HZD1500 Bin Blender
SAINTYCO INTERNATIONAL GROUP
Serial No: 170205
Year of Mfg: 2017.02
PART3: General Part _ Operation Qualification (GP- OQ)
Equipment: Bin Blender, Machine No.: HZD1500
HZD1500 BIN BLENDER
Operational Qualification (OQ) Protocol
SAINTY INTERNATIONAL GROUP
Page 1
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
Writer‘s signature
Your signature indicates that the preparation of this file (Edit/Revision) complies with the
validation project of the equipment operational requirements of GMP and industrial production
process for bin blender. It also fully reflects the necessary tasks that shall be completed during
the validation procedure, and it can implement the Operational Validation of the HZD1500 Bin
Blender.
Name Title Signature Date Unit
Kevin Project manager April 1st
,2017 SAINTYCO
Checker‘s signature
Your signature indicates you have carefully read this document and have confirmed its
exactness and this document fully reflects the validation tasks, and it can implement the
Operational Validation of the HZD1500 Bin Blender.
Name Title Signature Date Unit
Wenju Pei Technician April 1st
,2017 SAINTYCO
Approver’s signature
Your signature indicates that this document complies with the general plan of enterprise
validation, the technical production standards all the including files and information are
sufficient and can be directly applied. After the approval, any modification or correction to the
aim of this document or to the validation standard must be done in improving this document,
and before the execution of the modified/corrected document, it must be approved
Name Title Signature Date Unit
Lei Zhang Technical Manager April 1st
,2017 SAINTYCO
SAINTY INTERNATIONAL GROUP
Page 2
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
TABLE OF CONTENTS
1 PURPOSE.......................................................................................................................................................... 4
2 VALIDATION SCOPE...........................................................................................................................................4
3 PROTOCOL CHECKING..................................................................................................................................... 4
4 ORGANIZATION AND RESPONSIBILITIES.......................................................................................................... 4
5 SYSTEM DESCRIPTION.....................................................................................................................................5
5.1 NAMEPLATE................................................................................................................................................... 5
5.2 MAIN FUNCTIONS...........................................................................................................................................5
5.3 TECHNICAL USE.............................................................................................................................................5
5.6 REQUIREMENTS.............................................................................................................................................6
6 VALIDATION PROCEDURES AND RECORDS................................................................................................... 7
6.1 DOCUMENTS QUALIFICATION........................................................................................................................7
6.2 IQ QUALIFICATION.........................................................................................................................................7
6.3 MANUAL SETTING AND CALLING OF BLENDING TECHNICAL PROCEDURES (PARAMETERS).......................7
6.4 CLAMPING AND DISMANTLING OF THE BIN.................................................................................................. 8
6.5 AUTO LIFTING AND FALLING OF THE BIN.......................................................................................................9
6.6 OPERATIONAL QUALIFICATION OF ROTARY BLENDING.................................................................................9
6.7 QUALIFICATION OF THE BIN POSITIONING..................................................................................................10
6.8 PRINTING OF TECHNICAL RECORDS...........................................................................................................10
6.9 SYSTEM PROTECTION................................................................................................................................. 11
6.10 QUALIFICATION OF THE FUNCTIONS OF THE TOUCH PANEL....................................................................11
6.11 TRAINING................................................................................................................................................... 12
6.12 ATTACHED PAGE OF THE RECORDS......................................................................................................... 12
7 DEVIATIONS...................................................................................................................................................12
7.1 DEVIATIONS LIST......................................................................................................................................... 12
7.2 DEVIATIONS REPORT...................................................................................................................................12
8 ATTACHMENTS LIST.......................................................................................................................................12
9 OQ EVALUATION OF OQ RESULTS AND SUGGESTIONS.......................................................................... 13
10 CHECKING AND APPROVAL..........................................................................................................................13
11 ALTERATION CONTROL..................................................................................................................................13
RECORD:
DOCUMENTS QUALIFICATION.................................................................................................................................... 14
IQ QUALIFICATION...................................................................................................................................................... 15
MANUAL SETTING AND CALLING OF BLENDING PROCESS PROCEDURES (PARAMETERS)
错误!未定义书签。
CLAMPING AND DISMANTLING OF THE BIN...............................................................................................................17
SAINTY INTERNATIONAL GROUP
Page 3
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
QUALIFICATION OF AUTO LIFTING AND FALLING...................................................................................................... 18
OPERATIONAL QUALIFICATION OF ROTARY BLENDING............................................................................................19
QUALIFICATION OF BIN POSITIONING........................................................................................................................20
PRINTING OF TECHNICAL RECORDS......................................................................................................................... 21
SYSTEM PROTECTION................................................................................................................................................ 22
QUALIFICATION OF FUNCTIONS OF THE TOUCH PANEL...........................................................................................23
TRAINING..................................................................................................................................................................... 24
ATTACHED PAGE OF THE RECORD............................................................................................................................ 25
DEVIATIONS LIST.........................................................................................................................................................25
DEVIATIONS REPORT.................................................................................................................................................. 25
ATTACHMENTS LIST.....................................................................................................................错误!未定义书签。
CHECKING AND APPROVAL OF THE EXECUTION......................................................................................................26
APPENDIX;
APPENDIXⅠ: OQ RESULTS EVALUATION AND SUGGESTION..............................................................................26
SAINTY INTERNATIONAL GROUP
Page 4
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
1.Purpose
The purpose of this protocol is to provide guiding and technical standards to the operation
qualification of the HZD1500 Bin Blender.
This is to establish the validation protocol in order to obtain a document certifying that the
HZD1500 Bin Blender has been operated according to operational requirements of bin blender.
The acquisition of this document proves that the operation of the HZD1500 Bin Blender has
been implemented according to the approved protocol.
This protocol is the third part of the validation protocol of the HZD1500 Bin Blender:
Operational Qualification (OQ).
2.Validation Scope
Validation scope covers
 functions,
 operation procedures,
 operation SOP,
 training and other of the Bin Blender manufactured by SAINTYCO that is installed in
Room ______________, ID No.______________
Validation does not include separated validation of historic data.
3.Protocol Checking
At the following times, please check and ensure the suitability of this protocol:
 When the principal part of the validation has been modified
 When the validation scope has been modified
 When the design has been modified
 Prior to the execution of the OQ
 During the review after the OQ has been completed
4.Organization and Responsibilities
Define roles and responsibilities properly, according to their concrete division of labor.
All the personal participating to the execution of this protocol must provide their sample of
signature.
SAINTY INTERNATIONAL GROUP
Page 5
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
5.System Description
5.1 Nameplate
 NAME: Blender
 MODEL:HZD1500
 POWER SUPPLY: 440V/60Hz
 SPEED: 3~15r/min
 RATED CAPACITY:1500L
 POWER: 10.5 kW
5.2 Main functions
 Manual clamping and dismantling of the bin
 Auto lift and fall of the bin
 Adjustable blending rotary speed between 3~15rpm
 Blending finished, bin positions automatically
 Blending finished, print technical record
 Manual setting and calling of blending technical procedure (Parameters)
 Failures alarms during automatic operation process
5.3 Technical use
The equipment is mainly used for blending dried granules or powder.
5.4 Main technical parameters see Table B3-01
Table B3-01 Main technical parameters
Model HZD1500
Adaptive bin type LDZ1500 LDZ1000-1500 LDZ500-1500
Capacity L 1500 1000 500
Working load kg 750
Working speed r/min 3~15
Mixing time min 1~60
Mixing motor power kW 7.5
Lifting motor power kW 3
SAINTY INTERNATIONAL GROUP
Page 6
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
5.5 Manufacturer
Sanity International Group
402#, Tower-1, Pearl Mansion, Block-3, Rui’an city, Zhejiang Province, China
Website:www.saintyco.com
Email:sainty@saintyco.com
Tel:(86)0577-66612826
5.6 Requirements
5.6.1 Every validation results shall be truly and integrally filled in the Operational Qualification
Report OQR, this manual has provided a template of OQR.
5.6.2 Inspector and checker will decide whether the validation results are up to scratch, OQR
shall clearly indicate whether the validation has been passed. Inspector and checker shall sign
and record the date on the related chapters and sections; putting a tick as signature is
forbidden. On places that are not suitable to the system, please use N/A for indicating and
write the reason the suitable place.
5.6.3 The inspection file shall be kept as part of the inspection records, all the main accidents
should be recorded on the inspection file, such as system damages or failures causing the stop
of the inspection.
5.6.4 A group (or a day) of validation accomplished, validation group shall summarize briefly
the formed results or datum and shall conclude it (including inspection datum which are not up
to standard).
5.6.5 All deviations appeared during validation shall be recorded in the Deviation Report (DR).
5.6.6 After analyzing inconsistent items and deviations, they shall be validated again; this
validation can used actual protocol or change for another mode of qualification.
5.6.7 Every validation finished, results or records shall be analyzed again to form the
Operational Qualification Report. The Report should explicitly mention whether this validation
has been passed or not.
5.6.8 All the records, IQR, DR and the lastly formed Operational Qualification Report shall be
arranged, filled in a document for archiving and should be kept and saved as part of the
equipment dossier
SAINTY INTERNATIONAL GROUP
Page 7
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
6. Validation Procedures and Records
6.1 Documents Qualification
Purpose:
Qualify the documents pursuant to operational qualification of the blender system are fully
valid.
Procedure
Check carefully the following documents and qualify their integrality and
validity:
HZD1500 Bin Blender Product Manual
Electric configuration list
Qualification standard
The above applicable documents are the newest editions of the related system
Record
Record the validation result in OQR01;
Record deviation appeared during the qualification process in the deviation report.
6.2 IQ Qualification
Purpose
Qualify the IQ has been successfully executed and approved.
Procedure
Qualify the IQ document exists and has been executed and approved, moreover
errors have been clearly indicated. All the IQ errors shall have been evaluated and
ensured that these errors won’t influence the results of OQ.
Qualification standard
IQ has been executed and approved; moreover all the IQ errors that may influence
the OQ results have been treated or clearly indicated.
Record
Record the validation result in OQR02;
Record deviation appeared during the qualification process in the deviation report.
6.3 Manual setting and calling of blending technical procedures (Parameters)
Purpose
SAINTY INTERNATIONAL GROUP
Page 8
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
Qualify the technical procedures management (Setting and calling) of the blender
system complies with requirements of technical management for blending operation.
Procedure
Refer to the product manual or draft SOP operation and check the following items of
OQ:
A) Setting contents of technical procedures:
 Technical procedures/Medicine name
 Blending time
 Blending speed
 Storage code
B) Number of pre-set technical procedure groups
C) Qualification of calling of technical procedure
Acceptable standard
The technical procedures management (Setting and calling) of the blender system
complies with requirements of technical management for blending operation.
Record
Record the validation result in OQR03;
Record deviation appeared during the qualification process in the deviation report.
6.4 Clamping and dismantling of the Bin
Purpose
Qualify the clamping and dismantling of the bin complies with requirements for
operation and running.
Procedure
According to “Product manual” or “Operation SOP”, qualify clamping and dismantling
tasks of the bin:
 Connection of the bin to the main machine
 Operation process of the bin
 Qualification of bin in position
Qualification standard
The clamping and dismantling of the bin complies with requirements for operation
and running.
SAINTY INTERNATIONAL GROUP
Page 9
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
Record
Record the validation result in OQR04;
Record deviation appeared during the qualification process in the deviation report.
6.5 Auto lifting and falling of the bin
Purpose
Qualify the process and the stability of the auto lifting and falling of the bin comply
with URS and DQ requirements.
Procedure
Refer to the product manual or draft SOP operation and check the following items of
OQ:
 Lifting reducer
 Lifting screw-nut pairs
Acceptable standard
The process and the stability of the auto lifting and falling of the bin comply with URS
and DQ requirements.
Record
Record the validation result in OQR05;
Record deviation appeared during the qualification process in the deviation report.
6.6 Operational Qualification of rotary blending
Purpose
Qualify the operational reliability and stability of blender comply with design
requirements.
Procedure
Refer to the product manual or draft SOP operation and check the following items of
OQ:
 Blending reducer
 Blending time
 Blending speed
 Stability of the blending process
Acceptable standard
The operational reliability and stability of blender comply with design requirements.
SAINTY INTERNATIONAL GROUP
Page 10
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
Record
Record the validation result in OQR06;
Record deviation appeared during the qualification process in the deviation report.
6.7 Qualification of the bin positioning
Purpose
Qualify, on blending finishing, the correct positioning of the bin complies with design
requirements.
Procedure
Refer to the product manual or draft SOP operation, execute:
 Manual positioning
 Auto positioning
 Positioning after a manual stop of the process
Acceptable standard
The reproducibility of the bin positioning is fine and in every condition the bin can be
positioned in the same state.
Record
Record the validation result in OQR07;
Record deviation appeared during the qualification process in the deviation report.
6.8 Printing of technical records
Purpose
Qualify the printing of technical records complies with requirements for management
of batch number and quality traceability.
Procedure
Refer to the product manual or draft SOP operation, qualify
 Instant printing after blending is finished
 Reading and printing of historic records
Acceptable standard
The printing of technical records complies with requirements for management of
batch number and quality traceability, and is consistent with product manual or SOP
descriptions.
SAINTY INTERNATIONAL GROUP
Page 11
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
Record
Record the validation result in OQR08;
Record deviation appeared during the qualification process in the deviation report.
6.9 System protection
Purpose
Qualify the system protection of the blender complies with safety
requirements.
Procedure
Qualify the following items:
 Emergency stop
 Operation interruption
 Alarms
 Mechanical safety
Acceptable standard
The system protection of the blender complies with safety requirements.
Record
Record the validation result in OQR09;
Record deviation appeared during the qualification process in the deviation report.
6.10 Qualification of the functions of the touch panel
Purpose
Qualify the functions of the touch panel are consistent with pre-qualified
contents.
Procedure
Qualify the following items:
 Touch panel
 Buttons
Acceptable standard
The functions of the touch panel are consistent with pre-qualified contents.
Record
Record the validation result in OQR10;
Record deviation appeared during the qualification process in the deviation report.
SAINTY INTERNATIONAL GROUP
Page 12
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
6.11 Training
Purpose
Qualify the relative personnel has the suitable capacity for the system using, servicing
and daily management.
Procedure
Check the training plan and implementation record of the personnel for the system
using, servicing and daily management, qualify they have received effective training.
Acceptable standard
The personnel for the system using, servicing and daily management has received
effective training, and has the suitable capacity.
Record
Record the validation result in OQR11;
Record deviation appeared during the qualification process in the deviation report.
6.12 Attached page of the records
If the main record pages are not enough, the record like OQR12 can be used, then give a
clear indication of the title of the number and Qualification record reference.
Deviations
7.1 Deviations list
Collect all the deviations appeared during the OQ activities to form the deviations list and
indicate date of solution.
7.2 Deviations report
Record all the deviations and their management occurred during the protocol execution
process and analyze their effects on Validation conclusion.
Record the records contents, cause analysis, improved situations and effects on
Validation conclusion in the deviations report.
8. Attachments list
Collect all related documents, records, videos. CDs, use them as attachments for the
validation report. Compile the attachment list, specify the pages and use conditions.
SAINTY INTERNATIONAL GROUP
Page 13
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
9. OQ Evaluation of OQ results and suggestions
Collect all records and reports of chapters 6, 7 and 8. Validation group uses procedures
below to evaluate the results and to put forward some suggestions:
 Check the review of the qualification process
 Check and analyze the records
 Check and analyze the deviations report
 Draft out the conclusion
 Discuss and approve the report
10. Checking and Approval
Report is checked and approved by authorized person.
Validation Report and its attachments shall be arranged, filled in a document for archiving
and should be kept and saved as part of the equipment dossier.
Appendix I have provided an example of Operational Validation Report.
11. Alteration control
Any change of the equipment must be checked and approved by both parts, and then
changed files should be archived.
SAINTY INTERNATIONAL GROUP
Page 14
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender
Record No. OQR:01 Manufacturer SAINTYCO
Qualify/Date Check/Date
name:Documents Qualification
Document name
(PASS) (FAIL) (N/A)
Product Manual
Electric configuration list
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 15
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender
Record No. OQR02 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:IQ Qualification
NO. Description Expected result Measured result Conclusion
1 Qualify the IQ document exists and
has been executed and approved,
moreover errors have been clearly
indicated. All the IQ errors shall
have been evaluated and ensured
that these errors won’t influence the
results of OQ.
□ PASS
□ FAIL
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 16
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender
Record No. OQR:03 Manufacturer SAINTYCO
Qualify/Date Check/Date
Manual setting and calling of blending process procedures (Parameters)
Item Description Conclusion
Contents of process
procedure setting
Process procedure/Medicine name: 10 numbers or
letters code
□Yes □No
Blending time: can be set at will 1~60 min. □Yes □No
Blending rotation speed: 3~15rpm □Yes □No
Storage code:0~49 □Yes □No
Number of pre-set process
procedure groups
50 Groups □Yes □No
Calling of process
procedure
Input process procedure code: confirm a group
between 0~49
□Yes □No
Confirmation of the technical parameter in the menu □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 17
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:04 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name: Clamping and dismantling of the bin
Item Description Conclusion
Checking of the bin Bin is covered with a lid and clamped with a hook,
butterfly valve is closed
□Yes □No
Connection of the bin to
the main machine
The bin is pushed into rotary frame, four legs of the bin
are aligned with the clamping devices on chassis of
rotary frame
□Yes □No
Clamp in place process
2/3 area of the stacking plate at the bottom of bin is
reliably pressed when clamped
□Yes □No
Clamp sensor receives signal that bin is clamped in
place and will stop
□Yes □No
Lowered in place
qualification
When lowered in place, motor will auto stop □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 18
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender
Record No. OQR:05 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:Qualification of auto lifting and falling
Item Description Conclusion
Lifting motor Stable operation of motor, operation without oil leakage □Yes □No
Screw-nut pairs Continuous Bin lifting and falling without any block □Yes □No
Operation noise on fully loaded □Yes □No
standard value measured value
≤75dB(A)
Positioning
confirmation
Sensors of the clamping device sends stop signal when bin
clamped in position
□Yes □No
Bin fallen to ground position, motor stops automatically □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 19
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:06 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name: Operational Qualification of rotary blending
Item Description Conclusion
Blending reducer
Continuous stabile of operation current, the current is not more than
110% of the rated value of the motor ( )A
□Yes □No
Operation of reducer without oil leakage or abnormal noise □Yes □No
After 20min continuous operation, temperature rise at the middle of
the motor housing is not more than 35°
□Yes □No
Blending time
Mixing time:1~60min, time deviation is within the 3% of set value; for
example: on empty load condition: set one mixing speed, and use
several different mixing time , measured with stopwatch
□Yes □No
set value measured valve
10min
30min
60min
Stability of
blending process
On blending operation, left/right frames haven’t obvious vibration □Yes □No
There’s no displacement of the bin the rotary frame □Yes □No
Blending speed
Rotation speed is 3~15r/min, when without load, bin rotates
10 circle with rotation speed 3 r/min, and work out its rotation speed
□Yes □No
setting value:3 r/min actual value
Rotation speed is 3~15r/min, when without load, bin rotates
10 circle with rotation speed 8 r/min, and work out its rotation speed
□Yes □No
setting value:8 r/min actual value
Rotation speed is 3~15r/min, when without load, bin rotates
10 circle with rotation speed 15 r/min, and work out its rotation speed
□Yes □No
setting value:15 r/min actual value
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 20
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:07 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:Qualification of bin positioning
Item Description Conclusion
Auto positioning
On auto operation ending, bin auto positions to
original blending position
□Yes □No
After positioning, check visually the rotary frame is
vertical to the ground
定位转速 Positioning rotation speed: 3rpm
Positioning after a manual
process stop
After manual stop of auto procedure, manual
positioning can be used
□Yes □No
After positioning, check visually the rotary frame is
vertical to the ground
Positioning rotation speed: 3rpm
Manual positioning
On failure of auto positioning, use manual
positioning
□Yes □No
After positioning, check visually the rotary frame is
vertical to the ground
Positioning rotation speed: 3rpm
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 21
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:08 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name: Printing of technical records
Item Description Conclusion
Instant printing on
blending finishing
Date, format like ××××Y××M××D □Yes □No
Operator code, 4 letters or numbers □Yes □No
Medicine name, 10 letters or numbers □Yes □No
Medicine batch number, 10 letters or numbers □Yes □No
Blending time, ××min. □Yes □No
Blending speed, ××rpm
□Yes □No
Reading of historic
record
Can auto record the latest 20 groups of auto operation □Yes □No
On records searching menu, records can searched and
printed
□Yes □No
Printing of historic
record
Instant printing on printing content order □Yes □No
Date is the blending date □Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 22
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:09 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name: System protection
Item Description Conclusion
Emergency stop
Emergency stops are set on main operation panel and left frame □Yes □No
Press the emergency stop switch to stop the whole operation □Yes □No
On pressing the emergency stop switch, alarm device executes
acoustic and optical alarm
□Yes □No
On pressing the emergency stop switch, touch panel displays
“Emergency Stop” menu
□Yes □No
Operation
interruption
Human interruption (like emergency stop, system suspend),
touch panel displays relative menu
□Yes □No
Start after power-cut, touch panel displays “System power off”
menu
□Yes □No
Resume interruption, system indicates with acoustic and optic
alarm
□Yes □No
Alarms
On pressing the emergency stop, system alarms □Yes □No
Mechanical protection guardrail is carried out by the
photoelectric switch
□Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 23
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:10 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name: Qualification of functions of the touch panel
Item Description Conclusion
Touch panel Start system, background light lights; stop system,
background light extinguishes
□Yes □No
Button
Operation
buttons
Choosing a button of the panel, relative operation menu
shall appear, such as operation option, auto, manual and
so on; it shall be consistent with expected design.
□Yes □No
Printing
button
Printing button of touch panel, the printer prints all the
stored datum(operator No., print date, batch No….related
print see TR08 )
□Yes □No
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 24
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:11 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name: Training
Training project name Training project No.
Training record No.
Training contents
 Equipment system and basic machine configuration
knowledge training
 System work principle training
 SOP training
 System daily management and maintenance knowledge
training
 Other knowledge
Evaluation of training effects Operators, equipment administrant and maintenance
personnel control the knowledge and skill of their own
job requirements.
Conclusion
Other:
Any deviation? □(YES) □(NO)
Deviation recorded in DR, DR No. is:DR
Recorder Checker Checker Checker
Signature
Date
SAINTY INTERNATIONAL GROUP
Page 25
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:12 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:Attached page of the record
Record No. OQR Record name Pages
Total pages:
Page No.
OQR of HZD1500 Bin Blender Record No. OQR:13 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:Deviations list
Deviation No. Qualification
record No.
Description Date of solution
OQR of HZD1500 Bin Blender Record No. OQR:14 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:Deviations report
Deviation No. Record No.
Déviations description:
Signature Date
Reason analysis:
Signature Date
Improvement measure: Improvement result:
Signature/Date Signature/Date
Improvement results have positive effects on
operation validation
Yes No
SAINTY INTERNATIONAL GROUP
Page 26
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQR of HZD1500 Bin Blender Record No. OQR:16 Manufacturer SAINTYCO
Qualify/Date Check/Date
Name:Checking and Approval of the execution
Check the OQ results and original data, then form the ultimate conclusion of the OQ:
PASS □ FAIL □
If there’s still unsolved deviations, please fill down the following content:
Qualify if these unsolved deviations may influence the ultimate conclusion of the OQ.
YES □ NO □
Note:
Executed by
Signature Signature
Checked by
Signature Signature
Checked by
Signature Signature
AppendixⅠ: OQ results evaluation and suggestion
SAINTY INTERNATIONAL GROUP
Page 27
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
OQ Result Evaluation and Suggestion
1. Purpose
This is to set the evaluation of the HZD1500 Bin Blender, and to conclude if the activities of OQ
meet equipment requirements, and if the Equipment qualification can be concluded and
suggested.
2. Scope
 Operational Qualification of the HZD1500 Bin Blender manufactured by SAINTYCO
installed in Room , ID No.
 The contents of this validation document refer to the equipment, testing steps,
specifications, documentation. This information will be used to ensure that the
blender has been installed, operated and run according to the user’s design
specifications and company’s requirements.
 This document is compiled by SAINTYCO, and then the related approval signature,
supporting documents and other documentation will be included. Any supporting
datum and documentation shall be attached to the inspection report.
3. Summary
The validation of this equipment activities have been done according to the procedure
requirements of the Company (Management regulations of equipment validation), the
validation group proceeds according to the validation protocol of the HZD1500 Bin Blender.
The protocol should have the entire OQ validated and results of the checking listed. By the
validation process, the checking and auditing of the reports and deviations reports, qualify that
the protocol, during the implementation process, has no modification, is real and complete and
accords with requirements of the protocol.
The validation group, after has discussed, approves the Operational Qualification (OQ) of the
Bin Blender.
SAINTY INTERNATIONAL GROUP
Page 28
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
4. Qualification record
No. Item Evaluation and analysis
1
OQR1:
PASS□ FAIL□ N/A□
2
OQR2:
PASS□ FAIL□ N/A□
3
OQR3:
PASS□ FAIL□ N/A□
4
OQR4:
PASS□ FAIL□ N/A□
5
OQR5:
PASS□ FAIL□ N/A□
6
OQR6:
PASS□ FAIL□ N/A□
7
OQR7:
PASS□ FAIL□ N/A□
8
OQR8:
PASS□ FAIL□ N/A□
9
OQR9:
PASS□ FAIL□ N/A□
10
OQR10:
PASS□ FAIL□ N/A□
11
OQR11:
PASS□ FAIL□ N/A□
12
OQR12:
PASS□ FAIL□ N/A□
13
OQR13:
PASS□ FAIL□ N/A□
14
OQR14:
PASS□ FAIL□ N/A□
15
OQR15:
PASS□ FAIL□ N/A□
16
OQR16:
PASS□ FAIL□ N/A□
Conclusion
Activities of the Operational Qualification accord with the requirements of the
protocol, operation of the Bin Blender accords with standards of the equipment and
design, industrial manufacturing and GMP requirements. And can go to the next step
activities and equipment validation or equipment trial operation.
SAINTY INTERNATIONAL GROUP
Page 29
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
5. Results evaluation and suggestions
The group, after has checked the content report of the equipment validation and has discussed,
approves that the Operational Qualification (OQ) of the equipment accords with the
requirements of the protocol, thus Performance Qualification (PQ) of the equipment can be
performed.
By the validation process, the checking and auditing of the reports and deviations reports,
qualify that contents related to the OQ of the protocol, during the implementation process,
have not been modified, records are real and complete. The members of the validation group,
after have discussed, declares unanimously that activities of the Operational Qualification
accord with the requirements of the protocol, operation of the Bin Blender accords with
standards of the equipment and design, blender system accords with industrial manufacturing
and GMP requirements. And can go to the next step activities and equipment validation or
equipment trial operation.
6. List of signatures of validation group members (Brief)
7. Signatures
Executed by _
Signature
Date
(dd/mm/yyyy)
Checked by ____________________________ __________________
Signature
Date
(dd/mm/yyyy)
Checked by ____________________________ __________________
Signature
Date
(dd/mm/yyyy)
SAINTY INTERNATIONAL GROUP
Page 30
JN/JS/OQ-HZD1500
Operational Qualification Protocol for HZD1500 Bin Blender Version:V01
AC Alternating current
A Ampere
V Volt
Hz Hertz
PLC Programmable Logic Controller
ºC Degrees Celsius
DQ Design Qualification
IQ Installation Qualification
OQ Operational Qualification
PQ Performance Qualification
FAT Factory Acceptance Test
SAT Site Acceptance Test
DQR Design Qualification Report
IQR Installation Qualification Record
OQR Operational Qualification Record
PQR Performance Qualification Record
DR Deviation Report
N/A Not Applicable
SOP Standard Operating Procedure
RSD Relative Standard Deviation
HZD1500 bin blender oq documents

Contenu connexe

Tendances

BPR review and batch release
BPR review and batch release BPR review and batch release
BPR review and batch release Dr. Amsavel A
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationSagar Savale
 
Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)Atul Bhombe
 
Process Validation of API
Process Validation of APIProcess Validation of API
Process Validation of APIsrirao3462
 
Special Provisions of Pharmaceutical Plant Layout
Special Provisions of Pharmaceutical Plant LayoutSpecial Provisions of Pharmaceutical Plant Layout
Special Provisions of Pharmaceutical Plant LayoutSaikat Bagchi
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentPRANJAY PATIL
 
Process Validation of Liquid Orals
Process Validation of Liquid OralsProcess Validation of Liquid Orals
Process Validation of Liquid OralsAasawaree Yadav
 
SaintyCo HZD 1500 IBC Bin Blenders FAT Documents
SaintyCo HZD 1500 IBC Bin Blenders  FAT DocumentsSaintyCo HZD 1500 IBC Bin Blenders  FAT Documents
SaintyCo HZD 1500 IBC Bin Blenders FAT DocumentsTony Zeng
 
Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.nenalandim
 
Non sterile manufacturing process technology
Non sterile manufacturing process technologyNon sterile manufacturing process technology
Non sterile manufacturing process technologyPRANJAY PATIL
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Apoorva Bauskar
 
PROBLEMS ENCOUNTERED COATING TECHNOLOGY
PROBLEMS ENCOUNTERED COATING TECHNOLOGYPROBLEMS ENCOUNTERED COATING TECHNOLOGY
PROBLEMS ENCOUNTERED COATING TECHNOLOGYPRATIKKUMARMORE
 
SUPAC, BACPAC, Post Marketing Surveillance
SUPAC, BACPAC, Post Marketing SurveillanceSUPAC, BACPAC, Post Marketing Surveillance
SUPAC, BACPAC, Post Marketing SurveillanceMANIKANDAN V
 

Tendances (20)

BPR review and batch release
BPR review and batch release BPR review and batch release
BPR review and batch release
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
ISPE Good manufacturing practice
ISPE Good manufacturing practiceISPE Good manufacturing practice
ISPE Good manufacturing practice
 
Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)
 
Process Validation of API
Process Validation of APIProcess Validation of API
Process Validation of API
 
Water system validation
Water system validationWater system validation
Water system validation
 
Special Provisions of Pharmaceutical Plant Layout
Special Provisions of Pharmaceutical Plant LayoutSpecial Provisions of Pharmaceutical Plant Layout
Special Provisions of Pharmaceutical Plant Layout
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
TRS 957 (2010) - Annex 3 - WHO GMP for pharmaceutical products containing haz...
TRS 957 (2010) - Annex 3 - WHO GMP for pharmaceutical products containing haz...TRS 957 (2010) - Annex 3 - WHO GMP for pharmaceutical products containing haz...
TRS 957 (2010) - Annex 3 - WHO GMP for pharmaceutical products containing haz...
 
ICH Q7 GMP for API
ICH Q7 GMP for APIICH Q7 GMP for API
ICH Q7 GMP for API
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Process Validation of Liquid Orals
Process Validation of Liquid OralsProcess Validation of Liquid Orals
Process Validation of Liquid Orals
 
SaintyCo HZD 1500 IBC Bin Blenders FAT Documents
SaintyCo HZD 1500 IBC Bin Blenders  FAT DocumentsSaintyCo HZD 1500 IBC Bin Blenders  FAT Documents
SaintyCo HZD 1500 IBC Bin Blenders FAT Documents
 
Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.Qualification Of Bag Sealer.Finalpdf.
Qualification Of Bag Sealer.Finalpdf.
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Non sterile manufacturing process technology
Non sterile manufacturing process technologyNon sterile manufacturing process technology
Non sterile manufacturing process technology
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
PROBLEMS ENCOUNTERED COATING TECHNOLOGY
PROBLEMS ENCOUNTERED COATING TECHNOLOGYPROBLEMS ENCOUNTERED COATING TECHNOLOGY
PROBLEMS ENCOUNTERED COATING TECHNOLOGY
 
SUPAC, BACPAC, Post Marketing Surveillance
SUPAC, BACPAC, Post Marketing SurveillanceSUPAC, BACPAC, Post Marketing Surveillance
SUPAC, BACPAC, Post Marketing Surveillance
 
GMP REQUIREMENTS
GMP REQUIREMENTSGMP REQUIREMENTS
GMP REQUIREMENTS
 

Similaire à HZD1500 bin blender oq documents

ASME-V-2019.pdf
ASME-V-2019.pdfASME-V-2019.pdf
ASME-V-2019.pdfBCEDe1
 
Supplier-PPAP-Manual.pdf
Supplier-PPAP-Manual.pdfSupplier-PPAP-Manual.pdf
Supplier-PPAP-Manual.pdfPhanHngBin
 
MANUAL DE SERVIÇO RICOH MP-1500
MANUAL DE SERVIÇO RICOH MP-1500MANUAL DE SERVIÇO RICOH MP-1500
MANUAL DE SERVIÇO RICOH MP-1500Ciclone Andrade
 
How to register and update godiag v600 bmw scanner
How to register and update godiag v600 bmw scannerHow to register and update godiag v600 bmw scanner
How to register and update godiag v600 bmw scannerOBD365
 
ASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdfASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdfEduardoGuzmn55
 
Blomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdfBlomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdfssuser78bec11
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draftignitetribes
 
Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversWiroj Kaewkan
 
GM9907-LB batching controller User’s Manual
GM9907-LB batching controller User’s ManualGM9907-LB batching controller User’s Manual
GM9907-LB batching controller User’s ManualGeneral Measure
 
2140 api developer-student-guide
2140 api developer-student-guide2140 api developer-student-guide
2140 api developer-student-guideDarko Gicevski
 
Ocp cfops-terminology 2019v1.4
Ocp cfops-terminology 2019v1.4Ocp cfops-terminology 2019v1.4
Ocp cfops-terminology 2019v1.4ssusereb347d
 
Basic plumbing manual
Basic plumbing manualBasic plumbing manual
Basic plumbing manualberhanu taye
 

Similaire à HZD1500 bin blender oq documents (20)

DoD IAM
DoD IAMDoD IAM
DoD IAM
 
fifa
fifafifa
fifa
 
ASME-V-2019.pdf
ASME-V-2019.pdfASME-V-2019.pdf
ASME-V-2019.pdf
 
Supplier-PPAP-Manual.pdf
Supplier-PPAP-Manual.pdfSupplier-PPAP-Manual.pdf
Supplier-PPAP-Manual.pdf
 
MANUAL DE SERVIÇO RICOH MP-1500
MANUAL DE SERVIÇO RICOH MP-1500MANUAL DE SERVIÇO RICOH MP-1500
MANUAL DE SERVIÇO RICOH MP-1500
 
How to register and update godiag v600 bmw scanner
How to register and update godiag v600 bmw scannerHow to register and update godiag v600 bmw scanner
How to register and update godiag v600 bmw scanner
 
ASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdfASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdf
 
Nes 362
Nes 362Nes 362
Nes 362
 
Blomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdfBlomberg KWD2330X Service Manual.pdf
Blomberg KWD2330X Service Manual.pdf
 
Zabbix
Zabbix Zabbix
Zabbix
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
 
Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump drivers
 
KAIA Project Management Plan[1]
KAIA Project Management Plan[1]KAIA Project Management Plan[1]
KAIA Project Management Plan[1]
 
User Guide
User GuideUser Guide
User Guide
 
ASME-B16.49.pdf
ASME-B16.49.pdfASME-B16.49.pdf
ASME-B16.49.pdf
 
GM9907-LB batching controller User’s Manual
GM9907-LB batching controller User’s ManualGM9907-LB batching controller User’s Manual
GM9907-LB batching controller User’s Manual
 
2140 api developer-student-guide
2140 api developer-student-guide2140 api developer-student-guide
2140 api developer-student-guide
 
AUBTM-20 bluetooth module
AUBTM-20 bluetooth moduleAUBTM-20 bluetooth module
AUBTM-20 bluetooth module
 
Ocp cfops-terminology 2019v1.4
Ocp cfops-terminology 2019v1.4Ocp cfops-terminology 2019v1.4
Ocp cfops-terminology 2019v1.4
 
Basic plumbing manual
Basic plumbing manualBasic plumbing manual
Basic plumbing manual
 

Dernier

🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...
🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...
🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...Sheetaleventcompany
 
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...Dipal Arora
 
Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...
Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...
Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...Sheetaleventcompany
 
Difference Between Skeletal Smooth and Cardiac Muscles
Difference Between Skeletal Smooth and Cardiac MusclesDifference Between Skeletal Smooth and Cardiac Muscles
Difference Between Skeletal Smooth and Cardiac MusclesMedicoseAcademics
 
❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...
❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...
❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...Sheetaleventcompany
 
Call Girls Pune Just Call 9142599079 Top Class Call Girl Service Available
Call Girls Pune Just Call 9142599079 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9142599079 Top Class Call Girl Service Available
Call Girls Pune Just Call 9142599079 Top Class Call Girl Service AvailableSheetaleventcompany
 
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptxANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptxSwetaba Besh
 
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...Sheetaleventcompany
 
Kolkata Call Girls Shobhabazar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Gir...
Kolkata Call Girls Shobhabazar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Gir...Kolkata Call Girls Shobhabazar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Gir...
Kolkata Call Girls Shobhabazar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Gir...Namrata Singh
 
Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...
Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...
Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...Sheetaleventcompany
 
Hyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service Hyderabad
Hyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service HyderabadHyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service Hyderabad
Hyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service HyderabadSheetaleventcompany
 
Call 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room Delivery
Call 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room DeliveryCall 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room Delivery
Call 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room DeliveryJyoti singh
 
Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...
Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...
Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...Janvi Singh
 
Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...
Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...
Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...Sheetaleventcompany
 
Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...
Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...
Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...dishamehta3332
 
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...Sheetaleventcompany
 
Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...
Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...
Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...amritaverma53
 
❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...
❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...
❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...Sheetaleventcompany
 
(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...
(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...
(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...TanyaAhuja34
 
Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...
Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...
Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...gragneelam30
 

Dernier (20)

🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...
🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...
🍑👄Hyderabad Escorts Service☎️7783825323🍑👄 Call Girl service in Hyderabad☎️Hyd...
 
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
Bhawanipatna Call Girls 📞9332606886 Call Girls in Bhawanipatna Escorts servic...
 
Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...
Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...
Call Girl In Chandigarh 📞9809698092📞 Just📲 Call Inaaya Chandigarh Call Girls ...
 
Difference Between Skeletal Smooth and Cardiac Muscles
Difference Between Skeletal Smooth and Cardiac MusclesDifference Between Skeletal Smooth and Cardiac Muscles
Difference Between Skeletal Smooth and Cardiac Muscles
 
❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...
❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...
❤️Call Girl Service In Chandigarh☎️9814379184☎️ Call Girl in Chandigarh☎️ Cha...
 
Call Girls Pune Just Call 9142599079 Top Class Call Girl Service Available
Call Girls Pune Just Call 9142599079 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9142599079 Top Class Call Girl Service Available
Call Girls Pune Just Call 9142599079 Top Class Call Girl Service Available
 
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptxANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
 
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
Pune Call Girl Service 📞9xx000xx09📞Just Call Divya📲 Call Girl In Pune No💰Adva...
 
Kolkata Call Girls Shobhabazar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Gir...
Kolkata Call Girls Shobhabazar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Gir...Kolkata Call Girls Shobhabazar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Gir...
Kolkata Call Girls Shobhabazar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Gir...
 
Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...
Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...
Ahmedabad Call Girls Book Now 9630942363 Top Class Ahmedabad Escort Service A...
 
Hyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service Hyderabad
Hyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service HyderabadHyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service Hyderabad
Hyderabad Call Girls Service ❤️ 7783825323 Independent Escort Service Hyderabad
 
Call 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room Delivery
Call 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room DeliveryCall 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room Delivery
Call 8250092165 Patna Call Girls ₹4.5k Cash Payment With Room Delivery
 
Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...
Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...
Call Girls in Lucknow Just Call 👉👉 8875999948 Top Class Call Girl Service Ava...
 
Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...
Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...
Low Cost Call Girls Bangalore {9179660964} ❤️VVIP NISHA Call Girls in Bangalo...
 
Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...
Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...
Race Course Road } Book Call Girls in Bangalore | Whatsapp No 6378878445 VIP ...
 
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
❤️Amritsar Escorts Service☎️9815674956☎️ Call Girl service in Amritsar☎️ Amri...
 
Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...
Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...
Call Girl in Chennai | Whatsapp No 📞 7427069034 📞 VIP Escorts Service Availab...
 
❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...
❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...
❤️Panchkula Call Girls☎️9809698092☎️ Call Girl service in Panchkula☎️ Panchku...
 
(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...
(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...
(RIYA)🎄Airhostess Call Girl Jaipur Call Now 8445551418 Premium Collection Of ...
 
Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...
Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...
Call Girls Bangalore - 450+ Call Girl Cash Payment 💯Call Us 🔝 6378878445 🔝 💃 ...
 

HZD1500 bin blender oq documents

  • 1. HZD1500 Bin Blender SAINTYCO INTERNATIONAL GROUP Serial No: 170205 Year of Mfg: 2017.02 PART3: General Part _ Operation Qualification (GP- OQ) Equipment: Bin Blender, Machine No.: HZD1500 HZD1500 BIN BLENDER Operational Qualification (OQ) Protocol
  • 2. SAINTY INTERNATIONAL GROUP Page 1 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 Writer‘s signature Your signature indicates that the preparation of this file (Edit/Revision) complies with the validation project of the equipment operational requirements of GMP and industrial production process for bin blender. It also fully reflects the necessary tasks that shall be completed during the validation procedure, and it can implement the Operational Validation of the HZD1500 Bin Blender. Name Title Signature Date Unit Kevin Project manager April 1st ,2017 SAINTYCO Checker‘s signature Your signature indicates you have carefully read this document and have confirmed its exactness and this document fully reflects the validation tasks, and it can implement the Operational Validation of the HZD1500 Bin Blender. Name Title Signature Date Unit Wenju Pei Technician April 1st ,2017 SAINTYCO Approver’s signature Your signature indicates that this document complies with the general plan of enterprise validation, the technical production standards all the including files and information are sufficient and can be directly applied. After the approval, any modification or correction to the aim of this document or to the validation standard must be done in improving this document, and before the execution of the modified/corrected document, it must be approved Name Title Signature Date Unit Lei Zhang Technical Manager April 1st ,2017 SAINTYCO
  • 3. SAINTY INTERNATIONAL GROUP Page 2 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 TABLE OF CONTENTS 1 PURPOSE.......................................................................................................................................................... 4 2 VALIDATION SCOPE...........................................................................................................................................4 3 PROTOCOL CHECKING..................................................................................................................................... 4 4 ORGANIZATION AND RESPONSIBILITIES.......................................................................................................... 4 5 SYSTEM DESCRIPTION.....................................................................................................................................5 5.1 NAMEPLATE................................................................................................................................................... 5 5.2 MAIN FUNCTIONS...........................................................................................................................................5 5.3 TECHNICAL USE.............................................................................................................................................5 5.6 REQUIREMENTS.............................................................................................................................................6 6 VALIDATION PROCEDURES AND RECORDS................................................................................................... 7 6.1 DOCUMENTS QUALIFICATION........................................................................................................................7 6.2 IQ QUALIFICATION.........................................................................................................................................7 6.3 MANUAL SETTING AND CALLING OF BLENDING TECHNICAL PROCEDURES (PARAMETERS).......................7 6.4 CLAMPING AND DISMANTLING OF THE BIN.................................................................................................. 8 6.5 AUTO LIFTING AND FALLING OF THE BIN.......................................................................................................9 6.6 OPERATIONAL QUALIFICATION OF ROTARY BLENDING.................................................................................9 6.7 QUALIFICATION OF THE BIN POSITIONING..................................................................................................10 6.8 PRINTING OF TECHNICAL RECORDS...........................................................................................................10 6.9 SYSTEM PROTECTION................................................................................................................................. 11 6.10 QUALIFICATION OF THE FUNCTIONS OF THE TOUCH PANEL....................................................................11 6.11 TRAINING................................................................................................................................................... 12 6.12 ATTACHED PAGE OF THE RECORDS......................................................................................................... 12 7 DEVIATIONS...................................................................................................................................................12 7.1 DEVIATIONS LIST......................................................................................................................................... 12 7.2 DEVIATIONS REPORT...................................................................................................................................12 8 ATTACHMENTS LIST.......................................................................................................................................12 9 OQ EVALUATION OF OQ RESULTS AND SUGGESTIONS.......................................................................... 13 10 CHECKING AND APPROVAL..........................................................................................................................13 11 ALTERATION CONTROL..................................................................................................................................13 RECORD: DOCUMENTS QUALIFICATION.................................................................................................................................... 14 IQ QUALIFICATION...................................................................................................................................................... 15 MANUAL SETTING AND CALLING OF BLENDING PROCESS PROCEDURES (PARAMETERS) 错误!未定义书签。 CLAMPING AND DISMANTLING OF THE BIN...............................................................................................................17
  • 4. SAINTY INTERNATIONAL GROUP Page 3 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 QUALIFICATION OF AUTO LIFTING AND FALLING...................................................................................................... 18 OPERATIONAL QUALIFICATION OF ROTARY BLENDING............................................................................................19 QUALIFICATION OF BIN POSITIONING........................................................................................................................20 PRINTING OF TECHNICAL RECORDS......................................................................................................................... 21 SYSTEM PROTECTION................................................................................................................................................ 22 QUALIFICATION OF FUNCTIONS OF THE TOUCH PANEL...........................................................................................23 TRAINING..................................................................................................................................................................... 24 ATTACHED PAGE OF THE RECORD............................................................................................................................ 25 DEVIATIONS LIST.........................................................................................................................................................25 DEVIATIONS REPORT.................................................................................................................................................. 25 ATTACHMENTS LIST.....................................................................................................................错误!未定义书签。 CHECKING AND APPROVAL OF THE EXECUTION......................................................................................................26 APPENDIX; APPENDIXⅠ: OQ RESULTS EVALUATION AND SUGGESTION..............................................................................26
  • 5. SAINTY INTERNATIONAL GROUP Page 4 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 1.Purpose The purpose of this protocol is to provide guiding and technical standards to the operation qualification of the HZD1500 Bin Blender. This is to establish the validation protocol in order to obtain a document certifying that the HZD1500 Bin Blender has been operated according to operational requirements of bin blender. The acquisition of this document proves that the operation of the HZD1500 Bin Blender has been implemented according to the approved protocol. This protocol is the third part of the validation protocol of the HZD1500 Bin Blender: Operational Qualification (OQ). 2.Validation Scope Validation scope covers  functions,  operation procedures,  operation SOP,  training and other of the Bin Blender manufactured by SAINTYCO that is installed in Room ______________, ID No.______________ Validation does not include separated validation of historic data. 3.Protocol Checking At the following times, please check and ensure the suitability of this protocol:  When the principal part of the validation has been modified  When the validation scope has been modified  When the design has been modified  Prior to the execution of the OQ  During the review after the OQ has been completed 4.Organization and Responsibilities Define roles and responsibilities properly, according to their concrete division of labor. All the personal participating to the execution of this protocol must provide their sample of signature.
  • 6. SAINTY INTERNATIONAL GROUP Page 5 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 5.System Description 5.1 Nameplate  NAME: Blender  MODEL:HZD1500  POWER SUPPLY: 440V/60Hz  SPEED: 3~15r/min  RATED CAPACITY:1500L  POWER: 10.5 kW 5.2 Main functions  Manual clamping and dismantling of the bin  Auto lift and fall of the bin  Adjustable blending rotary speed between 3~15rpm  Blending finished, bin positions automatically  Blending finished, print technical record  Manual setting and calling of blending technical procedure (Parameters)  Failures alarms during automatic operation process 5.3 Technical use The equipment is mainly used for blending dried granules or powder. 5.4 Main technical parameters see Table B3-01 Table B3-01 Main technical parameters Model HZD1500 Adaptive bin type LDZ1500 LDZ1000-1500 LDZ500-1500 Capacity L 1500 1000 500 Working load kg 750 Working speed r/min 3~15 Mixing time min 1~60 Mixing motor power kW 7.5 Lifting motor power kW 3
  • 7. SAINTY INTERNATIONAL GROUP Page 6 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 5.5 Manufacturer Sanity International Group 402#, Tower-1, Pearl Mansion, Block-3, Rui’an city, Zhejiang Province, China Website:www.saintyco.com Email:sainty@saintyco.com Tel:(86)0577-66612826 5.6 Requirements 5.6.1 Every validation results shall be truly and integrally filled in the Operational Qualification Report OQR, this manual has provided a template of OQR. 5.6.2 Inspector and checker will decide whether the validation results are up to scratch, OQR shall clearly indicate whether the validation has been passed. Inspector and checker shall sign and record the date on the related chapters and sections; putting a tick as signature is forbidden. On places that are not suitable to the system, please use N/A for indicating and write the reason the suitable place. 5.6.3 The inspection file shall be kept as part of the inspection records, all the main accidents should be recorded on the inspection file, such as system damages or failures causing the stop of the inspection. 5.6.4 A group (or a day) of validation accomplished, validation group shall summarize briefly the formed results or datum and shall conclude it (including inspection datum which are not up to standard). 5.6.5 All deviations appeared during validation shall be recorded in the Deviation Report (DR). 5.6.6 After analyzing inconsistent items and deviations, they shall be validated again; this validation can used actual protocol or change for another mode of qualification. 5.6.7 Every validation finished, results or records shall be analyzed again to form the Operational Qualification Report. The Report should explicitly mention whether this validation has been passed or not. 5.6.8 All the records, IQR, DR and the lastly formed Operational Qualification Report shall be arranged, filled in a document for archiving and should be kept and saved as part of the equipment dossier
  • 8. SAINTY INTERNATIONAL GROUP Page 7 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 6. Validation Procedures and Records 6.1 Documents Qualification Purpose: Qualify the documents pursuant to operational qualification of the blender system are fully valid. Procedure Check carefully the following documents and qualify their integrality and validity: HZD1500 Bin Blender Product Manual Electric configuration list Qualification standard The above applicable documents are the newest editions of the related system Record Record the validation result in OQR01; Record deviation appeared during the qualification process in the deviation report. 6.2 IQ Qualification Purpose Qualify the IQ has been successfully executed and approved. Procedure Qualify the IQ document exists and has been executed and approved, moreover errors have been clearly indicated. All the IQ errors shall have been evaluated and ensured that these errors won’t influence the results of OQ. Qualification standard IQ has been executed and approved; moreover all the IQ errors that may influence the OQ results have been treated or clearly indicated. Record Record the validation result in OQR02; Record deviation appeared during the qualification process in the deviation report. 6.3 Manual setting and calling of blending technical procedures (Parameters) Purpose
  • 9. SAINTY INTERNATIONAL GROUP Page 8 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 Qualify the technical procedures management (Setting and calling) of the blender system complies with requirements of technical management for blending operation. Procedure Refer to the product manual or draft SOP operation and check the following items of OQ: A) Setting contents of technical procedures:  Technical procedures/Medicine name  Blending time  Blending speed  Storage code B) Number of pre-set technical procedure groups C) Qualification of calling of technical procedure Acceptable standard The technical procedures management (Setting and calling) of the blender system complies with requirements of technical management for blending operation. Record Record the validation result in OQR03; Record deviation appeared during the qualification process in the deviation report. 6.4 Clamping and dismantling of the Bin Purpose Qualify the clamping and dismantling of the bin complies with requirements for operation and running. Procedure According to “Product manual” or “Operation SOP”, qualify clamping and dismantling tasks of the bin:  Connection of the bin to the main machine  Operation process of the bin  Qualification of bin in position Qualification standard The clamping and dismantling of the bin complies with requirements for operation and running.
  • 10. SAINTY INTERNATIONAL GROUP Page 9 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 Record Record the validation result in OQR04; Record deviation appeared during the qualification process in the deviation report. 6.5 Auto lifting and falling of the bin Purpose Qualify the process and the stability of the auto lifting and falling of the bin comply with URS and DQ requirements. Procedure Refer to the product manual or draft SOP operation and check the following items of OQ:  Lifting reducer  Lifting screw-nut pairs Acceptable standard The process and the stability of the auto lifting and falling of the bin comply with URS and DQ requirements. Record Record the validation result in OQR05; Record deviation appeared during the qualification process in the deviation report. 6.6 Operational Qualification of rotary blending Purpose Qualify the operational reliability and stability of blender comply with design requirements. Procedure Refer to the product manual or draft SOP operation and check the following items of OQ:  Blending reducer  Blending time  Blending speed  Stability of the blending process Acceptable standard The operational reliability and stability of blender comply with design requirements.
  • 11. SAINTY INTERNATIONAL GROUP Page 10 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 Record Record the validation result in OQR06; Record deviation appeared during the qualification process in the deviation report. 6.7 Qualification of the bin positioning Purpose Qualify, on blending finishing, the correct positioning of the bin complies with design requirements. Procedure Refer to the product manual or draft SOP operation, execute:  Manual positioning  Auto positioning  Positioning after a manual stop of the process Acceptable standard The reproducibility of the bin positioning is fine and in every condition the bin can be positioned in the same state. Record Record the validation result in OQR07; Record deviation appeared during the qualification process in the deviation report. 6.8 Printing of technical records Purpose Qualify the printing of technical records complies with requirements for management of batch number and quality traceability. Procedure Refer to the product manual or draft SOP operation, qualify  Instant printing after blending is finished  Reading and printing of historic records Acceptable standard The printing of technical records complies with requirements for management of batch number and quality traceability, and is consistent with product manual or SOP descriptions.
  • 12. SAINTY INTERNATIONAL GROUP Page 11 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 Record Record the validation result in OQR08; Record deviation appeared during the qualification process in the deviation report. 6.9 System protection Purpose Qualify the system protection of the blender complies with safety requirements. Procedure Qualify the following items:  Emergency stop  Operation interruption  Alarms  Mechanical safety Acceptable standard The system protection of the blender complies with safety requirements. Record Record the validation result in OQR09; Record deviation appeared during the qualification process in the deviation report. 6.10 Qualification of the functions of the touch panel Purpose Qualify the functions of the touch panel are consistent with pre-qualified contents. Procedure Qualify the following items:  Touch panel  Buttons Acceptable standard The functions of the touch panel are consistent with pre-qualified contents. Record Record the validation result in OQR10; Record deviation appeared during the qualification process in the deviation report.
  • 13. SAINTY INTERNATIONAL GROUP Page 12 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 6.11 Training Purpose Qualify the relative personnel has the suitable capacity for the system using, servicing and daily management. Procedure Check the training plan and implementation record of the personnel for the system using, servicing and daily management, qualify they have received effective training. Acceptable standard The personnel for the system using, servicing and daily management has received effective training, and has the suitable capacity. Record Record the validation result in OQR11; Record deviation appeared during the qualification process in the deviation report. 6.12 Attached page of the records If the main record pages are not enough, the record like OQR12 can be used, then give a clear indication of the title of the number and Qualification record reference. Deviations 7.1 Deviations list Collect all the deviations appeared during the OQ activities to form the deviations list and indicate date of solution. 7.2 Deviations report Record all the deviations and their management occurred during the protocol execution process and analyze their effects on Validation conclusion. Record the records contents, cause analysis, improved situations and effects on Validation conclusion in the deviations report. 8. Attachments list Collect all related documents, records, videos. CDs, use them as attachments for the validation report. Compile the attachment list, specify the pages and use conditions.
  • 14. SAINTY INTERNATIONAL GROUP Page 13 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 9. OQ Evaluation of OQ results and suggestions Collect all records and reports of chapters 6, 7 and 8. Validation group uses procedures below to evaluate the results and to put forward some suggestions:  Check the review of the qualification process  Check and analyze the records  Check and analyze the deviations report  Draft out the conclusion  Discuss and approve the report 10. Checking and Approval Report is checked and approved by authorized person. Validation Report and its attachments shall be arranged, filled in a document for archiving and should be kept and saved as part of the equipment dossier. Appendix I have provided an example of Operational Validation Report. 11. Alteration control Any change of the equipment must be checked and approved by both parts, and then changed files should be archived.
  • 15. SAINTY INTERNATIONAL GROUP Page 14 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:01 Manufacturer SAINTYCO Qualify/Date Check/Date name:Documents Qualification Document name (PASS) (FAIL) (N/A) Product Manual Electric configuration list Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 16. SAINTY INTERNATIONAL GROUP Page 15 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR02 Manufacturer SAINTYCO Qualify/Date Check/Date Name:IQ Qualification NO. Description Expected result Measured result Conclusion 1 Qualify the IQ document exists and has been executed and approved, moreover errors have been clearly indicated. All the IQ errors shall have been evaluated and ensured that these errors won’t influence the results of OQ. □ PASS □ FAIL Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 17. SAINTY INTERNATIONAL GROUP Page 16 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:03 Manufacturer SAINTYCO Qualify/Date Check/Date Manual setting and calling of blending process procedures (Parameters) Item Description Conclusion Contents of process procedure setting Process procedure/Medicine name: 10 numbers or letters code □Yes □No Blending time: can be set at will 1~60 min. □Yes □No Blending rotation speed: 3~15rpm □Yes □No Storage code:0~49 □Yes □No Number of pre-set process procedure groups 50 Groups □Yes □No Calling of process procedure Input process procedure code: confirm a group between 0~49 □Yes □No Confirmation of the technical parameter in the menu □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 18. SAINTY INTERNATIONAL GROUP Page 17 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:04 Manufacturer SAINTYCO Qualify/Date Check/Date Name: Clamping and dismantling of the bin Item Description Conclusion Checking of the bin Bin is covered with a lid and clamped with a hook, butterfly valve is closed □Yes □No Connection of the bin to the main machine The bin is pushed into rotary frame, four legs of the bin are aligned with the clamping devices on chassis of rotary frame □Yes □No Clamp in place process 2/3 area of the stacking plate at the bottom of bin is reliably pressed when clamped □Yes □No Clamp sensor receives signal that bin is clamped in place and will stop □Yes □No Lowered in place qualification When lowered in place, motor will auto stop □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 19. SAINTY INTERNATIONAL GROUP Page 18 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:05 Manufacturer SAINTYCO Qualify/Date Check/Date Name:Qualification of auto lifting and falling Item Description Conclusion Lifting motor Stable operation of motor, operation without oil leakage □Yes □No Screw-nut pairs Continuous Bin lifting and falling without any block □Yes □No Operation noise on fully loaded □Yes □No standard value measured value ≤75dB(A) Positioning confirmation Sensors of the clamping device sends stop signal when bin clamped in position □Yes □No Bin fallen to ground position, motor stops automatically □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 20. SAINTY INTERNATIONAL GROUP Page 19 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:06 Manufacturer SAINTYCO Qualify/Date Check/Date Name: Operational Qualification of rotary blending Item Description Conclusion Blending reducer Continuous stabile of operation current, the current is not more than 110% of the rated value of the motor ( )A □Yes □No Operation of reducer without oil leakage or abnormal noise □Yes □No After 20min continuous operation, temperature rise at the middle of the motor housing is not more than 35° □Yes □No Blending time Mixing time:1~60min, time deviation is within the 3% of set value; for example: on empty load condition: set one mixing speed, and use several different mixing time , measured with stopwatch □Yes □No set value measured valve 10min 30min 60min Stability of blending process On blending operation, left/right frames haven’t obvious vibration □Yes □No There’s no displacement of the bin the rotary frame □Yes □No Blending speed Rotation speed is 3~15r/min, when without load, bin rotates 10 circle with rotation speed 3 r/min, and work out its rotation speed □Yes □No setting value:3 r/min actual value Rotation speed is 3~15r/min, when without load, bin rotates 10 circle with rotation speed 8 r/min, and work out its rotation speed □Yes □No setting value:8 r/min actual value Rotation speed is 3~15r/min, when without load, bin rotates 10 circle with rotation speed 15 r/min, and work out its rotation speed □Yes □No setting value:15 r/min actual value Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 21. SAINTY INTERNATIONAL GROUP Page 20 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:07 Manufacturer SAINTYCO Qualify/Date Check/Date Name:Qualification of bin positioning Item Description Conclusion Auto positioning On auto operation ending, bin auto positions to original blending position □Yes □No After positioning, check visually the rotary frame is vertical to the ground 定位转速 Positioning rotation speed: 3rpm Positioning after a manual process stop After manual stop of auto procedure, manual positioning can be used □Yes □No After positioning, check visually the rotary frame is vertical to the ground Positioning rotation speed: 3rpm Manual positioning On failure of auto positioning, use manual positioning □Yes □No After positioning, check visually the rotary frame is vertical to the ground Positioning rotation speed: 3rpm Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 22. SAINTY INTERNATIONAL GROUP Page 21 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:08 Manufacturer SAINTYCO Qualify/Date Check/Date Name: Printing of technical records Item Description Conclusion Instant printing on blending finishing Date, format like ××××Y××M××D □Yes □No Operator code, 4 letters or numbers □Yes □No Medicine name, 10 letters or numbers □Yes □No Medicine batch number, 10 letters or numbers □Yes □No Blending time, ××min. □Yes □No Blending speed, ××rpm □Yes □No Reading of historic record Can auto record the latest 20 groups of auto operation □Yes □No On records searching menu, records can searched and printed □Yes □No Printing of historic record Instant printing on printing content order □Yes □No Date is the blending date □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 23. SAINTY INTERNATIONAL GROUP Page 22 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:09 Manufacturer SAINTYCO Qualify/Date Check/Date Name: System protection Item Description Conclusion Emergency stop Emergency stops are set on main operation panel and left frame □Yes □No Press the emergency stop switch to stop the whole operation □Yes □No On pressing the emergency stop switch, alarm device executes acoustic and optical alarm □Yes □No On pressing the emergency stop switch, touch panel displays “Emergency Stop” menu □Yes □No Operation interruption Human interruption (like emergency stop, system suspend), touch panel displays relative menu □Yes □No Start after power-cut, touch panel displays “System power off” menu □Yes □No Resume interruption, system indicates with acoustic and optic alarm □Yes □No Alarms On pressing the emergency stop, system alarms □Yes □No Mechanical protection guardrail is carried out by the photoelectric switch □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 24. SAINTY INTERNATIONAL GROUP Page 23 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:10 Manufacturer SAINTYCO Qualify/Date Check/Date Name: Qualification of functions of the touch panel Item Description Conclusion Touch panel Start system, background light lights; stop system, background light extinguishes □Yes □No Button Operation buttons Choosing a button of the panel, relative operation menu shall appear, such as operation option, auto, manual and so on; it shall be consistent with expected design. □Yes □No Printing button Printing button of touch panel, the printer prints all the stored datum(operator No., print date, batch No….related print see TR08 ) □Yes □No Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 25. SAINTY INTERNATIONAL GROUP Page 24 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:11 Manufacturer SAINTYCO Qualify/Date Check/Date Name: Training Training project name Training project No. Training record No. Training contents  Equipment system and basic machine configuration knowledge training  System work principle training  SOP training  System daily management and maintenance knowledge training  Other knowledge Evaluation of training effects Operators, equipment administrant and maintenance personnel control the knowledge and skill of their own job requirements. Conclusion Other: Any deviation? □(YES) □(NO) Deviation recorded in DR, DR No. is:DR Recorder Checker Checker Checker Signature Date
  • 26. SAINTY INTERNATIONAL GROUP Page 25 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:12 Manufacturer SAINTYCO Qualify/Date Check/Date Name:Attached page of the record Record No. OQR Record name Pages Total pages: Page No. OQR of HZD1500 Bin Blender Record No. OQR:13 Manufacturer SAINTYCO Qualify/Date Check/Date Name:Deviations list Deviation No. Qualification record No. Description Date of solution OQR of HZD1500 Bin Blender Record No. OQR:14 Manufacturer SAINTYCO Qualify/Date Check/Date Name:Deviations report Deviation No. Record No. Déviations description: Signature Date Reason analysis: Signature Date Improvement measure: Improvement result: Signature/Date Signature/Date Improvement results have positive effects on operation validation Yes No
  • 27. SAINTY INTERNATIONAL GROUP Page 26 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQR of HZD1500 Bin Blender Record No. OQR:16 Manufacturer SAINTYCO Qualify/Date Check/Date Name:Checking and Approval of the execution Check the OQ results and original data, then form the ultimate conclusion of the OQ: PASS □ FAIL □ If there’s still unsolved deviations, please fill down the following content: Qualify if these unsolved deviations may influence the ultimate conclusion of the OQ. YES □ NO □ Note: Executed by Signature Signature Checked by Signature Signature Checked by Signature Signature AppendixⅠ: OQ results evaluation and suggestion
  • 28. SAINTY INTERNATIONAL GROUP Page 27 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 OQ Result Evaluation and Suggestion 1. Purpose This is to set the evaluation of the HZD1500 Bin Blender, and to conclude if the activities of OQ meet equipment requirements, and if the Equipment qualification can be concluded and suggested. 2. Scope  Operational Qualification of the HZD1500 Bin Blender manufactured by SAINTYCO installed in Room , ID No.  The contents of this validation document refer to the equipment, testing steps, specifications, documentation. This information will be used to ensure that the blender has been installed, operated and run according to the user’s design specifications and company’s requirements.  This document is compiled by SAINTYCO, and then the related approval signature, supporting documents and other documentation will be included. Any supporting datum and documentation shall be attached to the inspection report. 3. Summary The validation of this equipment activities have been done according to the procedure requirements of the Company (Management regulations of equipment validation), the validation group proceeds according to the validation protocol of the HZD1500 Bin Blender. The protocol should have the entire OQ validated and results of the checking listed. By the validation process, the checking and auditing of the reports and deviations reports, qualify that the protocol, during the implementation process, has no modification, is real and complete and accords with requirements of the protocol. The validation group, after has discussed, approves the Operational Qualification (OQ) of the Bin Blender.
  • 29. SAINTY INTERNATIONAL GROUP Page 28 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 4. Qualification record No. Item Evaluation and analysis 1 OQR1: PASS□ FAIL□ N/A□ 2 OQR2: PASS□ FAIL□ N/A□ 3 OQR3: PASS□ FAIL□ N/A□ 4 OQR4: PASS□ FAIL□ N/A□ 5 OQR5: PASS□ FAIL□ N/A□ 6 OQR6: PASS□ FAIL□ N/A□ 7 OQR7: PASS□ FAIL□ N/A□ 8 OQR8: PASS□ FAIL□ N/A□ 9 OQR9: PASS□ FAIL□ N/A□ 10 OQR10: PASS□ FAIL□ N/A□ 11 OQR11: PASS□ FAIL□ N/A□ 12 OQR12: PASS□ FAIL□ N/A□ 13 OQR13: PASS□ FAIL□ N/A□ 14 OQR14: PASS□ FAIL□ N/A□ 15 OQR15: PASS□ FAIL□ N/A□ 16 OQR16: PASS□ FAIL□ N/A□ Conclusion Activities of the Operational Qualification accord with the requirements of the protocol, operation of the Bin Blender accords with standards of the equipment and design, industrial manufacturing and GMP requirements. And can go to the next step activities and equipment validation or equipment trial operation.
  • 30. SAINTY INTERNATIONAL GROUP Page 29 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 5. Results evaluation and suggestions The group, after has checked the content report of the equipment validation and has discussed, approves that the Operational Qualification (OQ) of the equipment accords with the requirements of the protocol, thus Performance Qualification (PQ) of the equipment can be performed. By the validation process, the checking and auditing of the reports and deviations reports, qualify that contents related to the OQ of the protocol, during the implementation process, have not been modified, records are real and complete. The members of the validation group, after have discussed, declares unanimously that activities of the Operational Qualification accord with the requirements of the protocol, operation of the Bin Blender accords with standards of the equipment and design, blender system accords with industrial manufacturing and GMP requirements. And can go to the next step activities and equipment validation or equipment trial operation. 6. List of signatures of validation group members (Brief) 7. Signatures Executed by _ Signature Date (dd/mm/yyyy) Checked by ____________________________ __________________ Signature Date (dd/mm/yyyy) Checked by ____________________________ __________________ Signature Date (dd/mm/yyyy)
  • 31. SAINTY INTERNATIONAL GROUP Page 30 JN/JS/OQ-HZD1500 Operational Qualification Protocol for HZD1500 Bin Blender Version:V01 AC Alternating current A Ampere V Volt Hz Hertz PLC Programmable Logic Controller ºC Degrees Celsius DQ Design Qualification IQ Installation Qualification OQ Operational Qualification PQ Performance Qualification FAT Factory Acceptance Test SAT Site Acceptance Test DQR Design Qualification Report IQR Installation Qualification Record OQR Operational Qualification Record PQR Performance Qualification Record DR Deviation Report N/A Not Applicable SOP Standard Operating Procedure RSD Relative Standard Deviation