The Future Envelope 12
Interreg IT-AU FACEcamp project
------------
Conference on Building Envelopes
20-21 May 2019, NOI Techpark, Bolzano (Italy)
"It’s all about performances".
AWS Community Day CPH - Three problems of Terraform
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation of façade system”
1. The Future Envelope 12 final event 20-21 May 2019, Bolzano
The Future Envelope 12
It’s all about performances
• Development and implementation of
façade system
• Michael Reifer
• FRENER & REIFER GmbH/Srl
FACEcamp is funded by European Regional Development Fund and Interreg V-A Italy-Austria 2014-2020. www.interreg.net
2. The Future Envelope 12 final event 20-21 May 2019, Bolzano
FRENER
REIFER
Company development
3. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Euregio region TAAT SOUTH TYROL
4. The Future Envelope 12 final event 20-21 May 2019, Bolzano
FRENER & REIFER history
5. The Future Envelope 12 final event 20-21 May 2019, Bolzano
FRENER & REIFER history
6. The Future Envelope 12 final event 20-21 May 2019, Bolzano
New York
HQ Brixen
Augsburg
Zürich
Paris
London
Richard Meier Kenzo Tange
Tadao Ando
Norman Foster
SANAA Renzo Piano
Herzog & de Meuron
Zaha Hadid
FRENER & REIFER worldwide
7. The Future Envelope 12 final event 20-21 May 2019, Bolzano
FRENER & REIFER Film
8. The Future Envelope 12 final event 20-21 May 2019, Bolzano
(r) & D - Projects
Iconic Architecture
Complex Geometry
9. The Future Envelope 12 final event 20-21 May 2019, Bolzano
From Wildspitzbahn to Softbridge, a R&D transfer story
10. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Fabrication (classical), surface destruction
11. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Fabrication (classical), surface destruction
12. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Fabrication (classical), surface destruction
13. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Rendering
Fabrication, how to do a double curved mirror surface?
14. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Alternative fabrication (result of R&D project nURBS-tEC)
― Potential forming methods selection determination
― Forming limit parameter definition
― Forming limit parameter
15. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES
Prototyping alternative fabrication (MockUp passed)
16. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES
Installation
17. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES
work result
18. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES
Developement minimo „structural glased), based on minimo_FR
19. The Future Envelope 12 final event 20-21 May 2019, Bolzano
(r) & D - Projects
Iconic Architecture,
structural glass
20. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Structural glass pyramide, Hotel Adler, Val Gardena, pretensioned glas structure
21. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R&D: design variants, test scenario creation, supply chain development, prototyping
22. The Future Envelope 12 final event 20-21 May 2019, Bolzano
(r) & D - Projects
Iconic Architecture,
adaptive facades
23. The Future Envelope 12 final event 20-21 May 2019, Bolzano
New challenge: adaptive high end facade
24. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 1: make feasable the architectural vision
25. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 2: functionality and visual design, and supply chain logic development
26. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 3: automation control design, production of visual and functional prototype
27. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 4: testing: wind forces, wind noise, corrosion, flash
28. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 5: optimization and production „zero serie prototype“
29. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 6: supply chain implementation (Super market)
30. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 7: production & installation
31. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Step 8: impressions
32. The Future Envelope 12 final event 20-21 May 2019, Bolzano
developing
concepts
verifying
solutions
developing
solutions
designing
concepts
generating
ideas
producing
solutions
The F&R stage gate process
!
Step 9: R&D process standardisation for a complex ETO building system supplier
Project development as stage gate process with the right competencies on the right time
Generating ideas, developing design
Developing and designing concepts and variants
Developing solution variants and pricing variants, testing, developing supply chain models and suppliers
Producing solutions,
33. The Future Envelope 12 final event 20-21 May 2019, Bolzano
New market opportunities departing from the R&D project
34. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Building Envelopes
Context driven
R&D Aproach
R&D
holistic context driven
innovation approach
35. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Innovation Process
Questions 2011
1. What kind of building and
façade trends are to be
expected?
2. Is reacting to trends enough of
innovation?
3. How to close the strategic gap
between the F&R innovation
and the world architecture and
building trends
― Look for the right networks:
Universities, research institutes, parametric designers, suppliers…..
― Research in the right directions
― Enforce evolution true portfolio management and revies
R&D in F&R: the beginnings
36. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Information Flow
Cooperative problem Solving
Documentation
Energy Flow,
Cradle 2 Cradle
Life Cycle Parametrics
Context induviduality
System Component Logics
Geometric Parametrics,
Mathematical Detailing
Context Green BuildingContext Urban Integration
Material Flow
Process Parametrics
Part Logistic Parametrics
Context Building
Performance
Innovation portfolio, context and topics
37. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Building Supply Chain, Research and Developement Topics
38. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - projects
functional design
free form technology
39. The Future Envelope 12 final event 20-21 May 2019, Bolzano
State of the art in 2011: System Layers, Details (primary steel-concrete
Construction), RWTH
40. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC R&D: Surface Materials & Macro Joint Analysis (I.C. TU Stuttgart)
41. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC R&D: Forming Method Analysis, craftman based methods
42. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC R&D: Forming Method Analysis deep drawing methods & explo forming
43. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC R&D: Forming Method Analysis deep drawing methods & explo
forming
44. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Institut für Baukonstruktion und Entwerfen
Lehrstuhl 2, Prof. Stefan Behling
nURBS-tEC R&D: Forming Method Analysis
45. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC R&D: Forming Method Analysis
46. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC Process, Forming Technology Evaluation
Meth 1 Meth 2 Meth 3 Meth 4 Meth 5
Form
1
A
1
B
1
C
2
3
A
― technology readiness evaluation
― alinement forming methods to surface curvature regions
― forming limit parameter evaluation
47. The Future Envelope 12 final event 20-21 May 2019, BolzanoRESEARCH AND
nURBS-tEC prototypes & Start of production
48. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC Business field, Iconic Architecture, Surface types
49. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Intelligent
Architecture
Iconic
Architecture
Brand
Architecture
Exclusive
Living
Products and
technologies
Organic
Construction
Iconic
Architecture
Iconic
Superyots
Wide Size
Prototyping
Digital
Chain
•building envelope system supplier
(design 2 build)
•Other industries
•architectural freeform know how
•façade engineering and detailing
•„mathematical“ detailing
nURBS-tEC, business modelling, strategy alinement
50. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC, R&D:„Sandwich“ Core Parametrics
― research, test and parametrization of cut sheet metal core solutions
― research, test and parametrization of auxetic and folded core solutions
― research, test and parametrization of blown core solutions
51. The Future Envelope 12 final event 20-21 May 2019, Bolzano
nURBS-tEC, „mathematical“ detail engineering
― starting from classical façade engineering (cartesian)
― redesign details “mathematical” reproduceable (spherical coordinates)
― solve conttradiction between tolerance behavior and „mathematical detailing
52. The Future Envelope 12 final event 20-21 May 2019, Bolzano
― surface and panel geometry scripting
― core, frames and structure geometry scripting
― geometry dependencies and logistics scripting
nURBS-tEC, geometric model generation
53. The Future Envelope 12 final event 20-21 May 2019, Bolzano
― model logistics control and modification
― part drawing scripting
― production chain and NC code scripting
nURBS-tEC, digital chain generation
54. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - Projects
sustainability
integral facades
55. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Solpower, integrated semitransparent facade collector (I.C. TU Stuttgart, TU Munich
56. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Solpower, collector performance test (energetical & visual)
57. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Solpower, design prototyp, evaluation of global application potential
58. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - projects
sustainability
integral envelopes
59. The Future Envelope 12 final event 20-21 May 2019, Bolzano
i-Cover, modular regenerative envelope system (I.C. TUM, Eurac, TUIBK, KAB)
project objectives
― more adaptability
― more integration variants
― modular system
― model building simulation
― configurator prototype
― design pilot project
― installation pilot plant & facade
60. The Future Envelope 12 final event 20-21 May 2019, Bolzano
results
― modul variants 1
― modul variants 2
― Konfigurator
61. The Future Envelope 12 final event 20-21 May 2019, Bolzano
results
― modul variants 1
― modul variants 2
― configurator (Java, Excell)
― simulation office building
― design pilot plant
….not yet realized
62. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - projects
sustainability
adaptive facades
63. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Flex Cover, auto-reactive facade (I.C. TU Munich), based on i-Cover
64. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Flex Cover, auto-reactive facade, smartr materials as „regulators“
65. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Thermotrope Glass fins
66. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Autoractive thermo cylinder regulated double skin facade
67. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Autoractive hygroscopic regulated double skin facade (humidity regulating)
68. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Bio Cover, auto-reactive facade (I.C. TU Dresden, Arup a.o.), based on i-Cover
69. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - projects
sustainability
adaptive spaces
70. The Future Envelope 12 final event 20-21 May 2019, Bolzano
L.I.S.A. liviing indepentently in ST AA, inteligent wardrobe (ageing society)
71. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES
Flissade, the convertible space
72. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - projects
sustainability
circular Economie
73. The Future Envelope 12 final event 20-21 May 2019, Bolzano
As part of the “London Design Festival”,
Arup has collaborated with FRENER &
REIFER and BAM
to create the Circular Building,
The partners have teamed up
to apply and test circular
economy principles in the construction
industry by
asking the following question:
“Can we design a building where, at
the end of its life, all its components
and materials
can be re-used, re-manufactured,
just at least re-cycled?”
Circular Building ― Installation and exhibition in London
74. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Circular Buildings ― are leading to „BIG DATA“ in construction industry !
75. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R&D
process innovation
construction 4.0
76. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Source: DFKI (2013)
From industry 1.0 to industry 4.0
77. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Design Construction Operation
Building Information Modeling (BIM)
Cloud Computing
Virtual Reality (VR)
Augmented Reality
Simulations
Robotics
Additive Manufacturing
From industry 1.0 to industry 4.0, main building processes & digital context
Lean Construction
78. The Future Envelope 12 final event 20-21 May 2019, Bolzano
developing
concepts
verifying
solutions
developing
solutions
designing
concepts
generating
ideas
producing
solutions
The F&R stage gate process
!
F&R-innovation Step 1: process standardisation review departing from TKHQ learnings
Project development as stage gate process with the right competencies on the right time
Generating ideas, developing design
Developing and designing concepts and variants
Developing solution variants and pricing variants, testing, developing supply chain models and suppliers
Producing solutions,
79. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Project „Build 4 future“: front loaded installation planning (last planner system)
81. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Project „Build 4 future“: protoype evaluation, optimisation and digitalisation
3 Pilot projects „lean construction“
• Krankenhaus Bozen (repetitive)
• Swiss Re (repetitive,complex parts
• Soft Bridge (not repetitive, complex parts )
R&D Outcome: Excell-Prototypes
• for innovative site orientated ERP with
• agile site ressource and supply chain regulation
• NCR Monitoring and contiuous improvement
82. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Project „Cockpit“: developing digital planning, recording and regulation tools
Project „Cockpit:
I.C., FUBZ, Fraunhofer Italia,
3 building industry companies
„digitalisation“ of lean construction
BIM integration of lean process data
83. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R&D
process innovation
construction design 4.0
84. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Project „open BIM“: engineer 2 order (ETO) organised building supplier: example F&R
85. The Future Envelope 12 final event 20-21 May 2019, Bolzano
developing
concepts
verifying
solutions
developing
solutions
designing
concepts
generating
ideas
producing
solutions
!
Fact 1: Not well defined supplier interferences because of late involvement of suppliers
Fact 2: High costs in the realisation process because of not cleared intersections between suppliers
Fact 3: High competition and lowest prices seams to be much important than solution finding
Fact 4: BIM is not well manageable because lack of information at the right time
Project „Build 4 future“: problems and challanges for innovative project development
86. The Future Envelope 12 final event 20-21 May 2019, Bolzano
How we can rethink the project development process?
• How we can obtain more process transparency?
• How we can obtain more process efficiency?
• How we can reduce process costs?
• How we can use BIM with value added at the process?
The project development process
Project „Build 4 future“: problems and challanges for innovative project development
87. The Future Envelope 12 final event 20-21 May 2019, Bolzano
developing
concepts
verifying
solutions
developing
solutions
designing
concepts
generating
ideas
producing
solutions
The F&R stage gate process
!
Project development as stage gate process with the right competencies on the right time ???
Innovation to Order (ITO) or Engineerin to Order supplier (ETO)
Configuration to Order (CTO) supplier
Build to Order (BTO) or Production on Demand (PoD) supplier
Assembly to Order (ATO or Make to Stock supplier
Project „open BIM“: supplier types: supply chain variants in project development
Same Submission
line for every
supply chain model
88. The Future Envelope 12 final event 20-21 May 2019, Bolzano
developing
concepts
verifying
solutions
developing
solutions
designing
concepts
generating
ideas
producing
solutions
The F&R stage gate process
!
Project development as BIM friendly stage gate process !!!
• Defining supplier technology complexities from start
• Defining supplier supply chain model types from start
• Defining the integrated project delivery strategy and submission stages
• Defining the BIM strategy (stage orientated LOD)
Project „open BIM“: BIM and supply chain type orientated project development process
Same Submission
line for every
supply chain model
89. The Future Envelope 12 final event 20-21 May 2019, Bolzano
developing
concepts
verifying
solutions
developing
solutions
designing
concepts
generating
ideas
producing
solutions
The F&R stage gate process
Project „open BIM“: BIM and supply chain type orientated project development process
Different involvement submission lines for every
supply chain model
Suppliers sorted
by
supply chain model
90. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Source: http://www.makebim.com/2016/09/17/bim-collaboration-format-
with-archicad/?lang=en
Source: http://www.hks-architekten.de/de/news/hks-i-architekten-
planen-bim-pilotprojekt-des-bundes-berlin
Project „open BIM“: BIM and supply chain type orientated project development process
Open stage gate oriented BIM:
• Information delivery at the right time
• From the right competence
• With the right knowledge
• In the right LOD
• With the right recompense
• With the right data connectors
Results:
• Early clash detection
• Interference solution finding
• Transparence at the right time
• Reduction of cost uncertainities
91. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R&D
process digitalization
robotics in construction
92. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Construction robotics: : additive manufacturing: installation automation
Robotics in construction:
Installation automation:
• Scaffolding
• Brick positioning
• Brick installation
93. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Construction robotics: additive manufacturing: 3d „printing“
Robotics in construction:
3d printing:
• Concrete casting
• Concrete printing large scale
• 3d metal welding
94. The Future Envelope 12 final event 20-21 May 2019, Bolzano
R & (d) - projects
facecamp
knowlegde management
95. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Knowledge management based on fractal abstract structure, tested in flexcover
96. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Knowledge management based on fractal abstract structure, to be continue
97. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Inventing
future envelopes
What If ???
98. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Innovation portfolio, context and topics
todays world
future world
F&R_development
(r) & D
!
future world
from todays point of view
F&R_Innovation
R & (d)
!
?F&R_innoVision
What if ???
99. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Information Flow
Cooperative problem Solving
Documentation
Energy Flow,
Cradle 2 Cradle
Life Cycle Parametrics
Context induviduality
System Component Logics
Geometric Parametrics,
Mathematical Detailing
Context Green BuildingContext Urban Integration
Material Flow
Process Parametrics
Part Logistic Parametrics
Context Building
Performance
Innovation portfolio, todays view of future world
100. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Innovation portfolio in the future world ????
101. The Future Envelope 12 final event 20-21 May 2019, Bolzano
Thank you for your attention!
• Michael Reifer
• FRENER & REIFER GmbH/Srl
• m.reifer@frener-reifer.com
FACEcamp is funded by European Regional Development Fund and Interreg V-A Italy-Austria 2014-2020. www.interreg.net