SlideShare une entreprise Scribd logo
1  sur  26
Télécharger pour lire hors ligne
Welcome
Waterfront Sanitary Servicing
Master Plan Update
Public Information Event (PIE)
October 30, 2017
View display boards and speak one-on-one with project team staff
2
Purpose of PIE
• Present details of alternative solutions for Waterfront
Sanitary Servicing Update
• Present the evaluation of alternatives
• Present the Preliminary Preferred Solution
• Hear from you as a stakeholder
Please, complete your comment sheet so your
comments are properly recorded
Your input is important
3
Study Purpose and Objectives
PURPOSE:
• Develop a comprehensive Waterfront Sanitary Servicing Master Plan, to
service current, planned and future developments along Toronto’s
waterfront to 2041
OBJECTIVES
• Assess the existing system for adequacy and constraints, and recommend
upgrades and/or modifications
• Make “best use” of existing and proposed facilities
• Provide servicing for new development without increasing the number and
volume of combined sewer overflows
• Identify operational efficiencies
• Build on the 2012 Waterfront Sanitary Servicing Master Plan
4
The Study and
Municipal Class EA Process
Phase 1
Problem or
Opportunity
• Identify problem
or opportunity
Phase 2
Alternative
Solutions
• Identify alternative
solutions
• Inventory
environment
• Identify impacts
and mitigation
measures
• Evaluate
alternatives
• Select preferred
solution
Phase 3
Alternative Design
Concepts
Preferred Solution
• Identify alternative
design concepts
• Detail inventory
environment
• Evaluate
alternative
designs
• Select preferred
design
• Preliminary
finalization
Phase 4
Environmental
Study Report
• Complete ESR
• ESR on public
record
• Notice of
Completion
Phase 5
Implementation
• Contract drawings
and tender
documents
• Construction and
operation
• Monitor
We are
here
5
Study Area
6
Waterfront Sanitary Master Plan Update
is Linked with Other City Initiatives
Related studies completed since 2012 Waterfront Sanitary
Servicing Master Plan include:
• Don River and Central Waterfront Project: Strategy for combined sewer
overflow control in Don River and Central Waterfront.
• Integrated Pump Station (IPS): Ashbridges Bay Treatment Plant “M” and
“T” Pumping Station replacement.
• Waterfront Servicing: Multiple projects addressing local sanitary servicing
for the waterfront development precincts.
• Don Mouth Naturalization and Port Lands Flood Protection Project: EA
addressing re-naturalization of mouth of Don River.
• Port Lands + South of Eastern Transportation & Servicing Master Plan
EA: EA for the Port Lands area.
7
What has Changed Since 2012?
• Completion of other EA studies in particular Don River and Central
Waterfront project, and new Integrated Pump Station at Ashbridges Bay
Treatment Plant.
• Growth estimates have increased since 2012 master plan. Now estimating
146,000 more residents and 166,000 more jobs within the study area.
• Managing risk associated with operating levels along the Mid-Toronto
Interceptor.
• Timeline of demand for servicing capacity and more advanced Precinct
Plans.
• Wet-weather flow reduction initiative in Scott Street Sewage Pumping
Station (SPS) service area.
• Changes in local servicing (Cherry Street sewer and SPS, East Bayfront
sewer).
8
The Problem and Opportunity
• 312,000 residential and employment population growth
in the study area.
• Sustainable long-term servicing strategy required.
• Address immediate need for sanitary servicing.
• Opportunities to maximize the use of existing
infrastructure (local sewers, interceptors and pumping
stations).
• Opportunity to reduce dependence on pumping.
9
Evaluation Process
Screen alternatives for feasibility and ability to meet requirements of
Problem Statement. Eliminate infeasible or non-compliant
alternatives
Compare and evaluate alternative solutions using criteria which
include technical considerations, as well as our natural, social,
cultural and economic environment
Identify Preliminary Preferred Alternative/Solution for public and
stakeholder review
Identify Preferred Alternative/Solution
for 30-day review
10
Evaluation Criteria
Cultural Environment
•First Nations lands, archaeological sites
•Cultural / heritage features
Natural Environment
•Terrestrial vegetation and wildlife
•Aquatic vegetation and wildlife
•Groundwater
•Soil and geology
Socio-Economic Environment
•Long term community impacts
•Construction impacts
•Need for property acquisition
Servicing New Development
•Ability to meet short term servicing needs
•Adaptability to change in growth
•Design adaptability
Sustainability
•Energy efficiency
•Green house gas emissions
•Climate change adaptability
Technical Considerations
•Sewer system overflows and flooding risk
•Constructability and risk
•Contaminated materials disposal
•Long term system reliability/resilience
•System operational complexity
•Operational redundancy and flexibility
Financial Considerations
•Capital cost
•O&M costs
•Lifecycle costs
11
Overview of Alternative Solutions
DO NOTHING • Service new growth though existing sewer systems, no upgrades
ALTERNATIVE 1 CENTRAL 1 + PORT LANDS
• Upgrade Scott Street SPS (990 L/s), install Scott Street SPS gravity bypass
• Yonge Street and Lower Jarvis sanitary sewer upgrades
• New Port Lands SPS (977 L/s) with forcemain to Carlaw Ave. interconnect to MTI
• New Port Lands collection sewers
ALTERNATIVE 2 CENTRAL 2 + PORT LANDS
• Install Scott Street SPS gravity bypass
• New Lower Yonge Precinct SPS (830 L/s) with forcemain to Scott-Victoria interconnect to MTI
• Harbour Street and Lower Jarvis sanitary sewer upgrades
• New Port Lands SPS (977 L/s firm capacity) with forcemain to Carlaw Ave. interconnect to MTI
• New Port Lands collection sewers
ALTERNATIVE 3 CENTRAL 3 + PORT LANDS
• Decommission Scott Street SPS, divert flow to new Lower Yonge Precinct SPS (1,040 L/s) with
forcemain to Scott-Victoria interconnect to MTI
• New gravity sewer from Scott SPS to new SPS
• Lower Jarvis sanitary sewer upgrades
• New Port Lands SPS (977 L/s firm capacity) with forcemain to Carlaw Ave. interconnect to MTI
• New Port Lands collection sewers
ALTERNATIVE 4 INTERCEPTOR TUNNEL
• New interceptor trunk sewer to service the entire area following alignment of future Inner Harbour Wet
Weather Tunnel
• Elimination of four local SPS (Skydome, Simcoe, Scott, Cherry)
• New SPS (2,240 L/s) at tunnel terminus west of IPS discharging to MTI/LLI or HLI tunnel
• Short term services required – Scott SPS bypass; Scott SPS Upgrade (990 L/s); Yonge Street and Lower
Jarvis sewer upgrades; New Port Lands SPS (550 L/s) and Commissioners Street sewer
12
Do Nothing
PROS
• Lowest Capital and
Lifecycle costs
CONS
• Does not provide
adequate sanitary
servicing
• Results in overloading
of existing sanitary
sewers.
• Will result in an increase
in combined sewer
overflows
• More complex operation
to manage flow
COSTS
• No Cost
• No increase in
operational costs
13
Alternative 1
PROS
• Lowest Capital and
Lifecycle costs
• Lowest Capital and
Lifecycle costs
• Low impact on natural
environment
• Some adaptability to
changing conditions.
CONS
• Additional stress on the
Scott Street SPS
• Higher annual operation
and maintenance costs
COSTS
• $84.8 Million
Capital Cost
• $214 Million
Life Cycle (100 year)
14
Alternative 2
PROS
• More adaptable to
changing conditions
• Less disruption to the
community (Yonge
Street)
• Provides capacity relief
to existing Scott Street
SPS
• Similar to Alternative 1
CONS
• Additional sewage
pumping station
• Higher annual operation
and maintenance costs
COSTS
• $103 Million
Capital Cost
• $227 Million
Life Cycle (100 year)
15
Alternative 3
PROS
• More adaptable to
changing conditions
• Allows Scott Street SPS
to be decommissioned
CONS
• Higher annual operation
and maintenance costs
• Greater community
disruption (Yonge
Street)
• Higher costs than
Alternatives 1 or 2
COSTS
• $112 Million
Capital Cost
• $240 Million
Life Cycle (100 year)
x
16
Alternative 4
PROS
• Reduces number of
pumping stations to one
station at the end of the
interceptor
• Very adaptable to
changing development
CONS
• High capital costs
• High life cycle costs
• Requires short term
servicing
• Coordination with other
projects
• Land requirements
COSTS
• $263 Million
Capital Cost
• $319 Million
Life Cycle (100 year)
17
Evaluation Matrix - Alternative Scoring
Criteria Do Nothing
Alternative 1
Central 1 + Port
Lands
Alternative 2
Central 2 + Port
Lands
Alternative 3
Central 3 + Port
Lands
Alternative 4
Interceptor
Tunnel
1 CULTURAL ENVIRONMENT 10 6 6 6 6
2 NATURAL ENVIRONMENT 8 12 12 12 12
3 SOCIO-ECONOMIC ENVIRONMENT 11 13 9 9 7
4 SERVICING NEW DEVELOPMENT 3 11 11 11 13
5 SUSTAINABILITY 2 6 6 6 10
6 TECHNICAL CONSIDERATIONS 14 16 18 18 24
TECHNICAL SCORE TOTAL 48 64 62 62 72
*PIE Handout provides more detailed information on criteria and scoring
18
Evaluation Matrix - Alternative Scoring
Cost Metrics
Alternative 1
Central 1 + Port
Lands
Alternative 2
Central 2 + Port
Lands
Alternative 3
Central 3 + Port
Lands
Alternative 4
Interceptor
Tunnel
1 CAPITAL COST $84,800,000 $102,900,000 $111,600,000 $263,600,000
2 ANNUAL O&M COSTS $770,000 $810,000 $840,000 $240,000
3 LIFE CYCLE COSTS (100 YR) $214,100,000 $227,000,000 $239,900,000 $319,800,000
1 CAPITAL COST SCORE 5 3 3 1
2 ANNUAL O&M COSTS SCORE 3 1 1 5
3 LIFE CYCLE COSTS (100 YR) SCORE 5 3 3 1
FINANCIAL SCORE TOTAL 13 7 7 7
TOTAL ALTERNATIVE SCORING
TECHNICAL 64 62 62 72
FINANCIAL 13 7 7 7
TOTAL SCORE 77 69 69 79
19
Alternatives Evaluation
• Alternative 4 has the “highest”
Technical score, at the
“highest” cost.
• Alternative 1, 2 and 3 have
comparable Technical scores,
with Alternative 1 having the
highest Financial score.
• Alternative 4 implementation
timeline requires short-term
infrastructure improvements
that are effectively the same
as Alternative 1.
Timeline EA
Schedule
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Alternative 4 - Interceptor Tunnel
Interceptor Tunnel B Planning Design Construction In-Service
Terminus SPS B Planning Design Construction In-Service
Consolidation Sewers A+/B Planning Design Construction In-Service
Decommission SPSs
Short-Term Infrastructure
Scott Street I/I Initiative A+ Ongoing
(Potential 100 L/s
capacity restored)
Lower Jarvis Pipe
upgrade
A+ Design In-Service
Scott Street by-pass A+ Design In-Service
Yonge Street upgrade A+ Design In-Service
Scott Street SPS upgrade
to
990 L/s
A+ Design In-Service
Port Lands SPS (550 L/s) MESP/B Design In-Service
MESP‐Master Environmental Servicing Plan constitutes a municipal servicing plan (stormwater, wastewater, water and transportation) along with environmental 
management to support future development
 Construction of Interceptor Tunnel can
be deferred with Short-Term Servicing
 Scott Street SPS, Lower Yonge
Precinct, Don Lands, Unilever and
Port Lands immediate capacity needs
met with Short-Term Infrastructure
Alternative 4
Implementation requires short-term infrastructure to meet immediate capacity needs.
20
Alternatives Evaluation
• Alternative 4 and 1 have similar total scores.
• However, Alternative 4 is approximately $178M more in capital costs.
• The high cost for Alternative 4 is not considered preferable as it does
not necessarily provide additional benefits at this time.
• Many of the early upgrades associated with Alternative 4 include
Alternative 1 system improvements and upgrades.
• Alternative 1 has the lowest costs and makes the best use of existing
infrastructure.
• Overall, Alternative 1 is the preferred alternative for Waterfront
Sanitary Servicing.
21
Alternative 1 - Preferred Alternative
Timeline
EA
Schedule
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Alternative 1 – Upgrade Scott SPS, Scott St. Bypass, New Port Lands SPS
Scott Street I/I
Initiative
A+ Ongoing
(Potential 100 L/s
capacity restored)
Lower Jarvis Pipe
upgrade
A+ Design
In-
Service
Scott Street by-
pass
A+ Design
In-
Service
Yonge Street
upgrade
A+ Design
In-
Service
Scott Street SPS
upgrade to
990 L/s
A+ Design
In-
Service
Port Lands SPS
(550 L/s initial
stage)
MESP/B Design
In-
Service
Future expansion to ultimate 997 L/s
MESP‐Master Environmental Servicing Plan constitutes a municipal servicing plan (stormwater, wastewater, water and transportation) along with environmental 
management to support future development
Alternative 1
 Implementation addresses short-term needs.
 Future expansion of Port Lands SPS would be required and can be timed with growth.
 Alternative does not preclude the Alternative 4 servicing strategy.
22
Alternative 1 - Preferred Alternative
• Substantially lower capital cost.
• Independent servicing strategy for Scott St. SPS service area.
Bypass to Scott-Victoria inter-connection will allow for gravity
operation the majority of time.
• Independent servicing strategy for Port Lands can be
implemented to meet servicing demand from Lower Don Lands
and Unilever lands. Port Lands SPS capacity would be staged.
• Potentially the best approach to making future use of MTI via
gravity conveyance by interconnecting sewers, once IPS and
WWF tunnel system in place.
• Does not preclude future consideration of Alternative 4.
23
Alternative 1 - Preferred Alternative
Approvals:
Class EA Master Plan once complete will allow projects to proceed.
Design/Construction:
• Implementation timeline will meet capacity requirements.
• Scott Street Bypass, Lower Jarvis Upgrade and Yonge Street Upgrade the highest
priorities.
• Yonge St. Upgrade will have traffic and utility impacts. This project has the highest
potential constructability risk and further detailed work is required to properly scope.
• Scott Street area I/I reduction program initiated. Success of program may delay the
need for Scott St. SPS upgrade.
• Port Lands SPS timing needs to be coordinated with Lower Don Lands/Unilever and
flood protection work.
• Avoids need for design/construction coordination with IPS and WWF tunnel project.
24
Preferred Alternative - Construction Impacts
and Mitigation Measures
Possible Construction Impact Mitigation Proposed
Noise Adherence to City Noise By-Law.
Dust/Mud Tracking Use of dust suppressant, mud mats, street sweeping.
Site Safety Fenced, signed construction sites.
Traffic/Pedestrian Disruption
Detailed traffic plan to be developed. Notices distributed, as
necessary to inform of alternate routes.
Existing Utilities/Services
Utility support and relocation. Temporary services provided, if
necessary.
Natural Environment (trees, birds) Tree protection zones; tree replacement, if needed.
Cultural Environment (uncover artifacts) Unlikely. Protocols will be followed.
Pump Noise Long term monitoring of facility performance. Use of noise baffling.
Aesthetics
New pump station exterior designed to bring aesthetic value to
surroundings.
Odour Carbon-based odour control system.
25
Key Questions for Consideration Tonight
Do you have any comments or feedback regarding:
• The alternative solutions considered
• The evaluation criteria or process
• The preliminary preferred solution
• Other aspects of the study
26
Next Steps
When What
Tonight Present and receive input/feedback on the preliminary preferred solution
End-2017 Complete EA Report and submit for 30-day public comment period
PIE CONTACT INFORMATION
Mae Lee, City of Toronto
Telephone: (416) 392-8210
Tty: (416) 338-0889
Fax: (416) 392-2974
Email: mae.lee@toronto.ca
Email your comments by Nov. 10th, 2017

Contenu connexe

Tendances

Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Fairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Fairfax County
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Fairfax County
 
Route 28 Widening Public Information Meeting: March 12, 2019
Route 28 Widening Public Information Meeting: March 12, 2019Route 28 Widening Public Information Meeting: March 12, 2019
Route 28 Widening Public Information Meeting: March 12, 2019Fairfax County
 
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Fairfax County
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017Paul B. Martin
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationFairfax County
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRTCrosstown TO
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
 

Tendances (20)

Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
Route 28 Widening Public Information Meeting: March 12, 2019
Route 28 Widening Public Information Meeting: March 12, 2019Route 28 Widening Public Information Meeting: March 12, 2019
Route 28 Widening Public Information Meeting: March 12, 2019
 
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Stormwater Wastewater Consolidation
Stormwater Wastewater ConsolidationStormwater Wastewater Consolidation
Stormwater Wastewater Consolidation
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 

Similaire à Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).

Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Robert Muir
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectascemiami-dade
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christijeshaml10
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Fu Michael Justin
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05HartTWI
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?sneapa
 
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Geological Survey of Sweden
 
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...glennmcgillivray
 

Similaire à Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). (20)

Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christi
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
State of the City 2012
State of the City 2012State of the City 2012
State of the City 2012
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?
 
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
 
T16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouseT16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouse
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
 
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
 

Plus de Toronto Public Consultation Unit

King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Toronto Public Consultation Unit
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Toronto Public Consultation Unit
 

Plus de Toronto Public Consultation Unit (20)

King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
Downsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study MapsDownsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study Maps
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 

Dernier

Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 

Dernier (20)

Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).

  • 1. Welcome Waterfront Sanitary Servicing Master Plan Update Public Information Event (PIE) October 30, 2017 View display boards and speak one-on-one with project team staff
  • 2. 2 Purpose of PIE • Present details of alternative solutions for Waterfront Sanitary Servicing Update • Present the evaluation of alternatives • Present the Preliminary Preferred Solution • Hear from you as a stakeholder Please, complete your comment sheet so your comments are properly recorded Your input is important
  • 3. 3 Study Purpose and Objectives PURPOSE: • Develop a comprehensive Waterfront Sanitary Servicing Master Plan, to service current, planned and future developments along Toronto’s waterfront to 2041 OBJECTIVES • Assess the existing system for adequacy and constraints, and recommend upgrades and/or modifications • Make “best use” of existing and proposed facilities • Provide servicing for new development without increasing the number and volume of combined sewer overflows • Identify operational efficiencies • Build on the 2012 Waterfront Sanitary Servicing Master Plan
  • 4. 4 The Study and Municipal Class EA Process Phase 1 Problem or Opportunity • Identify problem or opportunity Phase 2 Alternative Solutions • Identify alternative solutions • Inventory environment • Identify impacts and mitigation measures • Evaluate alternatives • Select preferred solution Phase 3 Alternative Design Concepts Preferred Solution • Identify alternative design concepts • Detail inventory environment • Evaluate alternative designs • Select preferred design • Preliminary finalization Phase 4 Environmental Study Report • Complete ESR • ESR on public record • Notice of Completion Phase 5 Implementation • Contract drawings and tender documents • Construction and operation • Monitor We are here
  • 6. 6 Waterfront Sanitary Master Plan Update is Linked with Other City Initiatives Related studies completed since 2012 Waterfront Sanitary Servicing Master Plan include: • Don River and Central Waterfront Project: Strategy for combined sewer overflow control in Don River and Central Waterfront. • Integrated Pump Station (IPS): Ashbridges Bay Treatment Plant “M” and “T” Pumping Station replacement. • Waterfront Servicing: Multiple projects addressing local sanitary servicing for the waterfront development precincts. • Don Mouth Naturalization and Port Lands Flood Protection Project: EA addressing re-naturalization of mouth of Don River. • Port Lands + South of Eastern Transportation & Servicing Master Plan EA: EA for the Port Lands area.
  • 7. 7 What has Changed Since 2012? • Completion of other EA studies in particular Don River and Central Waterfront project, and new Integrated Pump Station at Ashbridges Bay Treatment Plant. • Growth estimates have increased since 2012 master plan. Now estimating 146,000 more residents and 166,000 more jobs within the study area. • Managing risk associated with operating levels along the Mid-Toronto Interceptor. • Timeline of demand for servicing capacity and more advanced Precinct Plans. • Wet-weather flow reduction initiative in Scott Street Sewage Pumping Station (SPS) service area. • Changes in local servicing (Cherry Street sewer and SPS, East Bayfront sewer).
  • 8. 8 The Problem and Opportunity • 312,000 residential and employment population growth in the study area. • Sustainable long-term servicing strategy required. • Address immediate need for sanitary servicing. • Opportunities to maximize the use of existing infrastructure (local sewers, interceptors and pumping stations). • Opportunity to reduce dependence on pumping.
  • 9. 9 Evaluation Process Screen alternatives for feasibility and ability to meet requirements of Problem Statement. Eliminate infeasible or non-compliant alternatives Compare and evaluate alternative solutions using criteria which include technical considerations, as well as our natural, social, cultural and economic environment Identify Preliminary Preferred Alternative/Solution for public and stakeholder review Identify Preferred Alternative/Solution for 30-day review
  • 10. 10 Evaluation Criteria Cultural Environment •First Nations lands, archaeological sites •Cultural / heritage features Natural Environment •Terrestrial vegetation and wildlife •Aquatic vegetation and wildlife •Groundwater •Soil and geology Socio-Economic Environment •Long term community impacts •Construction impacts •Need for property acquisition Servicing New Development •Ability to meet short term servicing needs •Adaptability to change in growth •Design adaptability Sustainability •Energy efficiency •Green house gas emissions •Climate change adaptability Technical Considerations •Sewer system overflows and flooding risk •Constructability and risk •Contaminated materials disposal •Long term system reliability/resilience •System operational complexity •Operational redundancy and flexibility Financial Considerations •Capital cost •O&M costs •Lifecycle costs
  • 11. 11 Overview of Alternative Solutions DO NOTHING • Service new growth though existing sewer systems, no upgrades ALTERNATIVE 1 CENTRAL 1 + PORT LANDS • Upgrade Scott Street SPS (990 L/s), install Scott Street SPS gravity bypass • Yonge Street and Lower Jarvis sanitary sewer upgrades • New Port Lands SPS (977 L/s) with forcemain to Carlaw Ave. interconnect to MTI • New Port Lands collection sewers ALTERNATIVE 2 CENTRAL 2 + PORT LANDS • Install Scott Street SPS gravity bypass • New Lower Yonge Precinct SPS (830 L/s) with forcemain to Scott-Victoria interconnect to MTI • Harbour Street and Lower Jarvis sanitary sewer upgrades • New Port Lands SPS (977 L/s firm capacity) with forcemain to Carlaw Ave. interconnect to MTI • New Port Lands collection sewers ALTERNATIVE 3 CENTRAL 3 + PORT LANDS • Decommission Scott Street SPS, divert flow to new Lower Yonge Precinct SPS (1,040 L/s) with forcemain to Scott-Victoria interconnect to MTI • New gravity sewer from Scott SPS to new SPS • Lower Jarvis sanitary sewer upgrades • New Port Lands SPS (977 L/s firm capacity) with forcemain to Carlaw Ave. interconnect to MTI • New Port Lands collection sewers ALTERNATIVE 4 INTERCEPTOR TUNNEL • New interceptor trunk sewer to service the entire area following alignment of future Inner Harbour Wet Weather Tunnel • Elimination of four local SPS (Skydome, Simcoe, Scott, Cherry) • New SPS (2,240 L/s) at tunnel terminus west of IPS discharging to MTI/LLI or HLI tunnel • Short term services required – Scott SPS bypass; Scott SPS Upgrade (990 L/s); Yonge Street and Lower Jarvis sewer upgrades; New Port Lands SPS (550 L/s) and Commissioners Street sewer
  • 12. 12 Do Nothing PROS • Lowest Capital and Lifecycle costs CONS • Does not provide adequate sanitary servicing • Results in overloading of existing sanitary sewers. • Will result in an increase in combined sewer overflows • More complex operation to manage flow COSTS • No Cost • No increase in operational costs
  • 13. 13 Alternative 1 PROS • Lowest Capital and Lifecycle costs • Lowest Capital and Lifecycle costs • Low impact on natural environment • Some adaptability to changing conditions. CONS • Additional stress on the Scott Street SPS • Higher annual operation and maintenance costs COSTS • $84.8 Million Capital Cost • $214 Million Life Cycle (100 year)
  • 14. 14 Alternative 2 PROS • More adaptable to changing conditions • Less disruption to the community (Yonge Street) • Provides capacity relief to existing Scott Street SPS • Similar to Alternative 1 CONS • Additional sewage pumping station • Higher annual operation and maintenance costs COSTS • $103 Million Capital Cost • $227 Million Life Cycle (100 year)
  • 15. 15 Alternative 3 PROS • More adaptable to changing conditions • Allows Scott Street SPS to be decommissioned CONS • Higher annual operation and maintenance costs • Greater community disruption (Yonge Street) • Higher costs than Alternatives 1 or 2 COSTS • $112 Million Capital Cost • $240 Million Life Cycle (100 year) x
  • 16. 16 Alternative 4 PROS • Reduces number of pumping stations to one station at the end of the interceptor • Very adaptable to changing development CONS • High capital costs • High life cycle costs • Requires short term servicing • Coordination with other projects • Land requirements COSTS • $263 Million Capital Cost • $319 Million Life Cycle (100 year)
  • 17. 17 Evaluation Matrix - Alternative Scoring Criteria Do Nothing Alternative 1 Central 1 + Port Lands Alternative 2 Central 2 + Port Lands Alternative 3 Central 3 + Port Lands Alternative 4 Interceptor Tunnel 1 CULTURAL ENVIRONMENT 10 6 6 6 6 2 NATURAL ENVIRONMENT 8 12 12 12 12 3 SOCIO-ECONOMIC ENVIRONMENT 11 13 9 9 7 4 SERVICING NEW DEVELOPMENT 3 11 11 11 13 5 SUSTAINABILITY 2 6 6 6 10 6 TECHNICAL CONSIDERATIONS 14 16 18 18 24 TECHNICAL SCORE TOTAL 48 64 62 62 72 *PIE Handout provides more detailed information on criteria and scoring
  • 18. 18 Evaluation Matrix - Alternative Scoring Cost Metrics Alternative 1 Central 1 + Port Lands Alternative 2 Central 2 + Port Lands Alternative 3 Central 3 + Port Lands Alternative 4 Interceptor Tunnel 1 CAPITAL COST $84,800,000 $102,900,000 $111,600,000 $263,600,000 2 ANNUAL O&M COSTS $770,000 $810,000 $840,000 $240,000 3 LIFE CYCLE COSTS (100 YR) $214,100,000 $227,000,000 $239,900,000 $319,800,000 1 CAPITAL COST SCORE 5 3 3 1 2 ANNUAL O&M COSTS SCORE 3 1 1 5 3 LIFE CYCLE COSTS (100 YR) SCORE 5 3 3 1 FINANCIAL SCORE TOTAL 13 7 7 7 TOTAL ALTERNATIVE SCORING TECHNICAL 64 62 62 72 FINANCIAL 13 7 7 7 TOTAL SCORE 77 69 69 79
  • 19. 19 Alternatives Evaluation • Alternative 4 has the “highest” Technical score, at the “highest” cost. • Alternative 1, 2 and 3 have comparable Technical scores, with Alternative 1 having the highest Financial score. • Alternative 4 implementation timeline requires short-term infrastructure improvements that are effectively the same as Alternative 1. Timeline EA Schedule 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Alternative 4 - Interceptor Tunnel Interceptor Tunnel B Planning Design Construction In-Service Terminus SPS B Planning Design Construction In-Service Consolidation Sewers A+/B Planning Design Construction In-Service Decommission SPSs Short-Term Infrastructure Scott Street I/I Initiative A+ Ongoing (Potential 100 L/s capacity restored) Lower Jarvis Pipe upgrade A+ Design In-Service Scott Street by-pass A+ Design In-Service Yonge Street upgrade A+ Design In-Service Scott Street SPS upgrade to 990 L/s A+ Design In-Service Port Lands SPS (550 L/s) MESP/B Design In-Service MESP‐Master Environmental Servicing Plan constitutes a municipal servicing plan (stormwater, wastewater, water and transportation) along with environmental  management to support future development  Construction of Interceptor Tunnel can be deferred with Short-Term Servicing  Scott Street SPS, Lower Yonge Precinct, Don Lands, Unilever and Port Lands immediate capacity needs met with Short-Term Infrastructure Alternative 4 Implementation requires short-term infrastructure to meet immediate capacity needs.
  • 20. 20 Alternatives Evaluation • Alternative 4 and 1 have similar total scores. • However, Alternative 4 is approximately $178M more in capital costs. • The high cost for Alternative 4 is not considered preferable as it does not necessarily provide additional benefits at this time. • Many of the early upgrades associated with Alternative 4 include Alternative 1 system improvements and upgrades. • Alternative 1 has the lowest costs and makes the best use of existing infrastructure. • Overall, Alternative 1 is the preferred alternative for Waterfront Sanitary Servicing.
  • 21. 21 Alternative 1 - Preferred Alternative Timeline EA Schedule 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Alternative 1 – Upgrade Scott SPS, Scott St. Bypass, New Port Lands SPS Scott Street I/I Initiative A+ Ongoing (Potential 100 L/s capacity restored) Lower Jarvis Pipe upgrade A+ Design In- Service Scott Street by- pass A+ Design In- Service Yonge Street upgrade A+ Design In- Service Scott Street SPS upgrade to 990 L/s A+ Design In- Service Port Lands SPS (550 L/s initial stage) MESP/B Design In- Service Future expansion to ultimate 997 L/s MESP‐Master Environmental Servicing Plan constitutes a municipal servicing plan (stormwater, wastewater, water and transportation) along with environmental  management to support future development Alternative 1  Implementation addresses short-term needs.  Future expansion of Port Lands SPS would be required and can be timed with growth.  Alternative does not preclude the Alternative 4 servicing strategy.
  • 22. 22 Alternative 1 - Preferred Alternative • Substantially lower capital cost. • Independent servicing strategy for Scott St. SPS service area. Bypass to Scott-Victoria inter-connection will allow for gravity operation the majority of time. • Independent servicing strategy for Port Lands can be implemented to meet servicing demand from Lower Don Lands and Unilever lands. Port Lands SPS capacity would be staged. • Potentially the best approach to making future use of MTI via gravity conveyance by interconnecting sewers, once IPS and WWF tunnel system in place. • Does not preclude future consideration of Alternative 4.
  • 23. 23 Alternative 1 - Preferred Alternative Approvals: Class EA Master Plan once complete will allow projects to proceed. Design/Construction: • Implementation timeline will meet capacity requirements. • Scott Street Bypass, Lower Jarvis Upgrade and Yonge Street Upgrade the highest priorities. • Yonge St. Upgrade will have traffic and utility impacts. This project has the highest potential constructability risk and further detailed work is required to properly scope. • Scott Street area I/I reduction program initiated. Success of program may delay the need for Scott St. SPS upgrade. • Port Lands SPS timing needs to be coordinated with Lower Don Lands/Unilever and flood protection work. • Avoids need for design/construction coordination with IPS and WWF tunnel project.
  • 24. 24 Preferred Alternative - Construction Impacts and Mitigation Measures Possible Construction Impact Mitigation Proposed Noise Adherence to City Noise By-Law. Dust/Mud Tracking Use of dust suppressant, mud mats, street sweeping. Site Safety Fenced, signed construction sites. Traffic/Pedestrian Disruption Detailed traffic plan to be developed. Notices distributed, as necessary to inform of alternate routes. Existing Utilities/Services Utility support and relocation. Temporary services provided, if necessary. Natural Environment (trees, birds) Tree protection zones; tree replacement, if needed. Cultural Environment (uncover artifacts) Unlikely. Protocols will be followed. Pump Noise Long term monitoring of facility performance. Use of noise baffling. Aesthetics New pump station exterior designed to bring aesthetic value to surroundings. Odour Carbon-based odour control system.
  • 25. 25 Key Questions for Consideration Tonight Do you have any comments or feedback regarding: • The alternative solutions considered • The evaluation criteria or process • The preliminary preferred solution • Other aspects of the study
  • 26. 26 Next Steps When What Tonight Present and receive input/feedback on the preliminary preferred solution End-2017 Complete EA Report and submit for 30-day public comment period PIE CONTACT INFORMATION Mae Lee, City of Toronto Telephone: (416) 392-8210 Tty: (416) 338-0889 Fax: (416) 392-2974 Email: mae.lee@toronto.ca Email your comments by Nov. 10th, 2017