Practice Problem: Chapter 3, Project Management 
Problem 1: 
The following represent activities in a major construction project. Draw the network to 
represent this project. 
Activity Immediate Predecessor 
A - 
B - 
C A 
D B 
E B 
F C, E 
G D 
H F, G 
1
Problem 2: 
Given the following Time Chart and Network Diagram, find the Critical Path. 
Activity a m b t Variance 
A 2 3 4 3 1/9 
B 1 2 3 2 1/9 
C 4 5 12 6 16/9 
D 1 3 5 3 4/9 
E 1 2 3 2 1/9 
Problem 3: 
What is the variance in completion time for the critical path found in Problem 2? 
Problem 4: 
A project has an expected completion time of 40 weeks and a standard deviation of 5 
weeks. It is assumed that the project completion time is normally distributed. 
(a) What is the probability of finishing the project in 50 weeks or less? 
(b) What is the probability of finishing the project in 38 weeks or less? 
(c) The due date for the project is set so that there is a 90% chance that the project will 
be finished by this date. What is the date? 
2
Problem 5: 
Development of a new deluxe version of a particular software product is being 
considered. The activities necessary for the completion of this project are listed in the 
table below along with their costs and completion times in weeks. 
3 
Activity Normal 
Time 
Crash 
Time 
Normal 
Cost 
Crash 
Cost 
Immediate 
Predecessor 
A 4 3 2,000 2,600 - 
B 2 1 2,200 2,800 A 
C 3 3 500 500 A 
D 8 4 2,300 2,600 A 
E 6 3 900 1,200 B, D 
F 3 2 3,000 4,200 C, E 
G 4 2 1,400 2,000 F 
(a) What is the project expected completion date? 
(b) What is the total cost required for completing this project on normal time? 
(c) If you wish to reduce the time required to complete this project by 1 week, which 
activity should be crashed, and how much will this increase the total cost?
ANSWERS: 
4 
Problem 1: 
Problem 2: 
Critical path: ACDE = 14 
Problem 3: 
Total variance   variances of activities on critical path 
Total variance = 1/9 + 16/9 + 4/9 + 1/9 = 2 2/9 = 2.44 
And σ = = 1.6
5 
Problem 4: 
(a) 
50 40 
Z 2 
5 
X  
 
  
   
Therefore: P(X  50)  P(Z  2)  0.97725 
(b) 
X   
2 
Z     
0.4 
5 
 
 
Therefore: P(X  38)  P(Z  0.4)  0.34458 
(c) 90% Z 1.28  ( -) /    40/ 5 
Therefore:  1.28*5 40  46.4weeks 
Problem 5: 
(a) 
Project completion time is therefore t t t t t A D E F G      4  8 6 3 4  25 
(b) Total cost  $2,000$2200$500$2,300$900$3,000 $1,400  $12,300 
(c) Crash D 1 week at an additional cost of 
$2,600 $2,300 $300 
  
$75 
 
8  
4 4

Contenu connexe

Tendances

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
Rahul Dubey
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
Harinadh Karimikonda
 

Tendances (20)

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Project management case study
Project management case studyProject management case study
Project management case study
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project development cycle
Project development cycleProject development cycle
Project development cycle
 
Applications of pert
Applications of pertApplications of pert
Applications of pert
 
P E R T
P E R TP E R T
P E R T
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
BOOT, BOT, Management Contracts & Turnkey PROJECTS
BOOT, BOT, Management Contracts & Turnkey PROJECTSBOOT, BOT, Management Contracts & Turnkey PROJECTS
BOOT, BOT, Management Contracts & Turnkey PROJECTS
 
Project management
Project managementProject management
Project management
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection Methods
 
Project management structures
Project management structuresProject management structures
Project management structures
 

Similaire à Network diagram problems

1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx
jackiewalcutt
 
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docxDeadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
edwardmarivel
 
Scheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docxScheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docx
kenjordan97598
 
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
drennanmicah
 
LectureProjectPlanning.ppt
LectureProjectPlanning.pptLectureProjectPlanning.ppt
LectureProjectPlanning.ppt
anhdbh
 
SchedulingPart 1. Question 1. How many of the statements are tru.docx
SchedulingPart 1.  Question 1.  How many of the statements are tru.docxSchedulingPart 1.  Question 1.  How many of the statements are tru.docx
SchedulingPart 1. Question 1. How many of the statements are tru.docx
anhlodge
 

Similaire à Network diagram problems (20)

Ch03pp
Ch03ppCh03pp
Ch03pp
 
1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx1.1. Provide the definitions for resource loading and resource.docx
1.1. Provide the definitions for resource loading and resource.docx
 
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docxDeadline 6 PM Friday September 27, 201310 Project Management Que.docx
Deadline 6 PM Friday September 27, 201310 Project Management Que.docx
 
Ch 06 - CPM PERT (1).pptx
Ch 06 - CPM  PERT (1).pptxCh 06 - CPM  PERT (1).pptx
Ch 06 - CPM PERT (1).pptx
 
Scheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docxScheduling Problems Complete the following problems covering pro.docx
Scheduling Problems Complete the following problems covering pro.docx
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
1LocationFixed CostsVariable Costs per unitA=BB=CC=DA$85,000260006.docx
 
Chap003
Chap003Chap003
Chap003
 
LectureProjectPlanning.ppt
LectureProjectPlanning.pptLectureProjectPlanning.ppt
LectureProjectPlanning.ppt
 
Project management
Project managementProject management
Project management
 
PERT/CPM
PERT/CPMPERT/CPM
PERT/CPM
 
PROJ 586 Entire Course NEW
PROJ 586 Entire Course NEWPROJ 586 Entire Course NEW
PROJ 586 Entire Course NEW
 
CPM-PERT-Examples .pptx
CPM-PERT-Examples .pptxCPM-PERT-Examples .pptx
CPM-PERT-Examples .pptx
 
SchedulingPart 1. Question 1. How many of the statements are tru.docx
SchedulingPart 1.  Question 1.  How many of the statements are tru.docxSchedulingPart 1.  Question 1.  How many of the statements are tru.docx
SchedulingPart 1. Question 1. How many of the statements are tru.docx
 
OPM101Chapter16_001 (2).ppt
OPM101Chapter16_001 (2).pptOPM101Chapter16_001 (2).ppt
OPM101Chapter16_001 (2).ppt
 
PROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.comPROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.com
 
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.comPROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
 
PROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.comPROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.com
 
Devry proj 586 final exam set 2 new
Devry proj 586 final exam set 2 newDevry proj 586 final exam set 2 new
Devry proj 586 final exam set 2 new
 
Introduction to Project Management
Introduction to Project Management Introduction to Project Management
Introduction to Project Management
 

Dernier

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Dernier (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Network diagram problems

  • 1. Practice Problem: Chapter 3, Project Management Problem 1: The following represent activities in a major construction project. Draw the network to represent this project. Activity Immediate Predecessor A - B - C A D B E B F C, E G D H F, G 1
  • 2. Problem 2: Given the following Time Chart and Network Diagram, find the Critical Path. Activity a m b t Variance A 2 3 4 3 1/9 B 1 2 3 2 1/9 C 4 5 12 6 16/9 D 1 3 5 3 4/9 E 1 2 3 2 1/9 Problem 3: What is the variance in completion time for the critical path found in Problem 2? Problem 4: A project has an expected completion time of 40 weeks and a standard deviation of 5 weeks. It is assumed that the project completion time is normally distributed. (a) What is the probability of finishing the project in 50 weeks or less? (b) What is the probability of finishing the project in 38 weeks or less? (c) The due date for the project is set so that there is a 90% chance that the project will be finished by this date. What is the date? 2
  • 3. Problem 5: Development of a new deluxe version of a particular software product is being considered. The activities necessary for the completion of this project are listed in the table below along with their costs and completion times in weeks. 3 Activity Normal Time Crash Time Normal Cost Crash Cost Immediate Predecessor A 4 3 2,000 2,600 - B 2 1 2,200 2,800 A C 3 3 500 500 A D 8 4 2,300 2,600 A E 6 3 900 1,200 B, D F 3 2 3,000 4,200 C, E G 4 2 1,400 2,000 F (a) What is the project expected completion date? (b) What is the total cost required for completing this project on normal time? (c) If you wish to reduce the time required to complete this project by 1 week, which activity should be crashed, and how much will this increase the total cost?
  • 4. ANSWERS: 4 Problem 1: Problem 2: Critical path: ACDE = 14 Problem 3: Total variance   variances of activities on critical path Total variance = 1/9 + 16/9 + 4/9 + 1/9 = 2 2/9 = 2.44 And σ = = 1.6
  • 5. 5 Problem 4: (a) 50 40 Z 2 5 X        Therefore: P(X  50)  P(Z  2)  0.97725 (b) X   2 Z     0.4 5   Therefore: P(X  38)  P(Z  0.4)  0.34458 (c) 90% Z 1.28  ( -) /    40/ 5 Therefore:  1.28*5 40  46.4weeks Problem 5: (a) Project completion time is therefore t t t t t A D E F G      4  8 6 3 4  25 (b) Total cost  $2,000$2200$500$2,300$900$3,000 $1,400  $12,300 (c) Crash D 1 week at an additional cost of $2,600 $2,300 $300   $75  8  4 4