SlideShare une entreprise Scribd logo
1  sur  23
Télécharger pour lire hors ligne
Introducing
   the fastest, easiest and least expensive way to mount PV modules
Introduction to
Benefits
Additional Information
Conventional Solar Installations Require Railing

Rails are expensive, time-consuming and challenging

                                   It’s time-consuming to manage the
                                    many SKUs and to load parts onto
                                                 trucks.

                                 Additionally, rails must be:
                                     • Stored in costly warehouse space
                                     • Cut to meet the requirements of
                                     the individual job
                                     • Carried or crane-hoisted onto the
                                     roof
                                     •Affixed to the roof with an array of
                                     small parts
The Challenges of Grounding Conventional Systems

 Grounding is difficult and time consuming

                           • Must ground each module and rail
                           • Each event takes 5+ minutes
                           • Often entails grounding “jumpers”
                           between rails.
                           • Ground lugs are susceptible to
                           corrosion, premature failure
                           • Systems often become improperly
                           grounded over time
Innovative Solar Mounting Solution


                                                                    • Installs quickly
                                                                  • Few parts simplify
                                                                         logistics
                                                                    • Self-grounding
                                                                  • Installs portrait or
                                                                        landscape

             Trinamount III installation in New Jersey – 500kWp




Trinamount makes solar cost-effective, fast and easy
How       works

• Groove in module frame
  simplifies system: no rails
• Self-contained grounding
 • Innovative component
  mating: snaps and ¼-turns
      • Fewer parts




        Innovative design sets Trinamount apart
3 Series cover a range of conditions
       I                      II                IIc                III



                COMPOSITION        CORRUGATED
TILE                                                  FLAT ROOFS
                  SHINGLE            METAL




                TRAPEZOIDAL
                   METAL




               STANDING SEAM
Introduction to Trinamount
Benefits
Additional Information
Trinamount is
          fast and easy    quick installation
                 self-contained grounding
            fewer parts, simplified logistics
                       rapid system design
fast/easy                   Quick Installation

   installation

    grounding
                              WATCH VIDEO

      logistics

        design    • No rails: no measuring or cutting
                  • One tool, fewer parts
                  • Integrated wire-management
                  • Self-grounded
                  • Drop and snap installations
                  • 2 kW of mounting hardware fits in a tool belt


                  Installs 4.5 times faster
fast/easy          World-Class Grounding Solution

   installation

    grounding                    • Integrated, optimized
                                 auto-grounding hardware
      logistics
                                 • A single ground lug
        design                   grounds multiple modules

                                 • UL 1703 listed




                  One ground lug per 72 modules
fast/easy             Fewer Parts Simplifies Logistics
                                                            pitched roof example
   installation              Competitor X                       Trinamount III
                      12             240" Rails            32         Leveling Feet
                      6              60" Rails             28           Interlocks
    grounding         12            Rail Splices           1           Ground Lug
                      48             Standoffs             32           Flashings
                      96           S.S. Lag Bolts          93              Total
      logistics       48               L-feet
                      96             S.S. Bolts
                      96             S.S. Nuts         66% fewer SKUs
        design
                       48       Galvanized flashings
                       54         Grounding lugs       80% fewer parts
                       42           Mid Clamps
                       12           End Clamps         System Configuration
                      140'       Bare #8AWG Wire       •   24 Trina 230W PA05 Modules
                       54        S.S. Ground Bolts     •   3 rows of 8 modules
                       54        S.S. Ground Nuts      •   Landscape Configuration
                       54          Star washers
                                                       •   5.52kW DC STC
                      732              Total




                  Fewer parts to ship, store and track
                                                                                      Source: Internal calculations
fast/easy                        Trinamount Design Tool
                                                    • Fast system design and engineering
   installation                                     • Best-in-class web-based software
                                                    • Order the right parts the first time
    grounding
                               For Trinamount I, II projects
      logistics
                               Log in to generate
        design                            • layout designs
                                          • attachment point spans
                                          • cantilever allowances
                                          • bills of materials

                     For Trinamount III projects:
                     Email design@trinasolar.com with specifications and pictures of
                     the project site for assistance

                  order the right parts the first time
                     www.trinamount-design.com
Trinamount
             saves money     theft-resistant
                    landscape installation
                lower labor and parts costs
savings                          Theft-Resistant
                 Module removal requires system-specific knowledge and tool
       secure      Channel-locks cannot fit around nut between modules

    landscape

   labor/parts




                         A secure investment
                                                                      15
savings               Landscape-Installation Options
                         Portrait                  Landscape
       secure

    landscape

   labor/parts
                      Max. 3.2 kW                 Max. 4.0 kW

                 Without rails, you can install in landscape or portrait
                                         modes
                     Landscape installations deliver more kWh



                   25% more kW in landscape
                                                                                   16

                                                                 Source: Internal calculations
savings                           Savings Add Up
                   Installed Cost per Watt for US Residential PV Systems
                                          ($/Wp)
       secure    $ 7.26


                              $ 5.98
                                                    - 10%
    landscape                              $ 5.26
                                                                $ 4.76

   labor/parts                                                                                  BOS
                                                                                                Inverters
                                                                                                Modules




                  2009         2010         2011               Trinamount




                 Installation savings make a real
                  difference in the bottom line
                                                    Sources: GTM Research, Internal estimates
savings          Savings Case Study: Introduction
                           :


       secure       ASSUMPTIONS
                   system size                        1 MWp
    landscape                                  4,256 modules
                   module count
   labor/parts     module wattage                     235 Wp
                   hourly rooftop labor rate      $   120.00
                   copper wire cost/foot          $     0.62
                   modules/row                            24
                   average row length (ft)               140
                   row count                             177




                                                           Source: Internal calculations
savings                      Savings Case Study: Cost Comparison
                 Rooftop installation - 1MWp system                 Competitor XX      Trinamount III                 Savings              %
                  Rooftop Labor Expenses
                                           Crew Size (headcount)                 3                         3                   -
       secure                              Max Module/day/crew                 180                       480                   300       167%
                                       Max Module/man-day Rate                  60                       160                   100
                                               Days to complete                 24                         9                     15

    landscape     (A) Subtotal: Rooftop Labor Expense (in $)                $68,096               $25,536               $42,560
                                                                                                                                          63%
                  Subtotal: Install Labor Exp (in $/Wp)                  $0.068/Wp              $0.026/Wp            $0.043/Wp

                  Grounding
   labor/parts             Incremental Intra-row Copper Wire (ft)          24,826.7                                      24,826.7
                            Incremental Intra-row Copper Wire ($)          $15,393           Trinamount                  $15,393
                                                                                             requires no
                                       Module Grounding Events              4,256.0           additional                  4,256.0
                                                  Minutes/Event                 1.0           grounding                       -
                                   Module Grounding Man-hours                  70.9                                          70.9
                            Module Grounding: Increm. Labor Exp.            $8,512                                        $8,512
                  (B) Subtotal, Incremental Module Grounding ($)            $23,905                    $0               $23,905
                  Subtotal, Incremental Module Grounding/W               $0.024/Wp              $0.000/Wp            $0.024/Wp
                  TOTAL     SAVINGS in $ (A+B)                              $92,001               $25,536               $66,465
                                                                                                                                          72%
                              in $/Wp                                    $0.092/Wp              $0.026/Wp            $0.066/Wp




                                                    72% total savings
                                     System completed in 9 days (vs. 24 days)
                                                                                      Source: Internal calculations and Competitor Y’s data sheets
Trinamount
     Faster and Easier                 Fewer Parts              Accommodates any Roof
 Installs up to 5 times faster      One tool, few parts         Systems for for flat, tiled and
                                                                       pitched roofs




     Theft Resistant                Improves Efficiency            Aesthetic Solution
 More difficult to steal from    Install modules landscape or   Array skirts keep your array
            roofs                    portrait for more kWh             looking clean
Introduction to Trinamount
Benefits
Additional Information
add’l info      Please visit our website for more details


     website




               you can find at our website:
                       • Videos               • Trinamount Design Tool
                       • Installation Manuals • Datasheets



                   www.trinasolar.com/trinamount
CHINA    sales@trinasolar.com

      JAPAN    japan@trinasolar.com

     KOREA     korea@trinasolar.com

      U.S.A.   usa@trinasolar.com

SWITZERLAND    europe@trinasolar.com        CONTACT US
   GERMANY     germany@trinasolar.com

       ITALY   italy@trinasolar.com

      SPAIN    spain@trinasolar.com

  AUSTRALIA    australia@trinasolar.com

                              www.trinasolar.com

Contenu connexe

Similaire à Trinamount

presentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptxpresentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptxSirachartChuto
 
MB Kit Systems: Custom Mechanical Solution Provider
MB Kit Systems: Custom Mechanical Solution ProviderMB Kit Systems: Custom Mechanical Solution Provider
MB Kit Systems: Custom Mechanical Solution ProviderMB Kit Systems Inc.
 
Arnold Nipper - Building resilient and scalable Terabit Exchangepoints
Arnold Nipper - Building resilient and scalable Terabit ExchangepointsArnold Nipper - Building resilient and scalable Terabit Exchangepoints
Arnold Nipper - Building resilient and scalable Terabit ExchangepointsPROIDEA
 
8000i wire-bonder overview
8000i wire-bonder overview8000i wire-bonder overview
8000i wire-bonder overviewfastbr
 
Julianna Ricci Portfolio 2016
Julianna Ricci Portfolio 2016Julianna Ricci Portfolio 2016
Julianna Ricci Portfolio 2016Julianna Ricci
 
Design and Manufacturing Development of Thick
Design and Manufacturing Development of ThickDesign and Manufacturing Development of Thick
Design and Manufacturing Development of ThickBill Cleary
 
NetIG RCI Brochure
NetIG RCI BrochureNetIG RCI Brochure
NetIG RCI BrochurePaul Manley
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling SystemMrirfan
 
Seismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsSeismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsPradeep Satyanarayana
 
Cloud Networking is not Virtual Networking - London VMUG 20130425
Cloud Networking is not Virtual Networking - London VMUG 20130425Cloud Networking is not Virtual Networking - London VMUG 20130425
Cloud Networking is not Virtual Networking - London VMUG 20130425Greg Ferro
 
Increasing the Strength and Reliability of Press Fits
Increasing the Strength and Reliability of Press FitsIncreasing the Strength and Reliability of Press Fits
Increasing the Strength and Reliability of Press FitsDesign World
 
Introduction into Surface Mount Technology
Introduction into Surface Mount TechnologyIntroduction into Surface Mount Technology
Introduction into Surface Mount TechnologyShanmugaVelC1
 
An close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of constructionAn close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of constructionShanmukha Srinivas Byrukuri Gangadhar
 
Dce product overview
Dce  product overview  Dce  product overview
Dce product overview bill_taylor
 

Similaire à Trinamount (20)

presentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptxpresentation1-131031235854-phpapp02.pptx
presentation1-131031235854-phpapp02.pptx
 
KBDF AC Drive Sales Sheet
KBDF AC Drive Sales SheetKBDF AC Drive Sales Sheet
KBDF AC Drive Sales Sheet
 
SMT
SMTSMT
SMT
 
MB Kit Systems: Custom Mechanical Solution Provider
MB Kit Systems: Custom Mechanical Solution ProviderMB Kit Systems: Custom Mechanical Solution Provider
MB Kit Systems: Custom Mechanical Solution Provider
 
Arnold Nipper - Building resilient and scalable Terabit Exchangepoints
Arnold Nipper - Building resilient and scalable Terabit ExchangepointsArnold Nipper - Building resilient and scalable Terabit Exchangepoints
Arnold Nipper - Building resilient and scalable Terabit Exchangepoints
 
8000i wire-bonder overview
8000i wire-bonder overview8000i wire-bonder overview
8000i wire-bonder overview
 
Julianna Ricci Portfolio 2016
Julianna Ricci Portfolio 2016Julianna Ricci Portfolio 2016
Julianna Ricci Portfolio 2016
 
Design and Manufacturing Development of Thick
Design and Manufacturing Development of ThickDesign and Manufacturing Development of Thick
Design and Manufacturing Development of Thick
 
Seismic capabilties - ProSIM
Seismic capabilties - ProSIMSeismic capabilties - ProSIM
Seismic capabilties - ProSIM
 
NetIG RCI Brochure
NetIG RCI BrochureNetIG RCI Brochure
NetIG RCI Brochure
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System
 
MATC Fall Lecture Series: Steve Garbe
MATC Fall Lecture Series: Steve GarbeMATC Fall Lecture Series: Steve Garbe
MATC Fall Lecture Series: Steve Garbe
 
Seismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsSeismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipments
 
Cloud Networking is not Virtual Networking - London VMUG 20130425
Cloud Networking is not Virtual Networking - London VMUG 20130425Cloud Networking is not Virtual Networking - London VMUG 20130425
Cloud Networking is not Virtual Networking - London VMUG 20130425
 
Increasing the Strength and Reliability of Press Fits
Increasing the Strength and Reliability of Press FitsIncreasing the Strength and Reliability of Press Fits
Increasing the Strength and Reliability of Press Fits
 
Introduction into Surface Mount Technology
Introduction into Surface Mount TechnologyIntroduction into Surface Mount Technology
Introduction into Surface Mount Technology
 
An close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of constructionAn close industrial approach to look into Pre-cast mode of construction
An close industrial approach to look into Pre-cast mode of construction
 
Dce product overview
Dce  product overview  Dce  product overview
Dce product overview
 
KBMA AC Drive Sales Sheet
KBMA AC Drive Sales SheetKBMA AC Drive Sales Sheet
KBMA AC Drive Sales Sheet
 
IDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & VaultsIDS Cable Ducting, Cable Chambers & Vaults
IDS Cable Ducting, Cable Chambers & Vaults
 

Plus de Trina Solar Ltd

Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance Trina Solar Ltd
 
Trinamount Présentation (Version française)
Trinamount Présentation (Version française)Trinamount Présentation (Version française)
Trinamount Présentation (Version française)Trina Solar Ltd
 
Honey TSM PC05A (version française)
Honey TSM PC05A (version française)Honey TSM PC05A (version française)
Honey TSM PC05A (version française)Trina Solar Ltd
 
Honey TSM-PC05A (Versione Italiana)
Honey TSM-PC05A (Versione Italiana)Honey TSM-PC05A (Versione Italiana)
Honey TSM-PC05A (Versione Italiana)Trina Solar Ltd
 
Honey PC05A (Deutsche Version)
Honey PC05A (Deutsche Version)Honey PC05A (Deutsche Version)
Honey PC05A (Deutsche Version)Trina Solar Ltd
 
Trinamount (Deutsche Version)
Trinamount (Deutsche Version)Trinamount (Deutsche Version)
Trinamount (Deutsche Version)Trina Solar Ltd
 

Plus de Trina Solar Ltd (8)

Trina Triple Crown
Trina Triple CrownTrina Triple Crown
Trina Triple Crown
 
Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance Trina Solar: Environmentally Responsible Approach to Performance
Trina Solar: Environmentally Responsible Approach to Performance
 
Trinamount Présentation (Version française)
Trinamount Présentation (Version française)Trinamount Présentation (Version française)
Trinamount Présentation (Version française)
 
Honey TSM PC05A (version française)
Honey TSM PC05A (version française)Honey TSM PC05A (version française)
Honey TSM PC05A (version française)
 
Honey TSM-PC05A (Versione Italiana)
Honey TSM-PC05A (Versione Italiana)Honey TSM-PC05A (Versione Italiana)
Honey TSM-PC05A (Versione Italiana)
 
Honey PC05A (Deutsche Version)
Honey PC05A (Deutsche Version)Honey PC05A (Deutsche Version)
Honey PC05A (Deutsche Version)
 
Trinamount (Deutsche Version)
Trinamount (Deutsche Version)Trinamount (Deutsche Version)
Trinamount (Deutsche Version)
 
Honey TSM-PC/PA05A
Honey TSM-PC/PA05AHoney TSM-PC/PA05A
Honey TSM-PC/PA05A
 

Dernier

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 

Dernier (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Trinamount

  • 1. Introducing the fastest, easiest and least expensive way to mount PV modules
  • 3. Conventional Solar Installations Require Railing Rails are expensive, time-consuming and challenging It’s time-consuming to manage the many SKUs and to load parts onto trucks. Additionally, rails must be: • Stored in costly warehouse space • Cut to meet the requirements of the individual job • Carried or crane-hoisted onto the roof •Affixed to the roof with an array of small parts
  • 4. The Challenges of Grounding Conventional Systems Grounding is difficult and time consuming • Must ground each module and rail • Each event takes 5+ minutes • Often entails grounding “jumpers” between rails. • Ground lugs are susceptible to corrosion, premature failure • Systems often become improperly grounded over time
  • 5. Innovative Solar Mounting Solution • Installs quickly • Few parts simplify logistics • Self-grounding • Installs portrait or landscape Trinamount III installation in New Jersey – 500kWp Trinamount makes solar cost-effective, fast and easy
  • 6. How works • Groove in module frame simplifies system: no rails • Self-contained grounding • Innovative component mating: snaps and ¼-turns • Fewer parts Innovative design sets Trinamount apart
  • 7. 3 Series cover a range of conditions I II IIc III COMPOSITION CORRUGATED TILE FLAT ROOFS SHINGLE METAL TRAPEZOIDAL METAL STANDING SEAM
  • 9. Trinamount is fast and easy quick installation self-contained grounding fewer parts, simplified logistics rapid system design
  • 10. fast/easy Quick Installation installation grounding WATCH VIDEO logistics design • No rails: no measuring or cutting • One tool, fewer parts • Integrated wire-management • Self-grounded • Drop and snap installations • 2 kW of mounting hardware fits in a tool belt Installs 4.5 times faster
  • 11. fast/easy World-Class Grounding Solution installation grounding • Integrated, optimized auto-grounding hardware logistics • A single ground lug design grounds multiple modules • UL 1703 listed One ground lug per 72 modules
  • 12. fast/easy Fewer Parts Simplifies Logistics pitched roof example installation Competitor X Trinamount III 12 240" Rails 32 Leveling Feet 6 60" Rails 28 Interlocks grounding 12 Rail Splices 1 Ground Lug 48 Standoffs 32 Flashings 96 S.S. Lag Bolts 93 Total logistics 48 L-feet 96 S.S. Bolts 96 S.S. Nuts 66% fewer SKUs design 48 Galvanized flashings 54 Grounding lugs 80% fewer parts 42 Mid Clamps 12 End Clamps System Configuration 140' Bare #8AWG Wire • 24 Trina 230W PA05 Modules 54 S.S. Ground Bolts • 3 rows of 8 modules 54 S.S. Ground Nuts • Landscape Configuration 54 Star washers • 5.52kW DC STC 732 Total Fewer parts to ship, store and track Source: Internal calculations
  • 13. fast/easy Trinamount Design Tool • Fast system design and engineering installation • Best-in-class web-based software • Order the right parts the first time grounding For Trinamount I, II projects logistics Log in to generate design • layout designs • attachment point spans • cantilever allowances • bills of materials For Trinamount III projects: Email design@trinasolar.com with specifications and pictures of the project site for assistance order the right parts the first time www.trinamount-design.com
  • 14. Trinamount saves money theft-resistant landscape installation lower labor and parts costs
  • 15. savings Theft-Resistant Module removal requires system-specific knowledge and tool secure Channel-locks cannot fit around nut between modules landscape labor/parts A secure investment 15
  • 16. savings Landscape-Installation Options Portrait Landscape secure landscape labor/parts Max. 3.2 kW Max. 4.0 kW Without rails, you can install in landscape or portrait modes Landscape installations deliver more kWh 25% more kW in landscape 16 Source: Internal calculations
  • 17. savings Savings Add Up Installed Cost per Watt for US Residential PV Systems ($/Wp) secure $ 7.26 $ 5.98 - 10% landscape $ 5.26 $ 4.76 labor/parts BOS Inverters Modules 2009 2010 2011 Trinamount Installation savings make a real difference in the bottom line Sources: GTM Research, Internal estimates
  • 18. savings Savings Case Study: Introduction : secure ASSUMPTIONS system size 1 MWp landscape 4,256 modules module count labor/parts module wattage 235 Wp hourly rooftop labor rate $ 120.00 copper wire cost/foot $ 0.62 modules/row 24 average row length (ft) 140 row count 177 Source: Internal calculations
  • 19. savings Savings Case Study: Cost Comparison Rooftop installation - 1MWp system Competitor XX Trinamount III Savings % Rooftop Labor Expenses Crew Size (headcount) 3 3 - secure Max Module/day/crew 180 480 300 167% Max Module/man-day Rate 60 160 100 Days to complete 24 9 15 landscape (A) Subtotal: Rooftop Labor Expense (in $) $68,096 $25,536 $42,560 63% Subtotal: Install Labor Exp (in $/Wp) $0.068/Wp $0.026/Wp $0.043/Wp Grounding labor/parts Incremental Intra-row Copper Wire (ft) 24,826.7 24,826.7 Incremental Intra-row Copper Wire ($) $15,393 Trinamount $15,393 requires no Module Grounding Events 4,256.0 additional 4,256.0 Minutes/Event 1.0 grounding - Module Grounding Man-hours 70.9 70.9 Module Grounding: Increm. Labor Exp. $8,512 $8,512 (B) Subtotal, Incremental Module Grounding ($) $23,905 $0 $23,905 Subtotal, Incremental Module Grounding/W $0.024/Wp $0.000/Wp $0.024/Wp TOTAL SAVINGS in $ (A+B) $92,001 $25,536 $66,465 72% in $/Wp $0.092/Wp $0.026/Wp $0.066/Wp 72% total savings System completed in 9 days (vs. 24 days) Source: Internal calculations and Competitor Y’s data sheets
  • 20. Trinamount Faster and Easier Fewer Parts Accommodates any Roof Installs up to 5 times faster One tool, few parts Systems for for flat, tiled and pitched roofs Theft Resistant Improves Efficiency Aesthetic Solution More difficult to steal from Install modules landscape or Array skirts keep your array roofs portrait for more kWh looking clean
  • 22. add’l info Please visit our website for more details website you can find at our website: • Videos • Trinamount Design Tool • Installation Manuals • Datasheets www.trinasolar.com/trinamount
  • 23. CHINA sales@trinasolar.com JAPAN japan@trinasolar.com KOREA korea@trinasolar.com U.S.A. usa@trinasolar.com SWITZERLAND europe@trinasolar.com CONTACT US GERMANY germany@trinasolar.com ITALY italy@trinasolar.com SPAIN spain@trinasolar.com AUSTRALIA australia@trinasolar.com www.trinasolar.com