This document provides 11 insulation installation details for a massmart meat production facility project. The details show various wall, ceiling, and roof joint configurations including steps joints, mitred corners, and thermal breaks. It also specifies waterproofing, vapor barriers, and an underfloor sacrificial layer.
1. RUDNEVRUDNEVa division of Southey Holdings Pty Ltd
31 Gillits Road - Westmead - Pinetown
P.O. Box 10634 - Ashwood
Tel.: (031) 709 0130/1/2
Fax.: (031) 709 2149
REG No.: 2012/204464/07
Design, manufacture and installation of insulated panels for
controlled environments - Cold rooms, Freezer rooms, Clean
rooms and Factory insulated structures.
Scale at A1:
AS SHOWN
Dm: Designed: Approved:
Checked: Tech Chk: Det Chk: Date:
TB ZMG
Drawing Title:
INSULATION
INSTALLATION
TYPICAL DETAILS
EDILCON CONSTRUCTION
(MASSMART MEAT
PRODUCTION FACILITY)
Project Number: Drawing Number: Revision:
By
Chk
Date SuffixRevision Details:
JHB0682 9080-006
DETAIL 1
WALL TO CEILING JOINT
(WITH STEP-JOINT)
(NTS)
08/11/2016
Issued for enquiry TB 25/10/2016 A
B
COPYRIGHT RESERVEDC
The content of this document is privileged and confidential and may not be disclosed or reproduced
without the express authorisation of the author, being "SOUTHEY HOLDINGS (PTY) LTD"
DETAIL 2
WALL TO CEILING JOINT
(WITHOUT STEP-JOINT)
(NTS)
DETAIL 3
CEILING TO WALL ANNEX JOINT
(NTS)
DETAIL 4
CEILING TO WALL ANNEX JOINT
(NTS)
DETAIL 5
WALL TO WALL JOINT
(INTERMEDIATE)
(NTS)
DETAIL 6
WALL TO WALL CORNER
JOINT (MITRED)
(NTS)
DETAIL 7
WALL TO CORNER ANNEX
JOINT (MITRED)
(NTS)
DETAIL 8
TEE BAR ROOF SUPPORT
(NTS)
DETAIL 9
TYPICAL BASE FIXING DETAIL
FOR CHILLERS & AMBIENT
TEMP ROOMS
(NTS)
DETAIL 10
SECTION THROUGH FREEZER DOOR SILL
(NTS)
DETAIL 11
INTERMEDIATE ROOF SUPPORT
(NTS)
DB
Waterproofing shown on freezer external wall to
ceiling joints in freezers, thermal break shown for
all ceiling to wall annex joints, waterproofing
shown on tee-bar roof support joints, vapour
barrier shown in floor detail, underfloor sacrifical
layer shown as 50mm thick, and, RC slab
thickness to be confirmed by structural engineer.
TB 08/11/2016 B