DOE TRU WASTES:
versus
NNSA PIT PRODUCTION
PLUTONIUM WASTES:
CLEANUP
WA S T E
PLUTONIUM
BOMB WASTE
PLUTONIUM
BOMB WASTE
THE FUTURE OF WIPP:
DOE transuranic (TRU) wastes
are plutonium contaminated wastes
from the past production of nuclear
weapons. In 1999 WIPP was first
granted a hazardous waste permit by
the New Mexico Environment
Department (NMED) to dispose of TRU
waste 2,150 feet below ground in a
mined geologic salt repository.
Plutonium pits are the essential
radioactive cores of nuclear weapons.
The U.S. is implementing a $2 trillion
"modernization" program to keep
nuclear weapons forever, helping to fuel
a new nuclear arms race. The Pentagon
has identified expanded plutonium pit
production as the #1 modernization
issue. No future pit production is to
maintain the safety and reliability of the
existing nuclear weapons stockpile.
WASTE
Source: RadWasteSummit 2020: National Nuclear Security
Administration Prioritization Approach - September 9, 2020, Page 8
NNSA’s mission is plutonium pit
production plain &simple.
2050...AND BEYOND
NNSA HAS STATED CLEARLY:
WIPP IS ESSENTIAL FOR PIT
PRODUCTION UNTIL 2080.
“
“
As you can see clearly in the National
Nuclear Security Administration’s chart
above, NNSA is getting ready to dump
radioactive wastes from plutonium pit
production at WIPP for the next 30 years.
Waste from expanded pit production will
soon far outweigh cleanup wastes.
(WIPP) HAS SO FAR
BEEN A CLEAN
UP SITE.
THE WASTE ISOLATION PILOT PLANT
(WIPP)
WIPP opened in 1999 and has now operated for more than 20 years.
THE WIPP PERMIT is scheduled to be renewed every ten
years and the final closure date of WIPP can be set in this
renewal. NMED is proposing a provision that will require
DOE to make a case for Permit renewal at the end of each
Permit term. This change includes requiring an accurate
inventory of radioactive TRU wastes destined for WIPP,
including pit production at the Los Alamos National Lab.
NMED is also adding a new Permit condition that triggers
the revocation of the Permit if the Land Withdrawal Act
volumetric disposal limit for wastes of 6.2 million cubic
feet is increased or otherwise changed.
Thirdly, NMED is adding a new Permit section to require
the prioritization of waste from New Mexico generator/
storage sites for emplacement at WIPP.
As we can clearly see from the chart, this DOE plan for
the future of WIPP will overwhelmingly end up being new
pit production wastes.
A Public Hearing: is currently
scheduled to start
You can follow us on our website at
nukewatch.org and on our social media
@nukewatchnm to stay updated on the
latest WIPP updates and action alerts.
Also check out stopforeverwipp.org.
The Hearing can be observed by the public, and public comments will
be possible. Learn more:https://nukewatch.org/wipp-hearing-determination-request/
May 2023
ALL FUTURE PIT PRODUCTION is
for speculative new designs that
can't be tested because of the
international testing moratorium,
thereby perhaps eroding confi-
dence in the stockpile. Or, alterna-
tively, these new designs could
push the U.S. into resuming testing,
which would have severe prolifer-
ation consequences.
Pit production will add an estimated
57,550 cubic meters of radioactive
plutonium wastes over 50 years,
more than half of WIPP's projected
future capacity. The National Acad-
emy of Sciences has already con-
cluded that WIPP doesn't have
sufficient capacity for all of DOE's
planned radioactive wastes.
Despite being located in New Mexico, out-of-state sites have
been given priority over radioactive wastes from Los Alamos Lab.
WIPP’s originally stated mission was to “Start Clean, Stay Clean.”
But in 2014 an improperly prepared waste drum from LANL
ruptured, which contaminated and shut down WIPP for 3 years.
Aug. 28, 2023
NOW THE NATIONAL NUCLEAR SECURITY ADMINISTRATION &
DEPARTMENT OF ENERGY ARE TRANSFORMING WIPP INTO A
RADIOACTIVE WASTE DUMP FOR EXPANDED
NUCLEAR WEAPONS PRODUCTION

Contenu connexe

Similaire à Updated WIPP Infographic

Is nuclear energy solution to our power problems ?
Is nuclear energy solution to our power problems ?Is nuclear energy solution to our power problems ?
Is nuclear energy solution to our power problems ?
Harsh Gupta
 
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENTANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
Doug Robertson
 
tompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Planttompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Plant
Emily Tompkins
 
David Farkas_Dissertation_Final
David Farkas_Dissertation_FinalDavid Farkas_Dissertation_Final
David Farkas_Dissertation_Final
David Farkas
 
The glg slide deck as 1700 edt monday 2 may 2011
The glg slide deck as 1700 edt monday 2 may 2011 The glg slide deck as 1700 edt monday 2 may 2011
The glg slide deck as 1700 edt monday 2 may 2011
tdrolet
 

Similaire à Updated WIPP Infographic (20)

Picatinny2
Picatinny2Picatinny2
Picatinny2
 
Is nuclear energy solution to our power problems ?
Is nuclear energy solution to our power problems ?Is nuclear energy solution to our power problems ?
Is nuclear energy solution to our power problems ?
 
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENTANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
 
Oregon
OregonOregon
Oregon
 
Greenpeace
GreenpeaceGreenpeace
Greenpeace
 
tompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Planttompkins_comm dev_Pilgrim Power Plant
tompkins_comm dev_Pilgrim Power Plant
 
David Farkas_Dissertation_Final
David Farkas_Dissertation_FinalDavid Farkas_Dissertation_Final
David Farkas_Dissertation_Final
 
Kentucky
KentuckyKentucky
Kentucky
 
New jersey
New jerseyNew jersey
New jersey
 
Program Lecture 2 Economic Returns From The Biosphere
Program Lecture 2   Economic Returns From The BiosphereProgram Lecture 2   Economic Returns From The Biosphere
Program Lecture 2 Economic Returns From The Biosphere
 
Kentucky
KentuckyKentucky
Kentucky
 
New jersey
New jerseyNew jersey
New jersey
 
Oregon
OregonOregon
Oregon
 
What the fracking? october 2012
What the fracking? october 2012What the fracking? october 2012
What the fracking? october 2012
 
Missouri
MissouriMissouri
Missouri
 
Nuclear power
Nuclear powerNuclear power
Nuclear power
 
Economics of plutonium recycle 6 nov2015fvh
Economics of plutonium recycle 6 nov2015fvhEconomics of plutonium recycle 6 nov2015fvh
Economics of plutonium recycle 6 nov2015fvh
 
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORTPIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
PIPELINE DESIGN, INTEGRITY AND RELIABILITY REPORT
 
Pipeline Design Report
Pipeline Design ReportPipeline Design Report
Pipeline Design Report
 
The glg slide deck as 1700 edt monday 2 may 2011
The glg slide deck as 1700 edt monday 2 may 2011 The glg slide deck as 1700 edt monday 2 may 2011
The glg slide deck as 1700 edt monday 2 may 2011
 

Dernier

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Dernier (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 

Updated WIPP Infographic

  • 1. DOE TRU WASTES: versus NNSA PIT PRODUCTION PLUTONIUM WASTES: CLEANUP WA S T E PLUTONIUM BOMB WASTE PLUTONIUM BOMB WASTE THE FUTURE OF WIPP: DOE transuranic (TRU) wastes are plutonium contaminated wastes from the past production of nuclear weapons. In 1999 WIPP was first granted a hazardous waste permit by the New Mexico Environment Department (NMED) to dispose of TRU waste 2,150 feet below ground in a mined geologic salt repository. Plutonium pits are the essential radioactive cores of nuclear weapons. The U.S. is implementing a $2 trillion "modernization" program to keep nuclear weapons forever, helping to fuel a new nuclear arms race. The Pentagon has identified expanded plutonium pit production as the #1 modernization issue. No future pit production is to maintain the safety and reliability of the existing nuclear weapons stockpile. WASTE Source: RadWasteSummit 2020: National Nuclear Security Administration Prioritization Approach - September 9, 2020, Page 8 NNSA’s mission is plutonium pit production plain &simple. 2050...AND BEYOND NNSA HAS STATED CLEARLY: WIPP IS ESSENTIAL FOR PIT PRODUCTION UNTIL 2080. “ “ As you can see clearly in the National Nuclear Security Administration’s chart above, NNSA is getting ready to dump radioactive wastes from plutonium pit production at WIPP for the next 30 years. Waste from expanded pit production will soon far outweigh cleanup wastes. (WIPP) HAS SO FAR BEEN A CLEAN UP SITE. THE WASTE ISOLATION PILOT PLANT (WIPP)
  • 2. WIPP opened in 1999 and has now operated for more than 20 years. THE WIPP PERMIT is scheduled to be renewed every ten years and the final closure date of WIPP can be set in this renewal. NMED is proposing a provision that will require DOE to make a case for Permit renewal at the end of each Permit term. This change includes requiring an accurate inventory of radioactive TRU wastes destined for WIPP, including pit production at the Los Alamos National Lab. NMED is also adding a new Permit condition that triggers the revocation of the Permit if the Land Withdrawal Act volumetric disposal limit for wastes of 6.2 million cubic feet is increased or otherwise changed. Thirdly, NMED is adding a new Permit section to require the prioritization of waste from New Mexico generator/ storage sites for emplacement at WIPP. As we can clearly see from the chart, this DOE plan for the future of WIPP will overwhelmingly end up being new pit production wastes. A Public Hearing: is currently scheduled to start You can follow us on our website at nukewatch.org and on our social media @nukewatchnm to stay updated on the latest WIPP updates and action alerts. Also check out stopforeverwipp.org. The Hearing can be observed by the public, and public comments will be possible. Learn more:https://nukewatch.org/wipp-hearing-determination-request/ May 2023 ALL FUTURE PIT PRODUCTION is for speculative new designs that can't be tested because of the international testing moratorium, thereby perhaps eroding confi- dence in the stockpile. Or, alterna- tively, these new designs could push the U.S. into resuming testing, which would have severe prolifer- ation consequences. Pit production will add an estimated 57,550 cubic meters of radioactive plutonium wastes over 50 years, more than half of WIPP's projected future capacity. The National Acad- emy of Sciences has already con- cluded that WIPP doesn't have sufficient capacity for all of DOE's planned radioactive wastes. Despite being located in New Mexico, out-of-state sites have been given priority over radioactive wastes from Los Alamos Lab. WIPP’s originally stated mission was to “Start Clean, Stay Clean.” But in 2014 an improperly prepared waste drum from LANL ruptured, which contaminated and shut down WIPP for 3 years. Aug. 28, 2023 NOW THE NATIONAL NUCLEAR SECURITY ADMINISTRATION & DEPARTMENT OF ENERGY ARE TRANSFORMING WIPP INTO A RADIOACTIVE WASTE DUMP FOR EXPANDED NUCLEAR WEAPONS PRODUCTION