Version date 02 May 2013
UK NISP delivered Outcomes
April 2005 – March 2012
METRICS Unit RESULTS
TO DATE
5YEARS Projection
with 20% decay
5YEARS Projection with
no decay
Landfill diversion T 9,074,493 21,863,907 45,372,465
CO2 reduction T 7,869,473 17,555,721 39,347,365
Virgin material savings T 11,679,029 33,262,089 58,395,145
Haz waste eliminated T 420,739 369,204 2,104,145
Water savings T 14,114,161 34,825,914 70,565,805
Cost savings £
£205,648,184 £411,546,215 £1,028,240,920
Additional sales £
£198,520,840 £351,614,047 £992,604,200
Other metrics
Jobs created Qty 10,000+ jobs have been directly created and
safeguarded
Jobs saved Qty
People trained in IS Qty 6,296
Private investment
£ £ 316,610,204
3. © International Synergies Limited
Version date 02 May 2013
Case Study: Fruitful Collaboration
Terra Nitrogen: Industry produces
derivatives of nitrogen and methanol.
Waste:12,500 tonnes of CO2 released
to atmosphere, hot steam and
ammonia.
John Baarda: Tomato producer
Additional production capacity
limited due to high costs of energy
Partnership
•Elimination of CO2 emissions
•Construction of a greenhouse
capable of producing 300,000
tomatoes per year
•Investment of £15M
•Creation of 65 new jobs
•Recovery of heat from steam
4. © International Synergies Limited
Version date 02 May 2013
Case Study: Innovation in materials
Companies:
• Mil-Ver Metals
• Denso Manufacturing UK
Summary:
• Hazardous waste generated from Denso
producing air conditioning units was collected
and reprocessed by Mil-Ver for use in its
manufacturing process
Achievements:
• Cost Saving €45,000 per year
• Hazardous waste eliminated 15 tonnes per year
• Carbon emissions reduced by 242 tonnes per year
5. © International Synergies Limited
Version date 02 May 2013
Case Study: Redevelopment of a hospital
Companies:
• Skanska
• Armoury Demolition
Summary:
• Skanska needed to address voids
from low depth mines during
redevelopment of a hospital
Material from a high rise demolition
was used to create a stone blanket
prior to piling
Achievements:
• 11,550 tonnes material reused
•>£250,000 cost savings
6. © International Synergies Limited
Version date 02 May 2013
Case Study: Scallop shells to forestry
Companies:
• West Coast Sea Products
• Forestry commission
Summary:
• Over 1,800 tonnes of shells generated per year
Shells incorporated in to sub-base aggregates for
forestry roads
Also used as top dressing of roads – decreasing
punctures
•Release calcium, reducing effects of acidification of
waters
•Decrease in disposal costs of £25,000 per annum
7. © International Synergies Limited
Version date 02 May 2013
Case Study: Cambridgeshire Guided Busway
• Cambridgeshire County Council is in the process of building the
longest guided busway in the world.
• NISP working on CGB at site clearance stage:
– Outlet found for 20,000 railway sleepers
– Sourced 3,000T of recycled aggregated for temporary roads
• Request to source 60,000m3 of drainage material
– NISP proposed tyre shred as an alternative
8. © International Synergies Limited
Version date 02 May 2013
NISP facilitation
• Tyre recyclers introduced to Major
Contractor
• 18,000T of tyre shred used
• Replaced 60,000T of aggregate
Outcomes
• Significant project cost savings
• >6,000 tonne CO2 saved
• Replication for next project
Case Study: Cambridgeshire Guided Busway
9. © International Synergies Limited
Version date 02 May 2013
Case Study: IS Transforms Individual Businesses:
e.g. John Pointon & Sons Ltd
• Pre – NISP: animal renderer
inputs: carcasses
outputs: landfill
perception: dirty industry
• Initial NISP stage: animal by-products diverted from
landfill to cement industry
• Second stage: improved efficiency of processes
• Third stage: move into bio-fuels utilising more by-
product
• Fourth stage: move to AD and grid connection
• Fifth stage: transfer in of innovative technologies
• Current situation
inputs: carcasses, organic residues
outputs: energy, minerals
vision: clean energy company
“Long term culture change needs
long term business engagement”
10. © International Synergies Limited
Version date 02 May 2013
Case Study: Business Solution for Foundry
Waste
• Links to foundries via Cast Metal
Federation
• Identified ways to reuse spent
foundry sand to brick manufacture
• Sustainable solution rather than
landfill
• Additional Sales - £200k
• Landfill Diversion – 10,000 te
• Cost Savings - £300k
• Virgin Materials – 10,000 te
• Jobs Saved - 42
11. © International Synergies Limited
Version date 02 May 2013
A Powerful Alliance for Subcontractors
WPD and East Alliance Partners
NISP worked with WPD (then E-on) to
increase the amount of recycled
aggregates used on sites and reduce
landfill costs via their contractors.
NISP created a Workspace so data about
local recyclers could be shared between
the East Alliance Partners. One common
Compliance Checklist was created which
amalgamated the individual Partners’
forms. This was used to assess new suppliers
joining the Framework.
The results include:
•Diversion from landfill: 73260 tonnes
•CO2 reduction: 168 tonnes
•Cost savings: £76077 per year
Central Networks Alliance
SUPPLIERS COMPLIANCE
CHECKLIST/QUESTIONNAIRE
Plant Operator
Local address
Registered address
What Geographic/Highway Authority areas can you supply to?
YES NO
Waste Management requirements (QP ref* 3.4.1, 3.4.4, 3.6.1 and 3.7.1)
Does your recycling operation have the required environmental permit/waste management
licensing/exemptions and is the Duty of Care applied?
NOTE: You must demonstrate that you meet the statutory and regulatory requirements, including use of registered waste
carriers and Waste Transfer Notes (WTNs). Please consult the Guidance Notes for further details.
Do you hold a Waste Carriers Licence?
Have you had any EA prosecutions in the last 3 years?
Acceptance of incoming waste (QP ref 3.4.1 to 3.4.4 and App C)
Do you have site/location specific Acceptance Criteria procedures for the incoming waste?
Do your Acceptance Criteria include a description of the types of waste accepted and a
description of the method of acceptance?
NOTE: List of Waste Regulations/EuropeanWaste Code for consistency with the WTNs must be used. You must
demonstrate that only inert waste is accepted for production of aggregates to the Quality Protocol. Inspection at receipt
and at tipping must be carried out.
Please list what EWC codes the site/ location can accept?
Are material input records kept?
NOTE: A record of each load received and accepted must be kept
Do you have a procedure for non-compliant waste?
NOTE: You must demonstrate how you are dealing with non-conforming incoming waste. Please consult the Guidance
Notes for further details.
12. © International Synergies Limited
Version date 02 May 2013
• Tarmac Building Products was
looking for alternative materials as
fill material in lightweight building
blocks
• Witherley Services was managing a
large stockpile of blast furnace slag
and looking for routes to market
The results include:
• 17,300 tonnes of material was
diverted from landfill
• 1777 tonnes of carbon dioxide
savings & Cost savings for Tarmac
versus expensive raw materials
Firm Foundations for Success
Witherley Services and Tarmac Building Products
13. © International Synergies Limited
Version date 02 May 2013
2011: Birmingham Big City Plan
• Tyseley Environmental
Enterprise Zone – Framework
for Action (May, 2011)
• Birmingham’s Priorities for
Tyseley:
“Support businesses and
organisations to capitalise on
low carbon opportunities and
maximise industrial symbiosis.”
14. © International Synergies Limited
Version date 02 May 2013
Identifying Investment Opportunities for Tyseley
Environmental Enterprise Zone (TEEZ)
PositionBirminghamasleaderinresource
recoverytechnologies
Today
Synergies
Tomorrow
Inward
Investment
Future
Innovation
• Potential resource and energy synergies
• Transport infrastructure for resource efficiency
• Opportunities for green growth and inward investment
• Businesses to benefit from technology transfer
• ‘Catalyst’ developments (key opportunity sites)
• Innovation potential for new business creation
• Opportunities for green growth and inward investment
• Transport infrastructure for resource efficiency
15. Specific Investment Opportunities based on
Local Resources
Industrial
plastics
ASR/ash for metal recovery
Site 3
- RDF/ERF
- Drying facility
Site 1
- Acids recovery
- Pre- MRF
- Plastics washing
- Gasification
Site 3
- WEEE repair & metals
recovery
- Technology incubator
- Fuel cell recovery
Site 2
- Pyrolysis
- Gasification
Needs site with industrial
buildings
- AD with urban farming
MSW
Non-recyclable
Clean plastics
RDF
Acids
WEEE
Non-recyclable
plastics
ASR
Paper sludge
Food waste
Bottom ash for metal recovery
Medical waste
Recoveredmetals
plastic
s
Char
Repairedequipment
Recovered acids
Bin bags
Fuel cells
Plastics manufacturer
- Closed loop bin bags
for B’ham
- Plastics innovation
ERF
16. © International Synergies Limited
Version date 02 May 2013
Future Vision: Integrated Resource Recovery System
with Innovation Centres
PositionBirminghamasleaderinresource
recoverytechnologies
Today
Synergies
Tomorrow
Inward
Investment
Future
Innovation
• Recover Palladium from road sweepings
• Small-scale local combined-heat-and-power (CHP)
opportunities anchored by existing incinerator
• Innovate means to recycle lithium-ion and nickel metal
hydride batteries in a cost-effective way
• Establish WEEE reprocessor to recover plastics, precious
metals and rare earth elements from WEEE
• Capture precious metals from incinerator bottom ash
• Use anaerobic digestion to anchor urban farming
integrated system
17. © International Synergies Limited
Version date 02 May 2013
Success in Europe - Romania
• Romania Synergy
Major international wood processor
20 Wood producers
Sawdust / Wood chips / Boards from trunk trimming
• Total resources – 446,100 tonnes
Virgin forest saved – 2,558 Hectares
Deforestation major issue in region – leading to
increased flooding
18. © International Synergies Limited
Version date 02 May 2013
Success in Europe - Hungary
• Hungarian Synergy
New road construction between two neighbouring towns
Previously had to travel through a large detour
2 ½ KM of road built using waste aggregate, bricks and
foundry sand
Low grade road, fifth of cost of main roads, improving
poorer communities
• Total resources – 6,000 tonnes
19. © International Synergies Limited
Version date 02 May 2013
Sludge reutilization
Tianjin SembCorp Sewage Treatment Co. , Ltd. operates a
sewage treatment plant in Tianjin Harbor Industrial Park.
The HanGu landfill site doesn't receive sludge according
to the new policy in TBNA.
A safe and economical method for sludge treatment is in
great need.
Yuchuan is a professional sludge treatment company,
whose core technology is extracting protein from sludge
for the manufacturing of protein products.
The two companies met in the 9th QWW and came up
with a potential synergy.
Yuchuan receives 15 tons of sludge from SembCorp per
month.
The Solution
The Challenge
The Results
Businesses Assisted: 2
Additional Sales: 70,000Yuan
Cost Savings: 464,000 Yuan
Landfill Diverted: 180 t/year
Virgin Materials: 180 t/year
China Project Results
22. © International Synergies Limited
Version date 02 May 2013
James Woodcock
International Coordinator
International Synergies Limited
t: +44 (0) 121 433 2660
dl: +44 (0) 121 433 2681
e: james.woodcock@international-synergies.com
www.international-synergies.com
@peter_laybourn
@IntlSynergies
@NISPnetwork
Thank You for Listening...