SlideShare une entreprise Scribd logo
1  sur  7
Email : cveera_vrs@yahoo.co.in
Mobile :+91 9999900301, +91 9884225246
VEERAKAMU C.
Senior Engineer - Piping
PROFESSION:
Senior Engineer - Piping
EDUCATIONAL QUALIFICATION:
Bachelor of Engineering (Manufacturing Engineering under Mechanical faculty)-Apr 2008
Anna University Main Campus, Chennai, Tamil Nadu, India
Diploma in Mechanical Engineering – Apr 2000
V.S.V.N. Polytechnic, Virudhunagar, Tamil Nadu, India
SUMMARY OF EXPERIENCE:
Professional experience (15 years) in Piping Design for Petrochemical, Refineries,
Chemicals and Power Plants. The Responsibilities are,
 Study of Basic Engineering Design Data and Preparation of ITB summary.
 Can work independently & Lead a team of designers for assigned design area,
 Progress monitoring and updation of Progress measurement system(PMS)
 Piping design and detailed engineering. Preparation of Piping routing studies and Nozzle Orientation
in view of Construction, Operation and maintenance requirements.
 Preparation of Unit Plot Plans and Equipment Layout plans.
 3D & 2D Modeling of Piping/Equipment using PDS/SP3D, AutoCAD, & Micro station for Pipe Rack,
Pump, Vessels and Columns, Heat exchangers, Air Coolers, Compressors, Bullets, etc.,
 Selection of standard Piping supports and Modeling the same and Special supports preparation.
 Piping Isometrics extraction & Checking of Isometrics based on P&ID, Generation of Piping GA
 Preparation of BOM sketch and Material Take off.
 Effective Inter-discipline coordination and squad check. Vendor/Civil Drawings review.
 Co-ordination for clash review in SPR
 Participation of 60% & 90% 3D Model review both Internal and with client.
 Preparation of Resolution reports for 3D model review comments and sent to PMC/Company.
 Field engineering, including troubleshooting and site assistance.
 Solving errors during isometric extraction, Report extraction from report manager, PDS Spec coding,
Editing and Loading the PCD files, Resolving spec related issues in Isometrics, Dimension tables
updating and loading, MDP, Orthogen, Design area and Model creation. RDB conflict reports.
 Good interpersonal and Co-ordination skills. Excellent analytical skills and capacity to work hard.
SOFTWARE PROFICEINCY:
 PDS – Piping Modeling, Equipment Modeling, Drawing Manager, Isometric Drawing Manager,
Interference Checking Manager, Drawing Manager, Report Manager, Project Administrator,
Reference Data manager
 SP3D – Piping, Equipment &furnishing, Hangers & supports, Drawings & Reports
 Smart Plant Review, Material Data Publisher, PDMS(Learner)
 Micro station, Orthogen
 Smile-E, AutoCAD, Ms office
CAREER SUMMARY:
1. SK E&C India Private Limited, Mar 2011– Till Date
2. Foster Wheeler India Pvt. Limited, Sep. 2005– Feb. 2011
3. Avant-Garde engineers and Consultants Pvt Ltd Feb. 2002- Sep. 2005
Page 1 of 7
VEERAKAMU C.
Senior Engineer - Piping
4. Bharat Heavy Electricals limited (Piping Centre) Jan. 2001-Dec. 2001
5. Bibrain Engineering Systems Private limited, Chennai Jun. 2000-Dec. 2000
DEPUTATED TO:
SK E&C SITE OFFICE, Abu Dhabi, UAE Aug.2012 – Feb
2013
(Field Assignment for Ruwais Refinery Expansion Project)
Foster Wheeler India Pvt. Limited, Gurgaon. Feb. 2010– Dec.
2010
Foster Wheeler India Pvt. Limited, Kolkata Nov. 2008–Dec.
2008
PROJECT EXPERIENCES:
1. SK E&C INDIA PVT. LTD.
Responsible Engineer – (Dec 2015 to Till Date)
Client – Kuwait National Petroleum Co.(KNPC)
Project – CFP2020 Project, Kuwait
Areas handled – Sulphur Recovery Unit(SRU)
Responsibilities:
 Involved in Model review comments close-out
 3D Modelling of Piping and Equipment for Assigned area
 Extraction of IFC isometrics and updating the comments.
 Material Take off for Valves
 Checking of IFC isometrics as per P&ID & Design checking
Responsible Engineer – (Mar 2013 to Dec 2015)
Client – Nghi Son Refinery and Petrochemical Limited Liability Company - Vietnam,
Project – Nghi Son Refinery and Petrochemical Complex Project
Areas handled – LPG Recovery Unit (LRU)
Responsibilities:
 Responsible Engineer for Design and detailed Engineering for assigned area of LRU unit
 Preliminary MTO from Proposal.
 Worked on Plot Plan Optimization and involved in Piping design studies for Columns, Compressors,
Air Coolers, Pumps, Exchanger, Pressure Vessel and Re-boilers.
 Preparation of Nozzle orientation Drgs.
 Planned and assigned the work to designer.
 3D modelling of Piping and equipment.
 Pipe rack loading information to Civil
 Participated internal and external 3D model reviews with Client, Preparation of MR close-out report.
 Vendor drawing review and inter-discipline squad checks. Inter-discipline co-ordination.
 Stress isometrics preparation and selection of Pipe supports as per specification.
 Fabrication isometrics extraction and tracking of Isometrics to issue IFC.
Piping Field Engineer – (Aug 2012 to Feb 2013)
Client – TAKREER,
Project – Ruwais Refinery Expansion Project, Ruwais, Abu Dhabi, UAE
Page 2 of 7
VEERAKAMU C.
Senior Engineer - Piping
Areas handled – Hydrogen Manufacturing Unit, CDU, HGO/LCO Mild cracking, Sour water
Stripper Unit,SRU & TGTU and Propane Feed unit to HMU.
Responsibilities:
 Responsible for attending Site Queries and supporting to Construction Team for above areas
 Revision of Piping Isometrics as per Site Modification and issue to Construction Team
 Visiting the Site at Regular to get onsite information of Major equipment, Piping and fitting, valves,
structures, instrument elements and control valves etc. from site
 Checking of Isometrics as per P&ID and latest information for HMU, SWR and SRU&TGTU.
 Responsible for modification of All LP Flare lines (below 2") and updating in the Model.
 Selection of Pipe supports for all small bore lines as per support specification and updating in the isos.
 Actively Participate Package 3D model review Meeting with PMC/Client.
 Responsible for Design and Detailed Engineering and 3D modeling (PDS) for Propane Feed unit to
HMU area which is newly added in Scope. Planned and assigned the Work to Two designers.
 Selection of Pipe supports as per Standard support specification.
 Preparation of civil information drawings.
 Responsible of preparation of Models for 60% & 90% Model review.
 Clearing the Punch list from PMC/Client
 Actively Participated 60% & 90% 3D Model review with PMC/Client at Site and close out report.
 Checking of Isometrics and Issue for Construction within short time notice.
Piping Engineer – (Mar 2011 to Aug 2012)
Client – Aramco Overseas Company (AOC), Saudi Arabia
Project –Wasit Gas Plant Project , Saudi Arabia
Areas handled – Pipe Racks and NGL Bullets, Product Pumps Area
Responsibilities:
 Responsible Engineer for Assigned Area in Project. Pipe Routing Studies for Pipe rack, NG, Off spec,
Butane Bullets and its related Product Pumps Area.
 Preparation of Plot Plan, Equipment Layout Plan & Equipment Nozzle Orientation drawing.
 3D Modeling of Equipments and Piping layout for Pipe rack, NG, Off spec, Butane Bullets and Product
Pumps area. Isometric Extraction from PDS. Checking of fabrication isometrics to Issue IFC
 Stress isometric extraction, selection of Pipe supports and modeling of supports in PDS
 Preparation of ITB summary report & Participation of Technical discussion.
 Updation of Progress measurement System(PMS)
 Preparation of MTO sketches using Auto cad and Material Take off
 Preparation of Line Shoot drawing for Pipe racks.
 Participation of 90% 3D Model review with Client(AOC) at Seoul, Korea.
 Preparation of Resolution close out reports for 60 & 90% Model review comments.
 Familiarization of Saudi Aramco Engineering standards and Procedures
2. Foster Wheeler India Pvt Ltd.
Piping Engineer – (Jan 2010 to Jan 2011)
Client – INDIAN OIL CORPORATION LIMITED, INDIA.
Project – IOCL, Paradip Refinery Project, Orissa, India.
Areas handled – Interconnecting Pipe Rack, Interface Gates and Caustic Dilution Pumps
unit.
Responsibilities:
 Pipe Routing Studies
 Preparation of piping layout for the area Which includes Piping layout for Main Pipe Racks, Interface
Gates & Caustic Dilution Pumps unit and Modeling (PDS) the same and Equipment modeling
 Support selection and modeling of physical and Logical supports
Page 3 of 7
VEERAKAMU C.
Senior Engineer - Piping
 Isometrics extraction and checking MTO in line with PMS and PEF and GA extraction
 Involved in the Preparation of unit Plot Plan for units through Drawing Manager and orthogen
 Closure of review tags
 Reviewing and comment the Vendor GA and civil drawings
 Pipe Clash checking & Resolve the Clashes
 Solving errors in isometric extractions, Running RDB Conflict Report and resolving report, Report
Extraction from PDS, Material Data Publisher (MDP)
 Done CAD co-ordination Activities includes resolving day to day PDS related issues
Piping Engineer – (Mar. 2009 to Dec 2009)
Client – EXXONMOBIL CHEMICAL ASIA PACIFIC
Project – Singapore parallel Train Project (In-Refinery Facilities)
Areas handled – Demin area, Waste water system, Pipe racks & interfacings.
Responsibilities:
 Pipe Routing Studies
 Preparation of piping layout for the area Which includes Utilities area of Demin area, Waste water
system, Pipe racks & interfacings and modeling (PDS) of the same and Equipment modeling.
 Support selection and modeling of physical and Logical supports
 Pipe Clash checking & Resolve the Clashes.
 Isometrics extraction and checking MTO in line with PMS and PEF and GA extraction
 Closure of Model review tags, Co-ordination with other areas for Interfaces/ Tie-ins
 Review on the Vendor drawings and comments to the vendors
 Preparation of Report format for Reports
Piping Engineer – (Nov. 2008 to Mar 2009)
Client – Woodside Burrup Pty Ltd (WBPL).
Project – Pluto LNG Project, Burrup Peninsula, Western Australia
Responsibilities:
 Support selection and modeling of support for Utility lines
 Extraction of Isometric drawings from PDS
 Co ordination with other disciplines
 Pipe Clash checking & Resolve the Clashes
 Supporting for cad coordination activities, Resolving Spec related issues in Isometrics, Solving errors
in isometric extractions, Solving material description errors in isometrics, working in Material Data
Publisher
Piping Designer – (Sep.2008 to Oct. 2009)
Client – EXXONMOBIL CHEMICAL ASIA PACIFIC
Project – Singapore parallel Train Project (In-Refinery Facilities)
Responsibilities:
 Preparation of Piping Isometric drawings for O1 Rev & O2 Rev. Involved in isometrics cycle like
Extraction of piping isometrics, updating comments from checking, stress and clients and Re-issue of
isometrics
Piping Designer – (May. 2007 to Sep. 2008)
Client – Shell Eastern Petroleum (Pte) Ltd
Project – SEPC-MEG Project, Singapore
Areas handled – Pipe Rack area, Dressed Vessels & columns area, Tankage area & CO2,
Residual compressor Area
Page 4 of 7
VEERAKAMU C.
Senior Engineer - Piping
Responsibilities:
 Job involves execution of Detailed Engineering
 Pipe Routing Studies and Modelling of Equipments, Piping layout for Pipe Rack area, Dressed Vessels
& columns area, Tankage area & CO2, Residual compressor Area
 Selection & Modelling of logical & physical supports
 Preparation of Material Take off
 Extraction of Isometrics from PDS
 Pipe Clash checking & Resolve the Clashes
 Review on the Vendor drawings and comments to the vendors
 Preparation of vessel clip drawings for dressed column and tanks.
 Extraction of Plot plans & GADs for Pipe Racks through Drawing Manager and Orthogen
 Solving errors in isometric extractions.
 Solving problems in PDS modeling and Isometrics.
 Running Reference Data Conflict Report, Report Extraction.
Piping Designer – (Sep. 2005 to Apr. 2007)
Client – Eastern petrochemical company (SHARQ)
Project – Sharq 3rd Expansion U & O Project. Jubail, Saudi Arabia
Areas handled – Sea water Area, Cooling Water Area, Rack Piping
Responsibilities:
 Pipe Routing Studies
 Equipment Modelling and preparing equipment Layout
 Pipe Routing Studies and Modeling of Equipments, piping layout for sea water, cooling water area and
Rack piping.
 Preparation of Material Take off
 Selection and Modeling of Physical support.
 Extraction of isometrics from PDS and checking and updating
 Co-ordination with other areas for Interfaces/ Tie-ins.
 Model review and interference checking and client comments updating.
3. Avant-Garde engineers and Consultants Pvt Ltd
Piping Designer – (Feb. 2002 to Sep. 2005)
Major Power Projects handled –Bhushan Steel & Strips limited – 1x77MW CPP – Orissa
Bhushan limited – 1x60MW CPP – Orissa
Bhushan limited – 1x40MW CPP – Orissa
Bhushan Steel & Strips limited – 1x33MW CPP – Orissa
Jaiprakash Associated ltd– 1x38.5MW CPP – MP
Shakthi Sugars ltd –1x32MW Baggasse based cogen –TN
Jaypee Cement ltd – 1x27MW CPP - Madhya Pradesh
Monnet power ltd – 1x25MW CPP – Chhattisgarh
Haidargarh chini mills -1x20.25MW Baggasse based – UP
K.C.P. Sugar Plant - 1x12MW Baggasse based cogen –AP
Responsibilities:
 Job involves execution of Detailed Engineering
 Responsible for Preparation of Equipment Layout, Boiler and Turbine Piping Layout for Power Plants
 Preparation of Loading Data for Pipe Racks
 Preparation Isometric drawings and Stress Isometric drawings
 Preparation Piping Bill of Material
 Review of Boiler and Turbine piping layouts from supplier
 Preparation of MDS for CSD Header, Storage & Flash tanks
Page 5 of 7
VEERAKAMU C.
Senior Engineer - Piping
4. BHARAT HEAVY ELECTRICALS LTD. – Chennai (Piping Center)
Technician Apprentice – (Jan. 2001 to Dec. 2001)
Client – BHARAT HEAVY ELECTRICALS LTD.
Project – Simhadri power plant
Responsibilities:
 Responsible for Preparation of Boiler and Turbine Piping Layout.
 Responsible for Preparation of Fabrication Isometric Drawing from Piping layouts and piping Bill of
Material
5. Bibrain Engineering Systems Pvt Ltd, Chennai
Piping Draughtsman – (Jun. 2000 to Dec. 2000
Project handled – GMR Vasavi – Chennai
Pan Century – Malaysia
Paguthan project
Responsibilities:
 Responsible for Preparation of Fabrication Isometric Drawing from Piping layouts and piping Bill of
Material
 Responsible for Preparation of Pipe support Detailed Drawings
Personal details:
Communication Address : No.2368, 1st
Floor
Near Market
Sector-23, Gurgaon
Haryana, India
Permanent Address : No.9/11A, 9th
Street,
TVS nagar, Padi,
Chennai – 600 050.
Tamil Nadu, India
Nationality : Indian
Languages Known : English, Hindi, Tamil, Telugu
Marital Status : Married
Passport No : H 1350400 (Expiry Date: 29-Oct-2018)
I assure that the above information given are true and correct to the best of my knowledge.
Page 6 of 7
VEERAKAMU C.
Senior Engineer - Piping
Thanking You
Date :
Place : Gurgaon C. Veerakamu
Page 7 of 7

Contenu connexe

Tendances

RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad Goraya
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceSameh Sameh
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineerHashim Vayalilakath
 

Tendances (20)

Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
GURUDEV S M - 2016
GURUDEV S M - 2016GURUDEV S M - 2016
GURUDEV S M - 2016
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS ExperienceCV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
CV MECHANICAL ENGINEER SAMEH AHMED 16 YEARS Experience
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 

En vedette

VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7Vipul Vichare
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Mohammad Arfin Alam
 
Civil engineer resume samples india
Civil engineer resume samples  indiaCivil engineer resume samples  india
Civil engineer resume samples indiasanthose menon
 

En vedette (8)

renjith piping engineer
renjith piping engineerrenjith piping engineer
renjith piping engineer
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
Project Controller
Project ControllerProject Controller
Project Controller
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
Resume ( Arfin Alam Engg....... Low Current System Sales/ 8 Yrs Exp / MBA+BE(...
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
Civil engineer resume samples india
Civil engineer resume samples  indiaCivil engineer resume samples  india
Civil engineer resume samples india
 
Karthik Bodducherla Sundar (Piping Engineer)
Karthik Bodducherla Sundar (Piping Engineer)Karthik Bodducherla Sundar (Piping Engineer)
Karthik Bodducherla Sundar (Piping Engineer)
 

Similaire à CV_VEERAKAMU.C_PIPING_

Similaire à CV_VEERAKAMU.C_PIPING_ (20)

GS
GSGS
GS
 
Ramesh pawar cv+
Ramesh pawar cv+Ramesh pawar cv+
Ramesh pawar cv+
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
Cv padmanabh
Cv padmanabhCv padmanabh
Cv padmanabh
 
Ansari Merajuddin
Ansari MerajuddinAnsari Merajuddin
Ansari Merajuddin
 
sujitResume (76)
sujitResume (76)sujitResume (76)
sujitResume (76)
 
CV Tanon TH
CV Tanon THCV Tanon TH
CV Tanon TH
 
Rsume CB
Rsume CBRsume CB
Rsume CB
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
HEAMNT_GURAV
HEAMNT_GURAVHEAMNT_GURAV
HEAMNT_GURAV
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
Devidas_17.01.17
Devidas_17.01.17Devidas_17.01.17
Devidas_17.01.17
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
Anil- PIPING
Anil- PIPINGAnil- PIPING
Anil- PIPING
 
MVTatel
MVTatelMVTatel
MVTatel
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816Mark Deskin - Resume_BR_0816
Mark Deskin - Resume_BR_0816
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEER
 

CV_VEERAKAMU.C_PIPING_

  • 1. Email : cveera_vrs@yahoo.co.in Mobile :+91 9999900301, +91 9884225246 VEERAKAMU C. Senior Engineer - Piping PROFESSION: Senior Engineer - Piping EDUCATIONAL QUALIFICATION: Bachelor of Engineering (Manufacturing Engineering under Mechanical faculty)-Apr 2008 Anna University Main Campus, Chennai, Tamil Nadu, India Diploma in Mechanical Engineering – Apr 2000 V.S.V.N. Polytechnic, Virudhunagar, Tamil Nadu, India SUMMARY OF EXPERIENCE: Professional experience (15 years) in Piping Design for Petrochemical, Refineries, Chemicals and Power Plants. The Responsibilities are,  Study of Basic Engineering Design Data and Preparation of ITB summary.  Can work independently & Lead a team of designers for assigned design area,  Progress monitoring and updation of Progress measurement system(PMS)  Piping design and detailed engineering. Preparation of Piping routing studies and Nozzle Orientation in view of Construction, Operation and maintenance requirements.  Preparation of Unit Plot Plans and Equipment Layout plans.  3D & 2D Modeling of Piping/Equipment using PDS/SP3D, AutoCAD, & Micro station for Pipe Rack, Pump, Vessels and Columns, Heat exchangers, Air Coolers, Compressors, Bullets, etc.,  Selection of standard Piping supports and Modeling the same and Special supports preparation.  Piping Isometrics extraction & Checking of Isometrics based on P&ID, Generation of Piping GA  Preparation of BOM sketch and Material Take off.  Effective Inter-discipline coordination and squad check. Vendor/Civil Drawings review.  Co-ordination for clash review in SPR  Participation of 60% & 90% 3D Model review both Internal and with client.  Preparation of Resolution reports for 3D model review comments and sent to PMC/Company.  Field engineering, including troubleshooting and site assistance.  Solving errors during isometric extraction, Report extraction from report manager, PDS Spec coding, Editing and Loading the PCD files, Resolving spec related issues in Isometrics, Dimension tables updating and loading, MDP, Orthogen, Design area and Model creation. RDB conflict reports.  Good interpersonal and Co-ordination skills. Excellent analytical skills and capacity to work hard. SOFTWARE PROFICEINCY:  PDS – Piping Modeling, Equipment Modeling, Drawing Manager, Isometric Drawing Manager, Interference Checking Manager, Drawing Manager, Report Manager, Project Administrator, Reference Data manager  SP3D – Piping, Equipment &furnishing, Hangers & supports, Drawings & Reports  Smart Plant Review, Material Data Publisher, PDMS(Learner)  Micro station, Orthogen  Smile-E, AutoCAD, Ms office CAREER SUMMARY: 1. SK E&C India Private Limited, Mar 2011– Till Date 2. Foster Wheeler India Pvt. Limited, Sep. 2005– Feb. 2011 3. Avant-Garde engineers and Consultants Pvt Ltd Feb. 2002- Sep. 2005 Page 1 of 7
  • 2. VEERAKAMU C. Senior Engineer - Piping 4. Bharat Heavy Electricals limited (Piping Centre) Jan. 2001-Dec. 2001 5. Bibrain Engineering Systems Private limited, Chennai Jun. 2000-Dec. 2000 DEPUTATED TO: SK E&C SITE OFFICE, Abu Dhabi, UAE Aug.2012 – Feb 2013 (Field Assignment for Ruwais Refinery Expansion Project) Foster Wheeler India Pvt. Limited, Gurgaon. Feb. 2010– Dec. 2010 Foster Wheeler India Pvt. Limited, Kolkata Nov. 2008–Dec. 2008 PROJECT EXPERIENCES: 1. SK E&C INDIA PVT. LTD. Responsible Engineer – (Dec 2015 to Till Date) Client – Kuwait National Petroleum Co.(KNPC) Project – CFP2020 Project, Kuwait Areas handled – Sulphur Recovery Unit(SRU) Responsibilities:  Involved in Model review comments close-out  3D Modelling of Piping and Equipment for Assigned area  Extraction of IFC isometrics and updating the comments.  Material Take off for Valves  Checking of IFC isometrics as per P&ID & Design checking Responsible Engineer – (Mar 2013 to Dec 2015) Client – Nghi Son Refinery and Petrochemical Limited Liability Company - Vietnam, Project – Nghi Son Refinery and Petrochemical Complex Project Areas handled – LPG Recovery Unit (LRU) Responsibilities:  Responsible Engineer for Design and detailed Engineering for assigned area of LRU unit  Preliminary MTO from Proposal.  Worked on Plot Plan Optimization and involved in Piping design studies for Columns, Compressors, Air Coolers, Pumps, Exchanger, Pressure Vessel and Re-boilers.  Preparation of Nozzle orientation Drgs.  Planned and assigned the work to designer.  3D modelling of Piping and equipment.  Pipe rack loading information to Civil  Participated internal and external 3D model reviews with Client, Preparation of MR close-out report.  Vendor drawing review and inter-discipline squad checks. Inter-discipline co-ordination.  Stress isometrics preparation and selection of Pipe supports as per specification.  Fabrication isometrics extraction and tracking of Isometrics to issue IFC. Piping Field Engineer – (Aug 2012 to Feb 2013) Client – TAKREER, Project – Ruwais Refinery Expansion Project, Ruwais, Abu Dhabi, UAE Page 2 of 7
  • 3. VEERAKAMU C. Senior Engineer - Piping Areas handled – Hydrogen Manufacturing Unit, CDU, HGO/LCO Mild cracking, Sour water Stripper Unit,SRU & TGTU and Propane Feed unit to HMU. Responsibilities:  Responsible for attending Site Queries and supporting to Construction Team for above areas  Revision of Piping Isometrics as per Site Modification and issue to Construction Team  Visiting the Site at Regular to get onsite information of Major equipment, Piping and fitting, valves, structures, instrument elements and control valves etc. from site  Checking of Isometrics as per P&ID and latest information for HMU, SWR and SRU&TGTU.  Responsible for modification of All LP Flare lines (below 2") and updating in the Model.  Selection of Pipe supports for all small bore lines as per support specification and updating in the isos.  Actively Participate Package 3D model review Meeting with PMC/Client.  Responsible for Design and Detailed Engineering and 3D modeling (PDS) for Propane Feed unit to HMU area which is newly added in Scope. Planned and assigned the Work to Two designers.  Selection of Pipe supports as per Standard support specification.  Preparation of civil information drawings.  Responsible of preparation of Models for 60% & 90% Model review.  Clearing the Punch list from PMC/Client  Actively Participated 60% & 90% 3D Model review with PMC/Client at Site and close out report.  Checking of Isometrics and Issue for Construction within short time notice. Piping Engineer – (Mar 2011 to Aug 2012) Client – Aramco Overseas Company (AOC), Saudi Arabia Project –Wasit Gas Plant Project , Saudi Arabia Areas handled – Pipe Racks and NGL Bullets, Product Pumps Area Responsibilities:  Responsible Engineer for Assigned Area in Project. Pipe Routing Studies for Pipe rack, NG, Off spec, Butane Bullets and its related Product Pumps Area.  Preparation of Plot Plan, Equipment Layout Plan & Equipment Nozzle Orientation drawing.  3D Modeling of Equipments and Piping layout for Pipe rack, NG, Off spec, Butane Bullets and Product Pumps area. Isometric Extraction from PDS. Checking of fabrication isometrics to Issue IFC  Stress isometric extraction, selection of Pipe supports and modeling of supports in PDS  Preparation of ITB summary report & Participation of Technical discussion.  Updation of Progress measurement System(PMS)  Preparation of MTO sketches using Auto cad and Material Take off  Preparation of Line Shoot drawing for Pipe racks.  Participation of 90% 3D Model review with Client(AOC) at Seoul, Korea.  Preparation of Resolution close out reports for 60 & 90% Model review comments.  Familiarization of Saudi Aramco Engineering standards and Procedures 2. Foster Wheeler India Pvt Ltd. Piping Engineer – (Jan 2010 to Jan 2011) Client – INDIAN OIL CORPORATION LIMITED, INDIA. Project – IOCL, Paradip Refinery Project, Orissa, India. Areas handled – Interconnecting Pipe Rack, Interface Gates and Caustic Dilution Pumps unit. Responsibilities:  Pipe Routing Studies  Preparation of piping layout for the area Which includes Piping layout for Main Pipe Racks, Interface Gates & Caustic Dilution Pumps unit and Modeling (PDS) the same and Equipment modeling  Support selection and modeling of physical and Logical supports Page 3 of 7
  • 4. VEERAKAMU C. Senior Engineer - Piping  Isometrics extraction and checking MTO in line with PMS and PEF and GA extraction  Involved in the Preparation of unit Plot Plan for units through Drawing Manager and orthogen  Closure of review tags  Reviewing and comment the Vendor GA and civil drawings  Pipe Clash checking & Resolve the Clashes  Solving errors in isometric extractions, Running RDB Conflict Report and resolving report, Report Extraction from PDS, Material Data Publisher (MDP)  Done CAD co-ordination Activities includes resolving day to day PDS related issues Piping Engineer – (Mar. 2009 to Dec 2009) Client – EXXONMOBIL CHEMICAL ASIA PACIFIC Project – Singapore parallel Train Project (In-Refinery Facilities) Areas handled – Demin area, Waste water system, Pipe racks & interfacings. Responsibilities:  Pipe Routing Studies  Preparation of piping layout for the area Which includes Utilities area of Demin area, Waste water system, Pipe racks & interfacings and modeling (PDS) of the same and Equipment modeling.  Support selection and modeling of physical and Logical supports  Pipe Clash checking & Resolve the Clashes.  Isometrics extraction and checking MTO in line with PMS and PEF and GA extraction  Closure of Model review tags, Co-ordination with other areas for Interfaces/ Tie-ins  Review on the Vendor drawings and comments to the vendors  Preparation of Report format for Reports Piping Engineer – (Nov. 2008 to Mar 2009) Client – Woodside Burrup Pty Ltd (WBPL). Project – Pluto LNG Project, Burrup Peninsula, Western Australia Responsibilities:  Support selection and modeling of support for Utility lines  Extraction of Isometric drawings from PDS  Co ordination with other disciplines  Pipe Clash checking & Resolve the Clashes  Supporting for cad coordination activities, Resolving Spec related issues in Isometrics, Solving errors in isometric extractions, Solving material description errors in isometrics, working in Material Data Publisher Piping Designer – (Sep.2008 to Oct. 2009) Client – EXXONMOBIL CHEMICAL ASIA PACIFIC Project – Singapore parallel Train Project (In-Refinery Facilities) Responsibilities:  Preparation of Piping Isometric drawings for O1 Rev & O2 Rev. Involved in isometrics cycle like Extraction of piping isometrics, updating comments from checking, stress and clients and Re-issue of isometrics Piping Designer – (May. 2007 to Sep. 2008) Client – Shell Eastern Petroleum (Pte) Ltd Project – SEPC-MEG Project, Singapore Areas handled – Pipe Rack area, Dressed Vessels & columns area, Tankage area & CO2, Residual compressor Area Page 4 of 7
  • 5. VEERAKAMU C. Senior Engineer - Piping Responsibilities:  Job involves execution of Detailed Engineering  Pipe Routing Studies and Modelling of Equipments, Piping layout for Pipe Rack area, Dressed Vessels & columns area, Tankage area & CO2, Residual compressor Area  Selection & Modelling of logical & physical supports  Preparation of Material Take off  Extraction of Isometrics from PDS  Pipe Clash checking & Resolve the Clashes  Review on the Vendor drawings and comments to the vendors  Preparation of vessel clip drawings for dressed column and tanks.  Extraction of Plot plans & GADs for Pipe Racks through Drawing Manager and Orthogen  Solving errors in isometric extractions.  Solving problems in PDS modeling and Isometrics.  Running Reference Data Conflict Report, Report Extraction. Piping Designer – (Sep. 2005 to Apr. 2007) Client – Eastern petrochemical company (SHARQ) Project – Sharq 3rd Expansion U & O Project. Jubail, Saudi Arabia Areas handled – Sea water Area, Cooling Water Area, Rack Piping Responsibilities:  Pipe Routing Studies  Equipment Modelling and preparing equipment Layout  Pipe Routing Studies and Modeling of Equipments, piping layout for sea water, cooling water area and Rack piping.  Preparation of Material Take off  Selection and Modeling of Physical support.  Extraction of isometrics from PDS and checking and updating  Co-ordination with other areas for Interfaces/ Tie-ins.  Model review and interference checking and client comments updating. 3. Avant-Garde engineers and Consultants Pvt Ltd Piping Designer – (Feb. 2002 to Sep. 2005) Major Power Projects handled –Bhushan Steel & Strips limited – 1x77MW CPP – Orissa Bhushan limited – 1x60MW CPP – Orissa Bhushan limited – 1x40MW CPP – Orissa Bhushan Steel & Strips limited – 1x33MW CPP – Orissa Jaiprakash Associated ltd– 1x38.5MW CPP – MP Shakthi Sugars ltd –1x32MW Baggasse based cogen –TN Jaypee Cement ltd – 1x27MW CPP - Madhya Pradesh Monnet power ltd – 1x25MW CPP – Chhattisgarh Haidargarh chini mills -1x20.25MW Baggasse based – UP K.C.P. Sugar Plant - 1x12MW Baggasse based cogen –AP Responsibilities:  Job involves execution of Detailed Engineering  Responsible for Preparation of Equipment Layout, Boiler and Turbine Piping Layout for Power Plants  Preparation of Loading Data for Pipe Racks  Preparation Isometric drawings and Stress Isometric drawings  Preparation Piping Bill of Material  Review of Boiler and Turbine piping layouts from supplier  Preparation of MDS for CSD Header, Storage & Flash tanks Page 5 of 7
  • 6. VEERAKAMU C. Senior Engineer - Piping 4. BHARAT HEAVY ELECTRICALS LTD. – Chennai (Piping Center) Technician Apprentice – (Jan. 2001 to Dec. 2001) Client – BHARAT HEAVY ELECTRICALS LTD. Project – Simhadri power plant Responsibilities:  Responsible for Preparation of Boiler and Turbine Piping Layout.  Responsible for Preparation of Fabrication Isometric Drawing from Piping layouts and piping Bill of Material 5. Bibrain Engineering Systems Pvt Ltd, Chennai Piping Draughtsman – (Jun. 2000 to Dec. 2000 Project handled – GMR Vasavi – Chennai Pan Century – Malaysia Paguthan project Responsibilities:  Responsible for Preparation of Fabrication Isometric Drawing from Piping layouts and piping Bill of Material  Responsible for Preparation of Pipe support Detailed Drawings Personal details: Communication Address : No.2368, 1st Floor Near Market Sector-23, Gurgaon Haryana, India Permanent Address : No.9/11A, 9th Street, TVS nagar, Padi, Chennai – 600 050. Tamil Nadu, India Nationality : Indian Languages Known : English, Hindi, Tamil, Telugu Marital Status : Married Passport No : H 1350400 (Expiry Date: 29-Oct-2018) I assure that the above information given are true and correct to the best of my knowledge. Page 6 of 7
  • 7. VEERAKAMU C. Senior Engineer - Piping Thanking You Date : Place : Gurgaon C. Veerakamu Page 7 of 7