Experiences with rural electrification in Bosnia and Herzegovina
Siniša Rodić
Project Manager, Energy and Environment
UNDP CO BiH
THE PROBLEM
•

Many people assume that most of the 1.3 billion people without access to energy
live in Africa and India. Very few would guess that there are thousands of families in
the Balkans that are not connected to the energy grid.

•

This is the reality of thousands Bosnian families today.

•

More than 1 out of 2.2 million displaced people during the Balkan wars of the 1990s
have returned to their homes and reclaimed their property rights.

•

Funding for returns is fast decreasing, leaving about a million people in a difficult
situation and thousands without any access to the power grid (over 3,000 families).

•

With resource prices continually rising and their incomes already below the poverty
level, these families are on the very margins of society and development.
LOCAL CONTEXT
•

They typically live in a small village or hamlet with 1 to 5 families located in an
isolated, rural location. Small scale agricultural production is the main source of
livelihood.

•

Their homes were connected to the grid before the war, but the infrastructure is
destroyed with repairs unrealistic as a result of both large scale investments and low
feasibility given the number of scattered families living in isolated locations.

•

The right to access to energy is equal to both the returnee families as is for all other
citizens and it is a pre-requisite for sustainable human development.

•

Within this context, UNDP Bosnia and Herzegovina was seeking for a solution that
will provide a sustainable, cost-effective solution for standalone, off grid renewable
energy supply for returnee families
THE PROCESS
•

Upon completion of first pilot electrification project with “in-house” RES solution (12
households), UNDP, in partnership with NESTA, released a global Renewable
Energy Challenge for design and development of:

 sustainable, cost-effective solution for a standalone, off-grid renewable energy
supply which can produce:
 minimum 1,25 kWh/day and
 minimum of 120 litres of hot-water
To cover the needs of an average returnee family in rural areas of Bosnia and
Herzegovina.
JUDGING CRITERIA
•

investment costs

•

energy output

•

battery capacity

•

hot water capacity

•

reliability

•

average running costs

•

maintenance costs

•

simplicity of use and replication potential
ROAD TO THE WINNER
•

37 solutions received

•

4 shortlisted - 1st evaluation (UNDP)

•

2 shortlisted after 2nd evaluation (completed in cooperation with NESTA panel of
experts)

•

1 tested solution – the winner
RESULT
•

Out of 37, after technical evaluation and field testing a winning solution selected!















Specification of the system:
Electrical power of the solar panel
Thermal power of solar panel
Inverter power
Max Inverter power
DC battery voltage
AC output voltage
Voltage of the panels
Max current of the panels
Max current of the charger
Efficiency of the inverter
Type of the inverter
Capacity of the batteries
Volume of the boiler

1275 W
1400 W
3000 W
4500 W
48 V
230 V/ 50 Hz
100 – 500 V
13 A
25 A
92%
Pure sine wave
4 x 200 Ah/12 V
120 L
NEXT STEPS
•

Now, UNDP is in the process of installing of 8 winning solutions in one village in
Bosnia and Herzegovina (the village of Prkosi, Bosanski Petrovac municipality).

 Just for illustration, to rebuild the grid (conventional) for this village the cost is
estimated at approx. 300,000 €. To install Individual Renewable Energy solutions the
cost is 40,000 €.
•

Negotiating with all national levels governments for scaling-up across the country.

•

Working with local NGOs and other donors for continuation of support with
installations of Renewable Energy solutions in Bosnia and Herzegovina
Thank you for your attention!
Siniša Rodić
Project Manager, Energy and Environment
UNDP CO BiH
sinisa.rodic@undp.org
+387 65 881 453

Contenu connexe

En vedette (9)

Low emission strategy dc zagreb_2012
Low emission strategy dc zagreb_2012Low emission strategy dc zagreb_2012
Low emission strategy dc zagreb_2012
 
Zarko Horvat, Holcim Hrvatska
Zarko Horvat, Holcim Hrvatska Zarko Horvat, Holcim Hrvatska
Zarko Horvat, Holcim Hrvatska
 
EU funding instruments of support to strengthening victims' rights
EU funding instruments of support to strengthening victims' rightsEU funding instruments of support to strengthening victims' rights
EU funding instruments of support to strengthening victims' rights
 
Leds 1st worshop_jelavic
Leds 1st worshop_jelavicLeds 1st worshop_jelavic
Leds 1st worshop_jelavic
 
Victim Support Scotland
Victim Support ScotlandVictim Support Scotland
Victim Support Scotland
 
9 undp albania presentation croatia event 9 december 2013
9 undp albania presentation croatia event 9 december 20139 undp albania presentation croatia event 9 december 2013
9 undp albania presentation croatia event 9 december 2013
 
Izrada nisko-ugljične strategije razvoja - podloge u RH
Izrada nisko-ugljične strategije razvoja - podloge u RHIzrada nisko-ugljične strategije razvoja - podloge u RH
Izrada nisko-ugljične strategije razvoja - podloge u RH
 
7 andreas tuerk better_zagreb_09_12 10h03
7 andreas tuerk  better_zagreb_09_12 10h037 andreas tuerk  better_zagreb_09_12 10h03
7 andreas tuerk better_zagreb_09_12 10h03
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
 

Similaire à 20 sinisa rodic experiences with rural electrification undp co bi-h_12112013

Lightning talks challenges and crowdsourcing as a way to gather new ideas-sa...
Lightning talks  challenges and crowdsourcing as a way to gather new ideas-sa...Lightning talks  challenges and crowdsourcing as a way to gather new ideas-sa...
Lightning talks challenges and crowdsourcing as a way to gather new ideas-sa...
United Nations Development Programme
 

Similaire à 20 sinisa rodic experiences with rural electrification undp co bi-h_12112013 (20)

Lightning talks challenges and crowdsourcing as a way to gather new ideas-sa...
Lightning talks  challenges and crowdsourcing as a way to gather new ideas-sa...Lightning talks  challenges and crowdsourcing as a way to gather new ideas-sa...
Lightning talks challenges and crowdsourcing as a way to gather new ideas-sa...
 
Rural Electrification in India
Rural Electrification in IndiaRural Electrification in India
Rural Electrification in India
 
Small hydropower potentials
Small hydropower potentialsSmall hydropower potentials
Small hydropower potentials
 
Rural electrification in India: are mini-grids the answer?
Rural electrification in India: are mini-grids the answer?Rural electrification in India: are mini-grids the answer?
Rural electrification in India: are mini-grids the answer?
 
The National CDM Project For Green Housing
The National CDM Project For Green HousingThe National CDM Project For Green Housing
The National CDM Project For Green Housing
 
Agua y Energía: Problemática y soluciones por Tomás Sancho, Consejo Mundial d...
Agua y Energía: Problemática y soluciones por Tomás Sancho, Consejo Mundial d...Agua y Energía: Problemática y soluciones por Tomás Sancho, Consejo Mundial d...
Agua y Energía: Problemática y soluciones por Tomás Sancho, Consejo Mundial d...
 
Energy through biogas in rural india by eshan ahuja
Energy through biogas in rural india by eshan ahujaEnergy through biogas in rural india by eshan ahuja
Energy through biogas in rural india by eshan ahuja
 
Energy Efficiency in Buildings: Europe and Central Asia
Energy Efficiency in Buildings: Europe and Central AsiaEnergy Efficiency in Buildings: Europe and Central Asia
Energy Efficiency in Buildings: Europe and Central Asia
 
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1cHZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
 
Arusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Arusha | Jun-14 | Changing Rural Economies through Small Scale ElectrificationArusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Arusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
 
Nova Scotia’s Goals
Nova Scotia’s GoalsNova Scotia’s Goals
Nova Scotia’s Goals
 
Green Homes: Promotion of Sustainble Housing in Nepal
Green Homes: Promotion of Sustainble Housing in Nepal Green Homes: Promotion of Sustainble Housing in Nepal
Green Homes: Promotion of Sustainble Housing in Nepal
 
DC House Project (Direct Curent House)
 DC House Project (Direct Curent House) DC House Project (Direct Curent House)
DC House Project (Direct Curent House)
 
Sustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western BalkansSustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western Balkans
 
Blake Lapthorn Construction Green Breakfast with John Martin - 31 May 2012
Blake Lapthorn Construction Green Breakfast with John Martin - 31 May 2012Blake Lapthorn Construction Green Breakfast with John Martin - 31 May 2012
Blake Lapthorn Construction Green Breakfast with John Martin - 31 May 2012
 
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island InitiativeBunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
 
New Renewables_Small Hydro Power
New Renewables_Small Hydro PowerNew Renewables_Small Hydro Power
New Renewables_Small Hydro Power
 
Providing Access to Clean Energy for Lighting in Rural Communities
Providing Access to Clean Energy for Lighting in Rural CommunitiesProviding Access to Clean Energy for Lighting in Rural Communities
Providing Access to Clean Energy for Lighting in Rural Communities
 
AC Distribution in Bangladesh (in a nutshell)
AC Distribution in Bangladesh (in a nutshell)AC Distribution in Bangladesh (in a nutshell)
AC Distribution in Bangladesh (in a nutshell)
 
Ghana | May-16 | ECREEE and oportunities for improving Energy Access in West ...
Ghana | May-16 | ECREEE and oportunities for improving Energy Access in West ...Ghana | May-16 | ECREEE and oportunities for improving Energy Access in West ...
Ghana | May-16 | ECREEE and oportunities for improving Energy Access in West ...
 

Plus de UNDPhr

Plus de UNDPhr (20)

Plan razvoja Jadrtovca i Morinja
Plan razvoja Jadrtovca i MorinjaPlan razvoja Jadrtovca i Morinja
Plan razvoja Jadrtovca i Morinja
 
Sustav za praćenje, mjerenje i verifikaciju ušteda energije
Sustav za praćenje, mjerenje i verifikaciju ušteda energijeSustav za praćenje, mjerenje i verifikaciju ušteda energije
Sustav za praćenje, mjerenje i verifikaciju ušteda energije
 
UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015
 
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEAEnergetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
 
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitostNacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
 
HEP - Current status and perspectives of ESCO projects in Croatia
HEP - Current status and   perspectives of ESCO projects in CroatiaHEP - Current status and   perspectives of ESCO projects in Croatia
HEP - Current status and perspectives of ESCO projects in Croatia
 
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUNDENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
 
Energy Insitute Hrvoje Pozar
Energy Insitute Hrvoje PozarEnergy Insitute Hrvoje Pozar
Energy Insitute Hrvoje Pozar
 
APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015
 
Projektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županijaProjektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županija
 
Projektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županijaProjektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županija
 
Projektni paket - Karlovačka zupanija
Projektni paket  - Karlovačka zupanijaProjektni paket  - Karlovačka zupanija
Projektni paket - Karlovačka zupanija
 
Strateške smjernice - Sisačko-moslavačka županija
Strateške smjernice - Sisačko-moslavačka županijaStrateške smjernice - Sisačko-moslavačka županija
Strateške smjernice - Sisačko-moslavačka županija
 
Strateške smjernice - Ličko-senjska županija
Strateške smjernice - Ličko-senjska županijaStrateške smjernice - Ličko-senjska županija
Strateške smjernice - Ličko-senjska županija
 
Strateške smjernice - Karlovačka županija
Strateške smjernice - Karlovačka županijaStrateške smjernice - Karlovačka županija
Strateške smjernice - Karlovačka županija
 
Cooperation EU and the Western Balkans
Cooperation EU and the Western BalkansCooperation EU and the Western Balkans
Cooperation EU and the Western Balkans
 
Sustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseSustainable Energy - Martin Krause
Sustainable Energy - Martin Krause
 
Better project - Introduction
Better project - IntroductionBetter project - Introduction
Better project - Introduction
 
EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014
 
Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014
 

Dernier

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Dernier (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

20 sinisa rodic experiences with rural electrification undp co bi-h_12112013

  • 1. Experiences with rural electrification in Bosnia and Herzegovina Siniša Rodić Project Manager, Energy and Environment UNDP CO BiH
  • 2. THE PROBLEM • Many people assume that most of the 1.3 billion people without access to energy live in Africa and India. Very few would guess that there are thousands of families in the Balkans that are not connected to the energy grid. • This is the reality of thousands Bosnian families today. • More than 1 out of 2.2 million displaced people during the Balkan wars of the 1990s have returned to their homes and reclaimed their property rights. • Funding for returns is fast decreasing, leaving about a million people in a difficult situation and thousands without any access to the power grid (over 3,000 families). • With resource prices continually rising and their incomes already below the poverty level, these families are on the very margins of society and development.
  • 3. LOCAL CONTEXT • They typically live in a small village or hamlet with 1 to 5 families located in an isolated, rural location. Small scale agricultural production is the main source of livelihood. • Their homes were connected to the grid before the war, but the infrastructure is destroyed with repairs unrealistic as a result of both large scale investments and low feasibility given the number of scattered families living in isolated locations. • The right to access to energy is equal to both the returnee families as is for all other citizens and it is a pre-requisite for sustainable human development. • Within this context, UNDP Bosnia and Herzegovina was seeking for a solution that will provide a sustainable, cost-effective solution for standalone, off grid renewable energy supply for returnee families
  • 4. THE PROCESS • Upon completion of first pilot electrification project with “in-house” RES solution (12 households), UNDP, in partnership with NESTA, released a global Renewable Energy Challenge for design and development of:  sustainable, cost-effective solution for a standalone, off-grid renewable energy supply which can produce:  minimum 1,25 kWh/day and  minimum of 120 litres of hot-water To cover the needs of an average returnee family in rural areas of Bosnia and Herzegovina.
  • 5. JUDGING CRITERIA • investment costs • energy output • battery capacity • hot water capacity • reliability • average running costs • maintenance costs • simplicity of use and replication potential
  • 6. ROAD TO THE WINNER • 37 solutions received • 4 shortlisted - 1st evaluation (UNDP) • 2 shortlisted after 2nd evaluation (completed in cooperation with NESTA panel of experts) • 1 tested solution – the winner
  • 7. RESULT • Out of 37, after technical evaluation and field testing a winning solution selected!              Specification of the system: Electrical power of the solar panel Thermal power of solar panel Inverter power Max Inverter power DC battery voltage AC output voltage Voltage of the panels Max current of the panels Max current of the charger Efficiency of the inverter Type of the inverter Capacity of the batteries Volume of the boiler 1275 W 1400 W 3000 W 4500 W 48 V 230 V/ 50 Hz 100 – 500 V 13 A 25 A 92% Pure sine wave 4 x 200 Ah/12 V 120 L
  • 8.
  • 9. NEXT STEPS • Now, UNDP is in the process of installing of 8 winning solutions in one village in Bosnia and Herzegovina (the village of Prkosi, Bosanski Petrovac municipality).  Just for illustration, to rebuild the grid (conventional) for this village the cost is estimated at approx. 300,000 €. To install Individual Renewable Energy solutions the cost is 40,000 €. • Negotiating with all national levels governments for scaling-up across the country. • Working with local NGOs and other donors for continuation of support with installations of Renewable Energy solutions in Bosnia and Herzegovina
  • 10. Thank you for your attention! Siniša Rodić Project Manager, Energy and Environment UNDP CO BiH sinisa.rodic@undp.org +387 65 881 453

Notes de l'éditeur

  1. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  2. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  3. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  4. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  5. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  6. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  7. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!
  8. You need intagible projects to make the tangible one sustainable and not for them to be only project related investmnets wihtout continuation, without making sure that someone can continue where you stoped!