SlideShare une entreprise Scribd logo
1  sur  20
Télécharger pour lire hors ligne
Industrial Engineering in Garments
(IE in Sewing Department )
Database Management Apparel System
Assignment – 1
Name of Group Members:
1. Suraj Gangurde
2. Shivam Sagar
Index
1. Introduction
2. Roles of IE
3. Requirement analysis
4. Process Flow Diagram
5. Work Flow Diagram
6. Entity Relationship Diagram
7. Data Flow Diagram
Industrial Engineer :
Industrial engineering is a branch of engineering which is
related with the optimization of complex systems or processes.
It is totally concerned with the improvement, development, and
implementation of integrated systems of people, money,
information, knowledge, energy and it’s also analysis as well as
the mathematical, physical and social sciences together with
the principles and systems of engineering design to predict and
assess the results to be obtained from such types of systems.
Roles of IE:
1. Planning layouts
2. Monitoring Production flow system
3. Decide the machines and attachments for all style
4. Monitoring and improve the operator performance
5. Operator training
6. Production control system
7. Quality control
Requirement Analysis :
1. Time study
Time Study is the analysis of a specific job by a qualified worker in an effort to
find the most efficient method in terms of time and effort. Time Study measures
the time necessary for a job or task to be completed using the best method.
2. Method study
Method study the process of subjecting work to systematic, critical scrutiny to
make it more effective and/or more efficient. It is one of the keys to achieving
productivity improvement.
3. M/c Calculation
4. Skill Matrix
Effective tool to boost productivity in apparel Industry Training . Skill
matrix is a table that shows skills of individuals in a team and any gaps between
the skills of employees and the job roles they have.
5. Thread Consumption
Calulation and analysis of the requirement of thread.
6. Calculate SAM
Standard allowed minute (SAM) means how much time is required to make one
complete garment including allowances. SAM is used to measure the task or
work content of a garment. This term is widely used byindustrial engineers and
production people in the garment manufacturing industry.
7. Operation Breakdown
The method of preparing operations' list in a sequence is called as operation
breakdown.
8. Calculate Efficiency
Process Flow of industrial engineer :
Negotiation with Garment Merchandiser
Garment Analysis
Make P.P meetingif all the required fabrics , trimmings and accessories are in housed .
Production Target
Set machine layout
Line setting
Line Balancing
Continuous production meeting
Collecting production data
Preparing production report
Production report analysis
Report submit to factory Manage
Explanation:
01 Negotiation with garments merchandiser
It is the very first work of an industrial engineer. Here, he should vastly discussed with
garments merchandiser about the in-coming garments product.
02 Garments analysis
Confirmed garments product is clearly analyzed here by industrial engineer. It helps to
complete rest of the processes very easily.
03 Make P.P meeting
Here, P.P meeting should be organized if all the required fabrics, trimmings and
accessories .
04 Production target
Production target should set here according to factory capacity. It helps to respect the
shipment date.
05 Set machine layout
Machine layout is set here according to total processes needed to complete a
garment item.
06 Line setting
In this process, actual line setting should be done to utilize the garment workers
properly. If it takes more time in line setting then garments production will be
decreased.
07 Line balancing
To minimize the number of work stations, cycle time, line balancing is done here. Its
a very important process to achieve desired production target.
08 Continuous production meeting
Production meeting should be done here at regular interval. If any problem will arise
during garments production, should take necessary actions to solve that.
09 Collecting production data
Production data should be collected here for preparing production report.
10 Preparing production report
Here, total garments production report has prepared to analysis about the whole
production.
11 Production report analysis
Garments production report is analyzed here from different points of view.
12 Report submit to factory manager
Finally garments production report have to submit into the factory manager.
Work Flow :
CALCULATE SAM OF
GARMENT AND
DIFFERENT
CONSUMPTIONS
WORK
MEASUREMENT OF
NEW CONFIRMED
ORDER
TO ADVICE PRODUCTION
DEPARTMENT ON
GARMENT SAM AND LINE
LAYOUT
TO CALCULATE LINE
EFFICIENCY
DAY TO DAY
ACTIVITY
TO CALCULATE
OPERATOR
EFFECIENCY
GRADE CHANGE OF
OPERATORS
TIME AND METHOD
STUDY
TIME STUDY
CHECK FOR WORK AIDS
AND COMPLIANCES
PREPARATION OF
INCENTIVE SCHEME
Database Management Format:
A data management format helps in manage data, meet funder requirements, and help
others use data if shared.
Buyer:
 Buyer id (int, 5)
 Details (text ,15)
 Order No. (int, 9)
 Style No. (int ,5)
 Product Type (text, 15)
Order Details:
 Style No. (int ,5)
 Product Detail (text, 15)
 Quantity (int, 9)
 Size Ratio (int, 5)
Operation Bulletin:
 Operation no. (int, 3)
 Name (text ,15)
 Runtime (int, 9)
 Efficiency (int, 3)
 SAM (int ,10)
 Work Center (text, 15)
 Remarks (text, 15)
Thread Consumption:
 Style No. (int ,5)
 Size (text ,5)
 SPI (int ,1)
 Quantity (int, 10)
 Operation Description (text, 15)
 Machine Type (text ,10)
 Seam Length (int ,3)
Costing:
 Total thread consumption (int 3)
 Thread rate (int 3)
 Price mtr. (int 4)
Hourly Production:
 Style (int 5)
 Quantity (int 9)
 SAM (int 10)
 Pieces per shift (int 4)
 Total avl. Min (int 10)
 Pieces pr.hr. (int 5)
Sewing:
 Layout (text 10)
 Efficiency (int 3)
BUYER
ORDER
No.
BUYER
Id
DETAIL
S
STYLE
No.
MERCHANDISING
ORDER DETAILS
STYLE No.
PRODUCT
DETAILS
INDUSTRIAL
ENGINEETING
THREAD
CONSUMPTION
OPERATION BULLETIN
SAM
HOURLY
PRODUCTION
SEWING
Product
type
QUANTITY
SIZE
RATIO
TECH
PACK
STYLE
TOTAL
AVAILABLE
MIN.
QUANTITY
PIECES PER
HOUR
SAM
PRICE PER
SHIFT
SAM
OPERATION
No.
OPERATION
NAME
REMARK
RUNTIME
EFFICIENCY
WORK
CENTRE
SIZE
STYLE No.
SPI
OPERTION
DESCRIPTION
SEAM
LENGTH
QUALITY
MACHINE
TYPE
LAYOUT EFFICIENCY
Merchandiser
E-R Diagram
IE
SAM Operation
Bulletin
Thread
Consumption
BUYER MERCHANDISING
Industrial engineeer
(IE)
Production Report
Level-0 Data Flow Diagram
Order Details
Costing Details
Order
Production
Report
Merchandiser
Production
Details
BUYER MERCHANDISING ORDER DETAILS
THREADING
Industrial engineeer
(IE)
FEASIBILITY
OPERATION BULLETIN
HOURLY PRODUCTION
SEWING
Production Report
Level-1 Data Flow Diagram
Order
Requirement
analysis
Sending
Report
Thread
Consumption
Techpack
Procedure Starts
Order
procede
to
sewing
floor
Sending report
Production
Report
Thread
Consumption
Operation
Bulletin
Feasibility
Details
BUYER MERCHANDISING ORDER DETAILS COSTING
THREADING
PURCHASE SOURCING
Industrial engineeer
(IE)
FEASIBILITY
OPERATION BULLETIN
SAM
COSTING
HOURLY PRODUCTION
SEWING
Production Report
Level-2 Data Flow Diagram
Costing Details
Costing
Details
Requirement
analysis
Calculation
Sending
Report
Order
Thread
Consumption
Production
Report
Feasibility
Thread
Consumption
Operation
Bulletin
Details
BUYER MERCHANDISING ORDER DETAILS COSTING
THREADING
PURCHASE SOURCING
Industrial engineeer
(IE)
FEASIBILITY
OPERATION BULLETIN
SAM
COSTING
HOURLY PRODUCTION
SEWING
LINE PLAN
MANPOWER
REQUIREMENT
LINE BALANCING
MACHINE
REQUEST
LINE LAYOUT OPERATIVE CAPACITY
Production Report
Request Generation
Purchase of Thread
Orders
Level-3 Data Flow Diagram
Calculation
Costing Details
Production
Report
Thread
Consumption
Feasibility
Operation
Bulletin
Sending Report
Costing
Details
Order
Sending Report
Requirement
analysis
Details
Normalization:
Normalization is the process of reorganizing data in a database so that it meets two basic
requirements .There is no redundancy of data (all data is stored in only one place), and data
dependencies are logical (all related data items are stored together). Normalization is
important for many reasons, but chiefly because it allows databases to take up as little disk
space as possible, resulting in increased performance.
Buyer:
 Buyer id
 Style no.
 Product Type
Order Details:
 Style No.
 Product Detail
 Quantity
 Size Ratio
Operation Bulletin:
 Style No.
 Operation no.
 Runtime
 Efficiency
 SAM
Thread Consumption:
 Style No.
 Size
 SPI
 Quantity
 Seam Length
Costing:
 Thread rate
 Price mtr.
 Quantity
Hourly Production:
 Style no.
 Quantity
 SAM
 Pieces per shift
 Pieces pr.hr.
Sewing:
 Layout
 Efficiency

Contenu connexe

Tendances

Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorRakibul Hasan
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel productionNiloy Rahman
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSRabiul Hasan
 
Garments production system
Garments production systemGarments production system
Garments production systemPacific Cotton
 
Inspection in garment industry
Inspection in garment industryInspection in garment industry
Inspection in garment industrySherminAkter1
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-systemMuhib Limon
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceMazharul Islam
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Sharif Bhuiyan
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentK.K.T Madhusanka
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 

Tendances (20)

Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
 
Work study presentation
Work study presentationWork study presentation
Work study presentation
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel production
 
Advance manufacturing system in sewing floor
Advance manufacturing system in sewing floorAdvance manufacturing system in sewing floor
Advance manufacturing system in sewing floor
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLS
 
Garments production system
Garments production systemGarments production system
Garments production system
 
Inspection in garment industry
Inspection in garment industryInspection in garment industry
Inspection in garment industry
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-system
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
 
Garment Defects
Garment DefectsGarment Defects
Garment Defects
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 

Similaire à industrial engineering in sewing department

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Ie microsoft office power point presentation
Ie  microsoft office power point presentationIe  microsoft office power point presentation
Ie microsoft office power point presentationShamim Hasan
 
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...ijtsrd
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptxVarun Mehrotra
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfHasanSajib3
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...HasanRabbi3
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...IAEME Publication
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...IRJET Journal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
A038301010
A038301010A038301010
A038301010theijes
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant MustafaElAkkad
 

Similaire à industrial engineering in sewing department (20)

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Ie microsoft office power point presentation
Ie  microsoft office power point presentationIe  microsoft office power point presentation
Ie microsoft office power point presentation
 
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Aie module3 handout
Aie module3 handoutAie module3 handout
Aie module3 handout
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdf
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
 
30120140504022
3012014050402230120140504022
30120140504022
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
A038301010
A038301010A038301010
A038301010
 
Line balancing
Line balancing Line balancing
Line balancing
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
 

Plus de ShivamSagar13

Plus de ShivamSagar13 (9)

Technical garments by ying gao
Technical garments by ying gaoTechnical garments by ying gao
Technical garments by ying gao
 
Attitude
AttitudeAttitude
Attitude
 
Ipr of vespa scooter
Ipr of vespa scooterIpr of vespa scooter
Ipr of vespa scooter
 
Zipper
ZipperZipper
Zipper
 
Event management system
Event management systemEvent management system
Event management system
 
Pottery docuemtation
Pottery docuemtationPottery docuemtation
Pottery docuemtation
 
Formal jackets
Formal jacketsFormal jackets
Formal jackets
 
Ai in sampling
Ai in samplingAi in sampling
Ai in sampling
 
Swot, 4 ps of mi
Swot, 4 ps of miSwot, 4 ps of mi
Swot, 4 ps of mi
 

Dernier

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 

Dernier (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 

industrial engineering in sewing department

  • 1. Industrial Engineering in Garments (IE in Sewing Department ) Database Management Apparel System Assignment – 1 Name of Group Members: 1. Suraj Gangurde 2. Shivam Sagar
  • 2. Index 1. Introduction 2. Roles of IE 3. Requirement analysis 4. Process Flow Diagram 5. Work Flow Diagram 6. Entity Relationship Diagram 7. Data Flow Diagram
  • 3. Industrial Engineer : Industrial engineering is a branch of engineering which is related with the optimization of complex systems or processes. It is totally concerned with the improvement, development, and implementation of integrated systems of people, money, information, knowledge, energy and it’s also analysis as well as the mathematical, physical and social sciences together with the principles and systems of engineering design to predict and assess the results to be obtained from such types of systems.
  • 4. Roles of IE: 1. Planning layouts 2. Monitoring Production flow system 3. Decide the machines and attachments for all style 4. Monitoring and improve the operator performance 5. Operator training 6. Production control system 7. Quality control Requirement Analysis : 1. Time study Time Study is the analysis of a specific job by a qualified worker in an effort to find the most efficient method in terms of time and effort. Time Study measures the time necessary for a job or task to be completed using the best method. 2. Method study
  • 5. Method study the process of subjecting work to systematic, critical scrutiny to make it more effective and/or more efficient. It is one of the keys to achieving productivity improvement. 3. M/c Calculation 4. Skill Matrix Effective tool to boost productivity in apparel Industry Training . Skill matrix is a table that shows skills of individuals in a team and any gaps between the skills of employees and the job roles they have. 5. Thread Consumption Calulation and analysis of the requirement of thread. 6. Calculate SAM Standard allowed minute (SAM) means how much time is required to make one complete garment including allowances. SAM is used to measure the task or work content of a garment. This term is widely used byindustrial engineers and production people in the garment manufacturing industry. 7. Operation Breakdown The method of preparing operations' list in a sequence is called as operation breakdown. 8. Calculate Efficiency
  • 6. Process Flow of industrial engineer : Negotiation with Garment Merchandiser Garment Analysis Make P.P meetingif all the required fabrics , trimmings and accessories are in housed . Production Target Set machine layout
  • 7. Line setting Line Balancing Continuous production meeting Collecting production data Preparing production report Production report analysis Report submit to factory Manage
  • 8. Explanation: 01 Negotiation with garments merchandiser It is the very first work of an industrial engineer. Here, he should vastly discussed with garments merchandiser about the in-coming garments product. 02 Garments analysis Confirmed garments product is clearly analyzed here by industrial engineer. It helps to complete rest of the processes very easily. 03 Make P.P meeting Here, P.P meeting should be organized if all the required fabrics, trimmings and accessories . 04 Production target Production target should set here according to factory capacity. It helps to respect the shipment date. 05 Set machine layout Machine layout is set here according to total processes needed to complete a garment item. 06 Line setting In this process, actual line setting should be done to utilize the garment workers properly. If it takes more time in line setting then garments production will be decreased. 07 Line balancing To minimize the number of work stations, cycle time, line balancing is done here. Its a very important process to achieve desired production target. 08 Continuous production meeting Production meeting should be done here at regular interval. If any problem will arise during garments production, should take necessary actions to solve that. 09 Collecting production data Production data should be collected here for preparing production report. 10 Preparing production report Here, total garments production report has prepared to analysis about the whole production. 11 Production report analysis Garments production report is analyzed here from different points of view. 12 Report submit to factory manager Finally garments production report have to submit into the factory manager.
  • 9. Work Flow : CALCULATE SAM OF GARMENT AND DIFFERENT CONSUMPTIONS WORK MEASUREMENT OF NEW CONFIRMED ORDER TO ADVICE PRODUCTION DEPARTMENT ON GARMENT SAM AND LINE LAYOUT TO CALCULATE LINE EFFICIENCY DAY TO DAY ACTIVITY TO CALCULATE OPERATOR EFFECIENCY GRADE CHANGE OF OPERATORS TIME AND METHOD STUDY TIME STUDY CHECK FOR WORK AIDS AND COMPLIANCES PREPARATION OF INCENTIVE SCHEME
  • 10. Database Management Format: A data management format helps in manage data, meet funder requirements, and help others use data if shared. Buyer:  Buyer id (int, 5)  Details (text ,15)  Order No. (int, 9)  Style No. (int ,5)  Product Type (text, 15) Order Details:  Style No. (int ,5)  Product Detail (text, 15)  Quantity (int, 9)  Size Ratio (int, 5) Operation Bulletin:  Operation no. (int, 3)  Name (text ,15)  Runtime (int, 9)  Efficiency (int, 3)  SAM (int ,10)  Work Center (text, 15)  Remarks (text, 15) Thread Consumption:  Style No. (int ,5)  Size (text ,5)  SPI (int ,1)  Quantity (int, 10)  Operation Description (text, 15)  Machine Type (text ,10)  Seam Length (int ,3)
  • 11. Costing:  Total thread consumption (int 3)  Thread rate (int 3)  Price mtr. (int 4) Hourly Production:  Style (int 5)  Quantity (int 9)  SAM (int 10)  Pieces per shift (int 4)  Total avl. Min (int 10)  Pieces pr.hr. (int 5) Sewing:  Layout (text 10)  Efficiency (int 3)
  • 12. BUYER ORDER No. BUYER Id DETAIL S STYLE No. MERCHANDISING ORDER DETAILS STYLE No. PRODUCT DETAILS INDUSTRIAL ENGINEETING THREAD CONSUMPTION OPERATION BULLETIN SAM HOURLY PRODUCTION SEWING Product type QUANTITY SIZE RATIO TECH PACK STYLE TOTAL AVAILABLE MIN. QUANTITY PIECES PER HOUR SAM PRICE PER SHIFT SAM OPERATION No. OPERATION NAME REMARK RUNTIME EFFICIENCY WORK CENTRE SIZE STYLE No. SPI OPERTION DESCRIPTION SEAM LENGTH QUALITY MACHINE TYPE LAYOUT EFFICIENCY Merchandiser E-R Diagram IE SAM Operation Bulletin Thread Consumption
  • 13. BUYER MERCHANDISING Industrial engineeer (IE) Production Report Level-0 Data Flow Diagram Order Details Costing Details Order Production Report Merchandiser Production Details
  • 14. BUYER MERCHANDISING ORDER DETAILS THREADING Industrial engineeer (IE) FEASIBILITY OPERATION BULLETIN HOURLY PRODUCTION SEWING Production Report Level-1 Data Flow Diagram Order Requirement analysis Sending Report Thread Consumption Techpack Procedure Starts Order procede to sewing floor Sending report Production Report Thread Consumption Operation Bulletin Feasibility Details
  • 15. BUYER MERCHANDISING ORDER DETAILS COSTING THREADING PURCHASE SOURCING Industrial engineeer (IE) FEASIBILITY OPERATION BULLETIN SAM COSTING HOURLY PRODUCTION SEWING Production Report Level-2 Data Flow Diagram Costing Details Costing Details Requirement analysis Calculation Sending Report Order Thread Consumption Production Report Feasibility Thread Consumption Operation Bulletin Details
  • 16. BUYER MERCHANDISING ORDER DETAILS COSTING THREADING PURCHASE SOURCING Industrial engineeer (IE) FEASIBILITY OPERATION BULLETIN SAM COSTING HOURLY PRODUCTION SEWING LINE PLAN MANPOWER REQUIREMENT LINE BALANCING MACHINE REQUEST LINE LAYOUT OPERATIVE CAPACITY Production Report Request Generation Purchase of Thread Orders Level-3 Data Flow Diagram Calculation Costing Details Production Report Thread Consumption Feasibility Operation Bulletin Sending Report Costing Details Order Sending Report Requirement analysis Details
  • 17.
  • 18.
  • 19. Normalization: Normalization is the process of reorganizing data in a database so that it meets two basic requirements .There is no redundancy of data (all data is stored in only one place), and data dependencies are logical (all related data items are stored together). Normalization is important for many reasons, but chiefly because it allows databases to take up as little disk space as possible, resulting in increased performance. Buyer:  Buyer id  Style no.  Product Type Order Details:  Style No.  Product Detail  Quantity  Size Ratio Operation Bulletin:  Style No.  Operation no.  Runtime  Efficiency  SAM Thread Consumption:  Style No.  Size  SPI  Quantity  Seam Length Costing:  Thread rate
  • 20.  Price mtr.  Quantity Hourly Production:  Style no.  Quantity  SAM  Pieces per shift  Pieces pr.hr. Sewing:  Layout  Efficiency