SlideShare une entreprise Scribd logo
1  sur  26
SeeLevel®& TitanOverfill® Protection; Audible/Visual Warning Systems (Other Applications)
Titan Logix® CD5 Chemical
Tank Farm Overfill Protection
September 13, 2016
• Increasing trends in tank (mobile & stationary) overfill occurrences.
• 2014: One Incident
• 325 BBL Vac Trailer balled out. Both employees (two (2) person transfer) left rear
doghouse during a mineral oil fluid transfer.
• Impact# 12816 Corrective Action “New Tankers coming into field this year will be equipped
with overfill protection gauges that will shut loading valve. Fleet will be retro-fit based on the
performance of these units”.
• 2015: Two Incidents:
• 100 BBL Fuel Truck overfilled with diesel releasing it into spilldam and rear doghouse of
the tanker (by design).
• 238 BBL Diesel Transport overfilled releasing 30 gallons of diesel out of rear mounted
trailer vent. Trailer was not level, nose high, loosing 25 BBL of displacement.
• 2016: One Incident:
• 325 BBL Crude Hauler overfilled releasing 5 gallons of crude oil
Factors Leading to Implementation
September 13, 20162
• New infrastructure regulations established in International Fire
Code 3406.5.1.10-3406.5.1.10.1
• 3406.5.1.10 Bottom Loading:
• When bottom loading a tank vehicle or tank car with or without vapor control, a
positive means shall be provided for loading with an automatic secondary shutoff
control to prevent overfill. The connecting components between transfer equipment
and the tank vehicle or tank car required to operate the secondary control shall be
functionally compatible.
Spillage is prevented when filling a bottom-loading tank vehicle by using a loading
system that loads a predetermined quantity of flammable or combustible liquid. An
automatic secondary shutoff control valve is required for a bottom-loading tank
vehicle.
• 3406.5.1.10.1 Dry Disconnect Coupling:
• When bottom loading a tank vehicle, the coupling between the liquid loading hose or
pipe and the truck piping shall be a dry disconnect coupling.
To prevent spillage when disconnecting the dispensing system from the bottom-loading
vehicle, the system is to use a dry connection.
Factors Leading to Implementation
September 13,
20163
300 BBL 4 Compartment Chemical Tanker
• Initially tanker overfill protection was introduced in Alpine in 2010 with
our 4 compartment, 300BBL chemical tanker.
• Each 75 barrel compartment is equipped with an independent Titan
Logix® TD80™ system.
• Audible and visual overfill warning system.
• Alarm are set to activate 90% capacity (Per CPAI SOP# S-001).
September 13, 20164
300 BBL 4 Compartment Chemical Tanker Plumbing
September 13, 20165
• Each chemical compartment has a dedicated pump/hose cabinet.
• 3” Roper® series 9622 stainless steel bi-direction pumps (Chemical Rated).
• Flow diagram supplied inside each cabinet.
• Pump is rated for pressures up to 100PSI and flows up to 165GPM.
• 75’ hose reels with Gates® Chem Master™ Xtreme™ FEP (formerly Gates®
Stallion®) PTFE line hose.
• -40°F to 300°F temperature range.
• Alpine’s change to Gates® Chem Master™ Xtrem™ FEP has increased chemical hose life
substantially since testing began in 2008.
300 BBL 4 Compartment Chemical Tanker
September 13, 20166
• Each tank compartment is monitored on a Titan Logix®
TD80™/Finch II Monitor Display, selected by the operator.
• Tank selector located to left of monitor.
• At 90% volume for the selected tank, the monitor activates an
audible alarm.
300 BBL 4 Compartment Chemical Tanker
September 13, 20167
• Street side mid-line mounted orange beacon activated at 90% capacity.
• All new and existing overfill beacons are being retro-fit to Federal Signal FB2PST-I
Fireball® warning strobes with red domes for fleet standardization.
• Alpine uses 3 colors of beacons on rolling stock for different conditions:
• Orange = Normal operating conditions/reverse indicator.
• Blue (if equipped) = Phase 2 or Phase 3 conditions (convoy conditions).
• Red (if equipped) = Tank overfill visual warning (exceeded 90% capacity).
2017 150 BBL Chemical Truck
• New build, 150BBL, 4 compartment chemical truck arriving 2016-2017 ice road season.
• Side mount pump and hose cabinets (2 cabinets each side) allow for better ergonomics to both the
operator and mechanics.
• Four (4) Titan Logix® TD80™ Liquid Level Gauges.
• Two (2) Finch II monitors (1 mounted each side).
• One (1) monitors compartments 1 & 3, the other monitors compartments 2 & 4.
• Designed to interact with CD5 chemical dock.
• Rochester float gauges for visual fill verification
• Redundancy to the electronic monitoring.
September 13, 20168
100 BBL 4 Compartment Chemical Truck
September 13, 20169
• Alpine’s 2006 build, 100BBL chemical truck is unable to support CD5 Chemical
Tank Farm.
• Individual Rochester float gauges located in each tank compartment.
• No electronic monitoring installed.
• This unit is as a DOT code 406 vessel.
• Upgrading the tank to support to CD5 is cost prohibitive due to requiring:
• Four (4) tank penetrations.
• Four tank Titan Logix® systems with installation.
• Overfill protection system installed.
• Multiple State inspections and recertification to DOT 406 Code.
• Current estimated cost of $150K-$200K.
100 BBL 4 Compartment Chemical Truck
September 13, 201610
• Standard rear doghouse unit designed for equipment, not ergonomics.
• When designed hoses used were Goodyear Arctic Flexwing these were upgraded in
2008 to Gates® Chem Master™ Xtrem™ FEP.
• Pumps are a non-chemical rated Blackmer® TX2 sliding vane pumps.
• Alpine Operations will relocate this unit to CD3 (Remote Drillsite) to support
chemical operations and as seasonal backup truck during ice road season.
• Tank shows no corrosion.
• Chassis repowered in 2013
Permissive Ground (Standard Operations)
• Permissive grounds provide piece of mind that a ground is established and
shuts down filling operations in the event a ground is lost.
• No overfill protection.
• Permissive grounds are easily overridden and do not meet new international
fire code, however are “legacy” installations across the slope.
September 13, 201611
CD5 Chemical Tank Farm Overfill Protection
September 13, 201612
• New construction at CD5 introduced new International Fire Code(s) to
Alpine.
• Alpine and CPAI Construction decided to design/engineer a pared down truck
racking system.
• International Fire Code compliance was met through communication between
truck and facility (communication is accomplished though SetSim).
• XV Valve automatically closes if the bulk tank or tanker hit 90% capacity.
• The paired down truck racking system utilizes the existing Titan Logix® TD80™ level
gauge on tankers.
CD5 Chemical Tank Farm Overfill Protection
September 13, 201613
• Standard permissive ground remained as an added layer of protection.
• Assuring grounding.
• Pumping operations can be shutdown by removing ground cable closing XV Valve.
CD5 Chemical Tank Farm Overfill Protection
September 13, 201614
• Truck racking system is a stand alone unit.
• Utilizing “hazardous location connections and enclosures”.
• Facility/tanker communication is accomplished via 4-pin Turck Inc. receptacle and
cord set.
• Remote point “pilot light” become illuminated when point to point
communication are established.
CD5 Overfill Protection (Truckside)
September 13, 201615
• The remote point station and plant communication comply with International
Fire Code 3406.5.1.10 Bottom Loading. The existing level gauge and Finch II
Monitor were was wired into the Turck Inc male receptacle.
• Tanker pumps cannot be activated until plant communication is established.
• A new travel mode is integrated into the switching to compensate for fluid
movement during transport.
Finch II Overfill Communication Wiring Diagram
• Both the Titan Logix®/Finch II and SeeLevel® TD80™ are designed to
accommodate integration into truck racking systems at minimal costs
• Overfill communication systems can easily be retro-fit into existing
infrastructure.
• This system has been proven to be reliable and can only be overridden on the
COPA Operator side in the event of a malfunction.
September 13, 201616
September 13, 2016
17
100BBLTruck,Tankers, &Vac Trailer
OverfillAlarm
• 2014 Conoco Phillips – corrective action requiring all new tankers be
equipped with overfill protection.
• Two (2) in the construction phase had a mid-build request to add
overfill protection that would shutdown the pony motor.
• Fluid movement was not taken into account.
• During transport the pony motors would shutdown. Fleet services would dispatch
a mechanic for heat & start.
• The shutdown systems were left intact by Conoco Phillips request.
• The field solution has been fills the two units with less fluid.
• 2015-2016 two (2) different systems were evaluated in Alpine.
• One Titan Logix® on the new 238BBL Diesel Transport
• One See-Level™ on the Refurbished 325BBL Rig Water Vac Trailer.
• Both audible and visual only.
• The Audible/Visual System has created true operator accountability.
Overfill Protection History
September 13, 201618
Titan Logix® Audible/Visual Overfill Warning
September 13, 201619
• Installed on the 230BBL Diesel Transport
received on the 2016 ice road season.
• Equipped with Titan Logix®/Finch II fluid
level gauge and the Rochester float gauge.
• Fluid level gauge equipped with an audible
alarm set to 90% of capacity.
• Speaker is Truck-Lite® Single Sound 102DB 4”
Round P/N 92918
• Will be replaced with Truck-Lite® Self
Adjusting Sound Regulating 77-97DB 4”
Round P/N 92914
Titan Logix® Audible/Visual Overfill Warning
• 2016 Diesel Transport:
• Fluid level gauge wired to
an amber beacon
indicating overfill at 90% .
• Amber strobe retro-fit to
Federal Signal FB2PST-I
Fireball® warning strobe
with red dome for fleet
standardization.
• Federal Signal Fireball®
warning strobe was chosen
to be used due to product
structure.
• Standard Alpine strobe used
on Tankers/100BBL Trucks
for Amber and blue strobes.
September 13, 201620
SeeLevel™ Audible/Visual Overfill Warning
September 13, 201621
• In 2016 Alpine received it’s first 325BBL Vac Trailer equipped with an
Audible/Visual over fill warning system.
• Wired to SeeLevel™ Float Gauge with alarm and warning strobe activating at 90% of
tank capacity.
• This unit is used to provide clean water support to Doyon Rig 19.
• Alpine will receive two (2) new Wells Support 325BBL Vac Trailers equipped
with overfill warning systems 2016-2017 ice road season.
• Alpine’s first test of the SeeLevel™ overfill warning system in an dirty service tanker.
Clean Service 325bbl truck with SeeLevel™
• The blue domed Federal Signal
FB2PST-I Fireball® warning strobe
was used in this system will be
retro-fit with red dome.
• Future tanker builds will be
equipped with dual exterior
mounted red Federal Signal FB2PST-I
Fireball® warning strobe.
• Future 325BBL Vac Trailer builds will
also incorporate a single Federal
Signal FB2PST-I Fireball® warning
strobe located in rear doghouse.
• This 325BBL Vac Trailer unit used
an exterior mounted Pollak®
backup alarm for the overfill
warning system.
• Future 325BBL Vac Trailer builds will
incorporate a Truck-Lite® Self
Adjusting Sound Regulating 77-97DB
4” Round back up alarm mounted in
rear doghouse.
September 13, 201622
SeeLevel™ Audible/Visual Overfill Warning
• Retro-fit of existing units is very cost effective if 325BBL Vac Trailers or
Tankers are equipped with SeeLevel™ gauge or Titan Logix® gauge.
• Retro-fit of existing Alpine 325BBL Vac Trailers expected to be
completed by end of summer 2017 (Per Corrective Action).
• Systems testing causing protracted delivery schedule.
September 13, 201623
In Closing – New Technology Opportunities
• With new technology comes the opportunity for continuous business
improvements. We must keep this in mind during all stages of design
for our infrastructure and core equipment.
• Learn from perceived failures and seize the opportunities to learn and
adapt. Some times the answer is right in front of us.
• Alpine introduced Over-Fill Warning Systems to the field in 2010, but failed to
research the technology for all Tankers/100BBL Trucks.
• By 2014 personal changes allowed this system to be forgotten and research had
to be repeated.
September 13, 201624
In Closing – Learn and Adapt
• The Titan Logix® system has proven to be a more reliable system.
• The SeeLevel™ Gauge has limitations due to design as a float gauge.
• Fluid movement in tank allows float to active Overfill Warning during transport.
• Dependent on the cleanliness of the 325BBL Vac Trailer Alpine has experienced
floats sticking and not measuring fluid levels correctly.
September 13, 201625
Questions:
Steven Lehmer
907-670-4410
September 13, 2016
26

Contenu connexe

Tendances

New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
Kristopher Vardell
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
Piotr Blaut
 

Tendances (20)

PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
LNG Dispensing Made Simple Using Micro Motion
LNG Dispensing Made Simple Using Micro MotionLNG Dispensing Made Simple Using Micro Motion
LNG Dispensing Made Simple Using Micro Motion
 
Quad Oa (EPA Methane Rule): Oil and Natural Gas Sector
Quad Oa (EPA Methane Rule): Oil and Natural Gas SectorQuad Oa (EPA Methane Rule): Oil and Natural Gas Sector
Quad Oa (EPA Methane Rule): Oil and Natural Gas Sector
 
Sea and river vessel telematics (Eng, v.1.0)
Sea and river vessel telematics (Eng, v.1.0)Sea and river vessel telematics (Eng, v.1.0)
Sea and river vessel telematics (Eng, v.1.0)
 
Operations Management at Petrol retail outlet
Operations Management at Petrol retail outletOperations Management at Petrol retail outlet
Operations Management at Petrol retail outlet
 
NDL FUEL STATION OPERATION
NDL FUEL STATION OPERATIONNDL FUEL STATION OPERATION
NDL FUEL STATION OPERATION
 
Europe User Conference: Albemarle FCC-SIM calibration best practices
Europe User Conference: Albemarle FCC-SIM calibration best practicesEurope User Conference: Albemarle FCC-SIM calibration best practices
Europe User Conference: Albemarle FCC-SIM calibration best practices
 
Inspection Guidelines for CNG & LPG Vehicle Conversions
Inspection Guidelines for CNG & LPG Vehicle ConversionsInspection Guidelines for CNG & LPG Vehicle Conversions
Inspection Guidelines for CNG & LPG Vehicle Conversions
 
Europe User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluationEurope User Conference: GRACE catalyst trial evaluation
Europe User Conference: GRACE catalyst trial evaluation
 
SPE-169923-MS
SPE-169923-MSSPE-169923-MS
SPE-169923-MS
 
Petrol Pump : Standards and Case Study
Petrol Pump : Standards and Case StudyPetrol Pump : Standards and Case Study
Petrol Pump : Standards and Case Study
 
Europe User Conference: ADNOC optimization of hydrocracking process as a func...
Europe User Conference: ADNOC optimization of hydrocracking process as a func...Europe User Conference: ADNOC optimization of hydrocracking process as a func...
Europe User Conference: ADNOC optimization of hydrocracking process as a func...
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
 
Refcon 6
Refcon 6Refcon 6
Refcon 6
 
VMT Company Introduction
VMT Company IntroductionVMT Company Introduction
VMT Company Introduction
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...
Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...
Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...
 
2014 04 11 solvo tos container
2014 04 11 solvo tos container2014 04 11 solvo tos container
2014 04 11 solvo tos container
 
2015 Fall Natural Gas Roundtable - McNeilus Presentation
2015 Fall Natural Gas Roundtable - McNeilus Presentation2015 Fall Natural Gas Roundtable - McNeilus Presentation
2015 Fall Natural Gas Roundtable - McNeilus Presentation
 

Similaire à Titan Logix Chemical Tank Overfill Protection Revision 1

Fit for Purpose Fleet Maximization (Revised)
Fit for Purpose Fleet Maximization (Revised)Fit for Purpose Fleet Maximization (Revised)
Fit for Purpose Fleet Maximization (Revised)
Steve Lehmer - EMS
 
Warren Safe T Plus Navy Ppg
Warren Safe T Plus Navy PpgWarren Safe T Plus Navy Ppg
Warren Safe T Plus Navy Ppg
Mark Klusza
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on Ships
Craig Carter
 
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
South Shore Clean Cities
 
Cummins isx12 g level 1-source_file_092514
Cummins isx12 g level 1-source_file_092514Cummins isx12 g level 1-source_file_092514
Cummins isx12 g level 1-source_file_092514
david Daffron
 
Fuel Management Systems 2015
Fuel Management Systems 2015Fuel Management Systems 2015
Fuel Management Systems 2015
Justin O'Donnell
 

Similaire à Titan Logix Chemical Tank Overfill Protection Revision 1 (20)

Fit for Purpose Fleet Maximization (Revised)
Fit for Purpose Fleet Maximization (Revised)Fit for Purpose Fleet Maximization (Revised)
Fit for Purpose Fleet Maximization (Revised)
 
Chemical security v5
Chemical security v5Chemical security v5
Chemical security v5
 
General Presentation- Fire Lion - 2018.pptx
General Presentation- Fire Lion - 2018.pptxGeneral Presentation- Fire Lion - 2018.pptx
General Presentation- Fire Lion - 2018.pptx
 
Slow Speed marine Engine Liner Wear Online Monitoring
Slow Speed marine Engine Liner Wear Online MonitoringSlow Speed marine Engine Liner Wear Online Monitoring
Slow Speed marine Engine Liner Wear Online Monitoring
 
API CNG LNG
API CNG LNGAPI CNG LNG
API CNG LNG
 
Marine Market Applications & Innovations
Marine Market Applications & InnovationsMarine Market Applications & Innovations
Marine Market Applications & Innovations
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Warren Safe T Plus Navy Ppg
Warren Safe T Plus Navy PpgWarren Safe T Plus Navy Ppg
Warren Safe T Plus Navy Ppg
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources Presentation
 
Oms
OmsOms
Oms
 
11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
 
S11 tech session draft 2014.03.11
S11 tech session draft 2014.03.11S11 tech session draft 2014.03.11
S11 tech session draft 2014.03.11
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on Ships
 
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
 
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
 
Cummins isx12 g level 1-source_file_092514
Cummins isx12 g level 1-source_file_092514Cummins isx12 g level 1-source_file_092514
Cummins isx12 g level 1-source_file_092514
 
Fuel Management Systems 2015
Fuel Management Systems 2015Fuel Management Systems 2015
Fuel Management Systems 2015
 
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the PipelineVirtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst Report
 

Titan Logix Chemical Tank Overfill Protection Revision 1

  • 1. SeeLevel®& TitanOverfill® Protection; Audible/Visual Warning Systems (Other Applications) Titan Logix® CD5 Chemical Tank Farm Overfill Protection September 13, 2016
  • 2. • Increasing trends in tank (mobile & stationary) overfill occurrences. • 2014: One Incident • 325 BBL Vac Trailer balled out. Both employees (two (2) person transfer) left rear doghouse during a mineral oil fluid transfer. • Impact# 12816 Corrective Action “New Tankers coming into field this year will be equipped with overfill protection gauges that will shut loading valve. Fleet will be retro-fit based on the performance of these units”. • 2015: Two Incidents: • 100 BBL Fuel Truck overfilled with diesel releasing it into spilldam and rear doghouse of the tanker (by design). • 238 BBL Diesel Transport overfilled releasing 30 gallons of diesel out of rear mounted trailer vent. Trailer was not level, nose high, loosing 25 BBL of displacement. • 2016: One Incident: • 325 BBL Crude Hauler overfilled releasing 5 gallons of crude oil Factors Leading to Implementation September 13, 20162
  • 3. • New infrastructure regulations established in International Fire Code 3406.5.1.10-3406.5.1.10.1 • 3406.5.1.10 Bottom Loading: • When bottom loading a tank vehicle or tank car with or without vapor control, a positive means shall be provided for loading with an automatic secondary shutoff control to prevent overfill. The connecting components between transfer equipment and the tank vehicle or tank car required to operate the secondary control shall be functionally compatible. Spillage is prevented when filling a bottom-loading tank vehicle by using a loading system that loads a predetermined quantity of flammable or combustible liquid. An automatic secondary shutoff control valve is required for a bottom-loading tank vehicle. • 3406.5.1.10.1 Dry Disconnect Coupling: • When bottom loading a tank vehicle, the coupling between the liquid loading hose or pipe and the truck piping shall be a dry disconnect coupling. To prevent spillage when disconnecting the dispensing system from the bottom-loading vehicle, the system is to use a dry connection. Factors Leading to Implementation September 13, 20163
  • 4. 300 BBL 4 Compartment Chemical Tanker • Initially tanker overfill protection was introduced in Alpine in 2010 with our 4 compartment, 300BBL chemical tanker. • Each 75 barrel compartment is equipped with an independent Titan Logix® TD80™ system. • Audible and visual overfill warning system. • Alarm are set to activate 90% capacity (Per CPAI SOP# S-001). September 13, 20164
  • 5. 300 BBL 4 Compartment Chemical Tanker Plumbing September 13, 20165 • Each chemical compartment has a dedicated pump/hose cabinet. • 3” Roper® series 9622 stainless steel bi-direction pumps (Chemical Rated). • Flow diagram supplied inside each cabinet. • Pump is rated for pressures up to 100PSI and flows up to 165GPM. • 75’ hose reels with Gates® Chem Master™ Xtreme™ FEP (formerly Gates® Stallion®) PTFE line hose. • -40°F to 300°F temperature range. • Alpine’s change to Gates® Chem Master™ Xtrem™ FEP has increased chemical hose life substantially since testing began in 2008.
  • 6. 300 BBL 4 Compartment Chemical Tanker September 13, 20166 • Each tank compartment is monitored on a Titan Logix® TD80™/Finch II Monitor Display, selected by the operator. • Tank selector located to left of monitor. • At 90% volume for the selected tank, the monitor activates an audible alarm.
  • 7. 300 BBL 4 Compartment Chemical Tanker September 13, 20167 • Street side mid-line mounted orange beacon activated at 90% capacity. • All new and existing overfill beacons are being retro-fit to Federal Signal FB2PST-I Fireball® warning strobes with red domes for fleet standardization. • Alpine uses 3 colors of beacons on rolling stock for different conditions: • Orange = Normal operating conditions/reverse indicator. • Blue (if equipped) = Phase 2 or Phase 3 conditions (convoy conditions). • Red (if equipped) = Tank overfill visual warning (exceeded 90% capacity).
  • 8. 2017 150 BBL Chemical Truck • New build, 150BBL, 4 compartment chemical truck arriving 2016-2017 ice road season. • Side mount pump and hose cabinets (2 cabinets each side) allow for better ergonomics to both the operator and mechanics. • Four (4) Titan Logix® TD80™ Liquid Level Gauges. • Two (2) Finch II monitors (1 mounted each side). • One (1) monitors compartments 1 & 3, the other monitors compartments 2 & 4. • Designed to interact with CD5 chemical dock. • Rochester float gauges for visual fill verification • Redundancy to the electronic monitoring. September 13, 20168
  • 9. 100 BBL 4 Compartment Chemical Truck September 13, 20169 • Alpine’s 2006 build, 100BBL chemical truck is unable to support CD5 Chemical Tank Farm. • Individual Rochester float gauges located in each tank compartment. • No electronic monitoring installed. • This unit is as a DOT code 406 vessel. • Upgrading the tank to support to CD5 is cost prohibitive due to requiring: • Four (4) tank penetrations. • Four tank Titan Logix® systems with installation. • Overfill protection system installed. • Multiple State inspections and recertification to DOT 406 Code. • Current estimated cost of $150K-$200K.
  • 10. 100 BBL 4 Compartment Chemical Truck September 13, 201610 • Standard rear doghouse unit designed for equipment, not ergonomics. • When designed hoses used were Goodyear Arctic Flexwing these were upgraded in 2008 to Gates® Chem Master™ Xtrem™ FEP. • Pumps are a non-chemical rated Blackmer® TX2 sliding vane pumps. • Alpine Operations will relocate this unit to CD3 (Remote Drillsite) to support chemical operations and as seasonal backup truck during ice road season. • Tank shows no corrosion. • Chassis repowered in 2013
  • 11. Permissive Ground (Standard Operations) • Permissive grounds provide piece of mind that a ground is established and shuts down filling operations in the event a ground is lost. • No overfill protection. • Permissive grounds are easily overridden and do not meet new international fire code, however are “legacy” installations across the slope. September 13, 201611
  • 12. CD5 Chemical Tank Farm Overfill Protection September 13, 201612 • New construction at CD5 introduced new International Fire Code(s) to Alpine. • Alpine and CPAI Construction decided to design/engineer a pared down truck racking system. • International Fire Code compliance was met through communication between truck and facility (communication is accomplished though SetSim). • XV Valve automatically closes if the bulk tank or tanker hit 90% capacity. • The paired down truck racking system utilizes the existing Titan Logix® TD80™ level gauge on tankers.
  • 13. CD5 Chemical Tank Farm Overfill Protection September 13, 201613 • Standard permissive ground remained as an added layer of protection. • Assuring grounding. • Pumping operations can be shutdown by removing ground cable closing XV Valve.
  • 14. CD5 Chemical Tank Farm Overfill Protection September 13, 201614 • Truck racking system is a stand alone unit. • Utilizing “hazardous location connections and enclosures”. • Facility/tanker communication is accomplished via 4-pin Turck Inc. receptacle and cord set. • Remote point “pilot light” become illuminated when point to point communication are established.
  • 15. CD5 Overfill Protection (Truckside) September 13, 201615 • The remote point station and plant communication comply with International Fire Code 3406.5.1.10 Bottom Loading. The existing level gauge and Finch II Monitor were was wired into the Turck Inc male receptacle. • Tanker pumps cannot be activated until plant communication is established. • A new travel mode is integrated into the switching to compensate for fluid movement during transport.
  • 16. Finch II Overfill Communication Wiring Diagram • Both the Titan Logix®/Finch II and SeeLevel® TD80™ are designed to accommodate integration into truck racking systems at minimal costs • Overfill communication systems can easily be retro-fit into existing infrastructure. • This system has been proven to be reliable and can only be overridden on the COPA Operator side in the event of a malfunction. September 13, 201616
  • 17. September 13, 2016 17 100BBLTruck,Tankers, &Vac Trailer OverfillAlarm
  • 18. • 2014 Conoco Phillips – corrective action requiring all new tankers be equipped with overfill protection. • Two (2) in the construction phase had a mid-build request to add overfill protection that would shutdown the pony motor. • Fluid movement was not taken into account. • During transport the pony motors would shutdown. Fleet services would dispatch a mechanic for heat & start. • The shutdown systems were left intact by Conoco Phillips request. • The field solution has been fills the two units with less fluid. • 2015-2016 two (2) different systems were evaluated in Alpine. • One Titan Logix® on the new 238BBL Diesel Transport • One See-Level™ on the Refurbished 325BBL Rig Water Vac Trailer. • Both audible and visual only. • The Audible/Visual System has created true operator accountability. Overfill Protection History September 13, 201618
  • 19. Titan Logix® Audible/Visual Overfill Warning September 13, 201619 • Installed on the 230BBL Diesel Transport received on the 2016 ice road season. • Equipped with Titan Logix®/Finch II fluid level gauge and the Rochester float gauge. • Fluid level gauge equipped with an audible alarm set to 90% of capacity. • Speaker is Truck-Lite® Single Sound 102DB 4” Round P/N 92918 • Will be replaced with Truck-Lite® Self Adjusting Sound Regulating 77-97DB 4” Round P/N 92914
  • 20. Titan Logix® Audible/Visual Overfill Warning • 2016 Diesel Transport: • Fluid level gauge wired to an amber beacon indicating overfill at 90% . • Amber strobe retro-fit to Federal Signal FB2PST-I Fireball® warning strobe with red dome for fleet standardization. • Federal Signal Fireball® warning strobe was chosen to be used due to product structure. • Standard Alpine strobe used on Tankers/100BBL Trucks for Amber and blue strobes. September 13, 201620
  • 21. SeeLevel™ Audible/Visual Overfill Warning September 13, 201621 • In 2016 Alpine received it’s first 325BBL Vac Trailer equipped with an Audible/Visual over fill warning system. • Wired to SeeLevel™ Float Gauge with alarm and warning strobe activating at 90% of tank capacity. • This unit is used to provide clean water support to Doyon Rig 19. • Alpine will receive two (2) new Wells Support 325BBL Vac Trailers equipped with overfill warning systems 2016-2017 ice road season. • Alpine’s first test of the SeeLevel™ overfill warning system in an dirty service tanker.
  • 22. Clean Service 325bbl truck with SeeLevel™ • The blue domed Federal Signal FB2PST-I Fireball® warning strobe was used in this system will be retro-fit with red dome. • Future tanker builds will be equipped with dual exterior mounted red Federal Signal FB2PST-I Fireball® warning strobe. • Future 325BBL Vac Trailer builds will also incorporate a single Federal Signal FB2PST-I Fireball® warning strobe located in rear doghouse. • This 325BBL Vac Trailer unit used an exterior mounted Pollak® backup alarm for the overfill warning system. • Future 325BBL Vac Trailer builds will incorporate a Truck-Lite® Self Adjusting Sound Regulating 77-97DB 4” Round back up alarm mounted in rear doghouse. September 13, 201622
  • 23. SeeLevel™ Audible/Visual Overfill Warning • Retro-fit of existing units is very cost effective if 325BBL Vac Trailers or Tankers are equipped with SeeLevel™ gauge or Titan Logix® gauge. • Retro-fit of existing Alpine 325BBL Vac Trailers expected to be completed by end of summer 2017 (Per Corrective Action). • Systems testing causing protracted delivery schedule. September 13, 201623
  • 24. In Closing – New Technology Opportunities • With new technology comes the opportunity for continuous business improvements. We must keep this in mind during all stages of design for our infrastructure and core equipment. • Learn from perceived failures and seize the opportunities to learn and adapt. Some times the answer is right in front of us. • Alpine introduced Over-Fill Warning Systems to the field in 2010, but failed to research the technology for all Tankers/100BBL Trucks. • By 2014 personal changes allowed this system to be forgotten and research had to be repeated. September 13, 201624
  • 25. In Closing – Learn and Adapt • The Titan Logix® system has proven to be a more reliable system. • The SeeLevel™ Gauge has limitations due to design as a float gauge. • Fluid movement in tank allows float to active Overfill Warning during transport. • Dependent on the cleanliness of the 325BBL Vac Trailer Alpine has experienced floats sticking and not measuring fluid levels correctly. September 13, 201625