TYPES OF SPILLWAYS
PROMINENT FEATURES
SPILLWAYS:-
 A spillways is a structure constructed a or near the dam site to dispose of
surplus water from the reservoir to the channel downstream.
 Spillways are provided for all dams as a safety measure against overtopping
and the consequent damages and failure.
 A spillways acts as a safety valve for the dam, because as soon as the water
level in the reservoir rises above a predetermined level, excess water I
discharged safety to the downstream channel, and the dam is not damaged.
TYPES OF SPILLWAY BASED ON MOST
PROMINENT FEATURES
 Free overflow spillway
 Overflow spillway
 Side channel spillway
 Open channel spillway
 Tunnel spillway
 Shaft spillway
 Siphon spillway
FREE OVERFLOW SPILLWAY
 A free overflow spillway is a type of spillway in which the control structure
consists of a low- height, narrow crested weir and less vertical.
 The overflowing water may discharge as a free jet clearly away from the d/s
face crest of the spillway.
 If no artificial protection is
provided on the down
stream side of the overflow
section.
Overflow spillway:-
 An overflow spillway is the most commonly used spillway. It is widely used
with gravity dams, arch dams and buttress dams.
 An overflow spillway is an improvement upon the free overflow spillway.
 The profile of the spillway is ‘ogee’ or ‘s’. The overflowing water is guided
smoothly over the crest and profile of the spillway so that overflow
water does not break
contact with the spillway
surface.
SIDE CHANNEL SPILLWAY
 A side channel spillway is the one in which the flow, after passing over a
weir, is carried away by the channel running essentially parallel to the
crest.
 The side channel spillway is usually constructed in a narrow canyon where
sufficient space is not available for an overflow spillway.
 Side channel spillway is also the best choice where a long overflow crest is
desired in order to limit
the surcharge head and
the abutment are steep.
OPEN CHANNEL SPILLWAY
 Open channel spillway is provided in the following situation :
(a) when it is not possible to provide overflow spillway.
(b) when valley is narrow.
(c) when separate site for spillway is not available.
 Generally this type of spillway is provided on earth or rock fill dam, and is
isolated from the main dam.
 The open channel is sometimes of constant width , but usually narrowed for
economy.
TUNNEL SPILLWAY
 A tunnel spillway is the one in which a closed channel is used to
convey the discharge around or near a dam.
 The control structure for this spillway may be in the form of an
overflow crest, vertical or inclined orifice entrance and side channel
crest.
 The tunnel is designed to flow partly full and it is not allowed to flow
full because siphonic action may develop due to negative pessure being
developed in the tunnel.
SHAFT SPILLWAY
 Shaft spillway is the one which has horizontally positioned lip through
which water enters and then drops through a vertical shaft and then to a
horizontal tunnel which convey water past the dam.
 A shaft spillway consists of three main elements :
(a) overflow control weir
(b) vertical control
(c) closed discharge channel
 The vertical shaft of large structures Is usually made of reinforced concrete
and the horizontal tunnel is tunnelled in rock.
 There are two general types of shaft spillway :
(a) standard crest type
(b) flat crest type
THANK YOU

Contenu connexe

Tendances (20)

Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
 
Spillways
SpillwaysSpillways
Spillways
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Spillways
SpillwaysSpillways
Spillways
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Ppt of design of dams
Ppt of design of damsPpt of design of dams
Ppt of design of dams
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Unit 4-canal lining
Unit 4-canal liningUnit 4-canal lining
Unit 4-canal lining
 
Classification of dams
Classification of damsClassification of dams
Classification of dams
 
Silt excluders
Silt excludersSilt excluders
Silt excluders
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Weirs on Permeable Foundations
Weirs on Permeable FoundationsWeirs on Permeable Foundations
Weirs on Permeable Foundations
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysis
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Design of gravity dams
Design of gravity damsDesign of gravity dams
Design of gravity dams
 

Similaire à TYPES OF SPILLWAYS & PROMINENT FEATURES

Types of spillways
Types of spillwaysTypes of spillways
Types of spillwayssaibabu48
 
Spillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copySpillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copybakht zamin
 
4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct itmv689093
 
seminar presentation report on spillway
 seminar presentation report on spillway seminar presentation report on spillway
seminar presentation report on spillwaymanjeet singh
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppthussenbelew
 
Spillways and Diversion Headwork's
Spillways and Diversion Headwork'sSpillways and Diversion Headwork's
Spillways and Diversion Headwork'skartikchourasia
 
Data preparation error
Data preparation errorData preparation error
Data preparation errorsaibabu48
 
Diversion head work
Diversion head workDiversion head work
Diversion head workdhruvalsu
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksAbdul Sahid
 
Unit 3 spillway
Unit 3 spillwayUnit 3 spillway
Unit 3 spillwayMood Naik
 

Similaire à TYPES OF SPILLWAYS & PROMINENT FEATURES (20)

Types of spillways
Types of spillwaysTypes of spillways
Types of spillways
 
Spillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copySpillways2000 101110063804-phpapp02 - copy
Spillways2000 101110063804-phpapp02 - copy
 
Spillways
SpillwaysSpillways
Spillways
 
unit-3.pdf
unit-3.pdfunit-3.pdf
unit-3.pdf
 
SPILLWAYS.pdf
SPILLWAYS.pdfSPILLWAYS.pdf
SPILLWAYS.pdf
 
Spillways
SpillwaysSpillways
Spillways
 
SPILLWAYS
SPILLWAYSSPILLWAYS
SPILLWAYS
 
4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it4 Spillway, Sluices and crest gates and how to construct it
4 Spillway, Sluices and crest gates and how to construct it
 
seminar presentation report on spillway
 seminar presentation report on spillway seminar presentation report on spillway
seminar presentation report on spillway
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppt
 
Spillways and Diversion Headwork's
Spillways and Diversion Headwork'sSpillways and Diversion Headwork's
Spillways and Diversion Headwork's
 
Data preparation error
Data preparation errorData preparation error
Data preparation error
 
Spillways
SpillwaysSpillways
Spillways
 
Module 4.pptx
Module 4.pptxModule 4.pptx
Module 4.pptx
 
Spillway
SpillwaySpillway
Spillway
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Unit 3 spillway
Unit 3 spillwayUnit 3 spillway
Unit 3 spillway
 
Canal structures
Canal structuresCanal structures
Canal structures
 

Plus de Malay Talaviya

Plus de Malay Talaviya (11)

Concrete Sleeper
Concrete SleeperConcrete Sleeper
Concrete Sleeper
 
Dragline
DraglineDragline
Dragline
 
Cavity wall
Cavity wall Cavity wall
Cavity wall
 
Dumpy level
Dumpy levelDumpy level
Dumpy level
 
Slump test
Slump testSlump test
Slump test
 
Advanced Type Civil Engineering Structures
Advanced Type  Civil Engineering StructuresAdvanced Type  Civil Engineering Structures
Advanced Type Civil Engineering Structures
 
concepts of TQM(total quality management)
concepts of TQM(total quality management)concepts of TQM(total quality management)
concepts of TQM(total quality management)
 
Project:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURES
Project:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURESProject:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURES
Project:- SURVEY AND ANALYSIS OF ROAD PAVEMENT FAILURES
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
Green building
Green buildingGreen building
Green building
 
Green building
Green buildingGreen building
Green building
 

Dernier

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 

Dernier (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 

TYPES OF SPILLWAYS & PROMINENT FEATURES

  • 2. SPILLWAYS:-  A spillways is a structure constructed a or near the dam site to dispose of surplus water from the reservoir to the channel downstream.  Spillways are provided for all dams as a safety measure against overtopping and the consequent damages and failure.  A spillways acts as a safety valve for the dam, because as soon as the water level in the reservoir rises above a predetermined level, excess water I discharged safety to the downstream channel, and the dam is not damaged.
  • 3. TYPES OF SPILLWAY BASED ON MOST PROMINENT FEATURES  Free overflow spillway  Overflow spillway  Side channel spillway  Open channel spillway  Tunnel spillway  Shaft spillway  Siphon spillway
  • 4. FREE OVERFLOW SPILLWAY  A free overflow spillway is a type of spillway in which the control structure consists of a low- height, narrow crested weir and less vertical.  The overflowing water may discharge as a free jet clearly away from the d/s face crest of the spillway.  If no artificial protection is provided on the down stream side of the overflow section.
  • 5. Overflow spillway:-  An overflow spillway is the most commonly used spillway. It is widely used with gravity dams, arch dams and buttress dams.  An overflow spillway is an improvement upon the free overflow spillway.  The profile of the spillway is ‘ogee’ or ‘s’. The overflowing water is guided smoothly over the crest and profile of the spillway so that overflow water does not break contact with the spillway surface.
  • 6. SIDE CHANNEL SPILLWAY  A side channel spillway is the one in which the flow, after passing over a weir, is carried away by the channel running essentially parallel to the crest.  The side channel spillway is usually constructed in a narrow canyon where sufficient space is not available for an overflow spillway.  Side channel spillway is also the best choice where a long overflow crest is desired in order to limit the surcharge head and the abutment are steep.
  • 7. OPEN CHANNEL SPILLWAY  Open channel spillway is provided in the following situation : (a) when it is not possible to provide overflow spillway. (b) when valley is narrow. (c) when separate site for spillway is not available.  Generally this type of spillway is provided on earth or rock fill dam, and is isolated from the main dam.  The open channel is sometimes of constant width , but usually narrowed for economy.
  • 8. TUNNEL SPILLWAY  A tunnel spillway is the one in which a closed channel is used to convey the discharge around or near a dam.  The control structure for this spillway may be in the form of an overflow crest, vertical or inclined orifice entrance and side channel crest.  The tunnel is designed to flow partly full and it is not allowed to flow full because siphonic action may develop due to negative pessure being developed in the tunnel.
  • 9.
  • 10. SHAFT SPILLWAY  Shaft spillway is the one which has horizontally positioned lip through which water enters and then drops through a vertical shaft and then to a horizontal tunnel which convey water past the dam.  A shaft spillway consists of three main elements : (a) overflow control weir (b) vertical control (c) closed discharge channel  The vertical shaft of large structures Is usually made of reinforced concrete and the horizontal tunnel is tunnelled in rock.  There are two general types of shaft spillway : (a) standard crest type (b) flat crest type
  • 11.