SlideShare une entreprise Scribd logo
1  sur  26
Télécharger pour lire hors ligne
Virtual Property
Using BIM in Facility Management
Tero Järvinen
Technology Director
Innovation and Development
14.06.2018
Building on Innovation
Almost 900 experts
HVAC Electricity Building
Automation
Hospital Design Mision
Critical,
Datacenters
Renovation
Consultancy Software Innovation
and
Development
AdministrationDigital Facility
Services
Building on Innovation
Central Finland
Hospital
Jyväskylä
106 000 brm2
T3 Hospital
Turku
40 000 brm2
Trauma Hospital
Helsinki
70 000 brm2
Children’s hospital
Helsinki
48 000 brm2
Some of our on-going projects (in Finland)
Building on Innovation
Turnover and profit
45,4
54,7
61,7
71,2
0
10
20
30
40
50
60
70
80
2014 2015 2016 2017
Turnover, M€
5,5
6,8 7,1
8,3
0
1
2
3
4
5
6
7
8
9
2014 2015 2016 2017
Profit, M€
Building on Innovation
Building on Innovation
Well-being for the building and the user
Usage guides our work
What is our customer
proposition?
How do we fulfil it?
Which customers’
processes do we support?
Usage/operation
Identify the need
for change
Specify and
design
Implement
What are our key
innovation areas?
Information
supportingusage
Analysis and
optimisation Visualisation
Tools and methods
for collaboration
Innovation Strategy 2017-2021
Building on Innovation
Enterprise Innovation Roadmap
VISION
A facility where
the user and
the facility
communicate
Thinking
facility
BIM data
IoT data
Human
data
BI data
2017
2018
2019
2020
Service and
product
development
Reporting
facility
Predictable
facility
Platforms for
visualisation
Platforms for
analysis and
optimisation
2021-
Design smart solutions
through smart
collaboration
Design
Learning
facility
Big data
New technology
enabling smart solutions
and smart operation
Software
Consulting
Developing smart
propertymanagement
and user capabilities
Building on Innovation
Background Information
Picture by Granlund from VR environment: YIT Tripla at Pasila, Helsinki
Technologies, ideas and processes behind
The Virtual Property
Demo: Finnish National Museum
Building on Innovation
Building on Innovation
Building on Innovation
Building on Innovation
Schematic Design
Location of Information
Device scheludes, Diagrams
Detail Design
Modeling of Network
Air Handling Units, Pumps,
Chillers… etc.
Networks
BIM models does
not contain
requirements of
central units
Combining Graphical BIM model
with Device Schelude database
you get all technical information
of devices and networks
Building on Innovation
BIM to use in FM
Preliminary design Detail Design Construction FM
Spaces / Zones
Designers BIM
models
FM requirements for
BIM model
BIM in FM
FM coordinator sets requirements and monitors fulfilment
Validation of as-
built content in
the models
Construction organisation FM -organisation
FM BIM execution
plan for the building
Monitoring
FM BIM
handover plan
Mobilisation of
transfer and education
FM Coorninator
Building on Innovation
BIM2FM key sentences
▪ Information content has to be standardised
 Information needs to be machine readable
▪ Information has to be prioritised
 There is too much information in the models, requirements and validations are hard task to do
 There is a need for information prioritisation and understanding of the use cases
 ”Everything is not possible”
▪ Information has to be available 24/7
 Cloud services
 Roles for users, authentification, documented API’s
▪ Information is not transferred
 Information is linked between cloud systems
 End user decides, which information source is ”home” for them
 One cloudservice does not solve problems, for multiple use cases you need multiple cloud services
▪ Information has to be updated
 Need for ”Digital Twin”. You need to update the virtual building before or after renovations / minor changes.
It has to be ”a process” in FM workflow
 If information content differs in Digital Twin, virtual model will be useless after couple of years. Information
in virtual model has to be reliable (depending of the use cases)
▪ Normal FM operations will be different
 ”BIM2FM” usability cannot be compared to existing use cases. Methods to fullfil the needs of existing use
cases will change
 Facility management and property owner organisations need to be ready for change and be willing to
change their workmethods
Building on Innovation
3D-Model
IFC
Information Enrichment
Granlund
Designer
Asset Information Model, AIM AIM-system
Applications
Utilisation of Information
Granlund
Manager
UseCase UseCase UseCase
Documented API
Sharing Information New Information
User-, Building- and Phase Management
Dynamic Information
IoT, Building Automation System, User Feedback
Manager
Performance
Optimisation
IoT
Granlund
Designer
Other
Applications
VirtualProperty
Business needs
DigitalTwin
ToolsforupdatingDigitalTwin
Property Management
FLMFacilityLifecycleManagement
Propery Portfolio
TheConceptofVirtualProperty
Tactical level
Strategic level
Operative level
Road map to Facility Life Cycle Management
Updating the Models
How to update changes in Digital Twin
Building on Innovation
Facility ManagementNewbuilding Renovation Guarantee period Facility Management
Update to native
models
Little retrofits:
2D-drawings, hand-made
drafts…
Copy from native model if
needed
Project drawings / models
Update to native
models
Renovation:
Modelling to
native model or
copy from it
Project
drawings /
models
Designers
Service for
building
owner
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
Designers
Service for
building
owner
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
Facility owner’s native BIM models and databases
BIM native model updating during lifecycle
First Use Cases
Building on Innovation
Phase 1
Service Request
User activity
Conditions
Temperature, RH, VOC, CO2 ...
Granlund Manager "Virtual Property" Release: Q3 / 2018
Building on Innovation
MEP Networks
• Device specifications
• System Information
• Service Area Zones
• Locating Equipments
• Design Values
• Measured Values
• Real Time Measurements
• Warranty Periods
• Indoor Locating
• Augmented Reality
• ...
Manufacturer: Trox
Design Air Flow: 35l/s
Measured Air Flow: 31l/s
312AHU01, Offices, A-block
Next phases in Granlund Manager
City Digital Twin
Picture by Granlund from VR environment: YIT Tripla at Pasila, Helsinki
Building on Innovation
City Digital Twin
Building on Innovation
Building on Innovation
City Level
Platform
Economy
Technical
View
Building on Innovation
Building on Innovation Thank You!

Contenu connexe

Tendances

Digital Twin and Smart Spaces
Digital Twin and Smart Spaces Digital Twin and Smart Spaces
Digital Twin and Smart Spaces
SANGHEE SHIN
 

Tendances (20)

7 Amazing Examples of Digital Twin Technology In Practice
7 Amazing Examples of Digital Twin Technology In Practice7 Amazing Examples of Digital Twin Technology In Practice
7 Amazing Examples of Digital Twin Technology In Practice
 
Digital Twin at-a-glance, Yong @SEMIforte
Digital Twin at-a-glance, Yong @SEMIforteDigital Twin at-a-glance, Yong @SEMIforte
Digital Twin at-a-glance, Yong @SEMIforte
 
Digital twin
Digital twinDigital twin
Digital twin
 
Digital twin
Digital twinDigital twin
Digital twin
 
Digital Twin - What is it and how can it help us?
Digital Twin - What is it and how can it help us?Digital Twin - What is it and how can it help us?
Digital Twin - What is it and how can it help us?
 
Digital Twin Technology
Digital Twin TechnologyDigital Twin Technology
Digital Twin Technology
 
Drive digital transformation to digital twin
Drive digital transformation to digital twinDrive digital transformation to digital twin
Drive digital transformation to digital twin
 
Digital twins: the power of a virtual visual copy - Unite Copenhagen 2019
Digital twins: the power of a virtual visual copy - Unite Copenhagen 2019Digital twins: the power of a virtual visual copy - Unite Copenhagen 2019
Digital twins: the power of a virtual visual copy - Unite Copenhagen 2019
 
Nurturing Digital Twins: How to Build Virtual Instances of Physical Assets to...
Nurturing Digital Twins: How to Build Virtual Instances of Physical Assets to...Nurturing Digital Twins: How to Build Virtual Instances of Physical Assets to...
Nurturing Digital Twins: How to Build Virtual Instances of Physical Assets to...
 
Digital twin
Digital twinDigital twin
Digital twin
 
Digital Twin and Smart Spaces
Digital Twin and Smart Spaces Digital Twin and Smart Spaces
Digital Twin and Smart Spaces
 
Digital Twin: convergence of Multimedia Technologies
Digital Twin: convergence of Multimedia TechnologiesDigital Twin: convergence of Multimedia Technologies
Digital Twin: convergence of Multimedia Technologies
 
digital twin seminar 1.pptx
digital twin seminar 1.pptxdigital twin seminar 1.pptx
digital twin seminar 1.pptx
 
Embedded digital twin
Embedded digital twinEmbedded digital twin
Embedded digital twin
 
Digital Twin
Digital TwinDigital Twin
Digital Twin
 
Metaverse Infographics
Metaverse InfographicsMetaverse Infographics
Metaverse Infographics
 
Digital twin
Digital twinDigital twin
Digital twin
 
DIGITAL_TWIN_final.pptx
DIGITAL_TWIN_final.pptxDIGITAL_TWIN_final.pptx
DIGITAL_TWIN_final.pptx
 
Dtwin [Autosaved].pptx
Dtwin [Autosaved].pptxDtwin [Autosaved].pptx
Dtwin [Autosaved].pptx
 
The Most Definitive guide to Industrial IoT Implementation
The Most Definitive guide to Industrial IoT ImplementationThe Most Definitive guide to Industrial IoT Implementation
The Most Definitive guide to Industrial IoT Implementation
 

Similaire à Virtual Property vs. Digital Twin

Similaire à Virtual Property vs. Digital Twin (20)

BIM2FM, BIM models to Facility Management, Concept
BIM2FM, BIM models to Facility Management, ConceptBIM2FM, BIM models to Facility Management, Concept
BIM2FM, BIM models to Facility Management, Concept
 
Φάννυ Κοφινά, 7th Digital Banking Forum
Φάννυ Κοφινά, 7th Digital Banking ForumΦάννυ Κοφινά, 7th Digital Banking Forum
Φάννυ Κοφινά, 7th Digital Banking Forum
 
Werkplek Van De Toekomst
Werkplek Van De ToekomstWerkplek Van De Toekomst
Werkplek Van De Toekomst
 
New age technology services and their implications on business success
New age technology services and their implications on business successNew age technology services and their implications on business success
New age technology services and their implications on business success
 
Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...
Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...
Miguel Angel Perdiguero - Head of BIG data & analytics Atos Iberia - semanain...
 
Digital Disruption Across Tomorrow's Manufacturing Supply Chains
Digital Disruption Across Tomorrow's Manufacturing Supply ChainsDigital Disruption Across Tomorrow's Manufacturing Supply Chains
Digital Disruption Across Tomorrow's Manufacturing Supply Chains
 
Digitization process at Leadec
Digitization process at LeadecDigitization process at Leadec
Digitization process at Leadec
 
DWS15 - Future networks forum - Virtualisation - Atos -Cedric Carel
DWS15 - Future networks forum - Virtualisation - Atos -Cedric CarelDWS15 - Future networks forum - Virtualisation - Atos -Cedric Carel
DWS15 - Future networks forum - Virtualisation - Atos -Cedric Carel
 
Lifecycle MEP design for buildings
Lifecycle MEP design for buildingsLifecycle MEP design for buildings
Lifecycle MEP design for buildings
 
Virtualiztion Cloud Computing Program Cionet 14 October A
Virtualiztion Cloud Computing Program Cionet 14 October AVirtualiztion Cloud Computing Program Cionet 14 October A
Virtualiztion Cloud Computing Program Cionet 14 October A
 
Ecotech Presentation.pdf
Ecotech Presentation.pdfEcotech Presentation.pdf
Ecotech Presentation.pdf
 
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
PureApp Hybrid Cloud - Mark Willemse ING Presentation 11th September 2014
 
Accelerating Cognitive Business with Hybrid Cloud
Accelerating Cognitive Business with Hybrid CloudAccelerating Cognitive Business with Hybrid Cloud
Accelerating Cognitive Business with Hybrid Cloud
 
Think Global, Work Digital. Cisco Industry 4.0
Think Global, Work Digital. Cisco Industry 4.0Think Global, Work Digital. Cisco Industry 4.0
Think Global, Work Digital. Cisco Industry 4.0
 
Cloud computing in practice
Cloud computing in practiceCloud computing in practice
Cloud computing in practice
 
4S Information Technologies
4S Information Technologies4S Information Technologies
4S Information Technologies
 
Yobitel Communicaitons Corporate Brochure
Yobitel Communicaitons Corporate BrochureYobitel Communicaitons Corporate Brochure
Yobitel Communicaitons Corporate Brochure
 
Briefing Simplicité Software (English)
Briefing Simplicité Software (English)Briefing Simplicité Software (English)
Briefing Simplicité Software (English)
 
How Schneider Electric Assures Its Salesforce Lightning Migration with Thousa...
How Schneider Electric Assures Its Salesforce Lightning Migration with Thousa...How Schneider Electric Assures Its Salesforce Lightning Migration with Thousa...
How Schneider Electric Assures Its Salesforce Lightning Migration with Thousa...
 
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David PhilpETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
 

Plus de Tero Järvinen

Plus de Tero Järvinen (12)

Guide: MEP Design in Construction Management -projects
Guide: MEP Design in Construction Management -projectsGuide: MEP Design in Construction Management -projects
Guide: MEP Design in Construction Management -projects
 
Virtual Reality in AEC
Virtual Reality in AECVirtual Reality in AEC
Virtual Reality in AEC
 
Granlund Virtual Property
Granlund Virtual PropertyGranlund Virtual Property
Granlund Virtual Property
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaboration
 
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
 
MEP-BIM process for designing project Origin, Suspended Ceilings, Provisions...
MEP-BIM process for designing project Origin,  Suspended Ceilings, Provisions...MEP-BIM process for designing project Origin,  Suspended Ceilings, Provisions...
MEP-BIM process for designing project Origin, Suspended Ceilings, Provisions...
 
EBEC2015 Helsinki. Concept of Big Room, Granlund Oy
EBEC2015 Helsinki. Concept of Big Room, Granlund OyEBEC2015 Helsinki. Concept of Big Room, Granlund Oy
EBEC2015 Helsinki. Concept of Big Room, Granlund Oy
 
Integroitu suunnittelu, tietomallit by Granlund
Integroitu suunnittelu, tietomallit by GranlundIntegroitu suunnittelu, tietomallit by Granlund
Integroitu suunnittelu, tietomallit by Granlund
 
MEP design and collaboration
MEP design and collaborationMEP design and collaboration
MEP design and collaboration
 
MEP BIM amount of objects in renovated hospital
MEP BIM amount of objects in renovated hospitalMEP BIM amount of objects in renovated hospital
MEP BIM amount of objects in renovated hospital
 
Granlund Designer, MEP design database software
Granlund Designer, MEP design database softwareGranlund Designer, MEP design database software
Granlund Designer, MEP design database software
 
MEP BIM design
MEP BIM designMEP BIM design
MEP BIM design
 

Dernier

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Dernier (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

Virtual Property vs. Digital Twin

  • 1. Virtual Property Using BIM in Facility Management Tero Järvinen Technology Director Innovation and Development 14.06.2018
  • 2. Building on Innovation Almost 900 experts HVAC Electricity Building Automation Hospital Design Mision Critical, Datacenters Renovation Consultancy Software Innovation and Development AdministrationDigital Facility Services
  • 3. Building on Innovation Central Finland Hospital Jyväskylä 106 000 brm2 T3 Hospital Turku 40 000 brm2 Trauma Hospital Helsinki 70 000 brm2 Children’s hospital Helsinki 48 000 brm2 Some of our on-going projects (in Finland)
  • 4. Building on Innovation Turnover and profit 45,4 54,7 61,7 71,2 0 10 20 30 40 50 60 70 80 2014 2015 2016 2017 Turnover, M€ 5,5 6,8 7,1 8,3 0 1 2 3 4 5 6 7 8 9 2014 2015 2016 2017 Profit, M€
  • 6. Building on Innovation Well-being for the building and the user Usage guides our work What is our customer proposition? How do we fulfil it? Which customers’ processes do we support? Usage/operation Identify the need for change Specify and design Implement What are our key innovation areas? Information supportingusage Analysis and optimisation Visualisation Tools and methods for collaboration Innovation Strategy 2017-2021
  • 7. Building on Innovation Enterprise Innovation Roadmap VISION A facility where the user and the facility communicate Thinking facility BIM data IoT data Human data BI data 2017 2018 2019 2020 Service and product development Reporting facility Predictable facility Platforms for visualisation Platforms for analysis and optimisation 2021- Design smart solutions through smart collaboration Design Learning facility Big data New technology enabling smart solutions and smart operation Software Consulting Developing smart propertymanagement and user capabilities
  • 8. Building on Innovation Background Information Picture by Granlund from VR environment: YIT Tripla at Pasila, Helsinki Technologies, ideas and processes behind The Virtual Property Demo: Finnish National Museum
  • 12. Building on Innovation Schematic Design Location of Information Device scheludes, Diagrams Detail Design Modeling of Network Air Handling Units, Pumps, Chillers… etc. Networks BIM models does not contain requirements of central units Combining Graphical BIM model with Device Schelude database you get all technical information of devices and networks
  • 13. Building on Innovation BIM to use in FM Preliminary design Detail Design Construction FM Spaces / Zones Designers BIM models FM requirements for BIM model BIM in FM FM coordinator sets requirements and monitors fulfilment Validation of as- built content in the models Construction organisation FM -organisation FM BIM execution plan for the building Monitoring FM BIM handover plan Mobilisation of transfer and education FM Coorninator
  • 14. Building on Innovation BIM2FM key sentences ▪ Information content has to be standardised  Information needs to be machine readable ▪ Information has to be prioritised  There is too much information in the models, requirements and validations are hard task to do  There is a need for information prioritisation and understanding of the use cases  ”Everything is not possible” ▪ Information has to be available 24/7  Cloud services  Roles for users, authentification, documented API’s ▪ Information is not transferred  Information is linked between cloud systems  End user decides, which information source is ”home” for them  One cloudservice does not solve problems, for multiple use cases you need multiple cloud services ▪ Information has to be updated  Need for ”Digital Twin”. You need to update the virtual building before or after renovations / minor changes. It has to be ”a process” in FM workflow  If information content differs in Digital Twin, virtual model will be useless after couple of years. Information in virtual model has to be reliable (depending of the use cases) ▪ Normal FM operations will be different  ”BIM2FM” usability cannot be compared to existing use cases. Methods to fullfil the needs of existing use cases will change  Facility management and property owner organisations need to be ready for change and be willing to change their workmethods
  • 15. Building on Innovation 3D-Model IFC Information Enrichment Granlund Designer Asset Information Model, AIM AIM-system Applications Utilisation of Information Granlund Manager UseCase UseCase UseCase Documented API Sharing Information New Information User-, Building- and Phase Management Dynamic Information IoT, Building Automation System, User Feedback Manager Performance Optimisation IoT Granlund Designer Other Applications VirtualProperty Business needs DigitalTwin ToolsforupdatingDigitalTwin Property Management FLMFacilityLifecycleManagement Propery Portfolio TheConceptofVirtualProperty Tactical level Strategic level Operative level Road map to Facility Life Cycle Management
  • 16. Updating the Models How to update changes in Digital Twin
  • 17. Building on Innovation Facility ManagementNewbuilding Renovation Guarantee period Facility Management Update to native models Little retrofits: 2D-drawings, hand-made drafts… Copy from native model if needed Project drawings / models Update to native models Renovation: Modelling to native model or copy from it Project drawings / models Designers Service for building owner IFC / PDF publish FM information systems API interfaces Daily use of FM software Designers Service for building owner IFC / PDF publish FM information systems API interfaces Daily use of FM software IFC / PDF publish FM information systems API interfaces Daily use of FM software Facility owner’s native BIM models and databases BIM native model updating during lifecycle
  • 19. Building on Innovation Phase 1 Service Request User activity Conditions Temperature, RH, VOC, CO2 ... Granlund Manager "Virtual Property" Release: Q3 / 2018
  • 20. Building on Innovation MEP Networks • Device specifications • System Information • Service Area Zones • Locating Equipments • Design Values • Measured Values • Real Time Measurements • Warranty Periods • Indoor Locating • Augmented Reality • ... Manufacturer: Trox Design Air Flow: 35l/s Measured Air Flow: 31l/s 312AHU01, Offices, A-block Next phases in Granlund Manager
  • 21. City Digital Twin Picture by Granlund from VR environment: YIT Tripla at Pasila, Helsinki
  • 24. Building on Innovation City Level Platform Economy Technical View