1. 1
CURRICULUM VITAE (CV)
1. Proposed Position: Site Supervision Engineer
2. Name of Firm :
3. Name : Mr. Souvanna RASACHACK Tel: 020 22212977
Email: thlsouvanna@gmail.com
4. Date of Birth: 05/06/1963 Citizenship: Lao
5. Education:
Master Of Science Hydropower Civil Engineer
1985 -1990 Study in institute Civil Engineering Azerbaijan in Baku former
USSR Republic, having Specialist in Hydro technique Construction and
Hydropower Engineering.
6. Membership in Professional Associations: None
7. Other Trainings: 1 Hydroelectric project Cost Estimating Course
2 Water Supply and Sanitation Sector project
3 Project Management
8. Countries of Work Experience: Lao
9. Languages: English, Russian, Vietnam, Thai
Spoken Read/understanding Written
English Good Good Good
Russian Faire Faire None
Vietnam Good Good Faire
Thai Good Good None
Lao Mother tongue
10. Employment Record:
From [Year]: 03/05/2014 to Now
Employer: Poyry Switzerland Ltd.
Positions held: Deputy Leading ENGINEER
Project Name: Xayaburi Hydroelectric Power Project
Work relation: Power house and spill way construction
From [Year]: 01/07/2013 to 30/04/2014
Employer: DM Construction-Trading Co.Ltd
Positions held: CIVIL ENGINEER
Project Name: Nam Phieng and Nam Phouy Hydropower project
Work relation: Feasibility Study
From [Year]: 01/01/2013 to 30/06/2013
Employer: Vientiane Development Engineer and consultant company
Positions held: Road local consultant
Project Name: 8.05KM Phonehong-Phonemee concrete road
Work relation: Concrete road
2. 2
From [Year]: 2010 to 2012
Employer: TH LAO ENTERPRISE & PARTNERS
Construction & Planning Engineers Consultants
Positions held: Construction Manager
Project Name: Theun Hinboun Expansion Project, 280MW install capacity
Work relation: Civil work, Mechanical and Electrical installation work for 2 power
house, 2 substation 115/22kv and 2 substation 230 kv.
From [Year]: 2009 to 2010:
Employer: TH LAO ENTERPRISE & PARTNERS
Construction & Planning Engineers Consultants
Positions held: Construction Manager
Project Name: NAMTHEUN 2 HYDROELECTRIC PROJECT, 1070MW install
capacity.
Work relation: 500KV Transmission line, Telecommunication System, Optical
Repeater, Savannakhet shelter.
Construction Planning/Manpower, materials, equipment scheduling and
preparation of temporary facilities.
Civil work, Mechanical work and Electrical work.
From [Year]: 2008 to [Year]: 2009
Employer: TH LAO ENTERPRISE & PARTNERS
Construction & Planning Engineers Consultants
Positions held: Construction Manager
Project Name: NAMTHEUN 2 HYDROELECTRIC PROJECT, 1070MW install
capacity
Work relation: 115/22KV SUBSTATION WORK.
Construction Planning/Manpower, materials, equipment scheduling and
preparation of temporary facilities.
Civil work, Mechanical work and Electrical work.
From [Year]: 2006 to [Year]: 2007
Employer: JACOBSEN ELECTRO A.S OF NORWAY
Positions held: SITE Manager
Project Name: NORTHERN AREA RURAL POWER DISTRIBTION PROJECT
FINANCED BY NDF 408 AND ADB
Work relation: 115/22KV SUBSTATION WORK
Construction Planning/Manpower, materials, equipment scheduling and
preparation of temporary facilities.
Civil work, Mechanical work and Electrical work.
From [Year]: 2004 to [Year]: 2005
3. 3
Employer: NORCONSULT INTERNATIONAL A.S IN ASSOCIATION WITH
STS CONSULTANTS
Positions held: ASSISTANT RESIDENT ENGINEER
Project Name: WATER SUPPLY AND SANITATION SECTOR PROJECT ADB
FINANCE: 1710-LAO (SF)
Work relation: WATER SUPPLY
QA, daily report, weekly report, monthly report, sign interims payment
certificate.
From [Year]: 2003 to [Year]: 2004
Employer: NORCONSULT INTERNATIONAL A.S IN ASSOCIATION WITH
STS CONSULTANTS
Positions held: ASSISTANT RESIDENT ENGINEER
Project Name: WATER SUPPLY AND SANITATION SECTOR PROJECT ADB
FINANCE: 1710-LAO (SF)
Work relation: WATER SUPPLY
QA, daily report, weekly report, monthly report, sign interims payment
certificate.
From [Year]: 2000 to [Year]: 2002
Employer: JACOBSEN ELECTRO A.S OF NORWAY
Positions held: CONSTRUCTION SUPERVISOR FOR CONTRACTOR
Project Name: POWER TRANSMISSION AND DISTRIBTION PROJECT, PTD2
CONTRACT FOR 115/34.5/22KV FINANCED BY NDF AND ADB
Work relation: 115/22KV SUBSTATION WORK
Civil work, Mechanical work and Electrical work
From [Year]: 1998 to [Year]: 2000
Employer: CONSULTING ENGNEER SOGREA OF FRANCE
Positions held: CHIEF ENGINEER INSPECTOR
Project Name: NAMLEUK HYDROPOWER PROJECT FINANCED BY ADB
Work relation: HYDROPOWER STATION
(Civil Engineer)
From [Year]: 1995 to [Year]: 1997
Employer: NORCONSULT INTERNATIONAL A.S OF NORWAY
Positions held: INSPECTOR
Project Name: THEUN-HINBOUN HYDROPOWER PROJECT FINANCED BY
ADB
Work relation: HYDROPOWER STATION
(Civil Engineer)
4. 4
From [Year]: 1993 to [Year]: 1995
Employer: CONSULTING ENGINEER-LAMAIYER INTERNATIONAL
Positions held: INSPECTOR
Project Name: NAMSONG DAM DIVERSION PROJECT FINANCED BY ADB
Work relation: NAMSONG DAM
(Civil engineer)
From [Year]: 1992 to [Year]: 1993
Employer: ELECTRICITE DU LAOS
Positions held: INSPECTOR
Project Name: THALAT-LOUANGPRABANG 115KV TRANSMISSION LINE
PROJECT FINANCED BY ADB
Work relation: 115KV TRANSMISSION LINE AND 115/22KV SUBSTATION
(Civil Engineer)
From [Year]: 1990 to [Year]: 1992
Employer: ELECTRICITE DU LAOS
Positions held: INSPECTOR
Project Name: SELABAM HYDROPOWER PROJECT FINANCED BY ADB
Work relation: HYDROPOWER STATION
(Civil Engineer)
11. Detailed Tasks Assigned.
Civil Engineer
Local consultant
12. Work Undertaken that Best Illustrates Capability
to Handle the Tasks Assigned
Name of project:
Xayaburi Hydroelectric Power Project
Year: 2014
Location: Xayaboury Province.
Client: Poyry Switzerland Ltd.
Main project features: Construction Power house and spill
way
Positions held: Site Supervision ENGINEER
Name of project:
Nam Phieng and Nam Phouy Hydropower
project
Year:
Location: Phieng District, Xayaboury Province.
Client: Ministry of Irrigation and forest
Main project features: Feasibility Study Hydropower and
Irrigation
Positions held: Project Manager/Civil Engineer
-Topography
-Geology
- Water annalist
-Design for construction
Name of project:
8.05KM Phonehong-Phonemee concrete road
5. 5
Construction Director
Construction Manager
Year:
Location: Phonehong District, Vientiane Province.
Client: Ministry of Transport post and Vientiane
authority
Main project features: Concrete road work
Positions held: consultant
- Activities performed: Quantity,
Quality, Progress & Price control.
- Inspection of the contractors works
- Hold weekly site meetings, and
writing minutes of meeting.
- Submit Interim payment
certificates to the Employer or his
representatives after signing and
receiving signature from PIU.
- Keep logs on site activities.
- Give site instructions.
- Test materials on site when
needed.
- Daily, weekly and monthly report
Name of project: Theun Hinboun Expansion
Project
Year: 2010 to 2012
Location: Khammouan Province
Client: Electricité Du Laos(EDL) /Theun-Hin boun
Power Company(EDL/THPC)
Main project features: Mechanical and Electrical installation
work for 2 power house, 2 substation 115/22kv and 2
substation 230 kv.
Positions held: Construction Director
Activities performed: -Construction
Planning/Manpower, materials, equipment
scheduling for Mechanical and Electrical
installation work (power house and substation).
-Weekly coordination meeting with client and
Resident Engineers.
Name of project:
NAMTHEUN 2 HYDROELECTRIC PROJECT
Year: 2009 to 2010
Location: Savannakhet province
Client: ABB Switzerland LTD
Main project features: Solar Shelter,
Telecommunication, Optical Repeater
Positions held: Construction Manager
Activities performed: Construction
Planning/Manpower, materials, equipment scheduling
6. 6
Construction Manager
and preparation of temporary facilities.
Civil work, Mechanical work and Electrical work.
As Construction Manager responsible for organizing work on
site, survey mapping & Design, quality & quantity control,
complete in according with Specifications, construction drawing,
time scheduled, giving instruction detailed sketches to Site
Engineer of each works on site, cover all control and checking
works performed by foremen as road work, steel reinforcement
bars fixing, form works and verifying for next step of approval of
Engineer’s representative on site.
The detailed works for construction of Solar Shelter are consist
of: Road come to site, box culvert, earth work, concrete work,
site survey for mapping, detail design of lay out, drainage
design, setting out and control of earth moving works, setting
out all structures, quantity control for earth work & concrete
work, quality control and complete construction of foundations,
cable ducts, landscaping, fence and erosion of slope protection
etc.
Prepared daily, weekly and monthly report
Mechanical & Electrical work.
Erection of all steel structure & equipment for solar, Pulling,
stringing, wiring of cable
Name of project:
NAMTHEUN 2 HYDROELECTRIC PROJECT
Year: 2008 to 2009
Location: Khammouan province
Client: ABB Thailand LTD
Main project features: 115/22Kv Substation work
Positions held: Construction Manager
Activities performed: Construction
Planning/Manpower, materials, equipment scheduling
and preparation of temporary facilities.
As Construction Manager responsible for organizing work on
site, survey mapping & Design, quality & quantity control,
complete in according with Specifications, construction drawing,
time scheduled, giving instruction detailed sketches to Site
Engineer of each works on site, cover all control and checking
works performed by foremen as road work, steel reinforcement
bars fixing, form works and verifying for next step of approval of
Engineer’s representative on site.
The detailed works for construction of Substation are consist of:
Road come to site, box culvert, earth work, concrete work, site
survey for mapping, detail design of lay out, drainage design,
setting out and control of earth moving works, setting out all
structures, quantity control for earth work & concrete work,
quality control and complete construction of Switchyard
foundations, cable ducts, landscaping and erosion of slope
protection etc.
Prepared daily, weekly and monthly report
Mechanical & Electrical work.
Erection of all steel structure & equipment inside substation,
Pulling, stringing, wiring of cable
7. 7
Site Manager
Assistant Resident
Engineer
Name of project:
Northern area rural power distribution project
Financed by NDF 408 and ADB
Year: 2006 to 2007
Location: Uodomxay, Luangnamtha province,
Pakmong at the Luangprabang province,
Hinhuep Vientiane province.
Client: Electricité Du Laos(EDL)
Main project features: 115/22Kv Substation work
Positions held: Site Manager
Activities performed: Construction
Planning/Manpower, materials, equipment scheduling
and preparation of temporary facilities.
As Site Manager responsible for organizing work on site,
survey mapping & Design, quality & quantity control, complete
in according with Specifications, construction drawing, time
scheduled, giving instruction detailed sketches to Site Engineer
of each works on site, cover all control and checking works
performed by foremen as steel reinforcement bars fixing and
form works and verifying for next step of approval of Engineer’s
representative onsite.
The detailed works for construction of Uodomxay, Luangnamta,
Pakmong and Hinheup substation are consist of: Road and
box culvert work, earth work, concrete work, site survey for
mapping, detail design of lay out ,drainage design, setting out
and control of earth moving works, setting out all structures,
quantity control for earth work, concrete work, quality control
and complete construction of Switchyard foundations, Storage,
control building , housing compound, cable ducts, landscaping
and erosion of slope protection, access road come to site etc…
Prepared daily, weekly and monthly report
Mechanical & Electrical work.
Erection of all steel structure & equipment inside substation,
Pulling, stringing, wiring of cable,
Commissioning work.
Name of project:
Water Supply and Sanitation Sector Project
ADB Loan:1710-Lao(SF)
Year: 2004 to 2005
Location: Paklay District, Sayaboury Province.
Client: Ministry of Transport post
Main project features: Water Supply work
Positions held: Assistant Resident Engineer
- Activities performed: Quantity,
Quality, Progress & Price control.
- Inspection of the contractors works
such as: Road work, Pipe laying
work, construction of Intake work,
Construction of Mekong river bank
8. 8
Assistant Resident
Engineer
Construction Supervisor
gabion mattress slope protection,
construction of Water Treatment
Plant, construction office building,
Mechanical, Electrical and
commissioning work.
- Hold weekly site meetings, and
writing minutes of meeting.
- Submit Interim payment
certificates to the Employer or his
representatives after signing and
receiving signature from PIU.
- Keep logs on site activities.
- Give site instructions.
- Test materials on site when
needed.
- Daily, weekly and monthly report
Name of project:
Water Supply and Sanitation Sector Project
ADB Loan:1710-Lao(SF)
Year: 2003 to 2004
Location: Tonpheung District Bokeo Province.
Client: Ministry of Transport post
Main project features: Water Supply work
Positions held: Assistant Resident Engineer
- Quantity, Quality, Progress & Price
control.
- Inspection of the contractors works
such as: Road work, Pipe laying
work, construction of Reservoir,
construction of Water Treatment
Plant, construction of Borehole,
construction office building,
Mechanical work, Electrical,
commissioning works.
- Hold weekly site meetings, and
writing minutes of meeting.
- Submit Interim payment
certificates to the Employer or his
representatives after signing and
receiving signature from PIU.
- Keep logs on site activities.
- Give site instructions.
- Test materials on site when
needed.
- Daily, weekly and monthly report
Name of project:
Power Transmission and Distribution Project,
PTD2 Contract for 115/34.5/22KV, Financed by
NDF and ADB
Year: 2000 to 2002
Location: Phonsavan, Xiengngen,
Xayabuary,Thalat,Namleuk Bandon and Nonhai
Client: Electricité Du Laos(EDL)
9. 9
Chief Engineer (Inspector)
Main project features: 115/22Kv Substation work
Positions held: Construction Supervisor
Activities performed: Construction
Planning/Manpower, materials, equipment scheduling
and preparation of temporary facilities.
Activities performed:
As construction supervisor responsible for organizing work
on site, quality & quantity control, complete in according with
Specifications, construction drawing, time scheduled, giving
instruction detailed sketches to foremen of each works on site,
cover all control and checking works performed by foremen as
steel reinforcement bars fixing and form works and verifying for
next step of approval of Engineer’s representative on site.
The detailed works for construction of Phonsavan,
Xiengngen, Xayabuary,Thalat,Namleuk Bandon and Nonhai
Substation area consist of: Road work, box culvert, earth work,
concrete work, site survey for mapping, detail design of lay out,
drainage design, setting out and control of earth moving works,
setting out all structures, quantity control for earth work and
concrete work, quality control and complete construction of
Switchyard foundations, concrete work, housing compound, for
control building, cable ducts, trenches landscaping, slope
erosion protection, road work etc.
Prepared daily, weekly and monthly report
Mechanical & Electrical work.
Erection of all steel structure & equipment inside substation,
Pulling, stringing, wiring of cable,
Commissioning work.
Name of project:
Nam Leuk Hydropower project, ADB financed,
60MW installed capacity
Year: 1998 to 2000
Location: Long xane-Xaysomboun special zone
Client: Electricité Du Laos(EDL) and seconded to
Consulting Engineer Sogreah of France
Main project features: Hydropower development
Positions held: Chief Engineer(Inspector)
Activities performed:
As Chief Engineer (Inspector) for road to Power House, power
house, Penstock, Substation work. Inspected and checked for
contractor performance of all activities related to construction
work of Power House, Substation, Penstock, and Tunnel areas
as such: Road work, earth work, concrete work, slope erosion
protection work by gabion mattress, shot Crete work, blasting,
rock bolts, anchor bolts & grouting work.
Prepared daily, weekly and monthly report
Mechanical & Electrical work.
Checked erection of all steel structure & equipment inside
substation, Pulling, stringing, wiring of cable, Commissioning
work.
Name of project:
10. 10
Inspector Civil Engineer
Inspector Civil Engineer
Inspector Civil Engineer
Theun-Hinboun Hydropower project, 210MW
installed capacity, ADB financed
Year: 1995 to 1997
Location: Bolikhamxay-Khammouan Province
Client: Electricité Du Laos(EDL) /Theun-Hin boun
Power Company(EDL/THPC) and Seconded to
Consulting Engineer Norconsult International AS,
Norway
Main project features: Hydropower development
Positions held: Inspector for Penstock,
Powerhouse, Substation and Tailrace canal
Activities performed:
As Civil Engineer, Inspector for Power House, Penstock,
Substation and Tailrace canal Construction work for Theun -
Hinboun Hydropower Project. Inspected and checked for
contractor performance of all activities related to construction
work of Power House, Penstock, Substation, and Tailrace canal
areas as such: Road work, pipe and box culvert, concrete
bridge work, earth work, concrete work, shot Crete work, slope
erosion protection work by gabion mattress, blasting work, rock
bolts, anchor bolts & grouting work.
Prepared daily, weekly
Name of project:
Namsong Dam Diversion Project, ADB financed
Year: 1993 to 1995
Location: Vientiane Province
Client: Electricité Du Laos(EDL) Seconded to
Consulting Engineer- Lamaiyer International
Main project features: Dam construction
Positions held: Inspector
Activities performed:
As Civil Engineer, Inspector for Nam Song Dam Diversion
Project. Inspected and checked for contractor performance of
all activities related to construction work of Nam Song Dam
areas as such: Road work, pipe and box culvert work, concrete
bridge work, earth work, concrete work, slope erosion
protection work by gabion mattress, pile driving work, shot
Crete work, anchor bolts & grouting work.
Prepared daily
Name of project:
Thalat-Louangprabang 115KV Transmission
Line, ADB financed
Year: 1992 to 1993
Location: Vientiane, Louangprabang Province
Client: Electricité Du Laos(EDL)
Main project features: 115KV Transmission Line and
115/22KV Substation work
Positions held: Inspector
11. 11
Inspector Civil Engineer
Activities performed:
As Civil Engineer, Inspector for construction work of Thalat –
Louangprabang 115kV Transmission line, Inspecting and
checking of contractor performance of all activities related to
construction work of Louangprabang Substation, tower’s
foundation and quality control of earth work, concrete work.
Prepared daily.
Name of project:
Selabam Hydropower Project, 5 MW installed
capacity, ADB financedADB financed
Year: 1990 to 1992
Location: Champasak Province
Client: Electricité Du Laos(EDL) and seconded to
Consulting Engineer- TATA of India
Main project features: Hydropower development
Positions held: Inspector
Activities performed:
As Civil Engineer, Inspector for construction work of Selabam
Hydropower Project, 5MW install capacity, In Champasak,
responsible for inspection and checking the work performed by
contractor are in accordance with Specification of contract and
construction drawing, verified before submitting for approval of
Engineer. Responsible for Penstock, Power House and Tailrace
Canal work (quality control of earthwork, concrete works, shot
Crete work, gabion Mattress wall for tailrace canal & blasting
work).
Prepared daily, weekly report
13. Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) this CV correctly describes my qualifications and my experience;
(ii) In the absence of medical incapacity, I will undertake this assignment for the
duration and in terms of the inputs specified for me in the Personnel Schedule in
Form TECH-7 provided team mobilization takes place within the validity of this
proposal or any agreed extension thereof;
(iii) I am committed to undertake the assignment within the validity of Proposal;
(iv) I am not part of the team who wrote the terms of reference for this consulting
services assignment;
(v) I am not sanctioned (ineligible for engagement) by .
I understand that any willful misstatement described herein may lead to my
disqualification or dismissal, if engaged.
Date: 01/10/2014
[Signature of expert or authorized representative of the
firm]
1
Day/Month/Year
Full name of authorized representative: Mr Souvanna RASACHACK
12. 12
1 This CV can be signed by an authorized representative of the Consultant provided that if the
Consultant’s proposal is ranked first, a copy of the CV signed by the expert and/or specialist must be
submitted to the Client prior to the commencement of contract negotiations.