SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
Quick Facts:
• Established: 1999
• Employees: Approx – 100
• Offices: Miami / Orlando / N. Carolina / S. Carolina
• Licensed, Insured and Bonded
• Financials: Annual Growth - 25% since 2010
• MBE / SBE / DBE / OSD / Preferred MDCPS vendor
• D-U-N-S: 12721954
• FEIN: 65-0949611
• MasterFormat Divisions: 25 | 26 | 27 | 28 | 33
Structured Cabling Solutions, Inc.
d/b/a SCS Technologies®
SCS-Technologies® is a Building Technology
Infrastructure and Systems provider. Through years
of strategic partnership planning, we have been
able to assemble a TEAM of integrators that
together under our supervision and project
management expertise helps contractors,
developers & end-users successfully deploy a full
Building Technology package.
Solutions & Services:
• IT Cabling Infrastructures
• Security Cabling Infrastructures
• A/V Cabling Infrastructures
• Cable Television Infrastructures
• Telecommunication room build-outs
• Copper/Fiber Back-Bone Cabling Systems
• Turn-key Network infrastructure & integration
• Turn-key VoIP system solutions
• Turn-key Wi-Fi system solutions
• Turn-key Security system solutions
• Turn-key A/V system solutions
• Ask us about more…
Value Proposition:
SCS-Technologies® mission is to help customers understand the importance of designing and installing a
proper foundational cabling infrastructure. The same infrastructure that will help support all of your current
and future building technology needs. We’re not just the “cabling guys” we design, install, integrate and
provide warranty for Turn-key solutions to help achieve your dreams for a smarter, faster & more efficient
building.
Clients (Partial):
Capabilities Statement
5632 NW 161st Street, Miami
Gardens, FL 33014
Monica@Cabling-Solutions.com Mobile: 305-915-1427
Miami Children’s Court House (MCCH)
MCCH is a 14-story, $110M building, located at 155 NW 3rd Street in the heart of
downtown Miami. The new courthouse was constructed to replace the old
distained juvenile courthouse about 5 miles west. MCCH covers a total of
375,000sqft housing (18) courtrooms, judicial chambers, court administration, clerks,
prosecutors, defense attorneys, police and correction officers.
SCS was contracted by Johnson Controls to provide and install the building’s entire
IT cabling infrastructure. The scope included cabling for all Voice, Data, Wi-Fi, IP
Cameras, Access Control & Audio Visual. Complete Telecommunication room
build-outs, intra-building copper/fiber back-bone cabling, testing, labeling and
certification for all cables installed. The total solution was backed by a manufacture
25yr warranty.
Contracted Value: $1.35 Million
Project duration: 14 months
Client: Johnson Controls / Suffolk Construction / Miami- Dade County
Past Performance (Partial)
Miami Design District (MDD)
MDD a neighborhood dedicated to innovative fashion, design, architecture and
one of a kind dining experiences. The District is located at 3841 NE 2nd Ave, covers
nearly (7) city blocks and continues to grow. In early 2015 the District completed
Phase #1 & #2 of construction which includes (5) new buildings: Palm Court, JBL,
OP-110, OP-120 & City View Garage. The District is currently still undergoing
construction now moving into Phase #3 & #4 which will add Paradise Plaza,
Museum Garage, Buick building and many more cutting-edge architectural
building designs.
SCS together with it’s partners, was contracted by Thunder Electric to provide,
install and help finalize the design for the District’s entire Turn-Key Network
Infrastructure. The scope included 2 deployment phases:
SCS’s Core Capabilities: Phase 1 – Provide and install infrastructure for all Voice,
Data, Wi-Fi, IP Cameras & Access Control systems. Complete Telecommunication
room build-outs, intra & inter-building copper/fiber back-bone cabling, testing,
labeling and certification for all cables installed. The total solution was backed by a
manufacture 25yr warranty.
- S C S P r o j e c t M a n a g e m e n t E x p e r t i s e -
SCS’s Partnership Power: Phase 2 – Provide, install, program & configure the Districts
entire Network Infrastructure for which ALL systems would communicate and
transfer data on. The scope included the complete deployment of Cisco 6509 Core
switch, Cisco 3700 series network switches, Cisco VoIP system, Cisco Wireless Access
Point system & UPS units to support all active network equipment. Additionally to
the scope SCS & it’s partner was faced with the task of integrating the Districts
network with all other sub system providers onsite. The daunting task was executed
flawlessly through proper coordination and system understanding.
Contracted Value: $1 Million
Project duration: 17 months
Client: Thunder Electric / Miami Design District Associates & Dacra Realty Inc. /
Coastal Construction
5632 NW 161st Street, Miami
Gardens, FL 33014
Monica@Cabling-Solutions.com Mobile: 305-915-1427
Supplier Diversity Certifications:
NMSDC MBE Certification # FL50540
SBE Certification
DBE Certification(s) FDOT and TXDOT
Miami Dade County CBE Certification
Brickell City Center (BCC)
Brickell City Centre is a $1.05 billion development that will occupy (9.1) acres along
South Miami Avenue between 6th and 8th Street in downtown Miami. It is the single
largest project currently underway in downtown Miami. The project consists of (2)
residential towers, (2) mid-rise office towers and a 263-room hotel. In addition, the
mixed-use development will include a 500,000 sq-ft of retail shopping,
entertainment & restaurant space for a grand total of 5.4 million sq-ft. BCC has a
total of (3) two-level underground parking garages spanning (7) acres below the
property for a total of (2,600) parking spaces.
Through Americaribe and John Moriarty & Associates of Florida, SCS was referred to
and contracted by Park Assist Systems to install a Turn-Key parking system for the
project’s (7) acre/(2,600) space parking garage. The system provides guests &
residents with a revolutionary approach to parking guidance. The system is
designed to maximize revenue and help minimize costs while treating parkers to
advanced levels of convenience, assurance and satisfaction.
The scope includes the installation of cable tracks, cat6 & power cabling to
designated devices; mounting, terminating, focusing; testing of all sensor cameras;
mounting and terminating all head-end system panels; installation of system
signage, kiosks & fiber network integration.
Contracted Value: $130,000
Project duration: Current
Client: Park Assist / Americaribe & John Moriarty / Swire Properties
American Express Corporate Campus (AMEX)
American Express Corporate Campus will be American Express's new regional
Headquarters located in Sunrise FL. The project consists of (2) glass sided buildings
(North & South) spanning 400,000 sq-ft. The new HQ will provide new offices for most
of the company’s 3,000 employees from Plantation, Weston & Miramar. Upon
completion the building will qualify for LEED certification.
SCS was contracted by SIEMENS Building Technologies to provide and install the
building’s entire IT cabling infrastructure & installation of the building entire SIEMENS
provided security IP camera and Access Control System. The scope includes
cabling for all Voice, Data, Wi-Fi, IP Cameras, Access Control & Audio Visual
systems. Complete Telecommunication room build-outs, intra & inter-building
copper/fiber back-bone cabling, testing, labeling and certification for all cables
installed. The total solution will be backed by a manufacture 25yr warranty
Contracted Value: $1.5 Million
Project duration: Current
Client: SIEMENS / Turner Construction / American Express
Past Performance (Continued)
5632 NW 161st Street, Miami
Gardens, FL 33014
Monica@Cabling-Solutions.com Mobile: 305-915-1427

Contenu connexe

Tendances (20)

Dean Costello Resume
Dean Costello ResumeDean Costello Resume
Dean Costello Resume
 
cj resume _update #1
cj resume _update #1cj resume _update #1
cj resume _update #1
 
2014 E-Tech-Company-Profile.v6em main
2014 E-Tech-Company-Profile.v6em main2014 E-Tech-Company-Profile.v6em main
2014 E-Tech-Company-Profile.v6em main
 
Digitechx Services Presentation
Digitechx Services PresentationDigitechx Services Presentation
Digitechx Services Presentation
 
Digitechx Services
Digitechx ServicesDigitechx Services
Digitechx Services
 
Pjf eng2013rail
Pjf eng2013railPjf eng2013rail
Pjf eng2013rail
 
Resume December 2012
Resume December 2012Resume December 2012
Resume December 2012
 
Erik Franzen Linkedin Resume
Erik Franzen Linkedin ResumeErik Franzen Linkedin Resume
Erik Franzen Linkedin Resume
 
Hackett ITResume SEPT01[2]
Hackett ITResume SEPT01[2]Hackett ITResume SEPT01[2]
Hackett ITResume SEPT01[2]
 
Twd Capabilities 2009
Twd Capabilities  2009Twd Capabilities  2009
Twd Capabilities 2009
 
List_of_Completed_Projects
List_of_Completed_ProjectsList_of_Completed_Projects
List_of_Completed_Projects
 
Walter Ocampo Resume
Walter Ocampo ResumeWalter Ocampo Resume
Walter Ocampo Resume
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
 
STANLEY VAUGHN RESUME MASTER
STANLEY VAUGHN RESUME MASTERSTANLEY VAUGHN RESUME MASTER
STANLEY VAUGHN RESUME MASTER
 
resume-qc, 2015
resume-qc, 2015resume-qc, 2015
resume-qc, 2015
 
Jim Hampton's Cover Letter
Jim Hampton's Cover LetterJim Hampton's Cover Letter
Jim Hampton's Cover Letter
 
Resume of Henry McKelvey
Resume of Henry McKelveyResume of Henry McKelvey
Resume of Henry McKelvey
 
InPro Solutions LLC
InPro Solutions LLCInPro Solutions LLC
InPro Solutions LLC
 
Resume-Michael Turner
Resume-Michael TurnerResume-Michael Turner
Resume-Michael Turner
 
Resume Yatish Kumar 2016
Resume Yatish Kumar 2016Resume Yatish Kumar 2016
Resume Yatish Kumar 2016
 

En vedette

জাতির পিতা শেখ মুজিবুর রহমান
জাতির পিতা শেখ মুজিবুর রহমানজাতির পিতা শেখ মুজিবুর রহমান
জাতির পিতা শেখ মুজিবুর রহমানSaiful bin A. Kalam
 
Welcome to the world of graphics design
Welcome to the world of graphics designWelcome to the world of graphics design
Welcome to the world of graphics designSaiful bin A. Kalam
 
bangla spelling rules প্রমিত বাংলা বানানের নিয়ম
bangla spelling rules প্রমিত বাংলা বানানের নিয়মbangla spelling rules প্রমিত বাংলা বানানের নিয়ম
bangla spelling rules প্রমিত বাংলা বানানের নিয়মSaiful bin A. Kalam
 
Avances en la tecnologia
Avances en la tecnologiaAvances en la tecnologia
Avances en la tecnologiaj4sonmartin
 
Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...
Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...
Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...DivvyCloud
 
ভঙ্গভঙ্গের কারণ ও ফলাফল
ভঙ্গভঙ্গের কারণ ও ফলাফলভঙ্গভঙ্গের কারণ ও ফলাফল
ভঙ্গভঙ্গের কারণ ও ফলাফলSaiful bin A. Kalam
 

En vedette (12)

জাতির পিতা শেখ মুজিবুর রহমান
জাতির পিতা শেখ মুজিবুর রহমানজাতির পিতা শেখ মুজিবুর রহমান
জাতির পিতা শেখ মুজিবুর রহমান
 
Welcome to the world of graphics design
Welcome to the world of graphics designWelcome to the world of graphics design
Welcome to the world of graphics design
 
Blogsconstruccionlisto 160521161248
Blogsconstruccionlisto 160521161248Blogsconstruccionlisto 160521161248
Blogsconstruccionlisto 160521161248
 
bangla spelling rules প্রমিত বাংলা বানানের নিয়ম
bangla spelling rules প্রমিত বাংলা বানানের নিয়মbangla spelling rules প্রমিত বাংলা বানানের নিয়ম
bangla spelling rules প্রমিত বাংলা বানানের নিয়ম
 
Eeuu
EeuuEeuu
Eeuu
 
Avances en la tecnologia
Avances en la tecnologiaAvances en la tecnologia
Avances en la tecnologia
 
Estrucura y desarrollo 2
Estrucura y desarrollo 2Estrucura y desarrollo 2
Estrucura y desarrollo 2
 
LA MATERIA
LA MATERIALA MATERIA
LA MATERIA
 
Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...
Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...
Bringing Cloud Computing Out of the Shadows: Shine the light on Shadow IT wit...
 
Los tributos en venezuela
Los tributos en venezuelaLos tributos en venezuela
Los tributos en venezuela
 
ভঙ্গভঙ্গের কারণ ও ফলাফল
ভঙ্গভঙ্গের কারণ ও ফলাফলভঙ্গভঙ্গের কারণ ও ফলাফল
ভঙ্গভঙ্গের কারণ ও ফলাফল
 
Graphic design introduction
Graphic design introductionGraphic design introduction
Graphic design introduction
 

Similaire à 1- SCS Capabilities Statement Monica

Jonathan Huber Resume (060810)
Jonathan Huber   Resume (060810)Jonathan Huber   Resume (060810)
Jonathan Huber Resume (060810)jh1847
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overviewminerlawrence
 
2016 Wims_Thomas Cyber PM ERP commecial 0217
2016 Wims_Thomas Cyber PM ERP commecial 02172016 Wims_Thomas Cyber PM ERP commecial 0217
2016 Wims_Thomas Cyber PM ERP commecial 0217Thomas R. Wims
 
Davyd ramirez resume
Davyd ramirez resumeDavyd ramirez resume
Davyd ramirez resumeDavyd Ramirez
 
Business plan for Absolute Telecom
Business plan for Absolute TelecomBusiness plan for Absolute Telecom
Business plan for Absolute TelecomKevin James
 
Jimmy McClain Resume V2
Jimmy McClain Resume V2Jimmy McClain Resume V2
Jimmy McClain Resume V2Jimmy McClain
 
Jeremiah_Goodmancurrentresume
Jeremiah_GoodmancurrentresumeJeremiah_Goodmancurrentresume
Jeremiah_GoodmancurrentresumeJeremiah Goodman
 
CaseStudy2011_King_Street_Center
CaseStudy2011_King_Street_CenterCaseStudy2011_King_Street_Center
CaseStudy2011_King_Street_CenterDaniel Kelly
 
Russell Jensen Resume V1.1
Russell Jensen Resume V1.1Russell Jensen Resume V1.1
Russell Jensen Resume V1.1Russell Jensen
 
Resume of Dwight Joslin
Resume of Dwight JoslinResume of Dwight Joslin
Resume of Dwight JoslinDwight Joslin
 
Steven Smith Resume 4-1-15
Steven Smith Resume 4-1-15Steven Smith Resume 4-1-15
Steven Smith Resume 4-1-15Steve Smith
 
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdfWireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdfAnil
 
Network Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_ConsolidatedNetwork Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_ConsolidatedKBIZEAU
 
Kenny Mok 2016
Kenny Mok 2016Kenny Mok 2016
Kenny Mok 2016Kenny Mok
 
Paul cliff-2014 voip resume
Paul cliff-2014 voip resumePaul cliff-2014 voip resume
Paul cliff-2014 voip resumePaul Cliff
 

Similaire à 1- SCS Capabilities Statement Monica (20)

Dennis M. Usky resume 9-14-2015
Dennis M. Usky resume 9-14-2015Dennis M. Usky resume 9-14-2015
Dennis M. Usky resume 9-14-2015
 
Jonathan Huber Resume (060810)
Jonathan Huber   Resume (060810)Jonathan Huber   Resume (060810)
Jonathan Huber Resume (060810)
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
 
Mike najarian resume
Mike najarian resumeMike najarian resume
Mike najarian resume
 
2016 Wims_Thomas Cyber PM ERP commecial 0217
2016 Wims_Thomas Cyber PM ERP commecial 02172016 Wims_Thomas Cyber PM ERP commecial 0217
2016 Wims_Thomas Cyber PM ERP commecial 0217
 
Davyd ramirez resume
Davyd ramirez resumeDavyd ramirez resume
Davyd ramirez resume
 
Business plan for Absolute Telecom
Business plan for Absolute TelecomBusiness plan for Absolute Telecom
Business plan for Absolute Telecom
 
Jimmy McClain Resume V2
Jimmy McClain Resume V2Jimmy McClain Resume V2
Jimmy McClain Resume V2
 
Jeremiah_Goodmancurrentresume
Jeremiah_GoodmancurrentresumeJeremiah_Goodmancurrentresume
Jeremiah_Goodmancurrentresume
 
CaseStudy2011_King_Street_Center
CaseStudy2011_King_Street_CenterCaseStudy2011_King_Street_Center
CaseStudy2011_King_Street_Center
 
Russell Jensen Resume V1.1
Russell Jensen Resume V1.1Russell Jensen Resume V1.1
Russell Jensen Resume V1.1
 
Resume of Dwight Joslin
Resume of Dwight JoslinResume of Dwight Joslin
Resume of Dwight Joslin
 
Steven Smith Resume 4-1-15
Steven Smith Resume 4-1-15Steven Smith Resume 4-1-15
Steven Smith Resume 4-1-15
 
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdfWireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
Wireline-Engineering-Solutions-for-a-Leading-Broadband-Provider.pdf
 
Network Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_ConsolidatedNetwork Solutions Supply Chain Industry Day_May28_2014_Consolidated
Network Solutions Supply Chain Industry Day_May28_2014_Consolidated
 
Kenny Mok 2016
Kenny Mok 2016Kenny Mok 2016
Kenny Mok 2016
 
Vivek Srivastava-2015
Vivek Srivastava-2015Vivek Srivastava-2015
Vivek Srivastava-2015
 
Lee kevin 20140120
Lee kevin 20140120Lee kevin 20140120
Lee kevin 20140120
 
Paul cliff-2014 voip resume
Paul cliff-2014 voip resumePaul cliff-2014 voip resume
Paul cliff-2014 voip resume
 
resume2
resume2resume2
resume2
 

1- SCS Capabilities Statement Monica

  • 1. Quick Facts: • Established: 1999 • Employees: Approx – 100 • Offices: Miami / Orlando / N. Carolina / S. Carolina • Licensed, Insured and Bonded • Financials: Annual Growth - 25% since 2010 • MBE / SBE / DBE / OSD / Preferred MDCPS vendor • D-U-N-S: 12721954 • FEIN: 65-0949611 • MasterFormat Divisions: 25 | 26 | 27 | 28 | 33 Structured Cabling Solutions, Inc. d/b/a SCS Technologies® SCS-Technologies® is a Building Technology Infrastructure and Systems provider. Through years of strategic partnership planning, we have been able to assemble a TEAM of integrators that together under our supervision and project management expertise helps contractors, developers & end-users successfully deploy a full Building Technology package. Solutions & Services: • IT Cabling Infrastructures • Security Cabling Infrastructures • A/V Cabling Infrastructures • Cable Television Infrastructures • Telecommunication room build-outs • Copper/Fiber Back-Bone Cabling Systems • Turn-key Network infrastructure & integration • Turn-key VoIP system solutions • Turn-key Wi-Fi system solutions • Turn-key Security system solutions • Turn-key A/V system solutions • Ask us about more… Value Proposition: SCS-Technologies® mission is to help customers understand the importance of designing and installing a proper foundational cabling infrastructure. The same infrastructure that will help support all of your current and future building technology needs. We’re not just the “cabling guys” we design, install, integrate and provide warranty for Turn-key solutions to help achieve your dreams for a smarter, faster & more efficient building. Clients (Partial): Capabilities Statement 5632 NW 161st Street, Miami Gardens, FL 33014 Monica@Cabling-Solutions.com Mobile: 305-915-1427
  • 2. Miami Children’s Court House (MCCH) MCCH is a 14-story, $110M building, located at 155 NW 3rd Street in the heart of downtown Miami. The new courthouse was constructed to replace the old distained juvenile courthouse about 5 miles west. MCCH covers a total of 375,000sqft housing (18) courtrooms, judicial chambers, court administration, clerks, prosecutors, defense attorneys, police and correction officers. SCS was contracted by Johnson Controls to provide and install the building’s entire IT cabling infrastructure. The scope included cabling for all Voice, Data, Wi-Fi, IP Cameras, Access Control & Audio Visual. Complete Telecommunication room build-outs, intra-building copper/fiber back-bone cabling, testing, labeling and certification for all cables installed. The total solution was backed by a manufacture 25yr warranty. Contracted Value: $1.35 Million Project duration: 14 months Client: Johnson Controls / Suffolk Construction / Miami- Dade County Past Performance (Partial) Miami Design District (MDD) MDD a neighborhood dedicated to innovative fashion, design, architecture and one of a kind dining experiences. The District is located at 3841 NE 2nd Ave, covers nearly (7) city blocks and continues to grow. In early 2015 the District completed Phase #1 & #2 of construction which includes (5) new buildings: Palm Court, JBL, OP-110, OP-120 & City View Garage. The District is currently still undergoing construction now moving into Phase #3 & #4 which will add Paradise Plaza, Museum Garage, Buick building and many more cutting-edge architectural building designs. SCS together with it’s partners, was contracted by Thunder Electric to provide, install and help finalize the design for the District’s entire Turn-Key Network Infrastructure. The scope included 2 deployment phases: SCS’s Core Capabilities: Phase 1 – Provide and install infrastructure for all Voice, Data, Wi-Fi, IP Cameras & Access Control systems. Complete Telecommunication room build-outs, intra & inter-building copper/fiber back-bone cabling, testing, labeling and certification for all cables installed. The total solution was backed by a manufacture 25yr warranty. - S C S P r o j e c t M a n a g e m e n t E x p e r t i s e - SCS’s Partnership Power: Phase 2 – Provide, install, program & configure the Districts entire Network Infrastructure for which ALL systems would communicate and transfer data on. The scope included the complete deployment of Cisco 6509 Core switch, Cisco 3700 series network switches, Cisco VoIP system, Cisco Wireless Access Point system & UPS units to support all active network equipment. Additionally to the scope SCS & it’s partner was faced with the task of integrating the Districts network with all other sub system providers onsite. The daunting task was executed flawlessly through proper coordination and system understanding. Contracted Value: $1 Million Project duration: 17 months Client: Thunder Electric / Miami Design District Associates & Dacra Realty Inc. / Coastal Construction 5632 NW 161st Street, Miami Gardens, FL 33014 Monica@Cabling-Solutions.com Mobile: 305-915-1427
  • 3. Supplier Diversity Certifications: NMSDC MBE Certification # FL50540 SBE Certification DBE Certification(s) FDOT and TXDOT Miami Dade County CBE Certification Brickell City Center (BCC) Brickell City Centre is a $1.05 billion development that will occupy (9.1) acres along South Miami Avenue between 6th and 8th Street in downtown Miami. It is the single largest project currently underway in downtown Miami. The project consists of (2) residential towers, (2) mid-rise office towers and a 263-room hotel. In addition, the mixed-use development will include a 500,000 sq-ft of retail shopping, entertainment & restaurant space for a grand total of 5.4 million sq-ft. BCC has a total of (3) two-level underground parking garages spanning (7) acres below the property for a total of (2,600) parking spaces. Through Americaribe and John Moriarty & Associates of Florida, SCS was referred to and contracted by Park Assist Systems to install a Turn-Key parking system for the project’s (7) acre/(2,600) space parking garage. The system provides guests & residents with a revolutionary approach to parking guidance. The system is designed to maximize revenue and help minimize costs while treating parkers to advanced levels of convenience, assurance and satisfaction. The scope includes the installation of cable tracks, cat6 & power cabling to designated devices; mounting, terminating, focusing; testing of all sensor cameras; mounting and terminating all head-end system panels; installation of system signage, kiosks & fiber network integration. Contracted Value: $130,000 Project duration: Current Client: Park Assist / Americaribe & John Moriarty / Swire Properties American Express Corporate Campus (AMEX) American Express Corporate Campus will be American Express's new regional Headquarters located in Sunrise FL. The project consists of (2) glass sided buildings (North & South) spanning 400,000 sq-ft. The new HQ will provide new offices for most of the company’s 3,000 employees from Plantation, Weston & Miramar. Upon completion the building will qualify for LEED certification. SCS was contracted by SIEMENS Building Technologies to provide and install the building’s entire IT cabling infrastructure & installation of the building entire SIEMENS provided security IP camera and Access Control System. The scope includes cabling for all Voice, Data, Wi-Fi, IP Cameras, Access Control & Audio Visual systems. Complete Telecommunication room build-outs, intra & inter-building copper/fiber back-bone cabling, testing, labeling and certification for all cables installed. The total solution will be backed by a manufacture 25yr warranty Contracted Value: $1.5 Million Project duration: Current Client: SIEMENS / Turner Construction / American Express Past Performance (Continued) 5632 NW 161st Street, Miami Gardens, FL 33014 Monica@Cabling-Solutions.com Mobile: 305-915-1427