SlideShare une entreprise Scribd logo
1  sur  8
VEMPARALA SRINIVASA RAO
Pedavadlapudi Village,
Mangalagiri Mandal,
Guntur – District,
Andhra Pradesh, India – 522 302
E- Mail: srinivasar8@gmail.com
INDIA Mobile: - +919550434336,
Afghanistan Mobile: - +93786087780
PROFILE:
I have total 15 years job experience in Hydro Power Projects. Like HM (Hydro
Mechanical works) & E&M (Electro Mechanical works). Right now I am working with
Hill International NV as an Electro Mechanical Engineer at Afghanistan 4.86 MW
GERESHK Hydro Power Project. I have completed Bachelor in Mechanical
Engineering (BE).
Positive attitude to adapt to any circumstances to bring out the best with available resources.
Educational Qualification:
Diploma in Mechanical Engineering (1999 to 2002)
V.K.R. & V.N.B. Polytechnic College, Gudivada
Bachelor in Mechanical Engineering (BE) (2006 to 2009) Distance Education
PACIFIC INSTITUTE OF ENGINEERING AND MANAGEMENT, New Delhi.
Additional Qualification: (Dec-2007)
• ASNT Level II in Magnetic Particle Testing (MPT)
• ASNT Level-II in Ultrasonic Testing (UT),
• ASNT Level II in Dye Penetrate Testing (DPT)
• ASNT Level II in Radiographic Testing (RT)
Computer/Software Skills:
• Microsoft Word
• Microsoft Excel
• Microsoft Power Point
OBJECTIVE
To build a successful career in service oriented organization and to be a part of highly motivated team wherein I
have an opportunity to demonstrate and develop my skills, make a positive contribution, set standards, gain
more confidence and help organization to achieve its goals.
PERSONAL DETAILS:
Name : VEMPARALA SRINIVASA RAO
Age & Date of Birth : 32Years
Nationality : Indian
Marital status : Married
Language Known As : Telugu, Hindi, English.
Experience in India : 12 years.
Experience in Afghanistan : 03 years.
Experience History
EXPERIENCE PROFILE:
Detailed Tasks Assigned
1. Work Undertaken that Best Illustrates Capability to Handle
the Tasks Assigned
Name of Assignment or Project:
GERESHK H.E POWER PROJECT (4.86 MW),
HILL INTERNATIONAL NV,
ELECTRO MECHANICAL ENGINEER,
(Electro Mechanical WORKS) DEC-2015 to TILL DATE
Location: Afghanistan
Positions Held: ELECTRO MECHANICAL ENGINEER
Activities Performed:
1) Anchoring on-site construction activities as per the given
drawings to ensure completion of project within the time
frame & cost parameters and effective resource utilization
to maximize the output.
2) Inspecting field sites to observe and evaluate condition and
operate ability of facilities and to collect field survey data
and measurements.
3) Implementation stringed systems on detailed Engineering /
Design, Quality Control & Plans during all the stages of
Projects.
4) Analyzes contract performance requirements, including
unique or unusual special provisions and terms and
conditions to ensure compliance with law, regulations,
corporate policy and procedures.
5) Establishing cordial working relationship and
communication with assigned crafts, supervisors and field
engineers.
6) Maintain data in department information systems and files.
7) Total planning, execution, erection and commissioning of
project.
8) Electrical operated trolley crane capacity 20 tones.
9) Erection of turbines including of first stage embedment,
Draft tube, Stay cone, Runner, Shaft, Distributor, Bearing
Assembles, Turbine Auxiliaries, Turbine alignment.
10) Erection of generators vertical.
11) Erection of ODY structures and insulators of LA, CT, PT,
SF6 Breakers, PI, isolator’s breakers and Transformers,
Trajectory panels AC/DC Panels
12) Positioning and aligning of all control panels at control
room as per drawing panels like gen relay, protection
panels, trans relay and protection panels, synchronizing
panel, line relay panel, switch gear
panels,LTAC,panels,turbine control panels, AVR panels.
13) Monitoring, understanding contract requirements,
implement the systems as well as influencing the content of
client construction drawings and procedures.
14) Making plans / scheduling section priorities & resources in
line with construction schedule, monitoring subsequent
progress, ensuring that the corrective action is agreed and
implemented where variation from schedule occurs.
15) Supervising the work under taken within own section,
ensuring compliance
Detailed Tasks Assigned
2. Work Undertaken that Best Illustrates Capability to Handle
the Tasks Assigned
Name of Assignment or Project:
SALMA H.E POWER PROJECT (42 MW).
COMPANY:- ANGELIQUE INTERNATIONAL
Project Engineer
(HM Mechanical works)
DURATION :- July-2014 to November - 2015
Location: Afghanistan
Positions Held: Project Engineer
Activities Performed:
• Project execution plan for Pipe fabrication & Erection,
• Fabrication of large diameter pipes according to the
Drawings.
• Follow up with Civil Group for Front Generation,
• Follow up with Shop Coordinator for pipe ferrules required
for erection,
• Pipe Erection, Line Supporting and all other erection related
works Pertaining to the area
• Optimum utilization of manpower/flexibility
• Planning to increase the production, to achieving the
production as targeted levels.
• Coordinating and finalizing Work-Permits, Risk Assessment
Sheet and Request Papers for allocated tasks,
• Tools & tackles and Plant & Machinery management.
• Reconciliation of materials.
• Review and preparation on quality plans, quality procedures
and inspection test plans in accordance with the applicable
engineering standards.
• To identify and prepare welding procedure specification
(WPS) & PQR for jobs as per project specifications and verify
welders meet PQR requirements.
• Inspection of welding and piping fabrication shop & site.
• Preparing quality control daily welding and fit up reports
subject to clearance of the work.
• Check the dimension, straightness, verticality and the slope
of piping against the drawing.
Detailed Tasks Assigned
• Coordinate Non Destructive Testing (NDT) activities and
review of PT, RT, reports.
• Witness hydro test and flushing activities.
• Reading the full scope of subsystems with their
corresponding P&ID & Isometric drawings.
• Incoming material & consumable inspection, reviewing
material test certificates, preparing MIR and monitoring the
proper storage as per requirement.
Electro mechanical works
3. Work Undertaken that Best Illustrates Capability to Handle
the Tasks Assigned
COMPANY:- Fozal power Pvt Ltd
DURATION :- New Delhi March-2014 to June-2014
Name of Assignment or Project: Fozal power Project.
Location: DELHI
Main Project Features: Fozal Hydroelectric project,
12.5 MW- Pipe line Fabrication & Erection, It’s having
429 meter open Penstock and Gates Erection, Having
Diameter of pipe from 2000 mm to 0.600 mm.
FABRICATION WORK FLOW:
Steel plates receiving → Edge preparation → Plate
rolling (Pipe bending machine) & fit up →
Welding → NDT Tests → Surface Preparation &
Protective Coating (Grit Blasting & Painting)
ERECTION WORK FLOW:
Ferrule / Spool shifting from fabrication shop to
Erection site → Erection of pipe → Alignment →
Welding → NDT Tests → Final painting → handed
over to Client.
Detailed Tasks Assigned 4. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
COMPANY NAME: - PES Engineering Pvt Ltd.
Position:- ASSISTANT MANAGER
(HYDRO MECHANICAL WORKS)
DURATION:- June-2002 to FEB - 2014
Name of Assignment or Project: Pārbati hydro power project
Hydro Power Project: 4x200 MW
Location: HIMACHAL PRADESH
Project Name: - Teesta – 3 hydro power project 6x200 mw,
Location: - Sikkim.
Positions Held: ASSISTANT MANAGER
(HYDRO MECHANICAL WORKS)
Activities Performed:
Anchoring on-site construction activities as per the given drawings to
ensure completion of project within the time frame & cost parameters
and effective resource utilization to maximize the output.
Inspecting field sites to observe and evaluate condition and operate
ability of facilities and to collect field survey data and measurements.
Implementation stringed systems on detailed Engineering / Design,
Quality Control & Plans during all the stages of Projects.
Analyzes contract performance requirements, including unique or
unusual special provisions and terms and conditions to ensure
compliance with law, regulations, corporate policy and procedures.
Establishing cordial working relationship and communication with
assigned crafts, supervisors and field engineers.
Maintain data in department information systems and files.
Total planning, execution, erection and commissioning of project.
Electrical operated trolley crane capacity 20 tones.
Erection of turbines including of first stage embedment, Draft tube,
Stay cone, Runner, Shaft, Distributor, Bearing Assembles, Turbine
Auxiliaries, Turbine alignment.
Erection of generators vertical.
Erection of ODY structures and insulators of LA, CT, PT, SF6
Breakers, PI, isolator’s breakers and Transformers, Trajectory panels
AC/DC Panels
Positioning and aligning of all control panels at control room as per
drawing panels like gen relay, protection panels, trans relay and
protection panels, synchronizing panel, line relay panel, switch gear
panels,LTAC,panels,turbine control panels, AVR panels.
Monitoring, understanding contract requirements, implement the
systems as well as influencing the content of client construction
drawings and procedures.
Making plans / scheduling section priorities & resources in line with
construction schedule, monitoring subsequent progress, ensuring that
the corrective action is agreed and implemented where variation from
schedule occurs.
Supervising the work under taken within own section, ensuring
compliance
Work with a multidiscipline group of engineers and technicians
providing engineering and design services to the hydroelectric
and power industry. Projects include life extension and upgrade
of existing power generating facilities as well as new power
generation facilities. Primary responsibilities are expected to
include:
1. Preparing procurement and design specifications,
2. Performing equipment and contractor bid evaluations,
3. Producing mechanical system designs,
4. Participating in equipment performance testing,
5. Providing field support during installation, testing and start-up
of hydro equipment in the field,
6. Performing hydro / power facility condition assessments,
7. Performing feasibility studies,
8. Preparing project cost estimates,
9. Assisting with preparation of proposals to clients,
PASSPORT DETAILS: - Passport no: - L9445167.
Issue Date: – 26-06-2014.
Expiry Date: – 25-06-2024.
Affiliate Information:
Professionally confident, technically sound, analytically methodical, excellent coordinator and
quality conscious professional.
PLACE: Afghanistan, Kabul.
V.SRINIVASA RAO DATE : 07-FEB-2017.

Contenu connexe

Tendances

Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
Sandip Karmakar
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
SUDARSANAN NANU
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV
Khalid Wdn
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
Saurabh Shah
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
Pamela Bundros
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu Kodaniyil
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
Rene Rico
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Hossam Fattah
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
Thangamani S
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
Raza Khan
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Mark Rodas
 

Tendances (20)

Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
nazeemres
nazeemresnazeemres
nazeemres
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
 
Firoz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CVFiroz Babu K - Sr. Mechanical Engineer - CV
Firoz Babu K - Sr. Mechanical Engineer - CV
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
HVAC Engineer Resume
HVAC Engineer ResumeHVAC Engineer Resume
HVAC Engineer Resume
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
 

En vedette

Resume Lishun Hu
Resume Lishun Hu Resume Lishun Hu
Resume Lishun Hu
Lishun Hu
 
HPF_III_Evaluation_Report_Final_2016
HPF_III_Evaluation_Report_Final_2016HPF_III_Evaluation_Report_Final_2016
HPF_III_Evaluation_Report_Final_2016
Asrade Abate
 
Битва 11.0 - Детская Библиотека
Битва 11.0 - Детская БиблиотекаБитва 11.0 - Детская Библиотека
Битва 11.0 - Детская Библиотека
Высшая Школа Брендинга
 

En vedette (15)

Diario de doble entrada
Diario de doble entradaDiario de doble entrada
Diario de doble entrada
 
Resume Lishun Hu
Resume Lishun Hu Resume Lishun Hu
Resume Lishun Hu
 
As close to 3 as possible: Sparring Lessons with Fintech and DevOps
As close to 3 as possible: Sparring Lessons with Fintech and DevOpsAs close to 3 as possible: Sparring Lessons with Fintech and DevOps
As close to 3 as possible: Sparring Lessons with Fintech and DevOps
 
Run bets
Run betsRun bets
Run bets
 
Proyecto final de tecnologia
Proyecto final de tecnologiaProyecto final de tecnologia
Proyecto final de tecnologia
 
Uso didáctico de los blogs
Uso didáctico de los blogsUso didáctico de los blogs
Uso didáctico de los blogs
 
Introdução ao SciLab
Introdução ao SciLabIntrodução ao SciLab
Introdução ao SciLab
 
SilkRoad and Employment Today: Set for Success
SilkRoad and Employment Today: Set for SuccessSilkRoad and Employment Today: Set for Success
SilkRoad and Employment Today: Set for Success
 
Agility Beyond the Development Team
Agility Beyond the Development TeamAgility Beyond the Development Team
Agility Beyond the Development Team
 
Рафаэль Усманов в защиту Селютиной О.И. Жалоба № 2808 от 23.01.2016 г.
Рафаэль Усманов в защиту Селютиной О.И. Жалоба № 2808 от 23.01.2016 г.Рафаэль Усманов в защиту Селютиной О.И. Жалоба № 2808 от 23.01.2016 г.
Рафаэль Усманов в защиту Селютиной О.И. Жалоба № 2808 от 23.01.2016 г.
 
И. Викхольм. Сообщения о преступлениях в отношении Р. Усманова и других 25.04...
И. Викхольм. Сообщения о преступлениях в отношении Р. Усманова и других 25.04...И. Викхольм. Сообщения о преступлениях в отношении Р. Усманова и других 25.04...
И. Викхольм. Сообщения о преступлениях в отношении Р. Усманова и других 25.04...
 
Tema 5 copia
Tema 5   copiaTema 5   copia
Tema 5 copia
 
HPF_III_Evaluation_Report_Final_2016
HPF_III_Evaluation_Report_Final_2016HPF_III_Evaluation_Report_Final_2016
HPF_III_Evaluation_Report_Final_2016
 
Битва 11.0 - Детская Библиотека
Битва 11.0 - Детская БиблиотекаБитва 11.0 - Детская Библиотека
Битва 11.0 - Детская Библиотека
 
Reed CC-PC
Reed CC-PCReed CC-PC
Reed CC-PC
 

Similaire à V. SRINIVASA RAO CV

Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
nomanqudrat
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
Umar Akbar
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
Nazeer Gaad
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
Nazeer Gaad
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
kaptan singh
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
Reddy Premnath
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
Mubashir ahmee
 

Similaire à V. SRINIVASA RAO CV (20)

Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

V. SRINIVASA RAO CV

  • 1. VEMPARALA SRINIVASA RAO Pedavadlapudi Village, Mangalagiri Mandal, Guntur – District, Andhra Pradesh, India – 522 302 E- Mail: srinivasar8@gmail.com INDIA Mobile: - +919550434336, Afghanistan Mobile: - +93786087780 PROFILE: I have total 15 years job experience in Hydro Power Projects. Like HM (Hydro Mechanical works) & E&M (Electro Mechanical works). Right now I am working with Hill International NV as an Electro Mechanical Engineer at Afghanistan 4.86 MW GERESHK Hydro Power Project. I have completed Bachelor in Mechanical Engineering (BE). Positive attitude to adapt to any circumstances to bring out the best with available resources. Educational Qualification: Diploma in Mechanical Engineering (1999 to 2002) V.K.R. & V.N.B. Polytechnic College, Gudivada Bachelor in Mechanical Engineering (BE) (2006 to 2009) Distance Education PACIFIC INSTITUTE OF ENGINEERING AND MANAGEMENT, New Delhi. Additional Qualification: (Dec-2007) • ASNT Level II in Magnetic Particle Testing (MPT) • ASNT Level-II in Ultrasonic Testing (UT), • ASNT Level II in Dye Penetrate Testing (DPT) • ASNT Level II in Radiographic Testing (RT) Computer/Software Skills: • Microsoft Word • Microsoft Excel • Microsoft Power Point
  • 2. OBJECTIVE To build a successful career in service oriented organization and to be a part of highly motivated team wherein I have an opportunity to demonstrate and develop my skills, make a positive contribution, set standards, gain more confidence and help organization to achieve its goals. PERSONAL DETAILS: Name : VEMPARALA SRINIVASA RAO Age & Date of Birth : 32Years Nationality : Indian Marital status : Married Language Known As : Telugu, Hindi, English. Experience in India : 12 years. Experience in Afghanistan : 03 years. Experience History EXPERIENCE PROFILE: Detailed Tasks Assigned 1. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of Assignment or Project: GERESHK H.E POWER PROJECT (4.86 MW), HILL INTERNATIONAL NV, ELECTRO MECHANICAL ENGINEER, (Electro Mechanical WORKS) DEC-2015 to TILL DATE Location: Afghanistan Positions Held: ELECTRO MECHANICAL ENGINEER Activities Performed: 1) Anchoring on-site construction activities as per the given drawings to ensure completion of project within the time frame & cost parameters and effective resource utilization to maximize the output. 2) Inspecting field sites to observe and evaluate condition and operate ability of facilities and to collect field survey data and measurements. 3) Implementation stringed systems on detailed Engineering / Design, Quality Control & Plans during all the stages of Projects. 4) Analyzes contract performance requirements, including unique or unusual special provisions and terms and
  • 3. conditions to ensure compliance with law, regulations, corporate policy and procedures. 5) Establishing cordial working relationship and communication with assigned crafts, supervisors and field engineers. 6) Maintain data in department information systems and files. 7) Total planning, execution, erection and commissioning of project. 8) Electrical operated trolley crane capacity 20 tones. 9) Erection of turbines including of first stage embedment, Draft tube, Stay cone, Runner, Shaft, Distributor, Bearing Assembles, Turbine Auxiliaries, Turbine alignment. 10) Erection of generators vertical. 11) Erection of ODY structures and insulators of LA, CT, PT, SF6 Breakers, PI, isolator’s breakers and Transformers, Trajectory panels AC/DC Panels 12) Positioning and aligning of all control panels at control room as per drawing panels like gen relay, protection panels, trans relay and protection panels, synchronizing panel, line relay panel, switch gear panels,LTAC,panels,turbine control panels, AVR panels. 13) Monitoring, understanding contract requirements, implement the systems as well as influencing the content of client construction drawings and procedures. 14) Making plans / scheduling section priorities & resources in line with construction schedule, monitoring subsequent progress, ensuring that the corrective action is agreed and implemented where variation from schedule occurs. 15) Supervising the work under taken within own section, ensuring compliance
  • 4. Detailed Tasks Assigned 2. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of Assignment or Project: SALMA H.E POWER PROJECT (42 MW). COMPANY:- ANGELIQUE INTERNATIONAL Project Engineer (HM Mechanical works) DURATION :- July-2014 to November - 2015 Location: Afghanistan Positions Held: Project Engineer Activities Performed: • Project execution plan for Pipe fabrication & Erection, • Fabrication of large diameter pipes according to the Drawings. • Follow up with Civil Group for Front Generation, • Follow up with Shop Coordinator for pipe ferrules required for erection, • Pipe Erection, Line Supporting and all other erection related works Pertaining to the area • Optimum utilization of manpower/flexibility • Planning to increase the production, to achieving the production as targeted levels. • Coordinating and finalizing Work-Permits, Risk Assessment Sheet and Request Papers for allocated tasks, • Tools & tackles and Plant & Machinery management. • Reconciliation of materials. • Review and preparation on quality plans, quality procedures and inspection test plans in accordance with the applicable engineering standards. • To identify and prepare welding procedure specification (WPS) & PQR for jobs as per project specifications and verify welders meet PQR requirements. • Inspection of welding and piping fabrication shop & site. • Preparing quality control daily welding and fit up reports subject to clearance of the work. • Check the dimension, straightness, verticality and the slope of piping against the drawing.
  • 5. Detailed Tasks Assigned • Coordinate Non Destructive Testing (NDT) activities and review of PT, RT, reports. • Witness hydro test and flushing activities. • Reading the full scope of subsystems with their corresponding P&ID & Isometric drawings. • Incoming material & consumable inspection, reviewing material test certificates, preparing MIR and monitoring the proper storage as per requirement. Electro mechanical works 3. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned COMPANY:- Fozal power Pvt Ltd DURATION :- New Delhi March-2014 to June-2014 Name of Assignment or Project: Fozal power Project. Location: DELHI Main Project Features: Fozal Hydroelectric project, 12.5 MW- Pipe line Fabrication & Erection, It’s having 429 meter open Penstock and Gates Erection, Having Diameter of pipe from 2000 mm to 0.600 mm. FABRICATION WORK FLOW: Steel plates receiving → Edge preparation → Plate rolling (Pipe bending machine) & fit up → Welding → NDT Tests → Surface Preparation & Protective Coating (Grit Blasting & Painting) ERECTION WORK FLOW: Ferrule / Spool shifting from fabrication shop to Erection site → Erection of pipe → Alignment → Welding → NDT Tests → Final painting → handed over to Client.
  • 6. Detailed Tasks Assigned 4. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned COMPANY NAME: - PES Engineering Pvt Ltd. Position:- ASSISTANT MANAGER (HYDRO MECHANICAL WORKS) DURATION:- June-2002 to FEB - 2014 Name of Assignment or Project: Pārbati hydro power project Hydro Power Project: 4x200 MW Location: HIMACHAL PRADESH Project Name: - Teesta – 3 hydro power project 6x200 mw, Location: - Sikkim. Positions Held: ASSISTANT MANAGER (HYDRO MECHANICAL WORKS) Activities Performed: Anchoring on-site construction activities as per the given drawings to ensure completion of project within the time frame & cost parameters and effective resource utilization to maximize the output. Inspecting field sites to observe and evaluate condition and operate ability of facilities and to collect field survey data and measurements. Implementation stringed systems on detailed Engineering / Design, Quality Control & Plans during all the stages of Projects. Analyzes contract performance requirements, including unique or unusual special provisions and terms and conditions to ensure compliance with law, regulations, corporate policy and procedures. Establishing cordial working relationship and communication with assigned crafts, supervisors and field engineers. Maintain data in department information systems and files. Total planning, execution, erection and commissioning of project. Electrical operated trolley crane capacity 20 tones. Erection of turbines including of first stage embedment, Draft tube, Stay cone, Runner, Shaft, Distributor, Bearing Assembles, Turbine Auxiliaries, Turbine alignment. Erection of generators vertical. Erection of ODY structures and insulators of LA, CT, PT, SF6 Breakers, PI, isolator’s breakers and Transformers, Trajectory panels
  • 7. AC/DC Panels Positioning and aligning of all control panels at control room as per drawing panels like gen relay, protection panels, trans relay and protection panels, synchronizing panel, line relay panel, switch gear panels,LTAC,panels,turbine control panels, AVR panels. Monitoring, understanding contract requirements, implement the systems as well as influencing the content of client construction drawings and procedures. Making plans / scheduling section priorities & resources in line with construction schedule, monitoring subsequent progress, ensuring that the corrective action is agreed and implemented where variation from schedule occurs. Supervising the work under taken within own section, ensuring compliance Work with a multidiscipline group of engineers and technicians providing engineering and design services to the hydroelectric and power industry. Projects include life extension and upgrade of existing power generating facilities as well as new power generation facilities. Primary responsibilities are expected to include: 1. Preparing procurement and design specifications, 2. Performing equipment and contractor bid evaluations, 3. Producing mechanical system designs, 4. Participating in equipment performance testing, 5. Providing field support during installation, testing and start-up of hydro equipment in the field, 6. Performing hydro / power facility condition assessments, 7. Performing feasibility studies, 8. Preparing project cost estimates, 9. Assisting with preparation of proposals to clients,
  • 8. PASSPORT DETAILS: - Passport no: - L9445167. Issue Date: – 26-06-2014. Expiry Date: – 25-06-2024. Affiliate Information: Professionally confident, technically sound, analytically methodical, excellent coordinator and quality conscious professional. PLACE: Afghanistan, Kabul. V.SRINIVASA RAO DATE : 07-FEB-2017.