PERT & CPM
SUBMITTED BY:-
SHASHANK KAPOOR
MECHANICAL , 154169
What isthe PERT&CPM?
It is nothing but the technique used in Network analysis
of project management, such as planning ,
management and control of project.
So, what is project ??
“A project is a series of activities directed
to accomplishment of a desired objective.”
Plan your work first…..then work your plan
Project Evaluation & Review
Techniques
(PERT)
In PERT is basicallyamethod to analyze the tasks involved in
completing agiven project,especially the time neededto completeeachtask,
and to identify the minimum time neededto complete the total project.
– Multiple time estimates
– Probabilistic activity times
USED IN : Project management - for non-repetitive jobs
(research and development work), where the time and cost
estimates tend to be quite uncertain. This technique uses
probabilistic time estimates.
Critical Path Method
(CPM)
In CPM activities are shown as a network of
precedence relationships using activity-on-node network
construction.
– Single estimate of activity time
– Deterministic activity times
USED IN : Production management - for the jobs of
repetitive in nature where the activity time
estimates can be predicted with considerable
certainty due to the existence of past experience.
KEY ELEMENTS
 Arrows:- leading from tail to head directionally Indicate
Activity
 Nodes:- Indicate Event, a point in time where one or more activities start
and/or finish.
 Earliest time:It is categorized in two sub elements.
1. Earliest Starting time (ES):-Time at which the activity can
start
2. Earliest finishing time(EF):-Equals to the earliest start time
for the activity plus the time required to complete the
activity
 Latest time :It is categorized in two sub elements.
1.Latest Starting time (LS):-Time in which the activity can be
completed without delaying
2.Latest Finishing time (LF):-equal to the latest finish time minus the time
required to complete the activity.
 Slack time:-The difference between its earliest and latest start time.
 Critical Path:-The path of activities having zero Slack time.
KEY ELEMENTS
 Optimistic time (a): – It is the shortest time in which the activity
can be completed.
 Most likely time (m) – It is the probable time required to perform
the activity.
 Pessimistic time (b)– It is the longest estimated time required to
perform an activity .
 Expected time (Te) – approximation time taken to complete an
activity.
Te=
𝒂+𝟒𝒎+𝒃
𝟔
 Standard deviation ( ) – Higher the SD is the greater amount of
uncertainty exists
 Variance (𝝈 𝟐
) − Large variance indicates great uncertainty, a small
variance indicates a more accurate estimate
=
𝑏−𝑎
6
ILLUSTRATION ON PERT
SOLUTION
Activity Optimistic
Time (a)
Most
likely
Time(m)
Pessimisti
c Time (b)
Expected
Time (Te)
Standard
Deviation
1-2 1 1 7 2 1
1-3 1 4 7 4 1
1-4 2 2 8 3 1
2-5 1 1 1 1 0
3-5 2 5 14 6 2
4-6 2 5 8 5 1
5-6 3 6 15 7 2
SOLUTION
CRITICAL PATH
 Paths:-
1-2-5-6 = 2+1+7=10
1-3-5-6 = 4+6+7=17
1-4-6 = 3+5=8
 1-3-5-6 is critical path since it take maximum time.
CRITICAL PATH
NODE LC-ES TOTAL
1 0-0 0
2 9-2 7
3 4-4 0
4 12-3 9
5 10-10 0
6 17-17 0
On Analyzing the Node which having total =0 is 1-3-5-6
Hence it is critical path
PROBABILISTIC
DETERMINATION
 What isthe Probability of it taking20 weeks?
CriticalPath=1-3-5-6=17weeks
T =20 weeks C=17 weeks
𝑧 = 𝑇−𝐶
𝜎2
(Variance) 𝜎2 = 1 + 4 + 4 = 9
𝑧 = 20−17
9
= 1
Lookup Zvalue in normal distribution table
Pz=0.8413 or 84.13%
Goingover 20 weeks would be 100 – 84.13 = 15.87%
(Probability of ittaking 20 weeks)
ILLUSTRATION ON CPM
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
SOLUTION
CRITICAL PATH
 Paths:-
 1-2-5-7-8=2+1+2+1=6 days
 1-3-5-7-8=3+2+2+1=8 days
 1-3-6-7-8=3+5+3+1=12days
 1-4-6-7-8=4+7+3+1=15 days
1-4-6-7-8 is critical path since it take maximum
time.
CRITICAL PATH
NODE LC-ES TOTAL
1 0-0 0
2 11-2 9
3 6-3 3
4 4-4 0
5 12-5 7
6 11-11 0
7 14-14 0
8 15-15 0
On Analyzing the Node which having total =0 is 1-4-6-7-8
Hence it is critical path
What happen if we have large
number of Network problem??
Conclusion
 For large number of network problem Ford
Fulkerson Max Flow Algorithm is the point
that can give us the optimal critical path
since it is use for finding the maximum flow
in a flow network for single source and single
sink.
THANK YOU

Contenu connexe

Tendances

Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 
Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)chandkec
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1adeelmunir158
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksPrasad Thanthratey
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Zulfiquer Ahmed Amin
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
Lect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMLect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMMubashir Ali
 
Critical path method
Critical path methodCritical path method
Critical path methodShubhi Verma
 

Tendances (20)

Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Cpmpert
CpmpertCpmpert
Cpmpert
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
 
Per tand project crashing
Per tand project crashingPer tand project crashing
Per tand project crashing
 
PROJECT SCHEDULING
PROJECT SCHEDULINGPROJECT SCHEDULING
PROJECT SCHEDULING
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
P E R T
P E R TP E R T
P E R T
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Lect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMLect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPM
 
Critical Path Method presentation.
Critical Path Method presentation.Critical Path Method presentation.
Critical Path Method presentation.
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Critical path method
Critical path methodCritical path method
Critical path method
 

Similaire à Pert and cpm

Syam critical path cpa
Syam critical path cpaSyam critical path cpa
Syam critical path cpasyamputra
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii referenceahsanrabbani
 
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.pptNitin137794
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering EconomicsDeepak Paithankar
 
Pert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOLPert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOLSiddanna Balapgol
 
[Document] MultiProject analysis with Critical Path Method
[Document] MultiProject analysis with Critical Path Method[Document] MultiProject analysis with Critical Path Method
[Document] MultiProject analysis with Critical Path MethodMichele Palumbo
 
ManSciProjMan-CPM.pptx
ManSciProjMan-CPM.pptxManSciProjMan-CPM.pptx
ManSciProjMan-CPM.pptxssuser85ddaa
 
Critical path method (CPM).pptx
Critical path method (CPM).pptxCritical path method (CPM).pptx
Critical path method (CPM).pptxHimanshuKaklotar1
 
Management science
Management scienceManagement science
Management sciencekamrul islam
 
Day 2 Revision
Day 2 RevisionDay 2 Revision
Day 2 RevisionJoyce Wong
 

Similaire à Pert and cpm (20)

Cpm pert
Cpm pertCpm pert
Cpm pert
 
CPM.pptx
CPM.pptxCPM.pptx
CPM.pptx
 
Syam critical path cpa
Syam critical path cpaSyam critical path cpa
Syam critical path cpa
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii reference
 
Pert cpm
Pert cpm Pert cpm
Pert cpm
 
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
470614683-CHAPTER-7-Project-Management-and-Network-Analysis-ppt.ppt
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 
Pert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOLPert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOL
 
PERT.pptx
PERT.pptxPERT.pptx
PERT.pptx
 
[Document] MultiProject analysis with Critical Path Method
[Document] MultiProject analysis with Critical Path Method[Document] MultiProject analysis with Critical Path Method
[Document] MultiProject analysis with Critical Path Method
 
PM-Problems.pptx
PM-Problems.pptxPM-Problems.pptx
PM-Problems.pptx
 
ManSciProjMan-CPM.pptx
ManSciProjMan-CPM.pptxManSciProjMan-CPM.pptx
ManSciProjMan-CPM.pptx
 
Pert
PertPert
Pert
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
Critical path method (CPM).pptx
Critical path method (CPM).pptxCritical path method (CPM).pptx
Critical path method (CPM).pptx
 
Management science
Management scienceManagement science
Management science
 
Day 2 Revision
Day 2 RevisionDay 2 Revision
Day 2 Revision
 
Day 1 - Revision
Day 1 - RevisionDay 1 - Revision
Day 1 - Revision
 

Plus de Shashank Kapoor

Rural engineering process : Development of farms by automation
Rural engineering process : Development of  farms by automationRural engineering process : Development of  farms by automation
Rural engineering process : Development of farms by automationShashank Kapoor
 
Design and analysis of polar, cartesian and delta 3d printer
Design and analysis of polar, cartesian and delta 3d printerDesign and analysis of polar, cartesian and delta 3d printer
Design and analysis of polar, cartesian and delta 3d printerShashank Kapoor
 
Multi processor scheduling
Multi  processor schedulingMulti  processor scheduling
Multi processor schedulingShashank Kapoor
 
Nano 3d printing : Two Photon lithography
Nano 3d printing : Two Photon lithographyNano 3d printing : Two Photon lithography
Nano 3d printing : Two Photon lithographyShashank Kapoor
 
MQTT Protocol: IOT Technology
MQTT Protocol: IOT TechnologyMQTT Protocol: IOT Technology
MQTT Protocol: IOT TechnologyShashank Kapoor
 
Real time Canny edge detection
Real time Canny edge detectionReal time Canny edge detection
Real time Canny edge detectionShashank Kapoor
 
Training report of C language
Training report of C languageTraining report of C language
Training report of C languageShashank Kapoor
 
Real time heart monitoring system
Real time heart monitoring systemReal time heart monitoring system
Real time heart monitoring systemShashank Kapoor
 
IFTTT: If This Then That
IFTTT: If This Then ThatIFTTT: If This Then That
IFTTT: If This Then ThatShashank Kapoor
 
Project management : Pert and Cpm
Project management : Pert and CpmProject management : Pert and Cpm
Project management : Pert and CpmShashank Kapoor
 
Bushed pin flange coupling
Bushed pin flange couplingBushed pin flange coupling
Bushed pin flange couplingShashank Kapoor
 
Jigs and there application
Jigs and there applicationJigs and there application
Jigs and there applicationShashank Kapoor
 
Air cooling of electrical equipments
Air cooling of electrical equipmentsAir cooling of electrical equipments
Air cooling of electrical equipmentsShashank Kapoor
 
Mach Number and Shock waves
Mach Number and Shock waves Mach Number and Shock waves
Mach Number and Shock waves Shashank Kapoor
 

Plus de Shashank Kapoor (15)

Rural engineering process : Development of farms by automation
Rural engineering process : Development of  farms by automationRural engineering process : Development of  farms by automation
Rural engineering process : Development of farms by automation
 
Design and analysis of polar, cartesian and delta 3d printer
Design and analysis of polar, cartesian and delta 3d printerDesign and analysis of polar, cartesian and delta 3d printer
Design and analysis of polar, cartesian and delta 3d printer
 
Cfc’s and hcfc’s
Cfc’s and hcfc’sCfc’s and hcfc’s
Cfc’s and hcfc’s
 
Multi processor scheduling
Multi  processor schedulingMulti  processor scheduling
Multi processor scheduling
 
Nano 3d printing : Two Photon lithography
Nano 3d printing : Two Photon lithographyNano 3d printing : Two Photon lithography
Nano 3d printing : Two Photon lithography
 
MQTT Protocol: IOT Technology
MQTT Protocol: IOT TechnologyMQTT Protocol: IOT Technology
MQTT Protocol: IOT Technology
 
Real time Canny edge detection
Real time Canny edge detectionReal time Canny edge detection
Real time Canny edge detection
 
Training report of C language
Training report of C languageTraining report of C language
Training report of C language
 
Real time heart monitoring system
Real time heart monitoring systemReal time heart monitoring system
Real time heart monitoring system
 
IFTTT: If This Then That
IFTTT: If This Then ThatIFTTT: If This Then That
IFTTT: If This Then That
 
Project management : Pert and Cpm
Project management : Pert and CpmProject management : Pert and Cpm
Project management : Pert and Cpm
 
Bushed pin flange coupling
Bushed pin flange couplingBushed pin flange coupling
Bushed pin flange coupling
 
Jigs and there application
Jigs and there applicationJigs and there application
Jigs and there application
 
Air cooling of electrical equipments
Air cooling of electrical equipmentsAir cooling of electrical equipments
Air cooling of electrical equipments
 
Mach Number and Shock waves
Mach Number and Shock waves Mach Number and Shock waves
Mach Number and Shock waves
 

Dernier

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Dernier (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Pert and cpm

  • 1. PERT & CPM SUBMITTED BY:- SHASHANK KAPOOR MECHANICAL , 154169
  • 2. What isthe PERT&CPM? It is nothing but the technique used in Network analysis of project management, such as planning , management and control of project. So, what is project ?? “A project is a series of activities directed to accomplishment of a desired objective.” Plan your work first…..then work your plan
  • 3. Project Evaluation & Review Techniques (PERT) In PERT is basicallyamethod to analyze the tasks involved in completing agiven project,especially the time neededto completeeachtask, and to identify the minimum time neededto complete the total project. – Multiple time estimates – Probabilistic activity times USED IN : Project management - for non-repetitive jobs (research and development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates.
  • 4. Critical Path Method (CPM) In CPM activities are shown as a network of precedence relationships using activity-on-node network construction. – Single estimate of activity time – Deterministic activity times USED IN : Production management - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
  • 5. KEY ELEMENTS  Arrows:- leading from tail to head directionally Indicate Activity  Nodes:- Indicate Event, a point in time where one or more activities start and/or finish.  Earliest time:It is categorized in two sub elements. 1. Earliest Starting time (ES):-Time at which the activity can start 2. Earliest finishing time(EF):-Equals to the earliest start time for the activity plus the time required to complete the activity  Latest time :It is categorized in two sub elements. 1.Latest Starting time (LS):-Time in which the activity can be completed without delaying 2.Latest Finishing time (LF):-equal to the latest finish time minus the time required to complete the activity.  Slack time:-The difference between its earliest and latest start time.  Critical Path:-The path of activities having zero Slack time.
  • 6. KEY ELEMENTS  Optimistic time (a): – It is the shortest time in which the activity can be completed.  Most likely time (m) – It is the probable time required to perform the activity.  Pessimistic time (b)– It is the longest estimated time required to perform an activity .  Expected time (Te) – approximation time taken to complete an activity. Te= 𝒂+𝟒𝒎+𝒃 𝟔  Standard deviation ( ) – Higher the SD is the greater amount of uncertainty exists  Variance (𝝈 𝟐 ) − Large variance indicates great uncertainty, a small variance indicates a more accurate estimate = 𝑏−𝑎 6
  • 8. SOLUTION Activity Optimistic Time (a) Most likely Time(m) Pessimisti c Time (b) Expected Time (Te) Standard Deviation 1-2 1 1 7 2 1 1-3 1 4 7 4 1 1-4 2 2 8 3 1 2-5 1 1 1 1 0 3-5 2 5 14 6 2 4-6 2 5 8 5 1 5-6 3 6 15 7 2
  • 10. CRITICAL PATH  Paths:- 1-2-5-6 = 2+1+7=10 1-3-5-6 = 4+6+7=17 1-4-6 = 3+5=8  1-3-5-6 is critical path since it take maximum time.
  • 11. CRITICAL PATH NODE LC-ES TOTAL 1 0-0 0 2 9-2 7 3 4-4 0 4 12-3 9 5 10-10 0 6 17-17 0 On Analyzing the Node which having total =0 is 1-3-5-6 Hence it is critical path
  • 12. PROBABILISTIC DETERMINATION  What isthe Probability of it taking20 weeks? CriticalPath=1-3-5-6=17weeks T =20 weeks C=17 weeks 𝑧 = 𝑇−𝐶 𝜎2 (Variance) 𝜎2 = 1 + 4 + 4 = 9 𝑧 = 20−17 9 = 1 Lookup Zvalue in normal distribution table Pz=0.8413 or 84.13% Goingover 20 weeks would be 100 – 84.13 = 15.87% (Probability of ittaking 20 weeks)
  • 25. CRITICAL PATH  Paths:-  1-2-5-7-8=2+1+2+1=6 days  1-3-5-7-8=3+2+2+1=8 days  1-3-6-7-8=3+5+3+1=12days  1-4-6-7-8=4+7+3+1=15 days 1-4-6-7-8 is critical path since it take maximum time.
  • 26. CRITICAL PATH NODE LC-ES TOTAL 1 0-0 0 2 11-2 9 3 6-3 3 4 4-4 0 5 12-5 7 6 11-11 0 7 14-14 0 8 15-15 0 On Analyzing the Node which having total =0 is 1-4-6-7-8 Hence it is critical path
  • 27. What happen if we have large number of Network problem??
  • 28. Conclusion  For large number of network problem Ford Fulkerson Max Flow Algorithm is the point that can give us the optimal critical path since it is use for finding the maximum flow in a flow network for single source and single sink.