Key Concepts
• Need For Better Contract Management
• Pre-award Conference
• Monitoring And Controlling Project Progress
» Gantt Charts
» CPM And PERT
» Closed Loop MRP Systems
• Monitoring And Controlling Total Supplier
Performance
» Supplier Performance Evaluation
18-2
Key Concepts
• Motivation
» Punishment
» Rewards
• Assistance
» Training
» Quality Audits And Procurement System Reviews
» Problem Solving
» Collaboration
» Managing The Relationship
18-3
Need for Better Contract Management
• Several changes in business have
increased the need for better contract
management:
» Collaboration is continuing to becoming more important
» Large inventories are no longer available
» Quality is expected
» Deliveries are expected to be on time, not early or late
» Schedules must be integrated and maintained
» Processes must be balanced
» Waste must be reduced or eliminated
» Communication must be in real-time
18-4
Pre-Award Conference
• All terms and conditions
• Delivery or operations schedule
• Staffing and supervision
• Site conditions, work rules, safety
• Invoicing procedures and documentation
• Materials purchase procedures
18-5
Pre-Award Conference
• Background checks and security
clearances
• Insurance certificates
• Permits
• Possible conflicts with other work
• Submission of time sheets
• Buyer responsibilities
• Collaboration milestones
18-6
Monitoring and Controlling Project Progress
• Operations Progress Reports
• Gantt Charts
• CPM And PERT
• Closed Loop MRP Systems
18-7
Production Schedule and Progress Chart (Gantt
Chart)
Description of Work Jan Feb Mar Apr May Jun
Engineering Drawing
Bill of Materials
Tooling, Etc.
Raw Material Proc.
Raw Material Rec’d.
Long-lead Proc. Parts
Production
Planned
Actual
18-8
Project Example: Capital Equipment Acquisition
Process
Label Description Time Predecessors
Activity Activity Activity Immediate
Preliminary Discussion
Solicitation of Information
Budgetary Estimates
Funding Authorization Request
Qualification of Potential Suppliers
Request for Proposal Processing
Proposal Analyses
Economic Impact Analyses
Exceptions to Specifications
Side-by-side Demonstrations
Notify Selected Supplier
Plan Negotiations
Conduct Negotiations
Execute Contract
Record Project Details
Contract Inspection
Purchase Contract Closeout
5 days
4 days
4 days
1 days
12 days
6 days
14 days
3 days
5 days
8 days
2 days
2 days
12 days
1 day
1 day
2 days
1 day
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
None
1
1
3
2
5
6,8,9,10
4,6
6
6
7
7
11,12
13
13
14,15
16
18-9
Project Example: View of a PERT Chart in
Microsoft Project
18-10
Critical Path Scheduling
• Critical Path is the longest path through
the network
• As a manager we need to know the critical
path to identify which activities we should
focus our efforts on controlling
• A delay in a critical path activity delays the
expected project completion time
• Critical path analysis also lets us know
which activities do not need to be
managed as strictly
18-11
Monitoring and Controlling Total Supplier
Performance
• Supplier Performance Evaluation
» Categorical Plan
» Weighted-Point Plan
» Cost-ratio Plan
18-12
Categorical Plan
• Requires continual evaluation
• Qualitative ratings are generated
» usually on a 3-point scale
• Individuals in departments conduct the
evaluation:
» Supply
» Engineering
» Quality
» Accounting
» Receiving
– Receiving’s evaluation factors might be: tardiness,
quantity, quality, completeness, packaging, etc.
18-13
Categorical Plan
18-14
Weighted Point Plan
• Step 1: Development of factors (selection
criteria) and weights
» Weights represent supply management’s
judgments concerning relative importance
• Step 2: Assignment of ratings
» Supplier performance on each factor must be
expressed in quantitative terms
18-15
Example: Weighted Point Plan
• Weight, Factor = Formula
» 50%, Quality performance = 100% - rejects%
» 25%, Service performance = 100% - 7% per
failure
» 25%, Price performance = Lowest price offered
divided by the price actually paid
18-16
Example: Weighted Point Plan Continued
Factor Weight Actual Performance Performance Evaluation
Quality 50% 5% Rejects 50 x (1.00 – 0.05) = 47.50
Service 25% 3 Failures 25 x [1.00 – (0.07 x 3)] = 19.75
Price 25% $100 25 x ($90 / $100) = 22.50
Overall Evaluation: = 89.75
Table 21-1
18-17
Another Example: Weighted Point Plan
Factor weight A B C
Technology
Delivery
Price
Stability
Quality
40 36 35 30
20 20 16 15
20 16 20 15
10 10 8 8
10 9 8 9
Rating total 100 91 87 77
18-18
Cost Ratio Plan Steps
1. Additional costs incurred when doing business with a
given supplier are identified
2. Costs are separated by quality, service, and price
elements of supplier performance
3. Each costs is then converted to a “cost ratio”
4. The ratio expresses the cost as a percent of the total
dollar purchase from that supplier
5. The individual cost ratios are totaled, producing the
supplier’s overall additional cost ratio
6. Supplier’s price is adjusted using its overall ratio
7. Adjusted prices are then used in supplier evaluation
18-19
Cost Ratio Plan Example
• Assume that for one supplier:
» Quality cost ratio = 2%
» Delivery cost ratio = 2%
» Service cost ratio = -1%
» Price = $72.25
• The sum of all cost ratios is 3 percent
• Hence, the adjusted price for this supplier is:
» [72.25 + (0.03  72.25)] = $74.42
• This is the price used for evaluation purposes
18-20
Motivation
• Punishment
» Litigation and punitive damages
» Not awarding future business
» Downgrading a supplier
» Billing the supplier for failures
• Rewards
» Follow on business
» Recognition
18-21
Assistance
• Transformational Training
• Quality Audits and Supply System
Reviews
• Problem Solving
18-22
Supplier Surveys
• How knowledgeable are our supply
managers?
• How accurate are our engineering
specifications?
• How clearly do we state our quality
requirements?
• How timely are our payments?
18-23
Additional Approaches to Improving Supplier
Relations
• Annual Supplier Meetings
• Supplier Roundtables
• Supplier Workshops
18-24
Collaboration
• Most successful supplier management results are
generated in collaborations
• The ultimate in collaborative relationships is a
virtual integration, wherein two independently
owned entities integrate their energies for as long
as the relationship benefits both parties
• One- or two-page memoranda of agreement
replace lengthy contracts, change orders, and
other legalistic and defensive procedures
18-25
Actions to Ensure Success of Supply Alliance
Relations
• Establish an inter-firm cross-functional team
• Team members should receive training
• Develop an inter-firm communication system
• Develop plans to increase and measure trust
• Arrange for co-location of key personnel and for
periodic visits to each other’s facilities
• Additional plans should be developed and
implemented for training on critical issues
18-26
Actions to Ensure Success of Supply Alliance
Relations Continued
• Establish measurable quantifiable objectives
• Monitor and report improvements
• Ethics should win over expediency
• Inter-firm team members need to embrace the
philosophy of collaboration
• Inter-firm team members should become
champions who ensure that their organizations
understand and support the alliance’s goals
18-27
Closing Remarks
• Without question, management of supply
contracts is a critical and challenging activity.
• Perhaps the most challenging aspect is the
evolution from controlling to managing the
relationship
• New attitudes and skills are required
18-28

Contenu connexe

Tendances

The purchasing process
The purchasing processThe purchasing process
The purchasing process
TASKTC
 
Top 10 Procurement KPI\'s
Top 10 Procurement KPI\'sTop 10 Procurement KPI\'s
Top 10 Procurement KPI\'s
amberkar
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
SWAPAN KUMAR ROY
 
Purchase Presentation 1
Purchase Presentation 1Purchase Presentation 1
Purchase Presentation 1
prateekbubai
 
CSCM Chapter 2 procurement
CSCM Chapter 2 procurement CSCM Chapter 2 procurement
CSCM Chapter 2 procurement
Est
 
CSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileCSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agile
Est
 
How to Effectively Measure a Procurement Organization Sample
How to Effectively Measure a Procurement Organization SampleHow to Effectively Measure a Procurement Organization Sample
How to Effectively Measure a Procurement Organization Sample
Julie Brignac
 

Tendances (20)

The purchasing process
The purchasing processThe purchasing process
The purchasing process
 
Indirect Procurement - Mr. Ashwani Singh (Watson Pharma)
Indirect Procurement - Mr. Ashwani Singh (Watson Pharma)Indirect Procurement - Mr. Ashwani Singh (Watson Pharma)
Indirect Procurement - Mr. Ashwani Singh (Watson Pharma)
 
Mba ii pmom_unit-2.6 purchase management a
Mba ii pmom_unit-2.6 purchase management aMba ii pmom_unit-2.6 purchase management a
Mba ii pmom_unit-2.6 purchase management a
 
Top 10 Procurement KPI\'s
Top 10 Procurement KPI\'sTop 10 Procurement KPI\'s
Top 10 Procurement KPI\'s
 
Procurement Presentation
Procurement PresentationProcurement Presentation
Procurement Presentation
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
 
Purchase Presentation 1
Purchase Presentation 1Purchase Presentation 1
Purchase Presentation 1
 
Types of purchasing system
Types of purchasing systemTypes of purchasing system
Types of purchasing system
 
Vendor Management and Contract Negotiations
Vendor Management and Contract NegotiationsVendor Management and Contract Negotiations
Vendor Management and Contract Negotiations
 
CSCM Chapter 2 procurement
CSCM Chapter 2 procurement CSCM Chapter 2 procurement
CSCM Chapter 2 procurement
 
What Is The Difference Between Procurement and Purchasing?
What Is The Difference Between Procurement and Purchasing?What Is The Difference Between Procurement and Purchasing?
What Is The Difference Between Procurement and Purchasing?
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
 
Purchase process
Purchase   processPurchase   process
Purchase process
 
CSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agileCSCM Chapter 10 lean and agile
CSCM Chapter 10 lean and agile
 
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
Procurement Cost Saving Strategy " Procurement dari cost centre menjadi profit...
 
ECM BY KP - Copy
ECM BY KP - CopyECM BY KP - Copy
ECM BY KP - Copy
 
Purchase management
Purchase managementPurchase management
Purchase management
 
Control you indirect spend with SAP SCM
Control you indirect spend with SAP SCMControl you indirect spend with SAP SCM
Control you indirect spend with SAP SCM
 
How to Effectively Measure a Procurement Organization Sample
How to Effectively Measure a Procurement Organization SampleHow to Effectively Measure a Procurement Organization Sample
How to Effectively Measure a Procurement Organization Sample
 
Vendor management
Vendor managementVendor management
Vendor management
 

Similaire à Chapter 18 Contract and Relationship Management

Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor management
Raminder Pal Singh
 
The Journey to World Class Presentation Contract Management - IACCM Sydney Co...
The Journey to World Class Presentation Contract Management - IACCM Sydney Co...The Journey to World Class Presentation Contract Management - IACCM Sydney Co...
The Journey to World Class Presentation Contract Management - IACCM Sydney Co...
David Gee
 
Maintenance cost to Savings
Maintenance cost to SavingsMaintenance cost to Savings
Maintenance cost to Savings
Swapnil Sharma
 
Ch13-Performance Measurement_Supply Chain
Ch13-Performance Measurement_Supply ChainCh13-Performance Measurement_Supply Chain
Ch13-Performance Measurement_Supply Chain
ChristianCDAM
 
Aptude's IT Managed Services Webinar
Aptude's IT Managed Services WebinarAptude's IT Managed Services Webinar
Aptude's IT Managed Services Webinar
aptude01
 
Danforth Intl Presentation
Danforth Intl PresentationDanforth Intl Presentation
Danforth Intl Presentation
kendan4th
 

Similaire à Chapter 18 Contract and Relationship Management (20)

Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor management
 
Key Performance Indicators
Key Performance IndicatorsKey Performance Indicators
Key Performance Indicators
 
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdfPPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
 
The Journey to World Class Presentation Contract Management - IACCM Sydney Co...
The Journey to World Class Presentation Contract Management - IACCM Sydney Co...The Journey to World Class Presentation Contract Management - IACCM Sydney Co...
The Journey to World Class Presentation Contract Management - IACCM Sydney Co...
 
Ict mgmt processes_roles_competencies
Ict mgmt processes_roles_competenciesIct mgmt processes_roles_competencies
Ict mgmt processes_roles_competencies
 
0.Commercial Management slides _Lvl3.pdf
0.Commercial Management slides _Lvl3.pdf0.Commercial Management slides _Lvl3.pdf
0.Commercial Management slides _Lvl3.pdf
 
How to implement a strategic IT vendor management program
How to implement a strategic IT vendor management programHow to implement a strategic IT vendor management program
How to implement a strategic IT vendor management program
 
How BP is Leveraging Technology to Energize Supplier Relationship Management
How BP is Leveraging Technology to Energize Supplier Relationship ManagementHow BP is Leveraging Technology to Energize Supplier Relationship Management
How BP is Leveraging Technology to Energize Supplier Relationship Management
 
Overcoming the 5 Most Common PCM Challenges
Overcoming the 5 Most Common PCM Challenges Overcoming the 5 Most Common PCM Challenges
Overcoming the 5 Most Common PCM Challenges
 
3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt
 
Maintenance cost to Savings
Maintenance cost to SavingsMaintenance cost to Savings
Maintenance cost to Savings
 
Ch13-Performance Measurement_Supply Chain
Ch13-Performance Measurement_Supply ChainCh13-Performance Measurement_Supply Chain
Ch13-Performance Measurement_Supply Chain
 
Benchmarking.ppt
Benchmarking.pptBenchmarking.ppt
Benchmarking.ppt
 
Topic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdfTopic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdf
 
Aptude's IT Managed Services Webinar
Aptude's IT Managed Services WebinarAptude's IT Managed Services Webinar
Aptude's IT Managed Services Webinar
 
Professional services Sourcing and Vendor
Professional services Sourcing and VendorProfessional services Sourcing and Vendor
Professional services Sourcing and Vendor
 
Governance in Outsourcing Made Simple
Governance in Outsourcing Made SimpleGovernance in Outsourcing Made Simple
Governance in Outsourcing Made Simple
 
Danforth Intl Presentation
Danforth Intl PresentationDanforth Intl Presentation
Danforth Intl Presentation
 
7. Process: ocp cfops compliance mgmt
7. Process: ocp cfops compliance mgmt7. Process: ocp cfops compliance mgmt
7. Process: ocp cfops compliance mgmt
 

Plus de Tran Thang

FINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANY
FINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANYFINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANY
FINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANY
Tran Thang
 

Plus de Tran Thang (20)

Chapter 19 Ethics and Social Responsibilities
Chapter 19 Ethics and Social ResponsibilitiesChapter 19 Ethics and Social Responsibilities
Chapter 19 Ethics and Social Responsibilities
 
Chapter 17 Contract Formation and Legal Issues
Chapter 17  Contract Formation and Legal IssuesChapter 17  Contract Formation and Legal Issues
Chapter 17 Contract Formation and Legal Issues
 
Chapter 11 Sourcing
Chapter 11 SourcingChapter 11 Sourcing
Chapter 11 Sourcing
 
Chapter 9 Purchasing Services
Chapter 9 Purchasing ServicesChapter 9 Purchasing Services
Chapter 9 Purchasing Services
 
Chapter 8 The Procurement of Equipment
Chapter 8 The Procurement of EquipmentChapter 8 The Procurement of Equipment
Chapter 8 The Procurement of Equipment
 
Chapter 6 Purchasing Descriptions and Specifications
Chapter 6 Purchasing Descriptions and SpecificationsChapter 6 Purchasing Descriptions and Specifications
Chapter 6 Purchasing Descriptions and Specifications
 
Chapter 5 New Product Development
Chapter 5 New Product DevelopmentChapter 5 New Product Development
Chapter 5 New Product Development
 
Chapter 4 A Portfolio of Relationships
Chapter 4 A Portfolio of RelationshipsChapter 4 A Portfolio of Relationships
Chapter 4 A Portfolio of Relationships
 
Chapter 3 Supply Management: An Organization Spanning Activity
Chapter 3 Supply Management:  An Organization Spanning ActivityChapter 3 Supply Management:  An Organization Spanning Activity
Chapter 3 Supply Management: An Organization Spanning Activity
 
Chapter 2 Organizational Issues
Chapter 2 Organizational IssuesChapter 2 Organizational Issues
Chapter 2 Organizational Issues
 
Chapter 1 The Progression to Professional Supply Management
Chapter 1 The Progression to Professional Supply ManagementChapter 1 The Progression to Professional Supply Management
Chapter 1 The Progression to Professional Supply Management
 
A management thinking to solving material outsourcing problems
A management thinking to solving material outsourcing problemsA management thinking to solving material outsourcing problems
A management thinking to solving material outsourcing problems
 
Research report the driver of supply management capability
Research report the driver of supply management capability Research report the driver of supply management capability
Research report the driver of supply management capability
 
The effects of quality management practices on and employees’ well-being
The effects of quality management practices on and employees’ well-beingThe effects of quality management practices on and employees’ well-being
The effects of quality management practices on and employees’ well-being
 
The impact of service quality on customer satisfaction and loyalty
The impact of service quality on customer satisfaction and loyaltyThe impact of service quality on customer satisfaction and loyalty
The impact of service quality on customer satisfaction and loyalty
 
Routing in Ad hoc networks
Routing in Ad hoc networksRouting in Ad hoc networks
Routing in Ad hoc networks
 
IP networks and mutlimedia
IP networks and mutlimediaIP networks and mutlimedia
IP networks and mutlimedia
 
Globalisation
GlobalisationGlobalisation
Globalisation
 
FINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANY
FINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANYFINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANY
FINANCIAL REPORT ANALYSIS: BECAMEX TRADE AND DEVELOPMENT JOIN STOCK COMPANY
 
Southwest Airlines in 2014: Culture, Values, and Operating Practices
Southwest Airlines in 2014: Culture, Values, and Operating PracticesSouthwest Airlines in 2014: Culture, Values, and Operating Practices
Southwest Airlines in 2014: Culture, Values, and Operating Practices
 

Dernier

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
dlhescort
 

Dernier (20)

Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Chapter 18 Contract and Relationship Management

  • 2. Key Concepts • Need For Better Contract Management • Pre-award Conference • Monitoring And Controlling Project Progress » Gantt Charts » CPM And PERT » Closed Loop MRP Systems • Monitoring And Controlling Total Supplier Performance » Supplier Performance Evaluation 18-2
  • 3. Key Concepts • Motivation » Punishment » Rewards • Assistance » Training » Quality Audits And Procurement System Reviews » Problem Solving » Collaboration » Managing The Relationship 18-3
  • 4. Need for Better Contract Management • Several changes in business have increased the need for better contract management: » Collaboration is continuing to becoming more important » Large inventories are no longer available » Quality is expected » Deliveries are expected to be on time, not early or late » Schedules must be integrated and maintained » Processes must be balanced » Waste must be reduced or eliminated » Communication must be in real-time 18-4
  • 5. Pre-Award Conference • All terms and conditions • Delivery or operations schedule • Staffing and supervision • Site conditions, work rules, safety • Invoicing procedures and documentation • Materials purchase procedures 18-5
  • 6. Pre-Award Conference • Background checks and security clearances • Insurance certificates • Permits • Possible conflicts with other work • Submission of time sheets • Buyer responsibilities • Collaboration milestones 18-6
  • 7. Monitoring and Controlling Project Progress • Operations Progress Reports • Gantt Charts • CPM And PERT • Closed Loop MRP Systems 18-7
  • 8. Production Schedule and Progress Chart (Gantt Chart) Description of Work Jan Feb Mar Apr May Jun Engineering Drawing Bill of Materials Tooling, Etc. Raw Material Proc. Raw Material Rec’d. Long-lead Proc. Parts Production Planned Actual 18-8
  • 9. Project Example: Capital Equipment Acquisition Process Label Description Time Predecessors Activity Activity Activity Immediate Preliminary Discussion Solicitation of Information Budgetary Estimates Funding Authorization Request Qualification of Potential Suppliers Request for Proposal Processing Proposal Analyses Economic Impact Analyses Exceptions to Specifications Side-by-side Demonstrations Notify Selected Supplier Plan Negotiations Conduct Negotiations Execute Contract Record Project Details Contract Inspection Purchase Contract Closeout 5 days 4 days 4 days 1 days 12 days 6 days 14 days 3 days 5 days 8 days 2 days 2 days 12 days 1 day 1 day 2 days 1 day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 None 1 1 3 2 5 6,8,9,10 4,6 6 6 7 7 11,12 13 13 14,15 16 18-9
  • 10. Project Example: View of a PERT Chart in Microsoft Project 18-10
  • 11. Critical Path Scheduling • Critical Path is the longest path through the network • As a manager we need to know the critical path to identify which activities we should focus our efforts on controlling • A delay in a critical path activity delays the expected project completion time • Critical path analysis also lets us know which activities do not need to be managed as strictly 18-11
  • 12. Monitoring and Controlling Total Supplier Performance • Supplier Performance Evaluation » Categorical Plan » Weighted-Point Plan » Cost-ratio Plan 18-12
  • 13. Categorical Plan • Requires continual evaluation • Qualitative ratings are generated » usually on a 3-point scale • Individuals in departments conduct the evaluation: » Supply » Engineering » Quality » Accounting » Receiving – Receiving’s evaluation factors might be: tardiness, quantity, quality, completeness, packaging, etc. 18-13
  • 15. Weighted Point Plan • Step 1: Development of factors (selection criteria) and weights » Weights represent supply management’s judgments concerning relative importance • Step 2: Assignment of ratings » Supplier performance on each factor must be expressed in quantitative terms 18-15
  • 16. Example: Weighted Point Plan • Weight, Factor = Formula » 50%, Quality performance = 100% - rejects% » 25%, Service performance = 100% - 7% per failure » 25%, Price performance = Lowest price offered divided by the price actually paid 18-16
  • 17. Example: Weighted Point Plan Continued Factor Weight Actual Performance Performance Evaluation Quality 50% 5% Rejects 50 x (1.00 – 0.05) = 47.50 Service 25% 3 Failures 25 x [1.00 – (0.07 x 3)] = 19.75 Price 25% $100 25 x ($90 / $100) = 22.50 Overall Evaluation: = 89.75 Table 21-1 18-17
  • 18. Another Example: Weighted Point Plan Factor weight A B C Technology Delivery Price Stability Quality 40 36 35 30 20 20 16 15 20 16 20 15 10 10 8 8 10 9 8 9 Rating total 100 91 87 77 18-18
  • 19. Cost Ratio Plan Steps 1. Additional costs incurred when doing business with a given supplier are identified 2. Costs are separated by quality, service, and price elements of supplier performance 3. Each costs is then converted to a “cost ratio” 4. The ratio expresses the cost as a percent of the total dollar purchase from that supplier 5. The individual cost ratios are totaled, producing the supplier’s overall additional cost ratio 6. Supplier’s price is adjusted using its overall ratio 7. Adjusted prices are then used in supplier evaluation 18-19
  • 20. Cost Ratio Plan Example • Assume that for one supplier: » Quality cost ratio = 2% » Delivery cost ratio = 2% » Service cost ratio = -1% » Price = $72.25 • The sum of all cost ratios is 3 percent • Hence, the adjusted price for this supplier is: » [72.25 + (0.03  72.25)] = $74.42 • This is the price used for evaluation purposes 18-20
  • 21. Motivation • Punishment » Litigation and punitive damages » Not awarding future business » Downgrading a supplier » Billing the supplier for failures • Rewards » Follow on business » Recognition 18-21
  • 22. Assistance • Transformational Training • Quality Audits and Supply System Reviews • Problem Solving 18-22
  • 23. Supplier Surveys • How knowledgeable are our supply managers? • How accurate are our engineering specifications? • How clearly do we state our quality requirements? • How timely are our payments? 18-23
  • 24. Additional Approaches to Improving Supplier Relations • Annual Supplier Meetings • Supplier Roundtables • Supplier Workshops 18-24
  • 25. Collaboration • Most successful supplier management results are generated in collaborations • The ultimate in collaborative relationships is a virtual integration, wherein two independently owned entities integrate their energies for as long as the relationship benefits both parties • One- or two-page memoranda of agreement replace lengthy contracts, change orders, and other legalistic and defensive procedures 18-25
  • 26. Actions to Ensure Success of Supply Alliance Relations • Establish an inter-firm cross-functional team • Team members should receive training • Develop an inter-firm communication system • Develop plans to increase and measure trust • Arrange for co-location of key personnel and for periodic visits to each other’s facilities • Additional plans should be developed and implemented for training on critical issues 18-26
  • 27. Actions to Ensure Success of Supply Alliance Relations Continued • Establish measurable quantifiable objectives • Monitor and report improvements • Ethics should win over expediency • Inter-firm team members need to embrace the philosophy of collaboration • Inter-firm team members should become champions who ensure that their organizations understand and support the alliance’s goals 18-27
  • 28. Closing Remarks • Without question, management of supply contracts is a critical and challenging activity. • Perhaps the most challenging aspect is the evolution from controlling to managing the relationship • New attitudes and skills are required 18-28