Slide 1: A title for the presentation, your name and id.
Slide 2: An introduction to the basic product and its purpose. Picture of the product in real life and your digitally prepared product must be included.
Slide 3: An introduction of the 1st Product Prototype using Tinkercad. Detailed text explanation should be in the slide.
Slide 4: An introduction of the 2nd Product Prototype using Autodesk 123D Design. Detailed text explanation should be in the slide.
Slide 5- 9: Materials / Constructions / Functions / Appearance / Social Environmental Factors for the 1st Product Prototype.
Slide 10 - 14: Materials / Constructions / Functions / Appearance / Social Environmental Factors for the 2nd Product Prototype.
Slide 15: Show the first major step in the assembly process. Title of the slide should be as follows: Process Graphics 1: _____Title__________. Each slide should have a short text paragraph explaining the assembly stage.
Slide 16: Show the 2nd major step in the assembly process. Title of the slide should be as follows: Process Graphics 2: _____Title__________. Each slide should have a short text paragraph explaining the assembly stage.
Slide 17: Show the third major step in the assembly process. Title of the slide should be as follows: Process Graphics 3: _____Title__________. Each slide should have a short text paragraph explaining the assembly stage.
Slide 18: Show the 4th major step in the assembly process. Title of the slide should be as follows: Process Graphics 4: _____Title__________. Each slide should have a short text paragraph explaining the assembly stage.
Slide 19: Identify three important problems you faced during the construction of the product prototypes using 123D Design and Make software.
Slide 20: How did the group members collaborate during the planning, analysis, design and execution stages? Write 2 sentences for each of the above stages.
Slide 21: Write a CONCLUSION paragraph about how to plan and execute a construction with LEGO.
** Each slide must have a picture / screenshot for both the assembly stage, and for the completed prototypes, wherever required. You must submit screenshots of the assembly when using Tinkercad.
1. 2nd Creative Factory Project: 2nd Stage
s1200150 Kanji Kobayashi
s1200215 Nobuaki Kawauchi
s1200225 Yuta Takahashi
s1200243 Takashi Norimatsu
2. Our team making Seven - Eleven!
Seven - Eleven is originated in US convenience store. Is a convenience store
the largest in Japan, companies that have deployed the world's largest number
of stores as well as chain store.
3. An introduction of the 1st
Product Prototype using Tinkercad
In recent years, the convenience store has become essential.
Then, I tried to select the well known a convenience store.
So, we made the model of the convenience store.
And, the model attach weight the outline in Tinkercad.
In addition, production time is about five hours.
I don't understand because I'm not using the 123D Design, I
pursued it in the current technique that I had as much as possible.
Tinkercad has determined the minimum value of the object scale.
Accordingly, a fine place could not very reproduce.
But, I'm satisfied with workmanship.Then, we move to an
assembling process.
4. An introduction of the 2nd
Product Prototype using Autodesk
123D Design.
Create a free illustrations by using 123D
Design, it was possible to make a three-
dimensional representation it. It was very
useful when creating a logo.
However, it had to change the color from
expressed by three-dimensional because
it can not change the color of a plane
design. Possible to change the material
to suit.
5. Materials-1st Product Prototype
Basucally, 1st Product Prototype is make
in the cube.
Cubes are stretched thin and can make
by scraping partially.
And, the object size of the Tinkercad is
determined a minimum value.
Accordingly, a fine place could not very
reproduce.
We were quite stuck to the Appearance
in Tinkercad.
6. Constructions-1st Product Prototype
The structure of the store, in the case
of a separate building is a bungalow.
Currently the mainstream is simple
architecture with lightweight rebar
prefabricated construction method.
The store is opened large one side
side wall of facing the front and
parking, it has been fitted with glass
from near the foot-to-ceiling height.
7. Functions-1st Product Prototype
In fact, it is not only just a stationary article.
In addition, this store doesn’t have now the
ability to open the door.
If by force say, there will be action to attract
customers.
This shop really interesting.
If the door is opened, the white walls Looming
in front of the eye.
8. Appearance-1st Product Prototype
The store is opened large one side side wall of
facing the front and parking, it has been fitted
with glass from near the foot-to-ceiling height.
Facing the 4-8 face about side by side large
glass was the structure and the appearance of
shelves of magazines are placed in general.
This is due to reasons crime prevention and
marketing, and by maintaining a state where the
normally customers in the store visible from
outside the store, to promote the attraction effect
of other customers and also serves as the effect
of suppressing the robbery, guests I have but
brought the psychological effects that easy to
enter the store
9. Social Environmental Factors-1st Product
Prototype
Building after the convenience store has been dismissed by closing the store is
re-used as a rental shop, or the case to be sold as a used real estate there is
no spare time to enumeration be any of the urban and suburban areas, rental
shop take the only when it is rent, indeed and numerous industries of the store,
including the restaurant, barber shop, launderette, a multitude of such
companies and politicians in office are entered as a tenant as.
Therefore, in the use of convenience stores trace is greater in other industries
industries, may have been made on the assumption that the use of
convenience store marks for equipment, such as large-size washing machine
and dryer in the launderette, the casement of convenience store it is designed
in a specification that can be assembled carried into the interior without
removing the door.
10. Basucally, 2nd Product Prototype is make in
the cube.
Cubes are stretched thin and can make by
scraping partially.
And, the object size is determined free.
Accordingly, a fine place could very
reproduce.
Doors and windows has become material to
the glass. It will show through in the store!
Materials-2nd Product Prototype
11. Constructions-2nd Product Prototype
The structure of the store, in the case of
a separate building is a bungalow.
Currently the mainstream is simple
architecture with lightweight rebar
prefabricated construction method.
The store is opened large one side side
wall of facing the front and parking, it
has been fitted with glass from near the
foot-to-ceiling height.
12. Function-2nd Product Prototype
In fact, it is not only just a stationary article.
In addition, this store doesn’t have now the
ability to open the door.
If by force say, there will be action to attract
customers.
This shop really interesting.
If the door is opened, there are only shelves
in the store!
13. Appearance-2nd Product Prototype
The store is opened large one side side wall of
facing the front and parking, it has been fitted with
glass from near the foot-to-ceiling height. Facing the
4-8 face about side by side large glass was the
structure and the appearance of shelves of
magazines are placed in general.
This is due to reasons crime prevention and
marketing, and by maintaining a state where the
normally customers in the store visible from outside
the store, to promote the attraction effect of other
customers and also serves as the effect of
suppressing the robbery, guests I have but brought
the psychological effects that easy to enter the store
14. Social Environmental Factor-
Building after the convenience store has been dismissed by closing the store is
re-used as a rental shop, or the case to be sold as a used real estate there is
no spare time to enumeration be any of the urban and suburban areas, rental
shop take the only when it is rent, indeed and numerous industries of the store,
including the restaurant, barber shop, launderette, a multitude of such
companies and politicians in office are entered as a tenant as.
Therefore, in the use of convenience stores trace is greater in other industries
industries, may have been made on the assumption that the use of
convenience store marks for equipment, such as large-size washing machine
and dryer in the launderette, the casement of convenience store it is designed
in a specification that can be assembled carried into the interior without
removing the door.
15. Process Graphics 1: Determine the overall size
I made wall to pile up the bricks.
Also the overall size decide here.
16. Process Graphics 2:Make signboard.
Sketch function can create a
symbol is used, and the 3D
display.
17. Process Graphics 3: Window and Automatic door.
Make a label from the window.
Add the symbol in the window, the
front door of the completed.
18. Process Graphics 4:Finish
Installation of bookshelf and the cash
register.It is installed in order to take
advantage of the material of the window.
Completed by installing a roof!
19. Three important problems using 123D Design
When you create a design sketch
function is useful.
123D Design is impossible to change
the color of the two-dimensional
elements.
It can be color changes, etc. in which a
two-dimensional element made with
sketch into a three-dimensional
element.
20. Group members activity
In all process, we worked in a twosome. Although we are a 4 people group. . .
Active user: Kanji Kobayashi and Takashi Norimatsu.
Planning: First, we looked for the essential things a familiar.Convenience store
came up first and foremost.
Analysis: We examined a convenience store using the web site.
And, we have compared the Lego product and the real thing.
Design: Anyway, make a convenience store using the individual software
respectively.Then, saw the product of each other, and exchanged
opinions, and allowed to reflect it.
Execution: First, we create a prototype using the software. Then, found the
features of the individual software and we were taking advantage of.
21. Write a CONCLUSION paragraph about how to plan and execute a
construction with LEGO.
1, decide what to produce.
2, determines the overall size
3, determine the order in which they are made.
4, production start.