SlideShare une entreprise Scribd logo
1  sur  57
Télécharger pour lire hors ligne
University of West Florida
Vanderbilt University
Virginia Commonwealth University
Virginia Department of General
Services
Wake Forest University
Washburn University
Washington University in St. Louis
Wellesley College
Wesleyan University
West Chester University
West Liberty University
West Virginia Health Science Center
West Virginia Institute of Technology
West Virginia School of Osteopathic
Medicine
West Virginia State University
West Virginia University
Western Connecticut State University
Western Oregon University
Westfield State University
Widener University
Williams College
Worcester Polytechnic Institute
Worcester State University
Xavier University
Yale University
Return on Physical Assets – ROPA+
Sightlines’ Facilities Intelligence Solution
Feel Free to Start a Dialogue with Our Presenter
Enter questions in the box at any time
Enter questions
here at any
point during the
webinar
Presentation slides
and webinar
recording will be
sent to each
attendee following
today’s session
2
Today’s Desired Outcome
Why We Do What We Do…
What Industry Challenges are Affecting You?
Sightlines and ROPA+ Overview
Questions and Discussion
3
3
Do You Have the Right Tools?
The
average
endowment
The average
building
replacement value
4
Your Independent Strategic Facilities Advisor
• Accurately quantify facilities performance
• Separate fact from fiction on mission-critical
issues
• Document trends, provide consistent
measurement, credible benchmarking, predict
future risks and opportunities and track progress
to goals.
Rigorous analytical toolkit to manage your largest asset
5
Optimize capital
investments and
improve operational
effectiveness
Outcome
Who We Serve
Robust membership and growing database provides experience and perspective
Partners to the Nation’s Leading Institutions:
• 14 of the Top 20 Colleges*
• 15 of the Top 20 Universities*
• 34 Flagship State Universities
• 13 of the 14 Big 10 Institutions
• 8 of the 12 Ivy Plus Institutions
• 8 of 13 Selective Liberal Arts Colleges
Serving state systems in:
• Alaska
• California
• Connecticut
• Hawaii
• Maine
• Massachusetts
• Minnesota
• Missouri
• New Hampshire
• New Jersey
• Oregon
• Pennsylvania
• Texas
• West Virginia
6
Challenges in Facilities
Management
“One side effect of this rapid growth has been the
creation of an increasingly large obligation for the
future renewal and replacement of the physical
plant.”
Rick Biedenwig – 1980
Founder, Pacific Partners Consulting Group
Source: Before the Roof Caves In II: Published with
assistance from APPA and Stanford University
“Before the Roof Caves In”
8
0%
2%
4%
6%
8%
10%
12%
%ofConstructedSpace
Constructed Space 1880-2015
Sightlines Database
Act Your Era – Not Your Age
9
Pre-War
Built before 1951
Durable construction
Older but typically lasts
longer
Post-War
Built between 1951 and
1975
Lower-quality
construction
Already needing more
repairs and renovations
Modern
Built between 1975 and
1990
Quick-flash construction
Low-quality building
components
Complex
Built in 1991 and newer
Technically complex
spaces
Higher-quality, more
expensive to maintain &
repair
Pre-War Post-War Modern Complex
9
Today’s Options are More Limited
Number of high
school graduates are
declining in many
states.
Decline in the
availability of
external resources
(state support, debt,
donors).
Tuition increases
have exceeded
inflation since 1985.
New wave of
construction
compounds risk…
10
Facilities Backlogs Continue to Rise
Backlog $/GSF
Public Average Private Average
0%
5%
10%
15%
20%
25%
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
2007 2008 2009 2010 2011 2012 2013 2014
$/GSF
0%
5%
10%
15%
20%
25%
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
2007 2008 2009 2010 2011 2012 2013 2014
Capital investment not enough to keep backlogs from growing
Avg. CAUBO backlog Avg. CAUBO backlog
11
11
How Do You Prevent the Prediction From Becoming Your Reality?
15
12
13
Sightlines Drives a New Conversation
Facilities intelligence toolkit that connects the dots between space,
capital and operating policies
A new conversation around
facilities management…
• Treats physical plant like a core
business
• Uses concepts of endowment
management to contextualize
investment decisions;
• Aligns facilities operations and
capital investment with institutional
mission and finance;
• Uses predictive analysis to focus
on outcomes and not inputs.
• Lets you tell your “facilities story”
as effective as possible.
Return on Physical Assets
– ROPA+
15
Three Phases for Continuous Improvement
Return on Physical Assets – ROPA+
A Vocabulary for Facilities Measurement, Benchmarking and Analysis
Asset Value Change
The annual
investment needed
to ensure buildings
will properly
perform and reach
their useful life
“Keep-Up Costs”
Annual
Stewardship
The accumulation
of repair and
modernization
needs and the
definition of
resource capacity
to correct them
“Catch-Up Costs”
Asset
Reinvestment
The effectiveness
of the facilities
operating budget,
staffing,
supervision, and
energy
management
Operational
Effectiveness
The measure of
service process,
the maintenance
quality of space
and systems, and
the customers
opinion of service
delivery
Service
Operations Success
16
17
The ROPA+ Process
Disciplined Methodology + Past Performance = Facilities Intelligence
• Sightlines collects and assembles data on campus to
quantify, verify, and qualify facility performance.Measure
• Through the benchmarking process, institutions have the
capability to create custom comparisons that help them
understand context and performance.
Benchmark
• Sightlines synthesizes an institution's verified data to
provide expert insight and perspective and develop
strategic directions for change.
Analyze &
Interpret
• Sightlines continues to support each campus through our
Member Portal, national thought leadership, Insights
Summit, educational webinars, and ongoing campus
consultation.
Membership
Why is Sightlines Different?
18
• As a colleague, not a vendor, Sightlines’ core
business is the strategic assessment of
facilities.
• We do not seek to sell equipment, provide
design services, or outsource operations.
• We do not rely on surveys or self-reported
data. Sightlines’ professionals collect base
data on site alongside your team.
• With our proprietary QVQ (Qualify, Verify,
Qualify) gives you confidence that our
conclusions are based on the most accurate
data in the industry.
• Sightlines presents a compelling story to
“make-the-case” for change to senior
leadership.
Sightlines Member Portal
It’s time to get more from your data…24/7/365
19
Member Support
Informed with live
notification to your data
Customized Access
Create customized
dashboard featuring
the metrics most
important to you
Seamlessly benchmark
against 300 member
institutions
Perspective and Context
My Story feature
presents Sightlines key
findings as an easy to
digest narrative
19
State of Facilities in Higher Education
2015 Benchmarks, Best Practices & Trends
Sightlines’ annual commentary on the
most important issues facing facilities
professionals…
• Analysis of benchmarks and trends
from over 450 Sightlines clients
• Best practices showing how
institutions have successfully
addressed the root causes of cost
increases.
Download the 2015 State of
Facilities at www.sightlines.com
20
20
Insights Summit ’15
The Hyatt Regency Newport, RI
November 9 - 11, 2015
21
21
ROPA+ Discovery
22
23
ROPA+ Data Collection Snapshot
Building Information Building Construction Date
Dates of Major Building Renovations
Building Function (Resident Hall, Academic, Athletic, …)
Building Gross Square Footage, Land Acres
Locations Served by Central Systems – Heating, Cooling, Electrical
Deferred Maintenance Deferred Maintenance Assessment (in-house or contracted)
Capital & Operating Project List Completed Projects both Operating and Capital Funds
New Construction Costs
CampusProfile
Staffing Table Department Organizational Chart
Distribution of Trades, Cust. and Grounds Staff by Shop Including Super.
Work Order Report Total Number of Requested and Completed
Completed Work Orders by Shop and Type (Repair, PM, Project, etc.)
Energy Profile Monthly Utility Cost and Consumption by Fuel Type (Gas, Oil, Electric)
Primary Generation Equipment Profile Including Hours of Operation
Operations
Institutional Financial Statement Balance Sheet and Operating Budget
Facilities Operating Budget Operating Budget and Actual by department and line item.
Capital Budget Recurring Capital budget (Plant fund, R&R account) and Capital
Finance
Selecting Peer Institutions: Start with Size, Program, Location
Impacts
• Operating Costs
• Energy Consumption
• Capital Needs
• Skill Mix of Staff
Impacts
• Custodial Demands
• Maintenance Demands
• Wear & Tear of Facilities
24
Impacts
• Grounds Staffing Demands
Peer Group #1: Operations Benchmark Group Peer Group #2: Grounds Benchmark Group
There is NO limit to the number of
benchmark groups you can create.
Examples include;
1. Capital & Operations Benchmark Group
2. Energy Benchmark group
3. Grounds Benchmark Group
4. Aspirant Benchmark Group
You must select at least seven institutions to create a peer group
24
We Determine…
> Age profile
> Functional profile
> Technical complexity
> Density analysis
Space Profile
What we collect and why…
25
We Collect…
> Square footage
> Construction dates
> Renovation history
> Functional descriptions
> Utility connections
We Answer…
• How does my age profile impact facilities risk?
• How does my space profile affect daily service
operations?
• Do I have the right mix of space to fulfill my
mission?
• Do I have too much or too little square footage?
• Can I afford the space I currently have?
• How do the above findings compare to peers?
Where on the Curve Do You Fall?
26
Pre-War
Built before 1951
Durable construction
Older but typically lasts
longer
Post-War
Built from 1951 to 1975
Lower-quality
construction
Already needing more
repairs and renovations
Modern
Built from 1976 to 1990
Quick-flash construction
Low-quality building
components
Complex
Built in 1991 and newer
Technically complex
spaces
Higher-quality, more
expensive to maintain &
repair
Pre-War Post-War Modern Complex
The campus age drives the overall risk profile
0%
5%
10%
15%
20%
25%
30%
35%
40%
%ofSpace
Sightlines Database- Construction Age Sightlines Database- Renovation Age CSUCI - Aux
26
20%
12%
13%
34%
45%
25%
22%
29%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Demonstration Peer Average
%ofTotalCampusGSF
Campus Age by Category
Under 10 10 to 25 25 to 50 Over 50
High Cost & Risk Age Profile Compared to Peers
Understanding the Impact of Age on Capital & Operations
High Risk
High Risk
Buildings Under 10
Little work. “Honeymoon” period.
Low Risk
Buildings 10 to 25
Short life-cycle needs; primarily space
renewal.
Medium Risk
Buildings 25 to 50
Major envelope and mechanical life cycles come
due. Functional obsolescence prevalent.
Higher Risk
Buildings over 50
Life cycles of major building components are past due.
Failures are possible. Core modernization cycles are
missed.
Highest risk
27
0%
5%
10%
15%
20%
25%
30%
2006 2007 2008 2009 2010 2011 2012 2013 2014
%Changesince2006
Percent Change in Space and Students vs. Peers
Demonstration GSF Peer Avg's GSF Demonstration Student FTE Peer Student FTE
Adding Space Faster than Students
Lowering Density
28
28
More Space & Smaller Buildings = Savings Opportunity
29
We Determine…
> Target investment level
> Annual funding to target
> Maintenance deferral rate
> Capital investment profile
Capital Profile
What we collect and why…
30
We Collect…
> Historical project spending
> Deferred maintenance assessment
> R&R project list
> Campus master plan
> New building construction costs
We Answer…
• How much “should” I invest each year?
• Does my past investment align with needs?
• What are conditions on my campus?
• Am I gaining or losing ground with respect to
backlog?
• How do the above findings compare to peers?
$39.4
$14.2
$10.6
$17.3
$8.7
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
$40.00
$45.00
3% Replacement Value Life Cycle Need Annual Investment Target
$inMillions
FY14 Annual Investment Target
Envelope/Mechanical Space/Program
Defining an Annual Investment Target
31
Functional obsolescence drives
investment prior to life cycles &
discounts the annual target
$0.0
$5.0
$10.0
$15.0
$20.0
$25.0
$30.0
$35.0
2006 2007 2008 2009 2010 2011 2012 2013 2014
Millions
Total Capital Investment vs. Funding Target
Annual Stewardship Annual Investment Target Life Cycle Need
Total Capital Investment vs. Funding Target
Includes only the investment in existing facilities
Increasing Backlog & Risk
32
Increasing Net Asset Value
Lowering Risk Profile
$0.0
$5.0
$10.0
$15.0
$20.0
$25.0
$30.0
$35.0
2006 2007 2008 2009 2010 2011 2012 2013 2014
Millions
Total Capital Investment vs. Funding Target
Annual Stewardship Asset Reinvestment Annual Investment Target Life Cycle Need
Total Capital Investment vs. Funding Target
Includes only the investment in existing facilities
Increasing Backlog & Risk
33
Increasing Net Asset Value
Lowering Risk Profile
34
Total Capital Investment Overtime
Demonstration Campus Peer Averages
• This includes stewardship (recurring
funding) & One-Time Capital
Funding (Bonds, Gifts, Grants)
Peer Averages
35
Mix of Total Capital Investment Overtime
Demonstration Campus
Connecting Annual Stewardship & Asset Reinvestment
36
The more you’ll have to “Catch-Up”The Less you “Keep-Up”
Peer AveragesDemonstration Campus
We Determine…
> Daily service/PM costs
> Staffing profile
> Supervisor coverage
> Work order performance
> Customer service profile
> Utility cost and consumption
Operations Profile
What we collect and why…
37
We Collect…
> Facilities budgets
> Staffing and org chart
> Trade distribution
> Work order reporting
> Utility invoices/history
We Answer…
• Is my facilities budget allocated appropriately?
• Is there effective planned or preventative
maintenance?
• Do I have sufficient staffing resources?
• Are my team members supervised effectively?
• Are there savings opportunities?
• How well served does the community feel?
• How do the above findings compare to peers?
Facilities Operating Expenditures
38
Demonstration Campus Peer Averages
• Strong PM compared to
peers, but limited capital and
the high risk age profile
continues to increase daily
service operating costs.
A Family of Operational Metrics Providing Context
Maintenance Performance
39
All benchmarks are in order of Technical Complexity
• Covering a lot of space given
the age profile and level of
backlog
• Productive team, but
question the sustainability
A Family of Operational Metrics Providing Context
Custodial Performance
40
All benchmarks are in order of Density
• Similar coverage,
supervision and materials
resources compare to peers.
• Similar level of output with
cleanliness inspection
Work Order Production Analysis
41
Work Orders per FTE Per Year = 460
Peer Average = 660
Difference is 30%
Key Factors: Age, backlog, building size
Daily
Service,
20,000 ,
67%
Prev.
Mntce,
7,000 ,
23%
Other,
3,000 ,
10%
30,000 Work Orders
Demonstration Campus
Energy Consumption vs. Peers
42
• Older facilities & new
technically complex space
is driving up energy
consumption
• Older facilities should be
targeted for renovation to
reduce consumption
• Savings should be
redirected back into annual
stewardship
Peer Averages
• Peers strong investment into
infrastructure & building
systems have helps level off
energy consumption.
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
0 1 2 3 4 5
Performance…
Work Requests
Organization
Scheduling Process
Centralization
Service Process
0 1 2 3 4 5
Grounds
Exterior
Mechanical Spaces
General…
Cleanliness
Campus Inspection
Customer Survey
13%
50%
32%
5%
Far Exceeds Expectations
Exceeds Expectations
Meets Expectations
Below Expectations
How are requests made?
Who can make requests?
Who schedules the work?
Is there a timeline/completion date given?
Are customers made aware of request
status?
Sightlines completes a building and
grounds inspection rating the general
repair, cleanliness, exterior condition,
and mechanical systems spaces in a 3
hour tour
1.00
3.00
5.00
1.00 3.00 5.00
WorkPerformance
Communication & Process
Excellent
Performance
Poor
Performance
Excellent
Performance
Best practice range
Separate report with all the
results & feedback
43
ROPA+ Prediction
44
Mitigating risk and eliminating the unknown
by identifying future capital investment needs
and setting future operational targets
$0
$10
$20
$30
$40
$50
$60
TotalDollars(Millions)
Current Need Renewal Need
Modernization & Infrastructure Projected Investment
Align Investment Capacity with Needs
$65
$172
$250
$155
$0
$50
$100
$150
$200
$250
$300
$350
$400
$450
Asset
Reinvestment
Need
Projected
Investment
TotalDollars(Millions)
45
Asset Reinvestment
Need
10 Year Capital Forecast
• While the needs are substantial, there is
enough funding to address the high risk
current needs and the renewal needs over the
next 10 years.
45
$12
$185
$220
$0
$50
$100
$150
$200
$250
Total 10 Year
Need
Projected
Investment
Capacity
TotalDollarsThousands(000’s)
Total Capital Need & Capacity
Deferred Maintenance Renewal Needs
Model the Impact of Capital Investments
46
$12
$36
$21
$6
$18
$4
$21
$15
$21
$30
$14
78%
75% 75%
77%
79% 80% 80% 80% 79% 80%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
$0
$10
$20
$30
$40
$50
$60
NetAssetValue(NAV)
TotalDollarsThousands(000’s)
Upcoming Total Capital Need by Year
Deferred Maintenance Renewal Needs Projected Investment Capacity NAV
46
$0
$50
$100
$150
$200
$250
Total 10 Year
Need
TotalDollarsThousands(000’s)
Total Capital Need & Capacity
Built-In Equipment
Interiors
Elevators
Plumbing
Envelope
Roofing
Safety/Code
Electrical
HVAC
Highlighting the Investment Risk Profile
47
$0
$10
$20
$30
$40
$50
$60
TotalDollarsThousands(000’s)
Upcoming Total Capital Need by Year
High Risk Medium Risk Low Risk
Source of data is from FRRM 2014 annual update
Low Risk
Medium
Risk
High Risk
47
Forecasting Future Backlog
Planned renovations will reduce backlog to $113 Million in FY18
48
$44
$29
$76
$27
$20
$36
$76
$20
$17
$51
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
Total Existing
Needs
Building M
Renovation
Building F
Renovation
Building A
Renovation
Estimated
Backlog 2018
3 Year Add'l
Needs
Millions
Estimated Backlog With Planned Renovations
$142/GSF $120/GSF $85/GSF
$93
* Year Add’l Deferred: estimated using FY11-15 average deferral
rate x projected targets FY25-27 (Not ROPA+)
** Future infrastructure needs not included in backlog projection
$113
Modernization Needs
Know the COST Before You Build
Sightlines’ new COST Forecaster
49
The only tool that uses your own validated
ROPA+ data to:
• Model the impact of new construction on
ongoing capital and operations
requirements
• Generate multiple building/demolition
scenarios
• Use peer and best practice data to make
sure you are not falling behind
• Proactively make the case the for new
funding to senior leadership BEFORE new
buildings are opened
ROPA+ Performance
50
Tracking and measuring success by integrating the
data collected from Discovery and Prediction with
external and internal campus changes, creating the
Sightlines Performance Dashboard
Identify Goals & Track Progress
51
Track Performance
Discuss Future
Goals & Areas of
Focus
Set Targets to
Achieve Goals
Identify Best in
Class Institutions
My Campus
Peers
Best in Class
Capital Investment
Operating Budget
Staffing
Energy
Service
Work Order
Space Management
Falling short of
peers and Best in
Class Institutions.
51
Facilities Operating Expenditures
52
$-
$1.00
$2.00
$3.00
$4.00
$5.00
Total Daily Service Costs
Maintenance Custodial Grounds
Daily Service Breakout
Area of
Focus
Defining Work Order Frequency Focuses the Analysis
Plotting demand work orders to buildings helps to understand productivity profile
53
-
200
400
600
800
1,000
1,200
1,400
$- $200 $400 $600 $800 $1,000
W.O.Count
Average Cost ($)/ W.O.
High Cost, Low FrequencyLow Cost, Low Frequency
Low Cost, High Frequency
High Cost, High Frequency
(Targeted Buildings)
Savings potential with
capital investment
54
Bringing it All Together
The Most Accurate
Data = 360° View of
Finance and Facilities
Analysis - Insight,
Benchmarking and
Best Practices or
“Facilities
Intelligence”
Data-Driven
Decisions Leveraging
Disciplined Data
Analytics
Make-the-case for
Balanced Policies on
Space, Capital and
Operations
Continually Improve
the campus by
aligning with Mission &
Strategy
Sightlines Drives Results
55
Upcoming Sightlines Events
Webinar on planned maintenance best practices w/ Penn State & Brown
Plan More, React Less:
Building & Expanding Your
Planned Maintenance
Program
Presented by:
Steve Maruszewski – Associate Vice
President of Physical Plant at Penn State
University
Paul Armas – Director of Maintenance
Operations at Brown University
Kevan Will – Manager of Operations at
Sightlines
Wednesday, April 27 @ 1PM
56
Questions and Discussion
57

Contenu connexe

Similaire à How Sightlines Can Change the Conversation on Your Campus

Planning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsPlanning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsSightlines
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesSightlines
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]Sightlines
 
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Sightlines
 
OneIS CANHEIT V03 NN
OneIS CANHEIT V03 NNOneIS CANHEIT V03 NN
OneIS CANHEIT V03 NNMark Roman
 
Resume - Phillip E Lucier 20150111
Resume - Phillip E  Lucier 20150111Resume - Phillip E  Lucier 20150111
Resume - Phillip E Lucier 20150111Phillip Lucier
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...Sightlines
 
document_1a_workshop_slides_-_multi_system.pptx
document_1a_workshop_slides_-_multi_system.pptxdocument_1a_workshop_slides_-_multi_system.pptx
document_1a_workshop_slides_-_multi_system.pptxRaadEngineers
 
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...Sightlines
 
RHulick Resume
RHulick ResumeRHulick Resume
RHulick Resumerchulick
 
Resume - EW Ops Leader
Resume - EW Ops LeaderResume - EW Ops Leader
Resume - EW Ops LeaderEric Wangerin
 
Implementing the Value Scorecard
Implementing the Value ScorecardImplementing the Value Scorecard
Implementing the Value ScorecardStephen Town
 
Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesSlideTeam
 
John Resume 10072015
John Resume 10072015John Resume 10072015
John Resume 10072015John Haddock
 
Seminoles United Consolidated Advancement Project
Seminoles United Consolidated Advancement ProjectSeminoles United Consolidated Advancement Project
Seminoles United Consolidated Advancement ProjectWendy Jaccard
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Sightlines
 
Chief AI Officer and AI Digital Transformation
Chief AI Officer and AI Digital TransformationChief AI Officer and AI Digital Transformation
Chief AI Officer and AI Digital TransformationValue Amplify Consulting
 
Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016
Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016
Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016Talis
 
ACT Work Ready Communities County Initiative
ACT Work Ready Communities County InitiativeACT Work Ready Communities County Initiative
ACT Work Ready Communities County Initiativenado-web
 

Similaire à How Sightlines Can Change the Conversation on Your Campus (20)

Planning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsPlanning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's Needs
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
 
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
 
OneIS CANHEIT V03 NN
OneIS CANHEIT V03 NNOneIS CANHEIT V03 NN
OneIS CANHEIT V03 NN
 
Resume - Phillip E Lucier 20150111
Resume - Phillip E  Lucier 20150111Resume - Phillip E  Lucier 20150111
Resume - Phillip E Lucier 20150111
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
 
document_1a_workshop_slides_-_multi_system.pptx
document_1a_workshop_slides_-_multi_system.pptxdocument_1a_workshop_slides_-_multi_system.pptx
document_1a_workshop_slides_-_multi_system.pptx
 
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
 
RHulick Resume
RHulick ResumeRHulick Resume
RHulick Resume
 
Resume - EW Ops Leader
Resume - EW Ops LeaderResume - EW Ops Leader
Resume - EW Ops Leader
 
Implementing the Value Scorecard
Implementing the Value ScorecardImplementing the Value Scorecard
Implementing the Value Scorecard
 
Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation Slides
 
The Essential Experience for CAEs - Audit Committee Need for Insight
The Essential Experience for CAEs - Audit Committee Need for InsightThe Essential Experience for CAEs - Audit Committee Need for Insight
The Essential Experience for CAEs - Audit Committee Need for Insight
 
John Resume 10072015
John Resume 10072015John Resume 10072015
John Resume 10072015
 
Seminoles United Consolidated Advancement Project
Seminoles United Consolidated Advancement ProjectSeminoles United Consolidated Advancement Project
Seminoles United Consolidated Advancement Project
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016
 
Chief AI Officer and AI Digital Transformation
Chief AI Officer and AI Digital TransformationChief AI Officer and AI Digital Transformation
Chief AI Officer and AI Digital Transformation
 
Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016
Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016
Talis Aspire Update - Keji Adedeji | Talis Insight Europe 2016
 
ACT Work Ready Communities County Initiative
ACT Work Ready Communities County InitiativeACT Work Ready Communities County Initiative
ACT Work Ready Communities County Initiative
 

Plus de Sightlines

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017Sightlines
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher EducationSightlines
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusSightlines
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Sightlines
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]Sightlines
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetSightlines
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus SustainabilitySightlines
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...Sightlines
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Sightlines
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher EducationSightlines
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogSightlines
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...Sightlines
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementSightlines
 
The State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsThe State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsSightlines
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessSightlines
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Sightlines
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanSightlines
 
The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16Sightlines
 
The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016Sightlines
 

Plus de Sightlines (20)

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus Sustainability
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlog
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th Commencement
 
The State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsThe State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern Institutions
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with Gordian
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates Success
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
 
The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16
 
The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016
 

Dernier

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 

Dernier (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 

How Sightlines Can Change the Conversation on Your Campus

  • 1. University of West Florida Vanderbilt University Virginia Commonwealth University Virginia Department of General Services Wake Forest University Washburn University Washington University in St. Louis Wellesley College Wesleyan University West Chester University West Liberty University West Virginia Health Science Center West Virginia Institute of Technology West Virginia School of Osteopathic Medicine West Virginia State University West Virginia University Western Connecticut State University Western Oregon University Westfield State University Widener University Williams College Worcester Polytechnic Institute Worcester State University Xavier University Yale University Return on Physical Assets – ROPA+ Sightlines’ Facilities Intelligence Solution
  • 2. Feel Free to Start a Dialogue with Our Presenter Enter questions in the box at any time Enter questions here at any point during the webinar Presentation slides and webinar recording will be sent to each attendee following today’s session 2
  • 3. Today’s Desired Outcome Why We Do What We Do… What Industry Challenges are Affecting You? Sightlines and ROPA+ Overview Questions and Discussion 3 3
  • 4. Do You Have the Right Tools? The average endowment The average building replacement value 4
  • 5. Your Independent Strategic Facilities Advisor • Accurately quantify facilities performance • Separate fact from fiction on mission-critical issues • Document trends, provide consistent measurement, credible benchmarking, predict future risks and opportunities and track progress to goals. Rigorous analytical toolkit to manage your largest asset 5 Optimize capital investments and improve operational effectiveness Outcome
  • 6. Who We Serve Robust membership and growing database provides experience and perspective Partners to the Nation’s Leading Institutions: • 14 of the Top 20 Colleges* • 15 of the Top 20 Universities* • 34 Flagship State Universities • 13 of the 14 Big 10 Institutions • 8 of the 12 Ivy Plus Institutions • 8 of 13 Selective Liberal Arts Colleges Serving state systems in: • Alaska • California • Connecticut • Hawaii • Maine • Massachusetts • Minnesota • Missouri • New Hampshire • New Jersey • Oregon • Pennsylvania • Texas • West Virginia 6
  • 8. “One side effect of this rapid growth has been the creation of an increasingly large obligation for the future renewal and replacement of the physical plant.” Rick Biedenwig – 1980 Founder, Pacific Partners Consulting Group Source: Before the Roof Caves In II: Published with assistance from APPA and Stanford University “Before the Roof Caves In” 8
  • 9. 0% 2% 4% 6% 8% 10% 12% %ofConstructedSpace Constructed Space 1880-2015 Sightlines Database Act Your Era – Not Your Age 9 Pre-War Built before 1951 Durable construction Older but typically lasts longer Post-War Built between 1951 and 1975 Lower-quality construction Already needing more repairs and renovations Modern Built between 1975 and 1990 Quick-flash construction Low-quality building components Complex Built in 1991 and newer Technically complex spaces Higher-quality, more expensive to maintain & repair Pre-War Post-War Modern Complex 9
  • 10. Today’s Options are More Limited Number of high school graduates are declining in many states. Decline in the availability of external resources (state support, debt, donors). Tuition increases have exceeded inflation since 1985. New wave of construction compounds risk… 10
  • 11. Facilities Backlogs Continue to Rise Backlog $/GSF Public Average Private Average 0% 5% 10% 15% 20% 25% 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 2007 2008 2009 2010 2011 2012 2013 2014 $/GSF 0% 5% 10% 15% 20% 25% 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 2007 2008 2009 2010 2011 2012 2013 2014 Capital investment not enough to keep backlogs from growing Avg. CAUBO backlog Avg. CAUBO backlog 11 11
  • 12. How Do You Prevent the Prediction From Becoming Your Reality? 15 12
  • 13. 13 Sightlines Drives a New Conversation Facilities intelligence toolkit that connects the dots between space, capital and operating policies A new conversation around facilities management… • Treats physical plant like a core business • Uses concepts of endowment management to contextualize investment decisions; • Aligns facilities operations and capital investment with institutional mission and finance; • Uses predictive analysis to focus on outcomes and not inputs. • Lets you tell your “facilities story” as effective as possible.
  • 14. Return on Physical Assets – ROPA+
  • 15. 15 Three Phases for Continuous Improvement
  • 16. Return on Physical Assets – ROPA+ A Vocabulary for Facilities Measurement, Benchmarking and Analysis Asset Value Change The annual investment needed to ensure buildings will properly perform and reach their useful life “Keep-Up Costs” Annual Stewardship The accumulation of repair and modernization needs and the definition of resource capacity to correct them “Catch-Up Costs” Asset Reinvestment The effectiveness of the facilities operating budget, staffing, supervision, and energy management Operational Effectiveness The measure of service process, the maintenance quality of space and systems, and the customers opinion of service delivery Service Operations Success 16
  • 17. 17 The ROPA+ Process Disciplined Methodology + Past Performance = Facilities Intelligence • Sightlines collects and assembles data on campus to quantify, verify, and qualify facility performance.Measure • Through the benchmarking process, institutions have the capability to create custom comparisons that help them understand context and performance. Benchmark • Sightlines synthesizes an institution's verified data to provide expert insight and perspective and develop strategic directions for change. Analyze & Interpret • Sightlines continues to support each campus through our Member Portal, national thought leadership, Insights Summit, educational webinars, and ongoing campus consultation. Membership
  • 18. Why is Sightlines Different? 18 • As a colleague, not a vendor, Sightlines’ core business is the strategic assessment of facilities. • We do not seek to sell equipment, provide design services, or outsource operations. • We do not rely on surveys or self-reported data. Sightlines’ professionals collect base data on site alongside your team. • With our proprietary QVQ (Qualify, Verify, Qualify) gives you confidence that our conclusions are based on the most accurate data in the industry. • Sightlines presents a compelling story to “make-the-case” for change to senior leadership.
  • 19. Sightlines Member Portal It’s time to get more from your data…24/7/365 19 Member Support Informed with live notification to your data Customized Access Create customized dashboard featuring the metrics most important to you Seamlessly benchmark against 300 member institutions Perspective and Context My Story feature presents Sightlines key findings as an easy to digest narrative 19
  • 20. State of Facilities in Higher Education 2015 Benchmarks, Best Practices & Trends Sightlines’ annual commentary on the most important issues facing facilities professionals… • Analysis of benchmarks and trends from over 450 Sightlines clients • Best practices showing how institutions have successfully addressed the root causes of cost increases. Download the 2015 State of Facilities at www.sightlines.com 20 20
  • 21. Insights Summit ’15 The Hyatt Regency Newport, RI November 9 - 11, 2015 21 21
  • 23. 23 ROPA+ Data Collection Snapshot Building Information Building Construction Date Dates of Major Building Renovations Building Function (Resident Hall, Academic, Athletic, …) Building Gross Square Footage, Land Acres Locations Served by Central Systems – Heating, Cooling, Electrical Deferred Maintenance Deferred Maintenance Assessment (in-house or contracted) Capital & Operating Project List Completed Projects both Operating and Capital Funds New Construction Costs CampusProfile Staffing Table Department Organizational Chart Distribution of Trades, Cust. and Grounds Staff by Shop Including Super. Work Order Report Total Number of Requested and Completed Completed Work Orders by Shop and Type (Repair, PM, Project, etc.) Energy Profile Monthly Utility Cost and Consumption by Fuel Type (Gas, Oil, Electric) Primary Generation Equipment Profile Including Hours of Operation Operations Institutional Financial Statement Balance Sheet and Operating Budget Facilities Operating Budget Operating Budget and Actual by department and line item. Capital Budget Recurring Capital budget (Plant fund, R&R account) and Capital Finance
  • 24. Selecting Peer Institutions: Start with Size, Program, Location Impacts • Operating Costs • Energy Consumption • Capital Needs • Skill Mix of Staff Impacts • Custodial Demands • Maintenance Demands • Wear & Tear of Facilities 24 Impacts • Grounds Staffing Demands Peer Group #1: Operations Benchmark Group Peer Group #2: Grounds Benchmark Group There is NO limit to the number of benchmark groups you can create. Examples include; 1. Capital & Operations Benchmark Group 2. Energy Benchmark group 3. Grounds Benchmark Group 4. Aspirant Benchmark Group You must select at least seven institutions to create a peer group 24
  • 25. We Determine… > Age profile > Functional profile > Technical complexity > Density analysis Space Profile What we collect and why… 25 We Collect… > Square footage > Construction dates > Renovation history > Functional descriptions > Utility connections We Answer… • How does my age profile impact facilities risk? • How does my space profile affect daily service operations? • Do I have the right mix of space to fulfill my mission? • Do I have too much or too little square footage? • Can I afford the space I currently have? • How do the above findings compare to peers?
  • 26. Where on the Curve Do You Fall? 26 Pre-War Built before 1951 Durable construction Older but typically lasts longer Post-War Built from 1951 to 1975 Lower-quality construction Already needing more repairs and renovations Modern Built from 1976 to 1990 Quick-flash construction Low-quality building components Complex Built in 1991 and newer Technically complex spaces Higher-quality, more expensive to maintain & repair Pre-War Post-War Modern Complex The campus age drives the overall risk profile 0% 5% 10% 15% 20% 25% 30% 35% 40% %ofSpace Sightlines Database- Construction Age Sightlines Database- Renovation Age CSUCI - Aux 26
  • 27. 20% 12% 13% 34% 45% 25% 22% 29% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Demonstration Peer Average %ofTotalCampusGSF Campus Age by Category Under 10 10 to 25 25 to 50 Over 50 High Cost & Risk Age Profile Compared to Peers Understanding the Impact of Age on Capital & Operations High Risk High Risk Buildings Under 10 Little work. “Honeymoon” period. Low Risk Buildings 10 to 25 Short life-cycle needs; primarily space renewal. Medium Risk Buildings 25 to 50 Major envelope and mechanical life cycles come due. Functional obsolescence prevalent. Higher Risk Buildings over 50 Life cycles of major building components are past due. Failures are possible. Core modernization cycles are missed. Highest risk 27
  • 28. 0% 5% 10% 15% 20% 25% 30% 2006 2007 2008 2009 2010 2011 2012 2013 2014 %Changesince2006 Percent Change in Space and Students vs. Peers Demonstration GSF Peer Avg's GSF Demonstration Student FTE Peer Student FTE Adding Space Faster than Students Lowering Density 28 28
  • 29. More Space & Smaller Buildings = Savings Opportunity 29
  • 30. We Determine… > Target investment level > Annual funding to target > Maintenance deferral rate > Capital investment profile Capital Profile What we collect and why… 30 We Collect… > Historical project spending > Deferred maintenance assessment > R&R project list > Campus master plan > New building construction costs We Answer… • How much “should” I invest each year? • Does my past investment align with needs? • What are conditions on my campus? • Am I gaining or losing ground with respect to backlog? • How do the above findings compare to peers?
  • 31. $39.4 $14.2 $10.6 $17.3 $8.7 $0.00 $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 $40.00 $45.00 3% Replacement Value Life Cycle Need Annual Investment Target $inMillions FY14 Annual Investment Target Envelope/Mechanical Space/Program Defining an Annual Investment Target 31 Functional obsolescence drives investment prior to life cycles & discounts the annual target
  • 32. $0.0 $5.0 $10.0 $15.0 $20.0 $25.0 $30.0 $35.0 2006 2007 2008 2009 2010 2011 2012 2013 2014 Millions Total Capital Investment vs. Funding Target Annual Stewardship Annual Investment Target Life Cycle Need Total Capital Investment vs. Funding Target Includes only the investment in existing facilities Increasing Backlog & Risk 32 Increasing Net Asset Value Lowering Risk Profile
  • 33. $0.0 $5.0 $10.0 $15.0 $20.0 $25.0 $30.0 $35.0 2006 2007 2008 2009 2010 2011 2012 2013 2014 Millions Total Capital Investment vs. Funding Target Annual Stewardship Asset Reinvestment Annual Investment Target Life Cycle Need Total Capital Investment vs. Funding Target Includes only the investment in existing facilities Increasing Backlog & Risk 33 Increasing Net Asset Value Lowering Risk Profile
  • 34. 34 Total Capital Investment Overtime Demonstration Campus Peer Averages • This includes stewardship (recurring funding) & One-Time Capital Funding (Bonds, Gifts, Grants)
  • 35. Peer Averages 35 Mix of Total Capital Investment Overtime Demonstration Campus
  • 36. Connecting Annual Stewardship & Asset Reinvestment 36 The more you’ll have to “Catch-Up”The Less you “Keep-Up” Peer AveragesDemonstration Campus
  • 37. We Determine… > Daily service/PM costs > Staffing profile > Supervisor coverage > Work order performance > Customer service profile > Utility cost and consumption Operations Profile What we collect and why… 37 We Collect… > Facilities budgets > Staffing and org chart > Trade distribution > Work order reporting > Utility invoices/history We Answer… • Is my facilities budget allocated appropriately? • Is there effective planned or preventative maintenance? • Do I have sufficient staffing resources? • Are my team members supervised effectively? • Are there savings opportunities? • How well served does the community feel? • How do the above findings compare to peers?
  • 38. Facilities Operating Expenditures 38 Demonstration Campus Peer Averages • Strong PM compared to peers, but limited capital and the high risk age profile continues to increase daily service operating costs.
  • 39. A Family of Operational Metrics Providing Context Maintenance Performance 39 All benchmarks are in order of Technical Complexity • Covering a lot of space given the age profile and level of backlog • Productive team, but question the sustainability
  • 40. A Family of Operational Metrics Providing Context Custodial Performance 40 All benchmarks are in order of Density • Similar coverage, supervision and materials resources compare to peers. • Similar level of output with cleanliness inspection
  • 41. Work Order Production Analysis 41 Work Orders per FTE Per Year = 460 Peer Average = 660 Difference is 30% Key Factors: Age, backlog, building size Daily Service, 20,000 , 67% Prev. Mntce, 7,000 , 23% Other, 3,000 , 10% 30,000 Work Orders
  • 42. Demonstration Campus Energy Consumption vs. Peers 42 • Older facilities & new technically complex space is driving up energy consumption • Older facilities should be targeted for renovation to reduce consumption • Savings should be redirected back into annual stewardship Peer Averages • Peers strong investment into infrastructure & building systems have helps level off energy consumption.
  • 43. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey 0 1 2 3 4 5 Performance… Work Requests Organization Scheduling Process Centralization Service Process 0 1 2 3 4 5 Grounds Exterior Mechanical Spaces General… Cleanliness Campus Inspection Customer Survey 13% 50% 32% 5% Far Exceeds Expectations Exceeds Expectations Meets Expectations Below Expectations How are requests made? Who can make requests? Who schedules the work? Is there a timeline/completion date given? Are customers made aware of request status? Sightlines completes a building and grounds inspection rating the general repair, cleanliness, exterior condition, and mechanical systems spaces in a 3 hour tour 1.00 3.00 5.00 1.00 3.00 5.00 WorkPerformance Communication & Process Excellent Performance Poor Performance Excellent Performance Best practice range Separate report with all the results & feedback 43
  • 44. ROPA+ Prediction 44 Mitigating risk and eliminating the unknown by identifying future capital investment needs and setting future operational targets
  • 45. $0 $10 $20 $30 $40 $50 $60 TotalDollars(Millions) Current Need Renewal Need Modernization & Infrastructure Projected Investment Align Investment Capacity with Needs $65 $172 $250 $155 $0 $50 $100 $150 $200 $250 $300 $350 $400 $450 Asset Reinvestment Need Projected Investment TotalDollars(Millions) 45 Asset Reinvestment Need 10 Year Capital Forecast • While the needs are substantial, there is enough funding to address the high risk current needs and the renewal needs over the next 10 years. 45
  • 46. $12 $185 $220 $0 $50 $100 $150 $200 $250 Total 10 Year Need Projected Investment Capacity TotalDollarsThousands(000’s) Total Capital Need & Capacity Deferred Maintenance Renewal Needs Model the Impact of Capital Investments 46 $12 $36 $21 $6 $18 $4 $21 $15 $21 $30 $14 78% 75% 75% 77% 79% 80% 80% 80% 79% 80% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% $0 $10 $20 $30 $40 $50 $60 NetAssetValue(NAV) TotalDollarsThousands(000’s) Upcoming Total Capital Need by Year Deferred Maintenance Renewal Needs Projected Investment Capacity NAV 46
  • 47. $0 $50 $100 $150 $200 $250 Total 10 Year Need TotalDollarsThousands(000’s) Total Capital Need & Capacity Built-In Equipment Interiors Elevators Plumbing Envelope Roofing Safety/Code Electrical HVAC Highlighting the Investment Risk Profile 47 $0 $10 $20 $30 $40 $50 $60 TotalDollarsThousands(000’s) Upcoming Total Capital Need by Year High Risk Medium Risk Low Risk Source of data is from FRRM 2014 annual update Low Risk Medium Risk High Risk 47
  • 48. Forecasting Future Backlog Planned renovations will reduce backlog to $113 Million in FY18 48 $44 $29 $76 $27 $20 $36 $76 $20 $17 $51 $0 $20 $40 $60 $80 $100 $120 $140 $160 $180 $200 Total Existing Needs Building M Renovation Building F Renovation Building A Renovation Estimated Backlog 2018 3 Year Add'l Needs Millions Estimated Backlog With Planned Renovations $142/GSF $120/GSF $85/GSF $93 * Year Add’l Deferred: estimated using FY11-15 average deferral rate x projected targets FY25-27 (Not ROPA+) ** Future infrastructure needs not included in backlog projection $113 Modernization Needs
  • 49. Know the COST Before You Build Sightlines’ new COST Forecaster 49 The only tool that uses your own validated ROPA+ data to: • Model the impact of new construction on ongoing capital and operations requirements • Generate multiple building/demolition scenarios • Use peer and best practice data to make sure you are not falling behind • Proactively make the case the for new funding to senior leadership BEFORE new buildings are opened
  • 50. ROPA+ Performance 50 Tracking and measuring success by integrating the data collected from Discovery and Prediction with external and internal campus changes, creating the Sightlines Performance Dashboard
  • 51. Identify Goals & Track Progress 51 Track Performance Discuss Future Goals & Areas of Focus Set Targets to Achieve Goals Identify Best in Class Institutions My Campus Peers Best in Class Capital Investment Operating Budget Staffing Energy Service Work Order Space Management Falling short of peers and Best in Class Institutions. 51
  • 52. Facilities Operating Expenditures 52 $- $1.00 $2.00 $3.00 $4.00 $5.00 Total Daily Service Costs Maintenance Custodial Grounds Daily Service Breakout Area of Focus
  • 53. Defining Work Order Frequency Focuses the Analysis Plotting demand work orders to buildings helps to understand productivity profile 53 - 200 400 600 800 1,000 1,200 1,400 $- $200 $400 $600 $800 $1,000 W.O.Count Average Cost ($)/ W.O. High Cost, Low FrequencyLow Cost, Low Frequency Low Cost, High Frequency High Cost, High Frequency (Targeted Buildings) Savings potential with capital investment
  • 54. 54 Bringing it All Together
  • 55. The Most Accurate Data = 360° View of Finance and Facilities Analysis - Insight, Benchmarking and Best Practices or “Facilities Intelligence” Data-Driven Decisions Leveraging Disciplined Data Analytics Make-the-case for Balanced Policies on Space, Capital and Operations Continually Improve the campus by aligning with Mission & Strategy Sightlines Drives Results 55
  • 56. Upcoming Sightlines Events Webinar on planned maintenance best practices w/ Penn State & Brown Plan More, React Less: Building & Expanding Your Planned Maintenance Program Presented by: Steve Maruszewski – Associate Vice President of Physical Plant at Penn State University Paul Armas – Director of Maintenance Operations at Brown University Kevan Will – Manager of Operations at Sightlines Wednesday, April 27 @ 1PM 56