Unit - V
Planning For The Built
Environment
Mr. Shrikant R Kate
B.E. (Civil) M. Tech. (CM)
Concept of an Integrated environment :-
Natural and Man-made
o Civil engineering projects need inputs from various experts, right from its
conceptualization to completion
o The civil project use lot of natural resources such as stones, bricks
manufactured out of soil, cement etc. as well as huge land for
construction .
o Thus, various agencies involved such as Architect, Contractor, Coordinating
agency, landscape designers, government agencies, suppliers etc. have to
work in proper coordination with each other for the effective
implementation of the project.
o Tokeep harmony with the nature is perhaps the first step that shall be
practiced in all over development projects . This can be achieved by
proper coordination between various agencies involved in construction…
Roles of the various agencies :
Architect :
* The basic role is planning of the entire projects.
* He should take into consideration the availability of local materials,
local environmental conditions, climatic conditions, overall objective of
the project for creating better environment than the existing conditions.
Civil Engineer :
* The civil engineer as Project Management Consultant has to work in various
capacities for the project, right from conception to completion.
* He as to coordinate various activities of all the agencies to make sure that the
project is completed as per schedule.
Structural Engineer :
The civil engineer with expertise in the knowledge of structural design of the
project components looks after their safely through designs.
Environmental Engineer:
Environmental Engineer has to play a major role in managing the water
supply and treatment for the project, management of the waste water
generated, solid waste management etc. for achieving better environmental
conditions.
Other Services :
Apart from these major consultants working in the project, various
other agencies and consultants such as Landscape architects, Interior
Designers , Plumbing Consultants etc. play a major role in the success of the
project.
Principles of Planning
• These are the guidelines for planning the buildings to
suit their functional requirements.
• Various principles of planning:-
1. Aspect
2. Prospect
3. Privacy
4. Roominess
5. Grouping
6. Circulation
7. Elegance
8. Sanitation
9. Orientation
10. Economy
1. Aspect:
• It is the positioning of different rooms in the house according to
their functional requirements.
• Aspect of any room is decided by following sun diagram
• It can be seen that eastern aspect will be most suitable for
kitchen i.e. a room receiving light from a particular direction is
said to have that aspect.
• Similarly with climate point of view, and as per the requirement
of light, air, etc decides the position of the room.
• Aspects for various types of rooms are enlisted in following
table:
2. Prospect:
• It is the arrangement of windows in the external walls of the
buildings so as to reveal certain desired views and conceal
undesired views from inside.
• This can be done by putting inclined brackets or by providing
blind walls.
• The prospect can be achieved by projecting windows as
shown:
3. Privacy:
•Privacy can be of a part or all parts
of a building from another building
or one room from another room.
•Privacy of the building can be
achieved by providing windows at
higher level than the adjoining road
or ground as well as by growing
plants and trees around the
building for example privacy for
swimming pool.
•Privacy inside a room can be
achieved by providing door on one
side of the longer wall so that
minimum portion of the room is
visible.
4. Roominess:
• It is the “feel of speciousness” obtained in the room when one
enters it.
• This is achieved by adjusting length to breadth ratio between 1.2 to
1.5.
• Light colors and also different colors on each wall depending on
light direction can also improve the roominess.
5. Grouping:
•It can be defined as the arrangement of various rooms to coordinate functions
of rooms and movement of users.
•For example kitchen and dining room should be adjacent ,the stair should
have approach from maximum rooms.
• In case of industries, hospitals, schools, the rooms are to be arranged
according to their sequence of operations
6. Circulation
• It is the movement inside the building in horizontal or
vertical direction.
• Horizontal circulation can be provided by passages. The
passages should be short, wide and well illuminated. The
doors should not open in corridor, as it will obstruct the
movement.
• For vertical circulation, centrally located staircases, ramps,
lifts, escalators are most suitable. Following fig. shows
good and bad circulation.
7. Elegance
• It is the effect produced by the elevation. It depends upon proportion
of width and height of the building and choice of material and colour
scheme.
• Elegance can also be achieved by using proper cladding material to
the face of the building. It can also be improved.
• The beautification process need not be costly.
8. Sanitation
• It includes provision of light, ventilation, cleanliness, water supply and
sanitary amenities.
• The minimum window area should not be less than 1/10th of floor
area to allow maximum sunlight to enter the room , which destroys
the germs.
• The doors and windows should be positioned in such a way that hot
air, foul odours are removed from the room and fresh cool air is
admitted in the room.
• This is achieved by providing ventilators near the roof in addition to
windows. Cross ventilation should be employed for proper circulation
of air.
• The sanitary units should be provided with non-absorbent flooring
materials with proper slopes and continuous water supply.
9. Orientation :
• It means fixing major axis of the building to achieve maximum natural
gifts.
• In India, the long walls should be provided towards North and South
and short walls in East and West direction to reduce the area exposed
to sunrays.
• In hot climate verandahs, chajjas and sun breakers should be provided
to protect the building from sunrays. Rooms occupied through out the
day should be placed on north.
10. Economy :
• It is the last but not the least principle of planning. All efforts are in vein
if the cost is not considered.
• In any case aspect and circulation . On the other hand, prospect can be
sacrificed for aspect.
• Simple building plans along with minimum doors and windows with
simple designs will reduce the cost.
• In any case, functional utility, structural stability of the construction
should never be sacrificed.
• Economy can also achieved by making maximum use of locally available
materials to suit the local environmental conditions and use of locally
available labour.
Role of Byelaws in Regulating
the Environment
 What is meant bye ‘Building bye-laws’?
1. These are the restrictions laid down by the municipal,town
planning or revenue authorities on construction and planning
of different types of buildings.
2. Building byelaws differ from place to place . For example
building byelaws for Mumbai will not be same as that of some
district or taluka place having municipality or a village having
grampanchayt.
3. The above mentioned authorities sanction the building plans
only after scrutinizing them regarding the byelaws.
Necessity of Building Byelaws
1. Tocurb the haphazard growth of towns or cities.
2. Tofacilitate future use of land, widening of streets, controlling the
ribbon development in an area.
3. Toreduce pollution in area by restricting population density in an area
there by providing hygienic environment
4. Toensure that every citizen will receive facilities like water supply,
sanitation, ventilation, electric supply, parking and safety.
Some Important Building Byelaws are as follows :-
1) For Open space requirement :
oThe open space around the building is required to be provided to meet
requirements regarding lighting , ventilations , future expansion , and approach.
oOpen space for front , rear and side yards depend upon height of building and
can be calculated by the formula
W = 3 + (h/10)/3 where W = width of the open space in .m
h = height of the building in. m < 25 m
o Open space for rear yard for the building of height less than 10m . Should be
3m average but in no case less than 1.8 m.
2) For height of the building :
Sr.no. Width of the road Height of Building
1. Upto 8 m. No more than 1 ½ times road width
2. 8m to 12 m. No more than 12m
3. >12m. No more than road- width and 21m
o The height of the building is governed by the width of the road which is
in front of the building or the minimum width of the rear space.
o In city areas, the construction is allowed on fall areas without provision
of margins on any side . For this, a light plane is marked at a suitable
angle from the edge or road on other side and the height of building is
suitably curtailed off to allow he light plant to pass so as not to make
adjacent property lack, from natural ventilation.
Relationship exists between road width of building height
• The height of a building is suitably curtailed
off to allow the light plane to pass as shown
below :
3) For various forms of building coverage :
Following definitions explain various forms building coverage:
i. Covered area :
It is the ground covered above plinth. Area occupied by compound wall, is not
included in the covered area.
ii. Plinth area :
It is the built up covered area measured at the floor level of a building .
Following areas shall be included:




Areas of walls at floor level excluding plinth offsets, projection beyond clouding
when building consists of columns.
Internal shafts of sanitary installations less than 2 m^2 in area, air conditioning
ducts, lift.
Porches and other cantilevers provided.
Area of barsats at terrace.
Following areas shall not be included:






Lofts.
Internal shafts of sanitary installations greater than 2 m^2 in area.
Unclosed balconies.
Towers , turrets and domes unless they from a storey.
Architectural buns , cornices.
Vertical sub breakers .
iii. Floor area :
It is the usable covered area of the building at any floor level.
Thus, Floor area = Plinth area – Walls
Following areas shall be included :
 Doors and other openings
 Internals pillar and supports
 Plaster along the wall exceeding 300 m^2.
Following areas shall not be included:
 Plaster along the wall less than 300 m^2.
 Fire places projecting beyond face of walls.
iv. Built up area :
o It is the area covered by all floor in the building.
o It includes everything covered under roof. Area occupied by balcony, staircase is
excluded from the built up area.
v. Carpet area :
o It is defined as actual area of usable room at any floor level.
o It does not include sanitary accommodation , verandahs , corridors and passages
, stores in domestic building , stair cases and shafts from lifts , garages , air
condition ducts and plant .
vi. F S I :
It is also called as Floor Area Ratio (FAR) is defined as, “ It is the ratio of Total
built up area for the building ( taken together) to the total plot area.”
The FSI is different for different area. E.g. FSI for various parts of the same city
may vary. The permitted FSI is governed by the Development Control (DC ) rules ,
prevailing in that area.
4) Set Back Distance :
o It is the distance measured from centerline of road up to which plinth of building
may extend.
o It is provided to facilitate future road widening , parking of vehicles , free
circulation of air etc .
o Set back distance is about 1.5 to 1.67 times more for theaters , commercial
complexes , factories than residential building.
Set back distance
Type of Roads Minimum set back
distance
Ratio of column 3 to
column 2
Residential
buildings
Industrial
buildings
Village Road 9 m. 15m. 1.67
Major district road 15 m 24 m 1.60
National or state highway 30 m 45 m 1.50
Environmental Protection Act 1986
o Rapid urbanization and industrialization in haphazard manner has
led to degradation of the environment.
o The concern over environment protection and sustainable
development has grown tremendously especially in the developed
countries since late sixties.
o This law was introduced mainly to cover the loopholes present in
the earlier that took care of the specific pollution problem.
The main objectives of this act are as follows:
o Implementing nationwide programs for preventing, controlling and
abating the environmental pollution.
o Laying down safety measures for prevention of accidents and their
monitoring.
o Training the people by conducting workshops, seminars related to
environmental pollution.
o Preparation of standards, codes, manuals for abating environmental
pollution
o Establishing and recognizing various laboratories and institutes to
carry testing and monitoring work under this act………
Concept of Green Buildings
 What is ‘ Green Building’ ?
It is a new concept in the design approach right from planning which
reduces the adverse impacts of buildings on the environment .
 Integral parts of green buildings are as follows:
* Use of clean and renewable forms of energy such as solar energy.
* Efficient use of water.
* Use of eco friendly materials for construction.
* Hygienic conditions in the premises. Etc.
 Advantages of Green Buildings
* Energy saving in such buildings could be as high as 30 to 40 %.
* Comfort and safety to the occupants.
* Use of natural resources such as air , light etc. thus reducing the burden on
the conventional resources .
 Guidelines for Achieving “ Green Building”
Some of the guidelines for achieving Green Building are as
follows :
1. Building Shape and Orientation
*Choose the building shape such that it meets the work requirements w.r.t. day
lighting , solar heating and cooling etc.
*The shape and orientation shall be such that the maximum utilization of natural
resources is made .
2. Construction process
*The site disturbance can be reduced markedly by adopting environmentally
conscious construction practices.
* The process adopted shall be such that it uses and conserves the natural
resources like vegetation, natural drainage system etc.
* Potential improvements during construction process include :
i. Efficient use of temporary power and water requirements.
ii. Reuse of building debris to reuse waste produced.
iii. Developing overall efficiency guidelines.
iv. Use of energy efficient lighting systems.
3. Use of solar energy in building planning and design
*Building designed for passive solar energy and day-lighting use
peculiar features such as large south-facing windows and materials
that absorb and slowly release the sun’s heat.
* Passive solar designs can reduce heating bills by as much as 50%.
4. Water Harvesting
* Water harvesting means collecting runoff from the soil’s surface,
paved surfaces and other sources, and storing it for future use
such as irrigation .
* Water harvesting can also be achieved through-
i. Rain water harvesting
ii. Indoor water conservation
iii. Use of part of wastewater for non-portable uses
5. Landscaping
As far as possible native trees and plants shall be planted . These
require less water and are suitable for local conditions of water
availability and soil type.
Site Selection
 Factors of selecting site for Residential Building :
1) It must be clear title and in residential zone.
2) As far as possible rectangular plot should be selected.
3) It must be near to market, school, hospital, commercial area,
transportation.
4) The plot should have a separate approach road.
5) The land should be such that hard strata shall be available at
minimum excavation.
6) If the plot is in the vicinity of river then it must be above the high
flood level.
7) Plot in low-lying areas should be avoided as rainwater may get
accumulated in the plot.
 Factors of selecting site for educational building:
1) Site plot must be of clear title.
2) As far as possible rectangular plot should be selected because the maximum
area of plot can be used for construction.
3) The plot should have separate approach road.
4) Site should be near to the bus stop or well connected to the nearby area by
train or other transport system.
5) The land should have hard strata at minimum depth.
6) Site should be free from air pollution..
 Factors of selecting site for factory :
1) Plot from proper zone must be selected as industrial estates are developed for
a specific type of industry. For example chemical zone , electronic industry
zone etc.
2) The plot should have a separate approach road .
3) The factory site should be near to the rail or road junction in view of
transport required.
4) Uninterrupted and adequate electricity and water supply should be available
.
5) The land should be such that hard strata will be available after minimum
excavation.
6) If the plot is in the vicinity of river then it must be above the high flood level.
Use of Eco-Friendly materials for
Construction
From the various materials those materials which causes minimum
damage to the environment, right from their raw materials usage
upto final product, are considered to be ‘Eco-Friendly’.
 Properties of eco-friendly materials :
1. These materials causes minimum damage to the environment, right
from the manufacturing to final product.
2. Require minimum energy during manufacturing.
3. They do not emit harmful gases/fumes during manufacturing.
4. These are locally available and can be extracted from nature very
easily.
5. At the end of the useful life, there is a possibility recycle and reuse.
 Various eco-friendly materials are categorized as
follows :
1) Naturally available eco-friendly materials or product developed
using eco-friendly raw materials method .
a) Bamboo , timber.
b) Sun dried bricks.
c) Mud uses for houses, wall plastering etc.
2) Eco-friendly materials developed using waste product :
a) Fly ash bricks:
These are waste products of the thermal power plant viz.
fly-ash for manufacturing the bricks.
b) Ply wood Manufactured from bagasse:
Bagasse is a solid waste product of sugar industry . It is
used in manufacturing ply-wood boards and panels.

Contenu connexe

Tendances

Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisJaptyesh Singh
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
Long wall and short wall method 1
Long wall and short wall method 1Long wall and short wall method 1
Long wall and short wall method 1Saiyyed Akbar
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimationDhavalMithaiwala
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and CostingSakshi Kirar
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimateArpit Sethia
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
Principles of building planning
Principles of building planningPrinciples of building planning
Principles of building planningJanki Patel
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1ArunRavi43
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 

Tendances (20)

Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Dampness in building
Dampness in buildingDampness in building
Dampness in building
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Long wall and short wall method 1
Long wall and short wall method 1Long wall and short wall method 1
Long wall and short wall method 1
 
Types of estimate
Types of estimateTypes of estimate
Types of estimate
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Cavity walls
Cavity wallsCavity walls
Cavity walls
 
Building planning
Building planningBuilding planning
Building planning
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
Estimation
EstimationEstimation
Estimation
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Principles of building planning
Principles of building planningPrinciples of building planning
Principles of building planning
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 

Similaire à Basic Civil and Environmental Engineering (BCEE)_Unit 5_SPPU_Planning for the built environment_by S R Kate

Planning for the built environment ppt
Planning for the built environment  pptPlanning for the built environment  ppt
Planning for the built environment pptRushabh Shrishrimal
 
MODULE 2 Introduction and Town Planning.pptx
MODULE 2 Introduction and Town Planning.pptxMODULE 2 Introduction and Town Planning.pptx
MODULE 2 Introduction and Town Planning.pptxSilasChaudhari
 
Portfolio of construction technology
Portfolio of construction technologyPortfolio of construction technology
Portfolio of construction technologyNoshad Ahmed Wahocho
 
Niharika Jain,Residential Designer
Niharika Jain,Residential DesignerNiharika Jain,Residential Designer
Niharika Jain,Residential Designerdezyneecole
 
Residential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c idResidential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c iddezyneecole
 
Principles of Planning for Residential Buildings
Principles of Planning for Residential BuildingsPrinciples of Planning for Residential Buildings
Principles of Planning for Residential BuildingsRohan Dasgupta
 
Lecture5 principles of planning
Lecture5 principles of planningLecture5 principles of planning
Lecture5 principles of planningAfroz Khan
 
Builiding Byes laws
Builiding Byes laws Builiding Byes laws
Builiding Byes laws Shourya Puri
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdfEyuel24
 
functional requirement of building
functional requirement of buildingfunctional requirement of building
functional requirement of buildingRamu Neupane
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingIRJET Journal
 
Factors considered in Architectural design.pdf
Factors considered in Architectural design.pdfFactors considered in Architectural design.pdf
Factors considered in Architectural design.pdfSimiNaseer
 
Site Selection, Orientation and Ventilation Of Building
Site Selection, Orientation and Ventilation Of BuildingSite Selection, Orientation and Ventilation Of Building
Site Selection, Orientation and Ventilation Of BuildingAsmarudDin
 

Similaire à Basic Civil and Environmental Engineering (BCEE)_Unit 5_SPPU_Planning for the built environment_by S R Kate (20)

Planning for the built environment ppt
Planning for the built environment  pptPlanning for the built environment  ppt
Planning for the built environment ppt
 
principles of Building planning (BTP) (ECE)
principles of Building planning (BTP) (ECE)principles of Building planning (BTP) (ECE)
principles of Building planning (BTP) (ECE)
 
Ch 8 building planning
Ch 8 building planningCh 8 building planning
Ch 8 building planning
 
MODULE 2 Introduction and Town Planning.pptx
MODULE 2 Introduction and Town Planning.pptxMODULE 2 Introduction and Town Planning.pptx
MODULE 2 Introduction and Town Planning.pptx
 
Ch 3 zoning
Ch 3 zoningCh 3 zoning
Ch 3 zoning
 
Civil Diploma Industrial Training Report
Civil Diploma Industrial Training ReportCivil Diploma Industrial Training Report
Civil Diploma Industrial Training Report
 
Portfolio of construction technology
Portfolio of construction technologyPortfolio of construction technology
Portfolio of construction technology
 
unit-1.pdf
unit-1.pdfunit-1.pdf
unit-1.pdf
 
Building Bye-laws
Building  Bye-lawsBuilding  Bye-laws
Building Bye-laws
 
Niharika Jain,Residential Designer
Niharika Jain,Residential DesignerNiharika Jain,Residential Designer
Niharika Jain,Residential Designer
 
Residential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c idResidential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c id
 
Principles of Planning for Residential Buildings
Principles of Planning for Residential BuildingsPrinciples of Planning for Residential Buildings
Principles of Planning for Residential Buildings
 
Lecture5 principles of planning
Lecture5 principles of planningLecture5 principles of planning
Lecture5 principles of planning
 
Builiding Byes laws
Builiding Byes laws Builiding Byes laws
Builiding Byes laws
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
functional requirement of building
functional requirement of buildingfunctional requirement of building
functional requirement of building
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
Factors considered in Architectural design.pdf
Factors considered in Architectural design.pdfFactors considered in Architectural design.pdf
Factors considered in Architectural design.pdf
 
Final project documentation pdf
Final project documentation pdfFinal project documentation pdf
Final project documentation pdf
 
Site Selection, Orientation and Ventilation Of Building
Site Selection, Orientation and Ventilation Of BuildingSite Selection, Orientation and Ventilation Of Building
Site Selection, Orientation and Ventilation Of Building
 

Plus de Shrikant Kate

Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...
Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...
Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...Shrikant Kate
 
Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...Shrikant Kate
 
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...Shrikant Kate
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Shrikant Kate
 
Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...
Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...
Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...Shrikant Kate
 
Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...
Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...
Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...Shrikant Kate
 
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Shrikant Kate
 
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...Shrikant Kate
 
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...Shrikant Kate
 
Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...
Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...
Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...Shrikant Kate
 
Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...
Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...
Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...Shrikant Kate
 

Plus de Shrikant Kate (12)

Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...
Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...
Introduction to Artificial Intelligence Technique for Civil Engineering_ Unit...
 
Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...Material Management and Human Resource Management _ Unit 5 _ Construction Man...
Material Management and Human Resource Management _ Unit 5 _ Construction Man...
 
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
 
Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...
Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...
Basic Civil and Environmental Engineering (BCEE)_Unit 6_SPPU_Energy and envir...
 
Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...
Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...
Architecture and Town Planning _Unit 6_SPPU_Spacial Township, SEZ, CRZ, Smart...
 
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
 
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
 
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
 
Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...
Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...
Architecture and town planning _Unit 2 _SPPU_principle of landscaping and urb...
 
Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...
Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...
Architecture and town planning _Unit 1_SPPU_Principles, elements, Qualities a...
 

Dernier

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Dernier (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Basic Civil and Environmental Engineering (BCEE)_Unit 5_SPPU_Planning for the built environment_by S R Kate

  • 1. Unit - V Planning For The Built Environment Mr. Shrikant R Kate B.E. (Civil) M. Tech. (CM)
  • 2. Concept of an Integrated environment :- Natural and Man-made o Civil engineering projects need inputs from various experts, right from its conceptualization to completion o The civil project use lot of natural resources such as stones, bricks manufactured out of soil, cement etc. as well as huge land for construction . o Thus, various agencies involved such as Architect, Contractor, Coordinating agency, landscape designers, government agencies, suppliers etc. have to work in proper coordination with each other for the effective implementation of the project. o Tokeep harmony with the nature is perhaps the first step that shall be practiced in all over development projects . This can be achieved by proper coordination between various agencies involved in construction… Roles of the various agencies : Architect : * The basic role is planning of the entire projects. * He should take into consideration the availability of local materials, local environmental conditions, climatic conditions, overall objective of the project for creating better environment than the existing conditions.
  • 3. Civil Engineer : * The civil engineer as Project Management Consultant has to work in various capacities for the project, right from conception to completion. * He as to coordinate various activities of all the agencies to make sure that the project is completed as per schedule. Structural Engineer : The civil engineer with expertise in the knowledge of structural design of the project components looks after their safely through designs. Environmental Engineer: Environmental Engineer has to play a major role in managing the water supply and treatment for the project, management of the waste water generated, solid waste management etc. for achieving better environmental conditions. Other Services : Apart from these major consultants working in the project, various other agencies and consultants such as Landscape architects, Interior Designers , Plumbing Consultants etc. play a major role in the success of the project.
  • 4. Principles of Planning • These are the guidelines for planning the buildings to suit their functional requirements. • Various principles of planning:- 1. Aspect 2. Prospect 3. Privacy 4. Roominess 5. Grouping 6. Circulation 7. Elegance 8. Sanitation 9. Orientation 10. Economy
  • 5. 1. Aspect: • It is the positioning of different rooms in the house according to their functional requirements. • Aspect of any room is decided by following sun diagram
  • 6. • It can be seen that eastern aspect will be most suitable for kitchen i.e. a room receiving light from a particular direction is said to have that aspect. • Similarly with climate point of view, and as per the requirement of light, air, etc decides the position of the room. • Aspects for various types of rooms are enlisted in following table:
  • 7. 2. Prospect: • It is the arrangement of windows in the external walls of the buildings so as to reveal certain desired views and conceal undesired views from inside. • This can be done by putting inclined brackets or by providing blind walls. • The prospect can be achieved by projecting windows as shown:
  • 8. 3. Privacy: •Privacy can be of a part or all parts of a building from another building or one room from another room. •Privacy of the building can be achieved by providing windows at higher level than the adjoining road or ground as well as by growing plants and trees around the building for example privacy for swimming pool. •Privacy inside a room can be achieved by providing door on one side of the longer wall so that minimum portion of the room is visible.
  • 9. 4. Roominess: • It is the “feel of speciousness” obtained in the room when one enters it. • This is achieved by adjusting length to breadth ratio between 1.2 to 1.5. • Light colors and also different colors on each wall depending on light direction can also improve the roominess. 5. Grouping: •It can be defined as the arrangement of various rooms to coordinate functions of rooms and movement of users. •For example kitchen and dining room should be adjacent ,the stair should have approach from maximum rooms. • In case of industries, hospitals, schools, the rooms are to be arranged according to their sequence of operations
  • 10. 6. Circulation • It is the movement inside the building in horizontal or vertical direction. • Horizontal circulation can be provided by passages. The passages should be short, wide and well illuminated. The doors should not open in corridor, as it will obstruct the movement. • For vertical circulation, centrally located staircases, ramps, lifts, escalators are most suitable. Following fig. shows good and bad circulation.
  • 11. 7. Elegance • It is the effect produced by the elevation. It depends upon proportion of width and height of the building and choice of material and colour scheme. • Elegance can also be achieved by using proper cladding material to the face of the building. It can also be improved. • The beautification process need not be costly. 8. Sanitation • It includes provision of light, ventilation, cleanliness, water supply and sanitary amenities. • The minimum window area should not be less than 1/10th of floor area to allow maximum sunlight to enter the room , which destroys the germs. • The doors and windows should be positioned in such a way that hot air, foul odours are removed from the room and fresh cool air is admitted in the room. • This is achieved by providing ventilators near the roof in addition to windows. Cross ventilation should be employed for proper circulation of air. • The sanitary units should be provided with non-absorbent flooring materials with proper slopes and continuous water supply.
  • 12. 9. Orientation : • It means fixing major axis of the building to achieve maximum natural gifts. • In India, the long walls should be provided towards North and South and short walls in East and West direction to reduce the area exposed to sunrays. • In hot climate verandahs, chajjas and sun breakers should be provided to protect the building from sunrays. Rooms occupied through out the day should be placed on north. 10. Economy : • It is the last but not the least principle of planning. All efforts are in vein if the cost is not considered. • In any case aspect and circulation . On the other hand, prospect can be sacrificed for aspect. • Simple building plans along with minimum doors and windows with simple designs will reduce the cost. • In any case, functional utility, structural stability of the construction should never be sacrificed. • Economy can also achieved by making maximum use of locally available materials to suit the local environmental conditions and use of locally available labour.
  • 13. Role of Byelaws in Regulating the Environment  What is meant bye ‘Building bye-laws’? 1. These are the restrictions laid down by the municipal,town planning or revenue authorities on construction and planning of different types of buildings. 2. Building byelaws differ from place to place . For example building byelaws for Mumbai will not be same as that of some district or taluka place having municipality or a village having grampanchayt. 3. The above mentioned authorities sanction the building plans only after scrutinizing them regarding the byelaws.
  • 14. Necessity of Building Byelaws 1. Tocurb the haphazard growth of towns or cities. 2. Tofacilitate future use of land, widening of streets, controlling the ribbon development in an area. 3. Toreduce pollution in area by restricting population density in an area there by providing hygienic environment 4. Toensure that every citizen will receive facilities like water supply, sanitation, ventilation, electric supply, parking and safety. Some Important Building Byelaws are as follows :- 1) For Open space requirement : oThe open space around the building is required to be provided to meet requirements regarding lighting , ventilations , future expansion , and approach. oOpen space for front , rear and side yards depend upon height of building and can be calculated by the formula W = 3 + (h/10)/3 where W = width of the open space in .m h = height of the building in. m < 25 m o Open space for rear yard for the building of height less than 10m . Should be 3m average but in no case less than 1.8 m.
  • 15. 2) For height of the building : Sr.no. Width of the road Height of Building 1. Upto 8 m. No more than 1 ½ times road width 2. 8m to 12 m. No more than 12m 3. >12m. No more than road- width and 21m o The height of the building is governed by the width of the road which is in front of the building or the minimum width of the rear space. o In city areas, the construction is allowed on fall areas without provision of margins on any side . For this, a light plane is marked at a suitable angle from the edge or road on other side and the height of building is suitably curtailed off to allow he light plant to pass so as not to make adjacent property lack, from natural ventilation. Relationship exists between road width of building height
  • 16. • The height of a building is suitably curtailed off to allow the light plane to pass as shown below :
  • 17. 3) For various forms of building coverage : Following definitions explain various forms building coverage: i. Covered area : It is the ground covered above plinth. Area occupied by compound wall, is not included in the covered area. ii. Plinth area : It is the built up covered area measured at the floor level of a building . Following areas shall be included:     Areas of walls at floor level excluding plinth offsets, projection beyond clouding when building consists of columns. Internal shafts of sanitary installations less than 2 m^2 in area, air conditioning ducts, lift. Porches and other cantilevers provided. Area of barsats at terrace. Following areas shall not be included:       Lofts. Internal shafts of sanitary installations greater than 2 m^2 in area. Unclosed balconies. Towers , turrets and domes unless they from a storey. Architectural buns , cornices. Vertical sub breakers .
  • 18. iii. Floor area : It is the usable covered area of the building at any floor level. Thus, Floor area = Plinth area – Walls Following areas shall be included :  Doors and other openings  Internals pillar and supports  Plaster along the wall exceeding 300 m^2. Following areas shall not be included:  Plaster along the wall less than 300 m^2.  Fire places projecting beyond face of walls. iv. Built up area : o It is the area covered by all floor in the building. o It includes everything covered under roof. Area occupied by balcony, staircase is excluded from the built up area. v. Carpet area : o It is defined as actual area of usable room at any floor level. o It does not include sanitary accommodation , verandahs , corridors and passages , stores in domestic building , stair cases and shafts from lifts , garages , air condition ducts and plant .
  • 19. vi. F S I : It is also called as Floor Area Ratio (FAR) is defined as, “ It is the ratio of Total built up area for the building ( taken together) to the total plot area.” The FSI is different for different area. E.g. FSI for various parts of the same city may vary. The permitted FSI is governed by the Development Control (DC ) rules , prevailing in that area. 4) Set Back Distance : o It is the distance measured from centerline of road up to which plinth of building may extend. o It is provided to facilitate future road widening , parking of vehicles , free circulation of air etc . o Set back distance is about 1.5 to 1.67 times more for theaters , commercial complexes , factories than residential building. Set back distance Type of Roads Minimum set back distance Ratio of column 3 to column 2 Residential buildings Industrial buildings Village Road 9 m. 15m. 1.67 Major district road 15 m 24 m 1.60 National or state highway 30 m 45 m 1.50
  • 20. Environmental Protection Act 1986 o Rapid urbanization and industrialization in haphazard manner has led to degradation of the environment. o The concern over environment protection and sustainable development has grown tremendously especially in the developed countries since late sixties. o This law was introduced mainly to cover the loopholes present in the earlier that took care of the specific pollution problem. The main objectives of this act are as follows: o Implementing nationwide programs for preventing, controlling and abating the environmental pollution. o Laying down safety measures for prevention of accidents and their monitoring. o Training the people by conducting workshops, seminars related to environmental pollution. o Preparation of standards, codes, manuals for abating environmental pollution o Establishing and recognizing various laboratories and institutes to carry testing and monitoring work under this act………
  • 21. Concept of Green Buildings  What is ‘ Green Building’ ? It is a new concept in the design approach right from planning which reduces the adverse impacts of buildings on the environment .  Integral parts of green buildings are as follows: * Use of clean and renewable forms of energy such as solar energy. * Efficient use of water. * Use of eco friendly materials for construction. * Hygienic conditions in the premises. Etc.  Advantages of Green Buildings * Energy saving in such buildings could be as high as 30 to 40 %. * Comfort and safety to the occupants. * Use of natural resources such as air , light etc. thus reducing the burden on the conventional resources .
  • 22.  Guidelines for Achieving “ Green Building” Some of the guidelines for achieving Green Building are as follows : 1. Building Shape and Orientation *Choose the building shape such that it meets the work requirements w.r.t. day lighting , solar heating and cooling etc. *The shape and orientation shall be such that the maximum utilization of natural resources is made . 2. Construction process *The site disturbance can be reduced markedly by adopting environmentally conscious construction practices. * The process adopted shall be such that it uses and conserves the natural resources like vegetation, natural drainage system etc. * Potential improvements during construction process include : i. Efficient use of temporary power and water requirements. ii. Reuse of building debris to reuse waste produced. iii. Developing overall efficiency guidelines. iv. Use of energy efficient lighting systems.
  • 23. 3. Use of solar energy in building planning and design *Building designed for passive solar energy and day-lighting use peculiar features such as large south-facing windows and materials that absorb and slowly release the sun’s heat. * Passive solar designs can reduce heating bills by as much as 50%. 4. Water Harvesting * Water harvesting means collecting runoff from the soil’s surface, paved surfaces and other sources, and storing it for future use such as irrigation . * Water harvesting can also be achieved through- i. Rain water harvesting ii. Indoor water conservation iii. Use of part of wastewater for non-portable uses 5. Landscaping As far as possible native trees and plants shall be planted . These require less water and are suitable for local conditions of water availability and soil type.
  • 24. Site Selection  Factors of selecting site for Residential Building : 1) It must be clear title and in residential zone. 2) As far as possible rectangular plot should be selected. 3) It must be near to market, school, hospital, commercial area, transportation. 4) The plot should have a separate approach road. 5) The land should be such that hard strata shall be available at minimum excavation. 6) If the plot is in the vicinity of river then it must be above the high flood level. 7) Plot in low-lying areas should be avoided as rainwater may get accumulated in the plot.
  • 25.  Factors of selecting site for educational building: 1) Site plot must be of clear title. 2) As far as possible rectangular plot should be selected because the maximum area of plot can be used for construction. 3) The plot should have separate approach road. 4) Site should be near to the bus stop or well connected to the nearby area by train or other transport system. 5) The land should have hard strata at minimum depth. 6) Site should be free from air pollution..  Factors of selecting site for factory : 1) Plot from proper zone must be selected as industrial estates are developed for a specific type of industry. For example chemical zone , electronic industry zone etc. 2) The plot should have a separate approach road . 3) The factory site should be near to the rail or road junction in view of transport required. 4) Uninterrupted and adequate electricity and water supply should be available . 5) The land should be such that hard strata will be available after minimum excavation. 6) If the plot is in the vicinity of river then it must be above the high flood level.
  • 26. Use of Eco-Friendly materials for Construction From the various materials those materials which causes minimum damage to the environment, right from their raw materials usage upto final product, are considered to be ‘Eco-Friendly’.  Properties of eco-friendly materials : 1. These materials causes minimum damage to the environment, right from the manufacturing to final product. 2. Require minimum energy during manufacturing. 3. They do not emit harmful gases/fumes during manufacturing. 4. These are locally available and can be extracted from nature very easily. 5. At the end of the useful life, there is a possibility recycle and reuse.
  • 27.  Various eco-friendly materials are categorized as follows : 1) Naturally available eco-friendly materials or product developed using eco-friendly raw materials method . a) Bamboo , timber. b) Sun dried bricks. c) Mud uses for houses, wall plastering etc. 2) Eco-friendly materials developed using waste product : a) Fly ash bricks: These are waste products of the thermal power plant viz. fly-ash for manufacturing the bricks. b) Ply wood Manufactured from bagasse: Bagasse is a solid waste product of sugar industry . It is used in manufacturing ply-wood boards and panels.