member, Institution of Engineers - from - The Institution of Engineers, India.
Personal Details
Date of Birth : 1st
January 1960
Residential Address (Permanent) : H.No. 3-18-87, Pragathi Nagar, Ramanthapur, Hyderabad
– 500013, Telangana, India.

Contenu connexe

Tendances (20)

Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
JD RYNDERS CV REV 2015 orig
JD RYNDERS CV REV 2015 origJD RYNDERS CV REV 2015 orig
JD RYNDERS CV REV 2015 orig
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
- CV ADNAN
- CV ADNAN- CV ADNAN
- CV ADNAN
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 

Similaire à RS Resume

Similaire à RS Resume (20)

KRT Resume 29th July 2015
KRT Resume 29th July 2015KRT Resume 29th July 2015
KRT Resume 29th July 2015
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Mohammad Saiful Haque. Rev -05
Mohammad Saiful Haque. Rev -05Mohammad Saiful Haque. Rev -05
Mohammad Saiful Haque. Rev -05
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
Profile at a glance
Profile at a glanceProfile at a glance
Profile at a glance
 
final resume
final resumefinal resume
final resume
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
social profile.
social profile.social profile.
social profile.
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
SABER CV
SABER CVSABER CV
SABER CV
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Project Controller
Project ControllerProject Controller
Project Controller
 
Gopa 16 Aug 2016
Gopa 16 Aug 2016Gopa 16 Aug 2016
Gopa 16 Aug 2016
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 

RS Resume

  • 1. R ShankaraiahR Shankaraiah Phone: +91 – 9177222380Phone: +91 – 9177222380 (M)(M) Email: rsatyashankar1960Email: rsatyashankar1960@gmail.com@gmail.com Professional Synopsis  A dynamic professional with about 32+ years of rich experience in Project Planning & Management, Erection & Commissioning, Operations & Maintenance and Man Management of Large Power Transmission & Distribution Projects.  Presently working with KEC International Limited (Projects Execution, Co-ordination and Management – EPCM Projects) As General Manager –Country Manager for Libya  A project planner with expertise in planning, executing and spearheading various erection, commissioning of EPC projects for reputed clients in compliance to international quality standards.  Deft in managing operations involving resource planning, optimum utilization, in-process inspection, team building and co-ordination with internal departments.  Proficiency in operations and maintenance of various equipments for reducing downtime & enhancing operational effectiveness of equipment.  Bachelors Degree in Engineering (B.E. – Electrical); Member (M.I.E.) - The Institution of Engineers India.  Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities. Organizational Experience (32+ Years) Since Jun’08 KEC International Limited (Largest International Power Transmission Company) – General Manager – Country Manager for Libya, Tunisia & in Saudi Arabia (Eastern Province) Aug’91 – Jun’08 Power Grid Corporation of India Limited – Chief Manager Dec’85 – Aug’91 National Thermal Power Corporation Limited (NTPC) – Senior Engineer Nov’83 – Dec’85 Neyveli Lignite Corporation Limited – Assistant Executive Engineer May’83 – Nov’83 Hyderabad Allwyn Limited – Graduate Engineer Key Achievements/Awards: 1) Excellence in Achieving MOU target Award to POWERGRID from MOP, Govt. of India for Establishment of Korba-Budipadar Inter Regional Transmission System ahead of schedule 2) Silver Shield Award to POWERGRID from Hon’ble President of India for Establishing Raichur -Gooty Transmission system under SRSS-III ahead of schedule 3) New project of Saudi Arabia(Eastern Province) – KEC Management/Mc Kinsey – Consultant for Project Eagle - acknowledged/appreciated as the world record for casting of first foundation within 5 months of signing the contract
  • 2. Growth Path May’83 – Nov’83 As Graduate Engineer – Hyderabad Allwyn Ltd. Nov’83 – Dec’85 - As Asst. Executive Engineer - NLC Dec’85 – Aug’91 - As Senior Engineer - NTPC Aug’91 – Jun’08 - As Chief Manager - POWERGRID Jun’08 Onwards As General Manager – Country Manager - KEC Key Tasks Handled Across the Tenures  Project Planning & Management o Monitoring and executing various erection, commissioning of Power projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of projects. All the Projects undertaken have been completed well ahead of the schedules avoiding cost over runs and reducing the Project cost significantly o Conducting cost benefit analysis of the projects including feasibility studies, assessment of the requirements, adaptation, interface and commissioning. o Arbitration and Dispute Redressal o Activities include Civil, Mechanical & Electrical Engg.  Erection & Commissioning o Anchoring on-site erection & commissioning of various 400 KV Power Transmission Lines & Sub-Stations etc. ensuring effective resource utilization to maximize the output. o Installation and commissioning of various equipments as well as conducting tests & inspections to ensure operational effectiveness. o Reviewing engineering drawings, technical specifications, cost estimates for installation & commission of the equipment; reviewing & analyzing contractor's change order proposals & submittals.  Operations & Maintenance o Planning and effecting predictive & preventive maintenance / repair schedules for the equipments to increase machine up time and reliability. o Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement specification & offer evaluation.  Man Management o Managing a massive work force of 500+ strong Team in Tripoli, Libya, 200+ strong Team in Tunisia o Directing, leading and motivating workforce; imparting continuous on job the training for accomplishing greater operational effectiveness/ efficiency.
  • 3. o Working on succession planning of the workforce, appraising the member’s performance & providing feedback. o Resolving interpersonal issues & working towards a harmonious work environment. Noteworthy Milestones General Manager – Country Manager - for KEC Libya & Tunisia Projects; Team Leader & Facilitator for startup and acceleration of new Projects in Saudi Arabia 1) 400 KV D/C & S/C Transmission Lines in Libya– 115 Million Euro – Most Difficult Project in Libya – 6 Lines commissioned and Acceptance Certificates received from the Client – 6 Lines are under progress (pending due to unrest/security situation in Libya). 30 Mn. USD Justifiable Claim made on the Client on A/C of QV, Idling, Direct & Indirect loss due to civil war in Libya 2) 400 KV S/C Khoms – GMMR I line in Libya – 90 Million USD – Project completed and contract closed 3) 220 KV D/C & S/C Libya – Tunisia Interconnector in Libya – 25 Million USD – Project completed and contract closed 4) 150 KV – 400 KV Transmission Lines in Tunisia - 96 Million USD – Project completed, Acceptance Certificates received from the Client 5) 235 KV, 400 KV Transmission Lines & S/S in Saudi Arabia (Eastern Province) – 178 Million USD - Most Complicated Project in Saudi - World record created in KEC by casting first foundation within 5 months from signing the contract by streamlining/squeezing the processes Distinctively constructed and functioned as: - As General Manager for Saudi Arabia (Eastern Province) - Project of 230 KV & 400 KV Transmission Lines in Dammam Area. Created world record in KEC for casting first foundation within 5 months of signing the contract. Excellent sales & margins achieved for F.Y. 2014-15. Project under progress. - As G.M./Country Manager for Tunisia – Project of 150 KV to 400 KV Transmission Lines. Project commissioned within the schedule and PAC/FAC received. - As G.M./Country Manager for Libya – Project of 400 KV D/C & S/C Transmission Lines (6 Lines commissioned) and 6 Lines under execution (pending due to unrest/security situation in Libya. Justifiable Claim made for 30 Mn. USD on A/C of QV, Idling, Direct & Indirect loss due to civil war in Libya. - As Country Manager for Libya – Project of 400 KV Khoms – GMMR I Transmission Line (540 Kms) commissioned, FAC received and contract closed. - As Country Manager for Libya – Project of 220 KV D/C & S/C Libya – Tunisia Inter Country Interconnector commissioned, FAC received and contract closed. - Project Head for construction of 400 KV D/C, Quad Conductor RAICHUR-GOOTY Inter State Transmission Line (160 Kms) and 400 KV Switchyards at Raichur KPCL & Gooty POWERGRID 400 KV Sub-Stations. Commissioned ahead of the schedule by 10 months - Project Head for construction of 400 KV S/C, HYDERABAD – KURNOOL – GOOTY Transmission Line (310 Kms) and 400 KV Switchyards at Kurnool APTRANSCO & Gooty POWERGRID 400 KV Sub- Stations ahead of the schedule by 5 months. This includes Pile Foundations for Tungabhadra River Crossing. - Execution Co-ordination of 500 KV HVDC Talcher – Kolar, 2000MW, 1300 Kms Bi-Pole Project (Southern Region -1 portion).
  • 4. - Project Head for construction of 400 KV Switchyard in NTPC Korba Korba-Raipur 400KV Transmission Line. - Survey, preparation of project report, Bill of Quantities & Cost Estimate for Administrative approval for 500 KV HVDC Line from Ibb Valley (Orissa) – Jaipur (Rajasthan), 400 KV D/C AC Raipur – Rourkela line and 765 KV AC Bilaspur – Jabalpur Line. - Project Head for construction of 220 KV Korba(M.P.) – Budipadar(Orissa) Transmission Line (200 Kms) and Switchyard at Korba (MPEB) East Switchyard as East-West Inter-connector (Inter- Regional Link) completed within 5 months. - Station Head for 400 KV JABALPUR Sub-Station (Most important Grid Sub-Station of Western Region) and connected lines (650 Kms) to NTPC, VSTPP Vindhyachal and Itarsi. - Project Head for the construction of 400KV D/C Jabalpur-Itarsi Transmission Line (250 Kms) (Ckt. III & IV) commissioned ahead of the schedule by 6 months. - Project Head for the construction of 400 KV Bhadrawathi (Chandrapur) Sub- Station – right from Land Acquisition to Construction & Commissioning under KSTPP, Korba Stage II – Largest S/S in Western Region with 2 x 500 MW HVDC Back to Back Station S/S extension for Chandrapur – Ramagundam Lines under CTP Scheme S/S extension works in Chandrapur (MSEB) Super Thermal Power Station - Execution Co-ordination & Commssioning of all 400 KV Lines & Sub-Stations under KSTPP Stage I, Stage II, VSTPP Stage I, Stage I additional in Western Region and under Ramagundam Stage III & System Strengthening in Southern region. - Incharge for Construction, Commissioning, Operation & Maintenance of 220 KV Sub-Station in Neyveli - Incharge for Construction of 220 KV D/C Line from NLC Thermal Station II – Mines II - Incharge for Maintenance & Establishment of 66 KV S/S & Dedicated Transmission Lines of Hyderabad Allwyn and Refrigeration Plant Maintenance and Factory Electrical Systems  Significantly contributed as Incharge in the operations & maintenance of 400 KV Transmission Lines & Sub-Stations. 400 KV Lines & Sub-Stations associated with evacuation of power from Korba, Vindhyachal and Ramagundam Super Thermal Power Stations. Emergency Restoration System:  Having Experience in use of Emergency Restoration System during tower collapses and disaster management and restoration of normal system in least possible time. Restoration works done in BCPP- BALCO, Jabalpur-Itarsi & Bhilai-Chandrapur Lines.  Efficiently rendered consultancy services to: - BCPP-BALCO 220 KV line & Switchyard (Balco Captive Power Plant) - 400 KV NTPC KSTPP, Korba Switchyard - 400 KV MPEB Switchyard at Korba (West) - 220 KV MPEB Switchyard at Korba (East) - 400 KV MPEB Switchyard at Bhilai - 400 KV MSEB Switchyard at Koradi/Nagpur & Chandrapur - APTRANSCO, Kurnool/Hyderabad - KPTCL, KPCL Raichur/Bangalore Other Project Planning, Co-coordinating and Management Functions:
  • 5.  Performed a vital role in Planning, monitoring, expediting of execution, Testing & Commissioning of all the TL Projects across the region and Field Quality/Safety Inspection/Education to Engineers of all Transmission Line and Sub-Station Projects in Western Region & Southern Regions  Standing faculty for training TL & S/S Engineers of POWERGRID in Construction, Erection, Testing & Commissioning of 400 KV Lines & Sub-Stations  Survey, Preparation of Feasibility Reports, BOQs for all newly envisaged Transmission Line Projects in Western Region & Southern Region – 1 which includes 220 KV, 400KV, 765KV AC and 500 KV HVDC Lines & Sub-Stations  Co-ordination with State and Central Govt. Authorities, State Electricity Boards and Local Bodies, Farmers, Public & Public Representatives in Western & Southern Regions.  Conducting Public Consultation Meetings with Farmers/Land owners in association with Revenue Officials to create confidence in Compensation and Rehabilitation Policies and Procedures of the Company  Co-Ordination with Forest Officials and Ministry of Forests and Environment for Forest Clearances in line with Forest Conservation Act etc.  Co-ordination with Power & Telecommunication Co-ordination Committee (PTCC) for approval for energisation of new lines.  Co-ordination with Railway Authorities for Railway Crossing Approvals.  Co-ordination with Central/State Labour Authorities & Commercial Tax Authorities. Qualifications Main Qualifications: 1978- 1983 (Regular) - Bachelors Degree in Engineering (B.E) – Electrical - passed in First Class with Distinction – from - University College of Engineering, Osmania University Campus, Hyderabad. Other Qualifications/Memberships: 1995 - Member, Institution of Engineers - from - The Institution of Engineers, India. Personal Details Date of Birth : 1st January 1960 Residential Address (Permanent) : H.No. 3-18-87, Pragathi Nagar, Ramanthapur, Hyderabad – 500013, Telangana, India.
  • 6.  Performed a vital role in Planning, monitoring, expediting of execution, Testing & Commissioning of all the TL Projects across the region and Field Quality/Safety Inspection/Education to Engineers of all Transmission Line and Sub-Station Projects in Western Region & Southern Regions  Standing faculty for training TL & S/S Engineers of POWERGRID in Construction, Erection, Testing & Commissioning of 400 KV Lines & Sub-Stations  Survey, Preparation of Feasibility Reports, BOQs for all newly envisaged Transmission Line Projects in Western Region & Southern Region – 1 which includes 220 KV, 400KV, 765KV AC and 500 KV HVDC Lines & Sub-Stations  Co-ordination with State and Central Govt. Authorities, State Electricity Boards and Local Bodies, Farmers, Public & Public Representatives in Western & Southern Regions.  Conducting Public Consultation Meetings with Farmers/Land owners in association with Revenue Officials to create confidence in Compensation and Rehabilitation Policies and Procedures of the Company  Co-Ordination with Forest Officials and Ministry of Forests and Environment for Forest Clearances in line with Forest Conservation Act etc.  Co-ordination with Power & Telecommunication Co-ordination Committee (PTCC) for approval for energisation of new lines.  Co-ordination with Railway Authorities for Railway Crossing Approvals.  Co-ordination with Central/State Labour Authorities & Commercial Tax Authorities. Qualifications Main Qualifications: 1978- 1983 (Regular) - Bachelors Degree in Engineering (B.E) – Electrical - passed in First Class with Distinction – from - University College of Engineering, Osmania University Campus, Hyderabad. Other Qualifications/Memberships: 1995 - Member, Institution of Engineers - from - The Institution of Engineers, India. Personal Details Date of Birth : 1st January 1960 Residential Address (Permanent) : H.No. 3-18-87, Pragathi Nagar, Ramanthapur, Hyderabad – 500013, Telangana, India.