This document discusses the evolution of a company's volumetric modular construction solutions. It provides an overview of the company's factory and accreditations. It then discusses the history and product evolution, from early pod-based solutions to today's high-performance modular housing units that achieve low energy costs. Examples of student, school and housing projects are presented to demonstrate the company's full turnkey service and how modular construction can deliver buildings quicker with higher quality.
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...
Modern Methods of Construction Evolution
1. Modern Methods of Construction
Evolution of our Volumetric Modular Offsite Solutions
2. smarter – quicker - greener
Introduction
Certification
Factory
Accreditation
Products
Clients
Market Size
History and Product Evolution
Today’s high performance products
Summary and Synergy
Presentation
Contents
3. smarter – quicker - greener
We offer factory finished modular buildings backed by stakeholders who have common
goals in the delivery of affordable housing.
All manufacture is on a ‘Fabric First’ basis which means that performance is via the
building envelope as opposed to bolt on renewables.
All M+E systems integrated to enable lowest possible household energy costs.
Achieve 2015 L1A Elemental Values as standard
All design and manufacture of affordable housing solutions via a ‘Volumetric approach.
Full turnkey service from inception through to sign off – including planning applications
and all onsite enabling works.
Totally holistic approach – Design through Delivery
Totally integrated supply chain
Modular construction
background
4. smarter – quicker - greener
Accreditations
ISO 9001
ISO 14001
60-year Agremont Certification
LABC Registered system approval
NHBC Warranty insurance
NEBOSH
BOPASS
5. smarter – quicker - greener
Manufacturing
Over 35 years of manufacturing experience for the commercial, housing and
educational markets
We operate fully inclusive design department including architectural and
structural.
Our Manufacturing plant covers 75,000 square feet
Metal shop. We have guillotine, folding and plasma cutting facilities
Wood Shop. We utilise lamination, router and panel saw technology
In-house cold rolling capability (coming online)
Dynamic model centred around main hub with regional satellite facilities
located where there is need for housing and employing local people.
6. smarter – quicker - greener
What we manufacture
Volumetric units
Housing – Public and Private sector – PRS
Low rise to 1 to 6 stories
High Rise 7 to 18 storeys +
Hotel solutions
Care Homes
Senior / Assisted living
Student rooms
Re-locatable accommodation units
Retail Units
8. smarter – quicker - greener
History and Evolution
The brief was to design a simple factory built solution to create rapidly
deployable living spaces within existing buildings.
9. smarter – quicker - greener
History and Evolution – Where its started
The Co-Pod housing system
10. smarter – quicker - greener
History and Evolution – Proposed Elevations
11. smarter – quicker - greener
History and Evolution – The CoPod in Situ
12. smarter – quicker - greener
History and Evolution – The Finished Apartments
17. smarter – quicker - greener
History and Evolution
We developed a range of 12 house types using a light steel frame panel system
with factory finished kitchens and bathrooms.
18. smarter – quicker - greener
Civils completed and bathroom and kitchen pods installed followed by structural wall and floor system.
Building fully framed in a single day with all bathrooms and kitchens complete.
20. smarter – quicker - greener
Structural Pods – Hotels, Students schemes and Care Homes
Pods designed to stack and provide racking for both the Light steel frame walls and support for
the floors which were Lewis decking with a Gyvlon pour.
25. smarter – quicker - greener
The birth of Roompod
Looking at this image we realised that it would be possible to build the entire room in the
factory as a fully structural element and volumetric offsite was born.
26. smarter – quicker - greener
History and Evolution – The first Volumetric scheme
30. smarter – quicker - greener
School Classrooms
Modular solution used to deliver 4 new Classrooms
All the modules were installed in only 5 weeks and the total construction time
was 10 Weeks
Kier was contracted to deliver new Scape Connect Up branded Classrooms.
Client required a turnkey solution to be delivered as quickly as possible.
Client wanted to relocate the neighbouring primary school onto Aylestone
secondary school and minimise the impact of the construction activities
Construction could only commence after the exam period had finished,
leaving 10 weeks to refurbish the existing block and construct a new
extension.
“The school opened on time to a delighted client, scoring 10/10 for customer
satisfaction. When asked how they felt their only comment was ‘Ecstatic’ “
Project value: £715k
Modular cost: £393k
Delivered on budget
31. smarter – quicker - greener
School Classrooms
Connext Up Box Clever design solution used to deliver 3 new Classrooms
All the modules were installed in only 6 weeks and the total construction time
was 3 months
Each module could be completely pre-fabricated off-site in a low-risk,
controlled environment
The modular construction commenced in parallel with groundworks, and was
not affected by incremental weather
The under floor heating is a fantastic addition allowing the Children to sit on
the floor comfortably for reading time
“The pupils take real pride in their new buildings and this is reflected in their
positive approaches to lessons “
Project value: £671k
Modular cost: £380k
Delivered on budget
32. smarter – quicker - greener
Scape Connext Up solution used to deliver 4 new Classrooms
All the modules were installed in only 6 weeks and the total construction time
was 12 weeks
“The whole process from beginning to end went very smoothly and the design
team worked with us to ensure that the end result was just what we needed.
The classrooms are definitely a wow factor. I am now waiting our first electric
bill as I am sure with the solar panels and the more efficient heating system our
bills will be much lower”
Project value: £609k
Modular cost: £308k
Delivered on budget
School Classrooms
34. smarter – quicker - greener
Today – High Performance Volumetric Housing
2016 Building Regulations are a game changer as they will require the traditional
builders to ‘Up their game’. Our factory modules achieve these high levels of
insulation on a ‘Fabric First basis without the need for renewables.
35. smarter – quicker - greener
Scotish Housing Association
Delivered to Scottish Gold Standard
36. smarter – quicker - greener
Scotish Housing Association
Delivered to Scottish Gold Standard
37. smarter – quicker - greener
Scottish Housing Association
48 Accommodation Units
16 x Apartments (50M²)
24 x 2 Storey, 2 Bed Houses
8 x 3 Storey, 3 Bed Houses
39. smarter – quicker - greener
House Type
Area
m²
Heating
Demand
kWh pa
DWH
Demand
kWh pa
Annual
Heating &
DHW Cost
PV
Array
kW
PV Annual
Energy Saved
kWh
PV Annual
Energy
saving
Nett
Annual
Energy
Cost
2 Bed Semi 80.2 1615 586 £289 0.75 644 -£84.56 £204.51
I Bed Apartment 49.7 903 493 £183 0.5 365 -£47.92 £135.28
3 Bed Semi 108.1 2026 626 £348 1 858 -£112.86 £235.14
Scotish Housing Association
Delivered to Scottish Gold Standard – Expected energy costs
52. smarter – quicker - greener
Delivering Project with Offsite Modular
BUILDINGS DELIVERED to much higher quality and levels of performance
GREATLY SHORTENS THE CONSTRUCTION TIME ON SITE. It is perfectly feasible to deliver a
modular house and move in the same day.
DELIVERS THE BUILDING QUICKER. Thereby frees up capital and reduces prelim costs. Analysis of
a direct comparison between building traditionally Vs offsite typically show that the offsite method
can be up to 10% more cost effective for a better quality building
LESS SNAGGING COSTS because quality will be higher due to factory environment.
ACCURACY OF BUDGETING. reduces likelihood of cost over runs.
GEOGRAPHIC COST SAVINGS. Factory housing uses local regional labour so when building in
expensive urban areas can prove to be even more cost effective.
REDUCES LABOUR ONSITE The need for 1st and 2nd fix trades such as plumbers, electricians, tilers
etc is drastically reduced.
REDUCES WASTE. It is estimated that waste accounts for 10% of all material delivered to site.
Factory waste runs less than1%.
HEALTH AND SAFETY incidents are greatly reduced because much of the work is carried out off site.
53. smarter – quicker - greener