SlideShare une entreprise Scribd logo
1  sur  2
STEVE CHU
3986 FORRESTAL DRIVE, ATLANTA, GA 30341
chu_s@bellsouth.net (404) 992-1380
PROFESSIONAL SUMMARY: 20 Years of mechanical design and project engineering including: ASME
Section VIII Pressure Vesseland equipment design, heater equipment design and piping layout, nuclear power
plant engineering/design change modification packages; 6 Years financial/sales and marketing related skills.
PROFESSIONAL EXPERIENCE:
SIGMA THERMAL,Project Engineer February 2015--July 2016
 Perform all mechanical engineering tasks required for industrial process heating system projects.
Comprising P&ID and equipment general arrangement review; ASME Section VIII vesseldesign;
B31.1, B31.3 piping design; pumps, fans,burners and fuel trains review and specificaion; pipe stress
analysis.
 Responsible for ensuring that projects are processed through the engineering group on schedule while
maintaining quality and sound engineering practices.
 Ensuring equipment is designed and supplied as specified by the customer and the Sales Engineer.
 Monitoring of each project's engineering performance to budget.
ALTRAN,Senior Mechanical Engineer June 2011--November 2014
 Performed flow accelerated corrosion (FAC) system susceptibility evaluations, EPRI
CHECWORKS™ SFA modeling and model updates, Inspection location selections, inspection scope
optimizations, on-site outage support for FAC activities including NDE data analysis, component
structural qualification, and remaining life evaluations for numerous US nuclear power stations.
 Performed design requirement traceability analysis on system requirements specifications, software
requirements specifications, software design descriptions, and logic diagrams for China’s Hainan and
Fuqing Nuclear Power Plants’ digital reactor protection system software utilizing IBM Rational
DOORS.
 Participated in the Pre-FAT testing at client’s facility in Beijing, China. Responsibilities included on-
site support for the execution of the Factory Acceptance Testing; served as chair of Anomaly Review
Board to ensure technical accuracy,compliance, completeness and risk mitigation, and closing
Anomaly Items (AIs); and tracked and reported progress to management in the US office.
ENERCON SERVICES INC,Mechanical Engineer May 2008--June 2011
 Designed new alternate reactor coolant pump sealinjection system consisting high pressure pump and
piping system, with independent diesel generator for Harris nuclear power plant.
 Generated Main Condenser Tube Bundle Procurement Specification for Robinson Nuclear Plant.
 Prepared Engineering Change package for the replacement of circulating water piping system from
red brass to stainless steelto eliminate single point vulnerability at nuclear power plant.
 Performed engineering study that included engineering/budget/planning/schedule to replace liquid
H₂, O₂, and N₂ storage and supply systems for the Hydrogen Water Chemistry Injection System at
Hatch Nuclear Power Plant.
 Performed walkdown at Grand Gulf Nuclear Station for evaluation and disposition of potential gas
accumulation in the emergency core cooling system piping in response to NRC’s Generic 2008-01
(Gas Accumulation/Intrusion in Piping Systems) letter mandate.
 Performed System Susceptible Evaluations, CHECWORKS™ SFA power up-rates and Susceptible
Non-Modeled evaluations. Prepared CHECWORKS™ SFA model updates for Fermi Unit 2
Measurement Uncertainty Recapture (MUR),Limerick Unit 2 MUR CHECWORKS™ SFA model
updates, LaSalle County Generating Station MUR, and completed updating Sequoyah Unit 2
CHECWORKS™ SFA model due to operating conditions.
 Prepared FAC piping replacement Engineering Change packages for Grand Gulf Nuclear Station.
GTS ENERGY INC, Proposal/Project Engineer April 2006--April 2008
 Managed scheduling, design, fabrication support, and delivery of thermal fluid heating systems.
 Calculate required sizes of burners, coils, pumps, pressure relief valves and other process equipment
for Water Bath Heaters and ThermalOil Heaters.
 Review customer specifications; coordinate with Sales, Project management and Manufacturing to
generate accurate budget proposals, resulting in higher profit margin on projects.
 Maintain compliance with Safety Codes and Standards: ASME Section VIII-Div 1, ASME B31.1,
ASME B31.3, API 520/521.
 Procurement and performing as expeditor of process equipments including heat exchangers and pump
skid assemblies from subcontractors.
 Performed as technical liaison in identifying and selecting qualified China manufacturers as
subcontractors.
TOMCO EQUIPMENTCOMPANY,MechanicalProject Engineer 1996--1999
 Design ASME pressure vesseland equipment for liquid CO2 industry, including DOT specification
cargo tanks, process piping, safety relief device sizing and selection, and refrigeration sizing.
 Coordinated production schedules with project management, and generated design specifications to
production personnel.
 Provided technical support to sales team and customers. Developed strong relationship with customer
by working jointly in acquiring American Bureau of Shipping design approval.
 Managed the pressure vesselfabricator’s QA Manual as a Quality Assurance team member, directed
Non-Destructive Testing, interacted with Insurance Authorized Inspectors and ASME regulatory
authorities.
THE KINNECORP.,Mechanical Project Engineer 1989--1996
 Design ASME Section VIII pressure vesseland equipment for liquid carbon dioxide industry.
 Worked in the design and detailing of ductwork and piping systems for various boiler recovery
systems, chemical process plants, and steel fabricators.
 Obtained data utilizing precision instrumentation for the design and modification of an existing
HVAC system in a commercial Atlanta high-rise.
 Worked with client in design of titanium dioxide sample mixing stations with capture hood using full
size model.
 Programmed and customized CAD software to improve drawing production efficiency
BRANDT ENVIRONMENTAL CORP.,MechanicalEngineer 1987--1989
 Performed process calculations and detail designs of fabric filtration and dust collection conveyor
systems for a wide range of pollution control projects.
ONLINE TRAINING APPLICATION UNLIMITED,Sales/Marketing Manager 2004--2005
 Performed selling and marketing of online training software.
U.S. FOODSERVICE, Territory Manager 2003--2004
 Obtained and managed foodservice customers on a daily basis. Consult and fully servicing the
customers’ needs along with managing credit terms and balances.
SELF EMPLOYED,Securities Trader 1999--2003
 Managed, Analyzed and Traded NASDAQ and NYSE securities.
EDUCATION: Bachelor of Mechanical Engineering, GEORGIA INSTITUTEOF TECHNOLOGY,1987
COMPUTER EXPERIENCE: Autodesk Inventor, Microsoft Dynamics, CAEPIPE, COMPRESS (ASME
Pressure VesselDesign software), CHECWORKS™ SFA,FAC Manager,IBM Rational DOORS, AutoCAD,
Navision, APV Code Calc design software.
SUPPLEMENT INFORMATION: US Citizen. Fluent in Mandarin Chinese

Contenu connexe

Tendances

Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resumeAbhinav Rawat
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray ResumeRon Bray
 
Muhammad Asif Iqbal_Resume - RYK updated
Muhammad Asif Iqbal_Resume - RYK updatedMuhammad Asif Iqbal_Resume - RYK updated
Muhammad Asif Iqbal_Resume - RYK updatedMuhammad Asif Iqbal
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015Larry Smock
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 

Tendances (20)

Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Muhammad Asif Iqbal_Resume - RYK updated
Muhammad Asif Iqbal_Resume - RYK updatedMuhammad Asif Iqbal_Resume - RYK updated
Muhammad Asif Iqbal_Resume - RYK updated
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 

Similaire à Steve Chu resume

Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Brandon Rhodes
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak
 
Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016Danielle Krysiak
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resumeJosé Ruiz
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515Dan Lucey
 
VMarschner Resume 05-2015
VMarschner Resume 05-2015VMarschner Resume 05-2015
VMarschner Resume 05-2015Veit Marschner
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 

Similaire à Steve Chu resume (20)

Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
Resume 5 13 16 months
Resume 5 13 16 monthsResume 5 13 16 months
Resume 5 13 16 months
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Ashwin_L&T
Ashwin_L&TAshwin_L&T
Ashwin_L&T
 
CV Jalaj Verma
CV Jalaj VermaCV Jalaj Verma
CV Jalaj Verma
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016Danielle Krysiak Mech Engineer 5-5-2016
Danielle Krysiak Mech Engineer 5-5-2016
 
Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016Danielle krysiak mech engineer 5 5-2016
Danielle krysiak mech engineer 5 5-2016
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Cameron
CameronCameron
Cameron
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resume
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515
 
VMarschner Resume 05-2015
VMarschner Resume 05-2015VMarschner Resume 05-2015
VMarschner Resume 05-2015
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 

Steve Chu resume

  • 1. STEVE CHU 3986 FORRESTAL DRIVE, ATLANTA, GA 30341 chu_s@bellsouth.net (404) 992-1380 PROFESSIONAL SUMMARY: 20 Years of mechanical design and project engineering including: ASME Section VIII Pressure Vesseland equipment design, heater equipment design and piping layout, nuclear power plant engineering/design change modification packages; 6 Years financial/sales and marketing related skills. PROFESSIONAL EXPERIENCE: SIGMA THERMAL,Project Engineer February 2015--July 2016  Perform all mechanical engineering tasks required for industrial process heating system projects. Comprising P&ID and equipment general arrangement review; ASME Section VIII vesseldesign; B31.1, B31.3 piping design; pumps, fans,burners and fuel trains review and specificaion; pipe stress analysis.  Responsible for ensuring that projects are processed through the engineering group on schedule while maintaining quality and sound engineering practices.  Ensuring equipment is designed and supplied as specified by the customer and the Sales Engineer.  Monitoring of each project's engineering performance to budget. ALTRAN,Senior Mechanical Engineer June 2011--November 2014  Performed flow accelerated corrosion (FAC) system susceptibility evaluations, EPRI CHECWORKS™ SFA modeling and model updates, Inspection location selections, inspection scope optimizations, on-site outage support for FAC activities including NDE data analysis, component structural qualification, and remaining life evaluations for numerous US nuclear power stations.  Performed design requirement traceability analysis on system requirements specifications, software requirements specifications, software design descriptions, and logic diagrams for China’s Hainan and Fuqing Nuclear Power Plants’ digital reactor protection system software utilizing IBM Rational DOORS.  Participated in the Pre-FAT testing at client’s facility in Beijing, China. Responsibilities included on- site support for the execution of the Factory Acceptance Testing; served as chair of Anomaly Review Board to ensure technical accuracy,compliance, completeness and risk mitigation, and closing Anomaly Items (AIs); and tracked and reported progress to management in the US office. ENERCON SERVICES INC,Mechanical Engineer May 2008--June 2011  Designed new alternate reactor coolant pump sealinjection system consisting high pressure pump and piping system, with independent diesel generator for Harris nuclear power plant.  Generated Main Condenser Tube Bundle Procurement Specification for Robinson Nuclear Plant.  Prepared Engineering Change package for the replacement of circulating water piping system from red brass to stainless steelto eliminate single point vulnerability at nuclear power plant.  Performed engineering study that included engineering/budget/planning/schedule to replace liquid H₂, O₂, and N₂ storage and supply systems for the Hydrogen Water Chemistry Injection System at Hatch Nuclear Power Plant.  Performed walkdown at Grand Gulf Nuclear Station for evaluation and disposition of potential gas accumulation in the emergency core cooling system piping in response to NRC’s Generic 2008-01 (Gas Accumulation/Intrusion in Piping Systems) letter mandate.  Performed System Susceptible Evaluations, CHECWORKS™ SFA power up-rates and Susceptible Non-Modeled evaluations. Prepared CHECWORKS™ SFA model updates for Fermi Unit 2 Measurement Uncertainty Recapture (MUR),Limerick Unit 2 MUR CHECWORKS™ SFA model updates, LaSalle County Generating Station MUR, and completed updating Sequoyah Unit 2 CHECWORKS™ SFA model due to operating conditions.  Prepared FAC piping replacement Engineering Change packages for Grand Gulf Nuclear Station. GTS ENERGY INC, Proposal/Project Engineer April 2006--April 2008  Managed scheduling, design, fabrication support, and delivery of thermal fluid heating systems.  Calculate required sizes of burners, coils, pumps, pressure relief valves and other process equipment for Water Bath Heaters and ThermalOil Heaters.
  • 2.  Review customer specifications; coordinate with Sales, Project management and Manufacturing to generate accurate budget proposals, resulting in higher profit margin on projects.  Maintain compliance with Safety Codes and Standards: ASME Section VIII-Div 1, ASME B31.1, ASME B31.3, API 520/521.  Procurement and performing as expeditor of process equipments including heat exchangers and pump skid assemblies from subcontractors.  Performed as technical liaison in identifying and selecting qualified China manufacturers as subcontractors. TOMCO EQUIPMENTCOMPANY,MechanicalProject Engineer 1996--1999  Design ASME pressure vesseland equipment for liquid CO2 industry, including DOT specification cargo tanks, process piping, safety relief device sizing and selection, and refrigeration sizing.  Coordinated production schedules with project management, and generated design specifications to production personnel.  Provided technical support to sales team and customers. Developed strong relationship with customer by working jointly in acquiring American Bureau of Shipping design approval.  Managed the pressure vesselfabricator’s QA Manual as a Quality Assurance team member, directed Non-Destructive Testing, interacted with Insurance Authorized Inspectors and ASME regulatory authorities. THE KINNECORP.,Mechanical Project Engineer 1989--1996  Design ASME Section VIII pressure vesseland equipment for liquid carbon dioxide industry.  Worked in the design and detailing of ductwork and piping systems for various boiler recovery systems, chemical process plants, and steel fabricators.  Obtained data utilizing precision instrumentation for the design and modification of an existing HVAC system in a commercial Atlanta high-rise.  Worked with client in design of titanium dioxide sample mixing stations with capture hood using full size model.  Programmed and customized CAD software to improve drawing production efficiency BRANDT ENVIRONMENTAL CORP.,MechanicalEngineer 1987--1989  Performed process calculations and detail designs of fabric filtration and dust collection conveyor systems for a wide range of pollution control projects. ONLINE TRAINING APPLICATION UNLIMITED,Sales/Marketing Manager 2004--2005  Performed selling and marketing of online training software. U.S. FOODSERVICE, Territory Manager 2003--2004  Obtained and managed foodservice customers on a daily basis. Consult and fully servicing the customers’ needs along with managing credit terms and balances. SELF EMPLOYED,Securities Trader 1999--2003  Managed, Analyzed and Traded NASDAQ and NYSE securities. EDUCATION: Bachelor of Mechanical Engineering, GEORGIA INSTITUTEOF TECHNOLOGY,1987 COMPUTER EXPERIENCE: Autodesk Inventor, Microsoft Dynamics, CAEPIPE, COMPRESS (ASME Pressure VesselDesign software), CHECWORKS™ SFA,FAC Manager,IBM Rational DOORS, AutoCAD, Navision, APV Code Calc design software. SUPPLEMENT INFORMATION: US Citizen. Fluent in Mandarin Chinese