Relief Line
Project Assessment
Coordinated Transit Consultation Program
Public Information Centre
June 13-25, 2015
Overview of Presentation
2
1. Coordination of Rapid Transit Studies
2. Overview of Key Studies
• GO RER/SmartTrack Background
• SmartTrack Eglinton West Feasibility Study
• Scarborough Subway Extension Project Assessment
3. Relief Line Project Assessment
Why are we here?
3
• We are seeking your opinions and comments on the work
currently underway.
• What we hear will be used to inform our work going forward.
• Sharing your thoughts is very important in order for the needs of
the community to be reflected in the final review.
• The best results will come by more people participating in and
contributing to the conversation. We need your input.
4
Coordination of
Rapid Transit
Studies
How is Network Transit Planning Coordinated?
5
• Metrolinx, the City and TTC are all working together
• Four major transit initiatives are interrelated:
• Other projects planned or under construction:
• Major projects are all interrelated and have a significant impact on the
overall transit network
‒ Connections between future projects and connections with existing lines will
form the foundation of an improved network
• We are currently in the process of undertaking the integrated
assessment of these projects through detailed ridership modelling
‒ Work on each project will inform the other analysis
‒ GO Regional Express Rail (RER)
‒ SmartTrack concept
‒ Scarborough Subway Extension
‒ Relief Line
‒ Finch West LRT
‒ Sheppard East LRT
‒ Toronto-York Spadina Subway Extension
‒ Eglinton Crosstown LRT
Public Engagement for Transit Planning Initiatives
6
7
Updated Transportation Model
• An updated transportation model will help us understand how each
project is related.
• Key features of the GTAModel V4.0 model system include:
– Covers the entire GTHA using 2011 TTS for the base data
– The model explicitly represents individuals and households
– The model considers how a person’s trips fit together instead of
considering each trip in individually
– Trips are modelled for entire 24-hour week-day time period (using five
time periods)
– The transit assignment model considers crowding on the system and fares
of different paths
• Critical timelines for modelling work:
June 2015 – Draft results of transportation modelling
– Report on employment land use modelling
July 2015 – Report on transportation modelling results
8
Timing
Current • Public consultation in June, 2015 on all projects
Mid/late
Summer
• Further analysis and assessment of options for each project
• Public consultation on project recommendations in
September, 2015
Fall • Report to Council October/November, 2015 on results and
public consultations and recommendations for next steps on
each project
Future
Work
• Issue Notice of Commencement for Final Project Review in
2016
Overview of Key Studies
 GO RER/SmartTrack
 SmartTrack Eglinton West Feasibility Study
 Scarborough Subway Extension Project Assessment
10
GO Regional Express Rail (RER)
• Over the next ten years, Metrolinx will introduce RER including 15-
minute, two-way, all-day transit service on most of the seven GO lines
(and significant service improvements on the other lines).
• Across the system, this will mean:
‒ Electrification of several corridors that will
reduce travel times by up to 20% and
reduce operating costs
‒ Four times the number of train trips
outside of rush hour and on weekends
‒ Twice the number of trips during rush hour
‒ Benefits for all 19 existing GO stations in
Toronto and the potential for new stations
‒ Infrastructure requirements of 150
kilometres of new, dedicated GO track and
dozens of new tunnels and bridges
11
RER and SmartTrack
• SmartTrack builds on RER and the existing GO network
– Proposes enhanced service on three existing corridors – Stouffville,
Lakeshore East, Kitchener
– Proposes a heavy rail corridor connecting Mount Dennis to the
Mississauga Airport Corporate Centre
• SmartTrack concept features
– Service frequency of 15 minutes or better
– All stop service in both directions
– TTC fare option
– Additional stations along the three existing GO corridors
– Electrified trains
• City Council has directed staff to further evaluate the SmartTrack
concept and report back
– This includes the Eglinton West SmartTrack Feasibility Review
12
The SmartTrack concept
builds on RER
SmartTrack Eglinton West Corridor – Objectives
13
• In February, 2015, City Council
directed staff to review the
feasibility of SmartTrack options
between Mt. Dennis Station and
the Mississauga Airport
Corporate Centre
• The first step is a high-level
feasibility review of various
options to connect Mount
Dennis station to the Mississauga
Airport Corporate Centre.
SmartTrack Eglinton West Corridor – Potential
Corridors and Conceptual Alignments
14
• Three corridor options will be tested for feasibility
– A continuous heavy rail spur connection from the Kitchener GO corridor
connection by way of Eglinton Avenue West
– A separate heavy rail corridor along Eglinton Avenue West with a transfer at
Mt Dennis
– A continuous heavy rail spur connection diverging from the existing GO
corridor somewhere in the vicinity of Highway 27 into the airport and south
to the Mississauga Airport Corporate Centre
• The feasibility of each alignment will be evaluated from the
following perspectives:
– Technical (i.e. design and engineering)
– Land use
– Regulatory and legislative
– Service concept (i.e. ability to integrate with other transit services)
– Financial
Note - All station location and alignment options
being considered are located within the study area.
Residents across Scarborough and the entire City
of Toronto will benefit from transit and
transportation network improvements created by
the Scarborough Subway Extension
Scarborough Subway Extension – Study Area
15
• Nine potential corridors have
been assessed
– Preliminary evaluation has
identified three best performing
• Consultation to-date:
– Two public meetings
– Stakeholder Advisory Group
– Interactive workshop
– Online consultation
• Looking for public feedback on:
– Existing conditions
– Short listed corridors
– Preliminary evaluation of
corridors
– Potential alignments and station
locations
Scarborough Subway Extension – Current Work
16
Relief Line
Project Assessment
18
Study Status
• In 2014, Relief Line Project Assessment launched to determine preferred
alignment and station locations
• In March 2015, public and stakeholder consultation was held to review
the long list of potential station options and draft evaluation criteria
WE ARE HERE
Focus of Today’s Consultation for the Relief Line
19
We are seeking feedback on:
1. Evaluation results of station location options
2. Four potential corridors connecting Downtown and Danforth Subway
• Relief Line is identified in The Big Move Regional
Transportation Plan and is a ‘Next Wave’ priority
project. No funding has yet been committed for the
Relief Line.
• YRNS and Relief Line Project Assessment are
complementary:
– Relief Line Project Assessment is determining a
preferred alignment between Downtown and Dnforth
through a comprehensive evaluation framework.
– YRNS/Metrolinx is examining timing for a relief line and
other regional network options to provide relief to the
Yonge subway.
Yonge Relief Network Study (YRNS)
20
• YRNS recognizes the importance the Relief Line in the context of the regional
transit network, as the Yonge Subway serves both local and regional travel demand.
• YRNS is being conducted in partnership with the City of Toronto, TTC, and York
Region.
21
Study Area
Note - All station location and
alignment options being considered are
located within the study area. Residents
from across the entire City of Toronto
will benefit from transit and
transportation network improvements
created by the Relief Line.
Evaluation Process
22
WE ARE HERE
SERVING PEOPLE
STRENGTHENING
PLACES
SUPPORTING
PROSPERITY
Evaluation criteria
based on principles
and criteria developed
during the Official Plan
Review process
“Feeling Congested?”
Evaluation Framework
23
What We Heard During March Consultations
Key Messages
• Relief Line needs to be part of an integrated transit network,
including connections to subway lines, streetcar system, SmartTrack,
and GO system
• Important to plan for future extension of the Relief Line to the north
and west
• Don’t tear up Queen and King Street during construction
• Protect neighbourhoods, parks and cultural heritage
• Look for ways that the Relief Line can provide opportunities for city
building and redevelopment around stations
• Link important destinations, including the Financial District, St.
Lawrence Market, City Hall, the Distillery District, Greektown, Gerrard
Square, and George Brown College
24
25
Results of
Potential Station
Areas Evaluation
Results of Potential Station Areas Evaluation
• 45 potential station areas
were identified and
evaluated
‒ In Downtown
‒ Along the Danforth
‒ Key activity areas, east
and west of the Don
River
• Preliminary evaluation
has identified those
station areas that would
best achieve objectives
for the project and the
communities
26
27
Key Station Evaluation Findings:
• Bay Street – close to area of high
employment density
• King / Wellington corridor stands out:
‒ Proximity to highest employment
density
‒ Ability to extend west along existing
public right-of-way
• Queen Street serves key destinations
such as the Eaton Centre, St. Michael’s
Hospital and City Hall
• Front Street / Union Station has high
existing pedestrian volumes
• Adelaide and Richmond are more
challenging to extend to the west
Downtown Stations
Downtown Stations
28
What We Heard During March Consultations
• Many respondents commented that Union Station is already congested
and that a different station should be considered for a Downtown
terminus
• Respondents noted that a Relief Line corridor on streets such as
Wellington, Richmond or Adelaide Streets would not disrupt streetcar
services
• Key destinations noted by respondents include the Financial District,
Eaton Centre, Ryerson University, City Hall, St. Michael’s Hospital
29
• The public rights-of-way to the north of
Greenwood would not allow for a straight
alignment following public rights-of-way
• Donlands and Chester have limited ability to
use existing public rights-of-way
• Carlaw and Jones would require lengthier
connections between the existing subway
station and the Relief Line
• Coxwell cannot directly reach Thorncliffe Park
along a future northern extension
Key Station Evaluation Findings
• Pape and Broadview stand out:
‒ High surface transit and walk-in
passenger volumes
‒ Designated as Avenues
‒ Ability to extend north following
existing public rights-of-way
‒ Can facilitate a future northern
extension to key destinations
such as Thorncliffe Park
Connection to the Danforth Subway
Connection to the Danforth Subway
30
What We Heard During March Consultations
• Pape Station received the vast majority of comments in support of a
connection to the Danforth Subway. Pape station has many key transit
connections and provides an amble opportunity for a northern
extension.
• There were many comments in support of Broadview Station as that
there is key surface transit connections and the potential to investigate
a future connection to the nearby Richmond Hill GO line.
• Respondents commented that redevelopment opportunities may exist
at Greenwood and Coxwell stations.
• Key destinations documented by respondents including Greektown,
Centennial College and Withrow Park.
31
Key Station Evaluation Findings:
• Pape / Gerrard has good
redevelopment potential and offers
opportunities for multiple connections
to existing and future transit
• Queen / Broadview has connections
with multiple streetcar routes and
supports redevelopment
opportunities
• Unilever site has good redevelopment
potential and opportunities to
connect to future transit; however,
there are technical challenges (such as
flood protection and soil
contamination)
• Queen / Degrassi and Queen / Jones
are physically constrained
East of the Don River
32
Key Station Evaluation Findings:
• Stations along Sherbourne have more
potential because of higher population
and employment densities
• A station at Regent Park addresses social
equity and could support redevelopment
• Front / Cherry serves areas of new
development and can provide surface
transit connections to the Portlands
• King / Cherry is physically constrained
with less redevelopment potential
• Lakeshore / Cherry and River / Queen
would be challenging to construct and
would have flooding risks
West of the Don River
What We Heard During March Consultations
East of the Don River
• The project team received broad support for stations at Gerrard Square and
the Unilever site
• There was strong support to not have a station at Queen/Degrassi due to
community concerns about impacts to nearby park space. This station
scored low on the technical evaluation and will not be carried forward
• Key destinations documented by respondents including Leslieville,
Chinatown, Bridgepoint Health and Gerrard Square
West of the Don River
• Respondents noted that the Relief Line could provide opportunities for city
building and redevelopment particularly in areas such as the West Donlands
• Important destinations noted by respondents include St. Lawrence Market
and George Brown College
East and West of the Don River
33
34
Potential
Corridors
Development of Potential Corridor Options
35
• Consider results of technical evaluation and public input
on potential station areas
• Determine best connecting stations in Downtown and to
Danforth Subway
• Identify best opportunities for future expansion to the
west and north
• Link key activity areas with highest potential, based on
city-building criteria
• Utilize public rights-of-way as much as possible to
minimize impacts to private property
• Consider technical requirements of subway operations
(e.g. curves, grades, trackwork)
Potential Corridors
36
• Four potential corridors have been
identified for further, more detailed
consideration:
 Corridor A – Broadview to Queen/Richmond
 Corridor B – Pape to Queen/Richmond
 Corridor C – Broadview to King/Wellington
 Corridor D – Pape to King/Wellington via Queen
• These corridors have the highest
potential to address the full range of
project objectives and city-building
criteria
• Potential corridors and their stations
will be further evaluated to identify a
preferred corridor
KEY MAP
Corridor A – Broadview to Queen/Richmond
37
• Provides service along the
Queen/Richmond corridor
with potential for inline
stations near:
– Broadview/Gerrard
(Bridgepoint Health)
– Regent Park
– Queen/Sherbourne (Moss
Park)
• Connection to the Danforth
Subway at Broadview
• Connection to the YUS Line
along Queen
• Provides service along the
Queen/Richmond corridor
with potential for inline
stations near:
– Gerrard Square (potential
connection to SmartTrack)
– Queen/Broadview Area
– Unilever Lands
– Queen/Sumach
– Queen/Sherbourne (Moss
Park)
• Connection to the Danforth
Subway at Pape
• Connection to the YUS Line
along Queen
Corridor B – Pape to Queen/Richmond
38
Corridor C – Broadview to King/Wellington
39
• Provides service along the
King/Wellington corridor
with potential for inline
stations near:
– Broadview/Gerrard
(Bridgepoint Health)
– Queen/ Broadview
– Front/Cherry
– King/ Sherbourne
• Connection to the Danforth
Subway at Broadview
• Connection to the YUS Line
along King
Corridor D – Pape to King/Wellington via Queen St.
40
• Provides service along the
King/Wellington corridor
with potential for inline
stations near:
– Gerrard Square (potential
connection to SmartTrack)
– Queen/Broadview Area
– Unilever Lands
– King/Cherry
– King/ Sherbourne
• Connection to the Danforth
Subway at Pape
• Connection to the YUS Line
along King
Next Steps
41
• With the information gathered
through this series of consultation,
we will:
– Select a preferred corridor based on
technical evaluation and public input
– Develop potential alignments within
the preferred corridor
• The next phase of consultation will
focus on the potential alignment
options within the preferred
corridor
Stay Involved
42
Questions?

Contenu connexe

Tendances

Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportToronto Public Consultation Unit
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Toronto Public Consultation Unit
 
Scarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation ReportScarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation ReportToronto Public Consultation Unit
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2StittsvilleCentral.ca
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyStittsvilleCentral.ca
 
COTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA BUS
 

Tendances (20)

Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
Relief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation ReportRelief Line Phase 3 Consultation Report
Relief Line Phase 3 Consultation Report
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
Scarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation ReportScarborough Subway Extension - June 2015 Public Consultation Report
Scarborough Subway Extension - June 2015 Public Consultation Report
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
 
Relief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and CriteriaRelief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and Criteria
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment Study
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
COTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA NextGen Online Public Meeting
COTA NextGen Online Public Meeting
 

En vedette

Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceToronto Public Consultation Unit
 
Evaluation of Alternative Fare Structures for Boston's Subway
Evaluation of Alternative Fare Structures for Boston's SubwayEvaluation of Alternative Fare Structures for Boston's Subway
Evaluation of Alternative Fare Structures for Boston's SubwayRobert Goodspeed
 
Rethinking the Interaction of People with Time & Place while Commuting
Rethinking the Interaction of People with Time & Place while CommutingRethinking the Interaction of People with Time & Place while Commuting
Rethinking the Interaction of People with Time & Place while Commutingmonsieurgaufrette
 
CitiBike pitch from Griffin Farley's Beautiful Minds Planning Competition
CitiBike pitch from Griffin Farley's Beautiful Minds Planning CompetitionCitiBike pitch from Griffin Farley's Beautiful Minds Planning Competition
CitiBike pitch from Griffin Farley's Beautiful Minds Planning CompetitionSteven Bayley
 

En vedette (8)

Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 
Scarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation PlanScarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation Plan
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
 
Scarborough Subway Extension Final Evaluation Criteria
Scarborough Subway Extension Final Evaluation CriteriaScarborough Subway Extension Final Evaluation Criteria
Scarborough Subway Extension Final Evaluation Criteria
 
February-March Consultation Report
February-March Consultation ReportFebruary-March Consultation Report
February-March Consultation Report
 
Evaluation of Alternative Fare Structures for Boston's Subway
Evaluation of Alternative Fare Structures for Boston's SubwayEvaluation of Alternative Fare Structures for Boston's Subway
Evaluation of Alternative Fare Structures for Boston's Subway
 
Rethinking the Interaction of People with Time & Place while Commuting
Rethinking the Interaction of People with Time & Place while CommutingRethinking the Interaction of People with Time & Place while Commuting
Rethinking the Interaction of People with Time & Place while Commuting
 
CitiBike pitch from Griffin Farley's Beautiful Minds Planning Competition
CitiBike pitch from Griffin Farley's Beautiful Minds Planning CompetitionCitiBike pitch from Griffin Farley's Beautiful Minds Planning Competition
CitiBike pitch from Griffin Farley's Beautiful Minds Planning Competition
 

Similaire à 2015 06-15 relief line presentation

Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Toronto Public Consultation Unit
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentationdirectionsto2050
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayFairfax County
 
Cycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity PresentationCycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity Presentationdirectionsto2050
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesInstitute for Transport Studies (ITS)
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house Crosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
Keep it moving - construction phase transport planning
Keep it moving - construction phase  transport planningKeep it moving - construction phase  transport planning
Keep it moving - construction phase transport planningJumpingJaq
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesAdina Levin
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentationRPO America
 

Similaire à 2015 06-15 relief line presentation (20)

Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
2014 12-18 Scarborough Subway Project Assessment
2014 12-18 Scarborough Subway Project Assessment2014 12-18 Scarborough Subway Project Assessment
2014 12-18 Scarborough Subway Project Assessment
 
I-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the BeltwayI-66 Corridor Improvements Outside the Beltway
I-66 Corridor Improvements Outside the Beltway
 
Cycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity PresentationCycle 2 Environmental and Social Equity Presentation
Cycle 2 Environmental and Social Equity Presentation
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
 
Transport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challengesTransport appraisal – evolution development and current challenges
Transport appraisal – evolution development and current challenges
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Keep it moving - construction phase transport planning
Keep it moving - construction phase  transport planningKeep it moving - construction phase  transport planning
Keep it moving - construction phase transport planning
 
Lecture 5.pptx
Lecture 5.pptxLecture 5.pptx
Lecture 5.pptx
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanes
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
Potential 2015 Bond Election
Potential 2015 Bond ElectionPotential 2015 Bond Election
Potential 2015 Bond Election
 

Plus de Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 

Plus de Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 

Dernier

Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 

Dernier (20)

Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 

2015 06-15 relief line presentation

  • 1. Relief Line Project Assessment Coordinated Transit Consultation Program Public Information Centre June 13-25, 2015
  • 2. Overview of Presentation 2 1. Coordination of Rapid Transit Studies 2. Overview of Key Studies • GO RER/SmartTrack Background • SmartTrack Eglinton West Feasibility Study • Scarborough Subway Extension Project Assessment 3. Relief Line Project Assessment
  • 3. Why are we here? 3 • We are seeking your opinions and comments on the work currently underway. • What we hear will be used to inform our work going forward. • Sharing your thoughts is very important in order for the needs of the community to be reflected in the final review. • The best results will come by more people participating in and contributing to the conversation. We need your input.
  • 5. How is Network Transit Planning Coordinated? 5 • Metrolinx, the City and TTC are all working together • Four major transit initiatives are interrelated: • Other projects planned or under construction: • Major projects are all interrelated and have a significant impact on the overall transit network ‒ Connections between future projects and connections with existing lines will form the foundation of an improved network • We are currently in the process of undertaking the integrated assessment of these projects through detailed ridership modelling ‒ Work on each project will inform the other analysis ‒ GO Regional Express Rail (RER) ‒ SmartTrack concept ‒ Scarborough Subway Extension ‒ Relief Line ‒ Finch West LRT ‒ Sheppard East LRT ‒ Toronto-York Spadina Subway Extension ‒ Eglinton Crosstown LRT
  • 6. Public Engagement for Transit Planning Initiatives 6
  • 7. 7 Updated Transportation Model • An updated transportation model will help us understand how each project is related. • Key features of the GTAModel V4.0 model system include: – Covers the entire GTHA using 2011 TTS for the base data – The model explicitly represents individuals and households – The model considers how a person’s trips fit together instead of considering each trip in individually – Trips are modelled for entire 24-hour week-day time period (using five time periods) – The transit assignment model considers crowding on the system and fares of different paths • Critical timelines for modelling work: June 2015 – Draft results of transportation modelling – Report on employment land use modelling July 2015 – Report on transportation modelling results
  • 8. 8 Timing Current • Public consultation in June, 2015 on all projects Mid/late Summer • Further analysis and assessment of options for each project • Public consultation on project recommendations in September, 2015 Fall • Report to Council October/November, 2015 on results and public consultations and recommendations for next steps on each project Future Work • Issue Notice of Commencement for Final Project Review in 2016
  • 9. Overview of Key Studies  GO RER/SmartTrack  SmartTrack Eglinton West Feasibility Study  Scarborough Subway Extension Project Assessment
  • 10. 10 GO Regional Express Rail (RER) • Over the next ten years, Metrolinx will introduce RER including 15- minute, two-way, all-day transit service on most of the seven GO lines (and significant service improvements on the other lines). • Across the system, this will mean: ‒ Electrification of several corridors that will reduce travel times by up to 20% and reduce operating costs ‒ Four times the number of train trips outside of rush hour and on weekends ‒ Twice the number of trips during rush hour ‒ Benefits for all 19 existing GO stations in Toronto and the potential for new stations ‒ Infrastructure requirements of 150 kilometres of new, dedicated GO track and dozens of new tunnels and bridges
  • 11. 11 RER and SmartTrack • SmartTrack builds on RER and the existing GO network – Proposes enhanced service on three existing corridors – Stouffville, Lakeshore East, Kitchener – Proposes a heavy rail corridor connecting Mount Dennis to the Mississauga Airport Corporate Centre • SmartTrack concept features – Service frequency of 15 minutes or better – All stop service in both directions – TTC fare option – Additional stations along the three existing GO corridors – Electrified trains • City Council has directed staff to further evaluate the SmartTrack concept and report back – This includes the Eglinton West SmartTrack Feasibility Review
  • 13. SmartTrack Eglinton West Corridor – Objectives 13 • In February, 2015, City Council directed staff to review the feasibility of SmartTrack options between Mt. Dennis Station and the Mississauga Airport Corporate Centre • The first step is a high-level feasibility review of various options to connect Mount Dennis station to the Mississauga Airport Corporate Centre.
  • 14. SmartTrack Eglinton West Corridor – Potential Corridors and Conceptual Alignments 14 • Three corridor options will be tested for feasibility – A continuous heavy rail spur connection from the Kitchener GO corridor connection by way of Eglinton Avenue West – A separate heavy rail corridor along Eglinton Avenue West with a transfer at Mt Dennis – A continuous heavy rail spur connection diverging from the existing GO corridor somewhere in the vicinity of Highway 27 into the airport and south to the Mississauga Airport Corporate Centre • The feasibility of each alignment will be evaluated from the following perspectives: – Technical (i.e. design and engineering) – Land use – Regulatory and legislative – Service concept (i.e. ability to integrate with other transit services) – Financial
  • 15. Note - All station location and alignment options being considered are located within the study area. Residents across Scarborough and the entire City of Toronto will benefit from transit and transportation network improvements created by the Scarborough Subway Extension Scarborough Subway Extension – Study Area 15
  • 16. • Nine potential corridors have been assessed – Preliminary evaluation has identified three best performing • Consultation to-date: – Two public meetings – Stakeholder Advisory Group – Interactive workshop – Online consultation • Looking for public feedback on: – Existing conditions – Short listed corridors – Preliminary evaluation of corridors – Potential alignments and station locations Scarborough Subway Extension – Current Work 16
  • 18. 18 Study Status • In 2014, Relief Line Project Assessment launched to determine preferred alignment and station locations • In March 2015, public and stakeholder consultation was held to review the long list of potential station options and draft evaluation criteria WE ARE HERE
  • 19. Focus of Today’s Consultation for the Relief Line 19 We are seeking feedback on: 1. Evaluation results of station location options 2. Four potential corridors connecting Downtown and Danforth Subway
  • 20. • Relief Line is identified in The Big Move Regional Transportation Plan and is a ‘Next Wave’ priority project. No funding has yet been committed for the Relief Line. • YRNS and Relief Line Project Assessment are complementary: – Relief Line Project Assessment is determining a preferred alignment between Downtown and Dnforth through a comprehensive evaluation framework. – YRNS/Metrolinx is examining timing for a relief line and other regional network options to provide relief to the Yonge subway. Yonge Relief Network Study (YRNS) 20 • YRNS recognizes the importance the Relief Line in the context of the regional transit network, as the Yonge Subway serves both local and regional travel demand. • YRNS is being conducted in partnership with the City of Toronto, TTC, and York Region.
  • 21. 21 Study Area Note - All station location and alignment options being considered are located within the study area. Residents from across the entire City of Toronto will benefit from transit and transportation network improvements created by the Relief Line.
  • 23. SERVING PEOPLE STRENGTHENING PLACES SUPPORTING PROSPERITY Evaluation criteria based on principles and criteria developed during the Official Plan Review process “Feeling Congested?” Evaluation Framework 23
  • 24. What We Heard During March Consultations Key Messages • Relief Line needs to be part of an integrated transit network, including connections to subway lines, streetcar system, SmartTrack, and GO system • Important to plan for future extension of the Relief Line to the north and west • Don’t tear up Queen and King Street during construction • Protect neighbourhoods, parks and cultural heritage • Look for ways that the Relief Line can provide opportunities for city building and redevelopment around stations • Link important destinations, including the Financial District, St. Lawrence Market, City Hall, the Distillery District, Greektown, Gerrard Square, and George Brown College 24
  • 26. Results of Potential Station Areas Evaluation • 45 potential station areas were identified and evaluated ‒ In Downtown ‒ Along the Danforth ‒ Key activity areas, east and west of the Don River • Preliminary evaluation has identified those station areas that would best achieve objectives for the project and the communities 26
  • 27. 27 Key Station Evaluation Findings: • Bay Street – close to area of high employment density • King / Wellington corridor stands out: ‒ Proximity to highest employment density ‒ Ability to extend west along existing public right-of-way • Queen Street serves key destinations such as the Eaton Centre, St. Michael’s Hospital and City Hall • Front Street / Union Station has high existing pedestrian volumes • Adelaide and Richmond are more challenging to extend to the west Downtown Stations
  • 28. Downtown Stations 28 What We Heard During March Consultations • Many respondents commented that Union Station is already congested and that a different station should be considered for a Downtown terminus • Respondents noted that a Relief Line corridor on streets such as Wellington, Richmond or Adelaide Streets would not disrupt streetcar services • Key destinations noted by respondents include the Financial District, Eaton Centre, Ryerson University, City Hall, St. Michael’s Hospital
  • 29. 29 • The public rights-of-way to the north of Greenwood would not allow for a straight alignment following public rights-of-way • Donlands and Chester have limited ability to use existing public rights-of-way • Carlaw and Jones would require lengthier connections between the existing subway station and the Relief Line • Coxwell cannot directly reach Thorncliffe Park along a future northern extension Key Station Evaluation Findings • Pape and Broadview stand out: ‒ High surface transit and walk-in passenger volumes ‒ Designated as Avenues ‒ Ability to extend north following existing public rights-of-way ‒ Can facilitate a future northern extension to key destinations such as Thorncliffe Park Connection to the Danforth Subway
  • 30. Connection to the Danforth Subway 30 What We Heard During March Consultations • Pape Station received the vast majority of comments in support of a connection to the Danforth Subway. Pape station has many key transit connections and provides an amble opportunity for a northern extension. • There were many comments in support of Broadview Station as that there is key surface transit connections and the potential to investigate a future connection to the nearby Richmond Hill GO line. • Respondents commented that redevelopment opportunities may exist at Greenwood and Coxwell stations. • Key destinations documented by respondents including Greektown, Centennial College and Withrow Park.
  • 31. 31 Key Station Evaluation Findings: • Pape / Gerrard has good redevelopment potential and offers opportunities for multiple connections to existing and future transit • Queen / Broadview has connections with multiple streetcar routes and supports redevelopment opportunities • Unilever site has good redevelopment potential and opportunities to connect to future transit; however, there are technical challenges (such as flood protection and soil contamination) • Queen / Degrassi and Queen / Jones are physically constrained East of the Don River
  • 32. 32 Key Station Evaluation Findings: • Stations along Sherbourne have more potential because of higher population and employment densities • A station at Regent Park addresses social equity and could support redevelopment • Front / Cherry serves areas of new development and can provide surface transit connections to the Portlands • King / Cherry is physically constrained with less redevelopment potential • Lakeshore / Cherry and River / Queen would be challenging to construct and would have flooding risks West of the Don River
  • 33. What We Heard During March Consultations East of the Don River • The project team received broad support for stations at Gerrard Square and the Unilever site • There was strong support to not have a station at Queen/Degrassi due to community concerns about impacts to nearby park space. This station scored low on the technical evaluation and will not be carried forward • Key destinations documented by respondents including Leslieville, Chinatown, Bridgepoint Health and Gerrard Square West of the Don River • Respondents noted that the Relief Line could provide opportunities for city building and redevelopment particularly in areas such as the West Donlands • Important destinations noted by respondents include St. Lawrence Market and George Brown College East and West of the Don River 33
  • 35. Development of Potential Corridor Options 35 • Consider results of technical evaluation and public input on potential station areas • Determine best connecting stations in Downtown and to Danforth Subway • Identify best opportunities for future expansion to the west and north • Link key activity areas with highest potential, based on city-building criteria • Utilize public rights-of-way as much as possible to minimize impacts to private property • Consider technical requirements of subway operations (e.g. curves, grades, trackwork)
  • 36. Potential Corridors 36 • Four potential corridors have been identified for further, more detailed consideration:  Corridor A – Broadview to Queen/Richmond  Corridor B – Pape to Queen/Richmond  Corridor C – Broadview to King/Wellington  Corridor D – Pape to King/Wellington via Queen • These corridors have the highest potential to address the full range of project objectives and city-building criteria • Potential corridors and their stations will be further evaluated to identify a preferred corridor KEY MAP
  • 37. Corridor A – Broadview to Queen/Richmond 37 • Provides service along the Queen/Richmond corridor with potential for inline stations near: – Broadview/Gerrard (Bridgepoint Health) – Regent Park – Queen/Sherbourne (Moss Park) • Connection to the Danforth Subway at Broadview • Connection to the YUS Line along Queen
  • 38. • Provides service along the Queen/Richmond corridor with potential for inline stations near: – Gerrard Square (potential connection to SmartTrack) – Queen/Broadview Area – Unilever Lands – Queen/Sumach – Queen/Sherbourne (Moss Park) • Connection to the Danforth Subway at Pape • Connection to the YUS Line along Queen Corridor B – Pape to Queen/Richmond 38
  • 39. Corridor C – Broadview to King/Wellington 39 • Provides service along the King/Wellington corridor with potential for inline stations near: – Broadview/Gerrard (Bridgepoint Health) – Queen/ Broadview – Front/Cherry – King/ Sherbourne • Connection to the Danforth Subway at Broadview • Connection to the YUS Line along King
  • 40. Corridor D – Pape to King/Wellington via Queen St. 40 • Provides service along the King/Wellington corridor with potential for inline stations near: – Gerrard Square (potential connection to SmartTrack) – Queen/Broadview Area – Unilever Lands – King/Cherry – King/ Sherbourne • Connection to the Danforth Subway at Pape • Connection to the YUS Line along King
  • 41. Next Steps 41 • With the information gathered through this series of consultation, we will: – Select a preferred corridor based on technical evaluation and public input – Develop potential alignments within the preferred corridor • The next phase of consultation will focus on the potential alignment options within the preferred corridor

Notes de l'éditeur

  1. Introductions … I am going to take this opportunity to go through each of the projects and then spend some time going into a more detail on the Relief Line. You can get more information on all of these projects by reviewing the panels and handouts around the room, and in the room across the hall, as well as from talking to members of the project teams.
  2. The main purpose of tonight’s meeting is for us to have discussions with you about major transit planning projects that are underway. We especially want to get your input. Your opinions and ideas are important to our work. It provides us with a balance between the technical work and number crunching. And will help us develop our recommendations to City Council and inform decision making. Please complete the comment forms this evening to let us know your views. Or you can do so on the website reliefline.ca.
  3. We are undergoing one of the largest capital investments in transit in Toronto history. This requires a significant level of coordination between the City, TTC and MX. We are working together on transit network solutions.
  4. Green Lines indicate the GO Corridors where Regional Express Rail will be implemented Black Line highlights the GO corridors for SmartTrack. Eglinton West SmartTrack Feasibility Study Scarborough Subway Extension Project Assessment Relief Line Project Assessment
  5. To help us understand how these projects are related, we are updating our transportation model, with help from UofT. The new model is more robust and up to date. The results will be factored into the technical analysis for each project.
  6. Over the next ten years, Metrolinx will introduce RER including 15-minute, two-way, all-day transit service on most of the seven GO lines. Across the system, this will mean faster trips and noticeably improved service during rush hour, and throughout the day. In order to improve the service, additional infrastructure will be needed, which will require further study.
  7. There is not really a huge different between SmartTrack and Regional Express Rail. Where SmartTrack differs is in having a TTC fare option, and in the total number of stations, including more stations that connect into the City’s transit system, including subway, LRT, buses and streetcars.
  8. This map highlights the corridors where SmartTrack is planned: The Stouffville/Lakeshore East GO Corridor Kitchener GO Corridor The Eglinton West Corridor, which is not part of the GO transit network today – heavy rail does not currently operate on the corridor.
  9. SmartTrack Eglinton West project is looking at the feasibility of providing a heavy rail connection to the Airport Corporate Centre. If a feasibility solution is found then we will conduct further more detailed study.
  10. Looking for a route from Kennedy Station to Sheppard, connecting through Scarborough Centre. The existing Scarborough Rapid Transit line will be replaced with this new subway service.
  11. We had 9 potential corridors Based on technical review and the public input we received, these have been narrowed down to 3.