Objective
• Objectively document the work task or
process for analysis
• Many methods are available
• New ones are invented regularly
• Break down the job into sub-components
or tasks
• Describe the tasks in a meaningful way
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
2
Pareto Chart
• Items of interest are identified and
measured on a common scale
• Then ordered in ascending order,
creating a cumulative distribution
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
3
Pareto Chart
• Pareto principle: 80% of the total activity
can be found in the first 20% of the
items.
• Goal is to identify the appropriate 20%
for analysis.
– 80% of inventory is associated with 20%
of the parts.
– 80% of the injuries are associated with
20% of the jobs.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
4
Fishbone Diagram (Cause-Effect)
• Identifies components lead to undesirable
(desirable) event in a process
• Principle event is identified at the fish head
• Associated contributing factors are identified
using a tree type structure.
• Closely related to many different charts used
in safety analysis (Fault-Tree method)
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
5
Example
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
6
Operations Process Charts
• Represents the chronological sequence of:
– operations,
– Inspections,
– Time allowances, and
– materials used in a process
• from the arrival of raw material to the
packaging of the finished product.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
7
Operations Process Charts
• Focuses on products and/or facilities
• Two symbols are used in the chart:
– Operations are denoted using a
small circle
– Inspections are denoted using a
small square
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
8
Operations Process Charts
• Vertical lines indicate general flow of the
process as work is completed
• Horizontal lines feeding into vertical lines
are for parts or subassemblies.
• Lines should not cross in the chart.
• Time values are assigned to operations
and inspections on the chart.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
9
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
10
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
11
Flow Process Charts
• Identify operations, inspections, materials,
moves, storages, and delays involved in
making a part or completing a process.
• Show all events in the correct sequence.
• Show the relationship between parts and
fabrication complexity.
• used for workers, components, or sub-
assemblies.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
12
Flow Process Charts
• Distinguish between produced and
purchased parts.
• Provide information on the number
of employees utilized and the time
required to perform each operation
and inspection.
• More details than operations
process charts
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
13
Flow Process Charts
• Two types are commonly used:
– Product or material
– Operative or person
• Help identify nonproduction hidden
costs such as distances traveled,
delays, and temporary storage.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
14
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
15
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
16
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
17
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
18
Flow Diagrams
• Supplement to Flow process charts
to indicate process flow
• Overhead pictorial plan of the facility.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
19
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
20
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
21
Worker and Machine Process Charts
• Show time relationship between
the working cycle of a person and
the operating cycle of a machine(s)
at a single workstation.
• Machine times and operator times
must be known for each element
• Chart drawn vertically to scale.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
22
Worker and Machine Process Charts
• Solid lines represent productive time,
• Breaks indicate idle time,
• Dotted lines represent non-productive
time.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
23
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
24
Gang Process Charts
• Worker and Machine Process charts
showing many workers are called
Gang Process Charts.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
25
Gang Process Charts
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
26
Gang Process Charts
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
27
Two-Handed Process Chart
• Left-hand / right-hand chart
• Operator process chart.
• Is a flow process chart directed at an
operator
• Each hand is documented separately.
• Useful when doing work methods analysis.
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
28
16 February 2015
King Saud University
College of Engineering
Department of Industrial Engineering
29

Contenu connexe

Tendances

Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingananya0122
 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineeringvijay kumar
 
Manufacturing Engineering Process Optimization
Manufacturing Engineering Process OptimizationManufacturing Engineering Process Optimization
Manufacturing Engineering Process OptimizationAmanda Yao
 
Intro to CAD/CAM/CIM
Intro to CAD/CAM/CIMIntro to CAD/CAM/CIM
Intro to CAD/CAM/CIMAbhay Gore
 
manufacturing support system
manufacturing support systemmanufacturing support system
manufacturing support systemsantan chaurasiya
 
Layout of FMS
Layout of FMSLayout of FMS
Layout of FMSsgrsoni45
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Conceptsvengefulwind
 
Automated manufacturing systems
Automated manufacturing systemsAutomated manufacturing systems
Automated manufacturing systemsMR Z
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPMANI KRISHNA
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activitiesRaja P
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxamanuel236786
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 
P chart & c-chart
P chart & c-chartP chart & c-chart
P chart & c-chartprinku k
 
01 introduction to production systems
01 introduction to production systems01 introduction to production systems
01 introduction to production systemsArif Rahman
 

Tendances (20)

Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Unit 1
Unit   1Unit   1
Unit 1
 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineering
 
Manufacturing Engineering Process Optimization
Manufacturing Engineering Process OptimizationManufacturing Engineering Process Optimization
Manufacturing Engineering Process Optimization
 
CIM
CIM CIM
CIM
 
Intro to CAD/CAM/CIM
Intro to CAD/CAM/CIMIntro to CAD/CAM/CIM
Intro to CAD/CAM/CIM
 
manufacturing support system
manufacturing support systemmanufacturing support system
manufacturing support system
 
What is INDUSTRIAL ENGINEERING?
What is INDUSTRIAL ENGINEERING?What is INDUSTRIAL ENGINEERING?
What is INDUSTRIAL ENGINEERING?
 
Layout of FMS
Layout of FMSLayout of FMS
Layout of FMS
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Concepts
 
Automated manufacturing systems
Automated manufacturing systemsAutomated manufacturing systems
Automated manufacturing systems
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activities
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
CIM 15ME62 Module-1
CIM 15ME62   Module-1CIM 15ME62   Module-1
CIM 15ME62 Module-1
 
Unit 1 manufacturing system design
Unit   1 manufacturing system designUnit   1 manufacturing system design
Unit 1 manufacturing system design
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
P chart & c-chart
P chart & c-chartP chart & c-chart
P chart & c-chart
 
01 introduction to production systems
01 introduction to production systems01 introduction to production systems
01 introduction to production systems
 

En vedette

Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsTanuj Kujur
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments productionMd.Abdur Rahim Al Bahar
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study pptBeereddy Swapna
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -ExampleJoseph Konnully
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work studyrahulmeshram14
 

En vedette (10)

Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
 
Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Flow process chart
Flow process chartFlow process chart
Flow process chart
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
 

Similaire à 3 work charting_methods

Statistical Control Process - Class Presentation
Statistical Control Process - Class PresentationStatistical Control Process - Class Presentation
Statistical Control Process - Class PresentationMillat Afridi
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET Journal
 
(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...Скоробогатов Дмитрий
 
Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPCMeghaj Mallick
 
Analyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingAnalyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingCIToolkit
 
Software Engg.pdf
Software Engg.pdfSoftware Engg.pdf
Software Engg.pdfktosri
 
Mohamed mohamed emam . mechanical engineer .CV
Mohamed mohamed emam . mechanical engineer .CVMohamed mohamed emam . mechanical engineer .CV
Mohamed mohamed emam . mechanical engineer .CVMohamed Emam
 
MEPCO Full 191217.ppt
MEPCO Full 191217.pptMEPCO Full 191217.ppt
MEPCO Full 191217.pptMadavanR1
 
Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...robgirvan
 
Topic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdfTopic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdfHuyNguyen657394
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxsurekha1287
 

Similaire à 3 work charting_methods (20)

Mareeswaran
MareeswaranMareeswaran
Mareeswaran
 
Statistical Control Process - Class Presentation
Statistical Control Process - Class PresentationStatistical Control Process - Class Presentation
Statistical Control Process - Class Presentation
 
CMCM77.pptx
CMCM77.pptxCMCM77.pptx
CMCM77.pptx
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
 
(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...
 
CMCM66.pptx
CMCM66.pptxCMCM66.pptx
CMCM66.pptx
 
CMCM33.pptx
CMCM33.pptxCMCM33.pptx
CMCM33.pptx
 
Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPC
 
CM1CM1.pptx
CM1CM1.pptxCM1CM1.pptx
CM1CM1.pptx
 
CMCM22.pptx
CMCM22.pptxCMCM22.pptx
CMCM22.pptx
 
Analyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingAnalyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value Mapping
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 
Software Engg.pdf
Software Engg.pdfSoftware Engg.pdf
Software Engg.pdf
 
Mohamed mohamed emam . mechanical engineer .CV
Mohamed mohamed emam . mechanical engineer .CVMohamed mohamed emam . mechanical engineer .CV
Mohamed mohamed emam . mechanical engineer .CV
 
MEPCO Full 191217.ppt
MEPCO Full 191217.pptMEPCO Full 191217.ppt
MEPCO Full 191217.ppt
 
Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...
 
Mohamad Husni_Resume
Mohamad Husni_ResumeMohamad Husni_Resume
Mohamad Husni_Resume
 
Topic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdfTopic 10 - Project Performance Management.pdf
Topic 10 - Project Performance Management.pdf
 
CMCM44.pptx
CMCM44.pptxCMCM44.pptx
CMCM44.pptx
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 

3 work charting_methods

  • 2. Objective • Objectively document the work task or process for analysis • Many methods are available • New ones are invented regularly • Break down the job into sub-components or tasks • Describe the tasks in a meaningful way 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 2
  • 3. Pareto Chart • Items of interest are identified and measured on a common scale • Then ordered in ascending order, creating a cumulative distribution 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 3
  • 4. Pareto Chart • Pareto principle: 80% of the total activity can be found in the first 20% of the items. • Goal is to identify the appropriate 20% for analysis. – 80% of inventory is associated with 20% of the parts. – 80% of the injuries are associated with 20% of the jobs. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 4
  • 5. Fishbone Diagram (Cause-Effect) • Identifies components lead to undesirable (desirable) event in a process • Principle event is identified at the fish head • Associated contributing factors are identified using a tree type structure. • Closely related to many different charts used in safety analysis (Fault-Tree method) 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 5
  • 6. Example 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 6
  • 7. Operations Process Charts • Represents the chronological sequence of: – operations, – Inspections, – Time allowances, and – materials used in a process • from the arrival of raw material to the packaging of the finished product. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 7
  • 8. Operations Process Charts • Focuses on products and/or facilities • Two symbols are used in the chart: – Operations are denoted using a small circle – Inspections are denoted using a small square 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 8
  • 9. Operations Process Charts • Vertical lines indicate general flow of the process as work is completed • Horizontal lines feeding into vertical lines are for parts or subassemblies. • Lines should not cross in the chart. • Time values are assigned to operations and inspections on the chart. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 9
  • 10. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 10
  • 11. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 11
  • 12. Flow Process Charts • Identify operations, inspections, materials, moves, storages, and delays involved in making a part or completing a process. • Show all events in the correct sequence. • Show the relationship between parts and fabrication complexity. • used for workers, components, or sub- assemblies. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 12
  • 13. Flow Process Charts • Distinguish between produced and purchased parts. • Provide information on the number of employees utilized and the time required to perform each operation and inspection. • More details than operations process charts 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 13
  • 14. Flow Process Charts • Two types are commonly used: – Product or material – Operative or person • Help identify nonproduction hidden costs such as distances traveled, delays, and temporary storage. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 14
  • 15. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 15
  • 16. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 16
  • 17. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 17
  • 18. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 18
  • 19. Flow Diagrams • Supplement to Flow process charts to indicate process flow • Overhead pictorial plan of the facility. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 19
  • 20. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 20
  • 21. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 21
  • 22. Worker and Machine Process Charts • Show time relationship between the working cycle of a person and the operating cycle of a machine(s) at a single workstation. • Machine times and operator times must be known for each element • Chart drawn vertically to scale. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 22
  • 23. Worker and Machine Process Charts • Solid lines represent productive time, • Breaks indicate idle time, • Dotted lines represent non-productive time. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 23
  • 24. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 24
  • 25. Gang Process Charts • Worker and Machine Process charts showing many workers are called Gang Process Charts. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 25
  • 26. Gang Process Charts 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 26
  • 27. Gang Process Charts 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 27
  • 28. Two-Handed Process Chart • Left-hand / right-hand chart • Operator process chart. • Is a flow process chart directed at an operator • Each hand is documented separately. • Useful when doing work methods analysis. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 28
  • 29. 16 February 2015 King Saud University College of Engineering Department of Industrial Engineering 29