SlideShare une entreprise Scribd logo
1  sur  3
TODD KELLY
105 Willow Trace Circle Unit # 5 Clemmons NC 27012
817-888-1741
bdc8633@gmail.com LinkedIn Todd Kelly
SUMMARY OF QUALIFICATIONS
Highly skilled, detail and action oriented, professional individual with a solid work ethic wanting to
combine my diverse background in manufacturing, leadership and assembly knowledge to further
my manufacturing engineering experience. I have an outstanding ability to solve problems quickly
and effectively with uncomplicated methods.
Extensive experience in:
 Machining
 Research and Development/Continuous
Design
 All forms of manufacturing
(composites, metals and sheet-metals)
 Equipment and Tooling Design
 Manufacturing Engineering  Design for Manufacturing
 Process Engineering  Certified Six Sigma Variation Green
Belt
PROFESSIONAL EXPERIENCE
Tru-Atlantic, Kernersville, NC 2015-Present
TruAtlantic offers manufacturing engineering, prototype tooling fabrication, detailed sheet
metal fabrication, assembly and kitting as well as composites.
Production Manager
 Oversee all manufacturing staff, processes, and facilities in a manufacturing operation.
Responsible for the output of 26 personnel including manufacturing, purchasing, quality, and
engineering. Working with sales, and marketing staff to ensure smooth product phase in and
phase out. Lead strategic planning from mission and objectives through execution and
evaluation for production team.
 Plan, directed and coordinated activities to ensure the production schedule is meet.
 Deliver process improvement initiatives in conjunction with Lean protocols to drive
change, maximize efficiency / production output, and to plan for future expansion.
 Collaborate with departmental leaders to promote a culture of excellence and ensure
employees receive the necessary training to produce high quality work in a safe
environment.
 Ensure workflow meets the demands the production schedule and prevents
operational delays.
 Serve as a trusted advisor to Director of Operations to drive company vision / mission
and provide ongoing status of projects.
 Analyze and prepare production budgets and timelines required to complete
production projects.
 Ensured that all safety and quality measures were adhered to during production
process, from beginning to end.
 Prepared various training programs, with consideration for complexity of production
process and construction engineers’ skills.
 Develop a preventative maintenance program.
 Create monthly budgetary requirements and Capital Expenditure budgets for the shop.
 Provide insight and problem solving for supply management team in regards to
process improvement, materials analysis, failure analysis, resin selection, process
monitoring and control.
 Lead all new product development projects.
 Lead and participated in-house and external Kaizen events resulting in substantial cost
reductions and avoidances.
Todd Kelly
Page 2 of 3
Bell Helicopter, Fort Worth, TX 2005-2015
Bell Helicopter is an industry-leading producer of commercial and military, manned and
unmanned vertical lift aircraft and tilt rotor aircraft.
Senior Manufacturing Engineer
 Experienced in process mapping and evaluating opportunities to increase first pass yield by
using the DMAIC tools.
 Selected to work in Manufacturing Research and Development department on a
rotational program to broaden knowledge of the R&D processes. Provided hands on
experiences, by providing technical inputs in phases of production lifecycle.
 Worked in MR&D to develop a new process for a composite air inlet for the V-22. This
new inlet improved the engine time on the aircraft by providing cleaner air for the
engine. The results of this testing led to a contract award from the government to
implement this effort on the aircraft.
 Collaborated with production to implement manufacturing improvements and tooling solutions
for the V-22 build of the composite yoke and wing skins. This increased throughput and
reduced quality defects to help meet on-time delivery.
 Coordinated activities to evaluate and resolve engineering related production problems in
assigned area of aircraft manufacturing facility for the V-22, 525, 901Tilt-Rotor Military &
Commercial Helicopter. Reviewed production schedules, engineering specifications, orders,
and related information to maintain current knowledge of manufacturing methods,
procedures, and activities assigned area. Investigated the reports of defective, damaged, or
malfunctioned parts, assemblies, equipment, or systems to determine nature and scope of
problem, Examined, measured, inspected, and test defective parts for conformance to
engineer design drawings or blueprint specifications, using precision measuring and testing
instruments, devices, and equipment Evaluated findings to formulate corrective action plan
and coordinated implementation of plan Performed BOM verification through
Visiprise/CAMS, Enovia/CATIA, SAP software Verified planning parts and fastener call-outs.
 Heavily involved with offsite supplier support for the V-22 program for the past eight years.
Worked with numerous suppliers across the United States and England to help with the
development, planning, manufacturing and/or tooling solutions to meet customerdemands for
a quality part with an on-time delivery.
 Assisted with FAI (First Article Inspection) of new or transitioned parts.
 Identified process bottlenecks and offered solutions on streamlining the process flow.
 Updated planning for the shop floor.
 Recognized by senior leaders for improving the process on the firewall panels and getting
the parts delivered on-time to prevent line shortage.
 Developed a process to coordinate and review engineering design and changes, providing
producibility assessmentandidentify issues that would impactprocess capability, cost,quality
and schedules which are now implemented by engineering.
 Provided process definitions, documentation and support for new product start-up program.
 Managed and controlled Account Managers for redesign and implementation of Inlet Barrier
Filter project for the V-22 involving technicians, engineers, manufacturing planning, quality
assurance teams and working with suppliers.
 Provided design modification on existing tooling to incorporate Six Sigma techniques and
ergonomics concepts, which help improve productivity and reduced job-related injuries.
 Developed statements of work, basis of estimates and proposal schedules for US Government
contracts and internal manufacturing projects.
Todd Kelly
Page 3 of 3
Triumph Actuation Systems, Clemmons, NC 2001-2005
Triumph Actuation Systems-is a designer, manufacturerand repairer of complex hydraulic
and hydro-mechanical aircraft components and systems.
Team Leader / Machinist
 Created a standard work visual control for CNC Milling Department to streamline set-ups and
use common tooling.
 Implemented new production control and planning methods for maintaining schedules.
 Streamlined cost reduction in CNC Mills set-up and operations, for a savings of $50,000
annually by combining three operations into one.
 Comprehensive knowledge of product architecture, manufacturing processes, and product
development used to develop a life cycle from concept to production implementation of new
products.
 Monitored network activities and reported conditions to senior management in areas working
to maintain 90-95% on time delivery.
 Four years of Supervisory experience leading the CNC Milling Department.
HAECO (TIMCO), Greensboro, NC 1997-2001
TIMCO Aviation Services, Inc. provides fully integrated aircraft MRO and interiors services
for commercial and government aircraft operators.
Machinist / Supervisor
 Perform layouts and prepare shop drawings as required using CAD/CAM system to produce
CNC code for multiple machines (mills and lathes)
 Maintained daily customer contact concerning reliability, support and aircraft maintenance
issues, including planning and coordinating line shortages.
 Three years of Supervisory experience.
 Review parts and create a bases of estimate proved to the customer for approval for part
completion.
 Perform required machine shop maintenance duties on machines, lathes, drill presses,
hydraulic presses, water jet, press brakes, heat treat ovens and band saws.
CERTIFICATIONS AND TRAINING
ESI Project Management Certificate, George Washington University, Washington, DC 2010
Variation Green Belt Certified, Textron Six Sigma, Fort Worth, TX 2008
Electrical Engineering (40 hours), Central Piedmont Community College, Charlotte, NC
GD&T for Production
SKILLS
Applications: CATIA V4, CATIA V5, AutoCAD, CAMS, ENOVIA, SAP, Primavera, Premier,
Microsoft Office and Project Management tools.
CNC Programming: FANUC, OKUMA, MAZAK and Siemens Cincinnati.
Machining: Horizontal, Vertical Milling Machine, Lathes, OD and Surface Grinders, eight axis
Turn Mill, Drill Press, Table Saw, Radial Arm Saw, Band Saws, Deburring equipment.
Inspection: CMM, Rockwell Hardness Tester, Electronic Height Gauge, Comparator,
Borescope and various gages.

Contenu connexe

Tendances

Tendances (19)

Gary Armstrong Resume-2
Gary Armstrong Resume-2Gary Armstrong Resume-2
Gary Armstrong Resume-2
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
HallResumeWordLinkedin14April15
HallResumeWordLinkedin14April15HallResumeWordLinkedin14April15
HallResumeWordLinkedin14April15
 
J Salter Resume Pmp 1 Final
J Salter Resume  Pmp 1 FinalJ Salter Resume  Pmp 1 Final
J Salter Resume Pmp 1 Final
 
Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015
 
Tacher, Robert MULTIPURPOSE RESUME
Tacher, Robert MULTIPURPOSE RESUMETacher, Robert MULTIPURPOSE RESUME
Tacher, Robert MULTIPURPOSE RESUME
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16Ben Franke Resume 3-1-16
Ben Franke Resume 3-1-16
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016C
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Michael's Resume
Michael's ResumeMichael's Resume
Michael's Resume
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16
 
Chandler, M - RM Resume
Chandler, M - RM ResumeChandler, M - RM Resume
Chandler, M - RM Resume
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 

En vedette (15)

IT Resume
IT ResumeIT Resume
IT Resume
 
Megan Schlosser_Resume2016
Megan Schlosser_Resume2016Megan Schlosser_Resume2016
Megan Schlosser_Resume2016
 
New Resume 2016
New Resume 2016New Resume 2016
New Resume 2016
 
Rdelaflor resume 2015
Rdelaflor resume 2015Rdelaflor resume 2015
Rdelaflor resume 2015
 
Arpit Joshi new
Arpit Joshi newArpit Joshi new
Arpit Joshi new
 
Nikki D. Green Resume (1)
Nikki D. Green Resume (1)Nikki D. Green Resume (1)
Nikki D. Green Resume (1)
 
J Harry McGrath Resume ND.2.
J Harry McGrath Resume ND.2.J Harry McGrath Resume ND.2.
J Harry McGrath Resume ND.2.
 
Mary -Margo- Corbett Resume 2015
Mary -Margo- Corbett Resume 2015Mary -Margo- Corbett Resume 2015
Mary -Margo- Corbett Resume 2015
 
Resume Health- Senior
Resume Health- SeniorResume Health- Senior
Resume Health- Senior
 
2016 ATSS Charlotte Resume Final
2016 ATSS Charlotte Resume Final2016 ATSS Charlotte Resume Final
2016 ATSS Charlotte Resume Final
 
Kathy Resume PDF Format - Music Industry
Kathy Resume PDF Format - Music IndustryKathy Resume PDF Format - Music Industry
Kathy Resume PDF Format - Music Industry
 
Resume aaron rogers
Resume aaron rogersResume aaron rogers
Resume aaron rogers
 
First-Year Resume
First-Year ResumeFirst-Year Resume
First-Year Resume
 
R.A. McCollum resume
R.A. McCollum resumeR.A. McCollum resume
R.A. McCollum resume
 
Sql developer resume
Sql developer resumeSql developer resume
Sql developer resume
 

Similaire à Todd's Resume

Similaire à Todd's Resume (20)

R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_Resume
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
QUINTIN GATEWOO2
QUINTIN GATEWOO2QUINTIN GATEWOO2
QUINTIN GATEWOO2
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
All Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - SupportAll Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - Support
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Lynne Krogsrud 09022016
Lynne Krogsrud 09022016Lynne Krogsrud 09022016
Lynne Krogsrud 09022016
 
Shannon Griffiths Resume
Shannon Griffiths ResumeShannon Griffiths Resume
Shannon Griffiths Resume
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
Anthony Balaskas Resume
Anthony Balaskas ResumeAnthony Balaskas Resume
Anthony Balaskas Resume
 
Gulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGulfstream Mfg Eng Resume
Gulfstream Mfg Eng Resume
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
 
Krishna Resume
Krishna ResumeKrishna Resume
Krishna Resume
 
Kraig Kottenstette 102016.doc
Kraig Kottenstette 102016.docKraig Kottenstette 102016.doc
Kraig Kottenstette 102016.doc
 
SGM 012017
SGM 012017SGM 012017
SGM 012017
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 

Todd's Resume

  • 1. TODD KELLY 105 Willow Trace Circle Unit # 5 Clemmons NC 27012 817-888-1741 bdc8633@gmail.com LinkedIn Todd Kelly SUMMARY OF QUALIFICATIONS Highly skilled, detail and action oriented, professional individual with a solid work ethic wanting to combine my diverse background in manufacturing, leadership and assembly knowledge to further my manufacturing engineering experience. I have an outstanding ability to solve problems quickly and effectively with uncomplicated methods. Extensive experience in:  Machining  Research and Development/Continuous Design  All forms of manufacturing (composites, metals and sheet-metals)  Equipment and Tooling Design  Manufacturing Engineering  Design for Manufacturing  Process Engineering  Certified Six Sigma Variation Green Belt PROFESSIONAL EXPERIENCE Tru-Atlantic, Kernersville, NC 2015-Present TruAtlantic offers manufacturing engineering, prototype tooling fabrication, detailed sheet metal fabrication, assembly and kitting as well as composites. Production Manager  Oversee all manufacturing staff, processes, and facilities in a manufacturing operation. Responsible for the output of 26 personnel including manufacturing, purchasing, quality, and engineering. Working with sales, and marketing staff to ensure smooth product phase in and phase out. Lead strategic planning from mission and objectives through execution and evaluation for production team.  Plan, directed and coordinated activities to ensure the production schedule is meet.  Deliver process improvement initiatives in conjunction with Lean protocols to drive change, maximize efficiency / production output, and to plan for future expansion.  Collaborate with departmental leaders to promote a culture of excellence and ensure employees receive the necessary training to produce high quality work in a safe environment.  Ensure workflow meets the demands the production schedule and prevents operational delays.  Serve as a trusted advisor to Director of Operations to drive company vision / mission and provide ongoing status of projects.  Analyze and prepare production budgets and timelines required to complete production projects.  Ensured that all safety and quality measures were adhered to during production process, from beginning to end.  Prepared various training programs, with consideration for complexity of production process and construction engineers’ skills.  Develop a preventative maintenance program.  Create monthly budgetary requirements and Capital Expenditure budgets for the shop.  Provide insight and problem solving for supply management team in regards to process improvement, materials analysis, failure analysis, resin selection, process monitoring and control.  Lead all new product development projects.  Lead and participated in-house and external Kaizen events resulting in substantial cost reductions and avoidances.
  • 2. Todd Kelly Page 2 of 3 Bell Helicopter, Fort Worth, TX 2005-2015 Bell Helicopter is an industry-leading producer of commercial and military, manned and unmanned vertical lift aircraft and tilt rotor aircraft. Senior Manufacturing Engineer  Experienced in process mapping and evaluating opportunities to increase first pass yield by using the DMAIC tools.  Selected to work in Manufacturing Research and Development department on a rotational program to broaden knowledge of the R&D processes. Provided hands on experiences, by providing technical inputs in phases of production lifecycle.  Worked in MR&D to develop a new process for a composite air inlet for the V-22. This new inlet improved the engine time on the aircraft by providing cleaner air for the engine. The results of this testing led to a contract award from the government to implement this effort on the aircraft.  Collaborated with production to implement manufacturing improvements and tooling solutions for the V-22 build of the composite yoke and wing skins. This increased throughput and reduced quality defects to help meet on-time delivery.  Coordinated activities to evaluate and resolve engineering related production problems in assigned area of aircraft manufacturing facility for the V-22, 525, 901Tilt-Rotor Military & Commercial Helicopter. Reviewed production schedules, engineering specifications, orders, and related information to maintain current knowledge of manufacturing methods, procedures, and activities assigned area. Investigated the reports of defective, damaged, or malfunctioned parts, assemblies, equipment, or systems to determine nature and scope of problem, Examined, measured, inspected, and test defective parts for conformance to engineer design drawings or blueprint specifications, using precision measuring and testing instruments, devices, and equipment Evaluated findings to formulate corrective action plan and coordinated implementation of plan Performed BOM verification through Visiprise/CAMS, Enovia/CATIA, SAP software Verified planning parts and fastener call-outs.  Heavily involved with offsite supplier support for the V-22 program for the past eight years. Worked with numerous suppliers across the United States and England to help with the development, planning, manufacturing and/or tooling solutions to meet customerdemands for a quality part with an on-time delivery.  Assisted with FAI (First Article Inspection) of new or transitioned parts.  Identified process bottlenecks and offered solutions on streamlining the process flow.  Updated planning for the shop floor.  Recognized by senior leaders for improving the process on the firewall panels and getting the parts delivered on-time to prevent line shortage.  Developed a process to coordinate and review engineering design and changes, providing producibility assessmentandidentify issues that would impactprocess capability, cost,quality and schedules which are now implemented by engineering.  Provided process definitions, documentation and support for new product start-up program.  Managed and controlled Account Managers for redesign and implementation of Inlet Barrier Filter project for the V-22 involving technicians, engineers, manufacturing planning, quality assurance teams and working with suppliers.  Provided design modification on existing tooling to incorporate Six Sigma techniques and ergonomics concepts, which help improve productivity and reduced job-related injuries.  Developed statements of work, basis of estimates and proposal schedules for US Government contracts and internal manufacturing projects.
  • 3. Todd Kelly Page 3 of 3 Triumph Actuation Systems, Clemmons, NC 2001-2005 Triumph Actuation Systems-is a designer, manufacturerand repairer of complex hydraulic and hydro-mechanical aircraft components and systems. Team Leader / Machinist  Created a standard work visual control for CNC Milling Department to streamline set-ups and use common tooling.  Implemented new production control and planning methods for maintaining schedules.  Streamlined cost reduction in CNC Mills set-up and operations, for a savings of $50,000 annually by combining three operations into one.  Comprehensive knowledge of product architecture, manufacturing processes, and product development used to develop a life cycle from concept to production implementation of new products.  Monitored network activities and reported conditions to senior management in areas working to maintain 90-95% on time delivery.  Four years of Supervisory experience leading the CNC Milling Department. HAECO (TIMCO), Greensboro, NC 1997-2001 TIMCO Aviation Services, Inc. provides fully integrated aircraft MRO and interiors services for commercial and government aircraft operators. Machinist / Supervisor  Perform layouts and prepare shop drawings as required using CAD/CAM system to produce CNC code for multiple machines (mills and lathes)  Maintained daily customer contact concerning reliability, support and aircraft maintenance issues, including planning and coordinating line shortages.  Three years of Supervisory experience.  Review parts and create a bases of estimate proved to the customer for approval for part completion.  Perform required machine shop maintenance duties on machines, lathes, drill presses, hydraulic presses, water jet, press brakes, heat treat ovens and band saws. CERTIFICATIONS AND TRAINING ESI Project Management Certificate, George Washington University, Washington, DC 2010 Variation Green Belt Certified, Textron Six Sigma, Fort Worth, TX 2008 Electrical Engineering (40 hours), Central Piedmont Community College, Charlotte, NC GD&T for Production SKILLS Applications: CATIA V4, CATIA V5, AutoCAD, CAMS, ENOVIA, SAP, Primavera, Premier, Microsoft Office and Project Management tools. CNC Programming: FANUC, OKUMA, MAZAK and Siemens Cincinnati. Machining: Horizontal, Vertical Milling Machine, Lathes, OD and Surface Grinders, eight axis Turn Mill, Drill Press, Table Saw, Radial Arm Saw, Band Saws, Deburring equipment. Inspection: CMM, Rockwell Hardness Tester, Electronic Height Gauge, Comparator, Borescope and various gages.