2. Structural Fabrications (SF) - Rail
o SF provide nationwide fabrication &
structural steelwork
o Network Rail & LUL
o Complete service over the whole
project
o Including
design, fabrication, manufacture, instal
lation and maintenance.
3. SF capabilities within Rail
o Fabrication
o Steelwork
o DDA handrail
o Stainless steel barriers
o Cladding & Roofing
o GRP works
o Brickwork
o Ground works
o Timber fencing works
o Refurbishment
o Polycarbonate roofing with aluminium guttering
o Painting to N1 specification
4. SF – Recent major contracts
o Murphy's
o Mansell PLC
o Balfour Beatty
o Severn Trent
o Modus Interiors
o Global Rail
o Alpha Construction
o May Gurney
o Isg plc
o Birse Rail
5. SF – Rail projects
o LUL Victoria Line
o Dover Street
o Northumberland Park
o Cobourg Street
o Cloudesley Station
o Hazel Grove
o Newington Road
o Fazakerley Station
o Barrow on Furnace Station
o Hooton Station
o Standen Hay
o Lazonby
6. Hazel Grove
o Lift shaft steelwork with
link steelwork connections
o DDA handrail
o Cladding, clad roofing with
aluminium guttering
o Design, fabrication of
internal roofing system
around new link
connections
o Including
steelwork, brickwork &
ground works.
8. Newington Road
o Removing redundant steelwork, over-plating
and local repairs to bridge steelwork
o Current project at Widnes – Replacing stair treads & bridge deck with Strongwell
I beam GRP decking
10. Fazakerley Station
o Lift shaft steelwork
with link steelwork
connections
o DDA handrail
o Cladding
o Polycarbonate roofing
with aluminium
guttering
o N1 paint specif’n of
link steelwork
o Brickwork & ground
works
11. Barrow
o Lift shaft steelwork & motor
room steelwork
o DDA handrail
o Kingspan KS1000 Optimo D
cladding
o Rigidal zip-lok roofing with
aluminium guttering
o Design, fabrication &
installation of canopy around
new lift shafts including
steelwork
o Over boarding & mineral felt
waterproofing.
12. Hooton Station
o New build & installation of
double span 25m bridge with
camber linking 3 platforms
o 3 lift shafts with stairs & motor
rooms
o Nickel cast nosing's on stairs
with nylon coated stainless
steel hand rail
o Design & fabrication of
internal roofing system around
new link connections including
steelwork & DDA Nylon
handrails.
13. Why SF
o Speed
– Meet your targets
o Flexibility
– Delivering to your needs
o Dependability
– Solve problems
o Quality
– Assured at all times
o Competitiveness
– Value for your money
o Customer Service
– Working relationships allows SF to be
responsive to your needs
14. Technical Support
o Dedicated Senior Contract
Managers (SCM)
– SCM full account responsibility
– Technical support for routine &
emergency operations
– Supported by technical team
including MD
– Direct communication with SCM for a
timely response
– Realistic but challenging deadlines
established
– Focused to deliver on time
15. Certification
o Link Up
o ISO 9001: 2008
o ISO 14001: 2004
o ISO 18001: 2007 (Audit pending)
o UVDB
o RoSPA
o CSCS
o NFB
16. Responsiveness by SF
o SF built on delivering quality products with service based on
being responsive to customer needs
– Relationship with customers
– Intelligent forecasting
– Target date driven
– Direct contacts – Dedicated SCM
– Technical expertise
– Skilled workshop
– Flexibility throughout SF
– Our own installation teams
– Flexible & high capacity due to multi-skilled team
– 2 Shift system available
17. Structural Fabrications - Summary
o SF have worked with industry leading companies
o Experienced to implement your needs
o Technical resource to combat emergency operations
o Ordering processes focussed to meet delivery dates
o Management information snapshot available quickly
o Capable of future developments for best practice, innovation &
competitiveness
o SF culture is one of delivering quality while being responsive to
your needs