SlideShare une entreprise Scribd logo
1  sur  2
RESUME
RS VIKRAM
Mobile: +91-8903116666 E-Mail: vikram.swamykannu@gmail.com
Seeking Middle Level Assignments in Production Planning & Supply Chain Management
with a reputed organisation.
PROFESSIONAL PROFILE
 A Result oriented professional With Over 4 Years of Experience in Production Planning
 Experience in delegating work schedule, Capacity & production Planning
 Proficient in implementing new technique for improving reducing Inventory, Maintaining FIFO
CORE COMPETENCIES
Production Planning, Material Management
 Preparing Daily production plans and monitoring the production plan execution
 Preparing after sales (spares) requirement schedule
 Preparing Export Part requirement schedule
 Inventory control, FIFO implementation, JIT implementation, Kanban system implementation
CAREER HIGHLIGHTS:-
AUG-2012 TO TILL – GESTAMP AUTOMOTOVE CHENNAI PRIVATE LTD. SPAIN BASED AUTO ANCILLARY
ENGINEER (PRODUCTION PLANNING & INVENTORY CONTROL) –
KEY RESPONSIBILITIES:
 Formulating production planning schedule based on actual W.I.P. Stock & finish goods
 To coordinate with all concerned departments for smooth production as per schedule.
 Check production plan priority for the day based on latest customer plan, stock situation and
production backlog.
 Maintaining zero shortage for RM, BOP, & Packing material
 Coordinating with logistics & Production (press & weld) team to plan vehicles as per MRD
 Controlling Excess supply of material and Reducing Backlogs.
 Follow-up / check the progress of actual production against plan.
 Monthly Capacity analysis based on customer volume
 Maintaining inventory in WIP area
 Monitoring FIFO of SFG goods
 Daily/Monthly Report Preparation for Operations meeting.
 Special focus on VOR order completion
 Invoice generation through SAP for customer(Ford/Nissan)
 GRN booking for BOP parts
 Material movement to assembly production line
Significant Accomplishments
 Reduced the inventory of 27 SFG parts from 10 days to 5 days by formulating the production
plan based on the daily requirement
 Analysed and freezed the press parts turnaround time for simplifying the press loading plan
 Implemented the Kanban system between the SFG to Weld assy line
KNOWLEDGE PURVIEW
 Customer invoice generation in SAP system
 Stock monitoring in SAP system
 Inventory reduction in SFG & RM & FG through ABC analysis.
TRAINING PROGRAMME
 SAP PP MODULE conducted by IBM Spain
Project Involved
 Nissan MICRA (X02A),Nissan SUNNY (L02B),
 Renault DUSTER (H79),Datsun GO (K2,K2 SAF)
 Ford ECOSPORTS(B515),Ford FIGO(B517)
EDUCATIONAL INFORMATION
 B.E in Mechanical Engineering (2008-2012) from SSIET (Sree Sastha Institute of Engineering &
Tech, Affiliated to Anna University), Chennai got First Class with 7.58 CGPA.
 Got 85% in Higher Sec Education Examination in 2008.
TECHNICAL SKILL
 MS OFFICE 2010
 SAP
 CAPTOR V3
 AUTOCAD 2010
PERSONAL DETAILS
Address : Plot no:13, EVP Sri Ram Nagar, Mangadu, Chennai -122
Date of Birth : 03th June 1991
Father’s name : R.Swamy kannu
Languages Known : English, Tamil
Marital Status : Single
Personal Traits : Optimistic, Hardworking, Team player.
DECLARATION;-
I hereby declare that the above furnished information is true to best of my knowledge.
DATE: Yours faithfully
PLACE: (RS VIKRAM)

Contenu connexe

Tendances

Prageeth Store keeper Bio-Data -20015
Prageeth Store keeper Bio-Data -20015Prageeth Store keeper Bio-Data -20015
Prageeth Store keeper Bio-Data -20015prageed prabhakaran
 
Resume as Procurement Engineer
Resume as Procurement EngineerResume as Procurement Engineer
Resume as Procurement EngineerKarthick MK
 
Resume for Store incharge
Resume for Store inchargeResume for Store incharge
Resume for Store inchargesandeep janghu
 
Accountant CV (1)
Accountant CV (1)Accountant CV (1)
Accountant CV (1)Afsal TK
 
Resume-Mech.Store Keeper-10.8.15
Resume-Mech.Store Keeper-10.8.15Resume-Mech.Store Keeper-10.8.15
Resume-Mech.Store Keeper-10.8.15Paul Michael Rego
 
Sachin Resume -Procurement engineer (1)
Sachin Resume -Procurement engineer (1)Sachin Resume -Procurement engineer (1)
Sachin Resume -Procurement engineer (1)Sachin Umap
 
Resume for Purchase & procurement
Resume for Purchase & procurementResume for Purchase & procurement
Resume for Purchase & procurementRAJASEKAR SIVAKUMAR
 
Renato New Cv Updated october2014
Renato New Cv Updated october2014Renato New Cv Updated october2014
Renato New Cv Updated october2014Renato Canonoy
 
Saifuddaulah Store keeper cv.Original
Saifuddaulah Store  keeper cv.OriginalSaifuddaulah Store  keeper cv.Original
Saifuddaulah Store keeper cv.OriginalSaif Khan
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Mehtab Zaidi
 
Supply Chain Manager Resume
Supply Chain Manager ResumeSupply Chain Manager Resume
Supply Chain Manager ResumeVyNguyen505
 
1. cv of s.s. ansari. 7.3 yr (store keeper)
1. cv of s.s. ansari.  7.3 yr (store keeper)1. cv of s.s. ansari.  7.3 yr (store keeper)
1. cv of s.s. ansari. 7.3 yr (store keeper)Shahnawaz Shamsi Ansari
 
Usman Gul Store Incharge
Usman Gul Store InchargeUsman Gul Store Incharge
Usman Gul Store InchargeUSMAN GUL
 
Curriculum Vitae - Store Keeper - 28-12-2016
Curriculum Vitae - Store Keeper - 28-12-2016Curriculum Vitae - Store Keeper - 28-12-2016
Curriculum Vitae - Store Keeper - 28-12-2016Mohammad Umar
 

Tendances (20)

Prageeth Store keeper Bio-Data -20015
Prageeth Store keeper Bio-Data -20015Prageeth Store keeper Bio-Data -20015
Prageeth Store keeper Bio-Data -20015
 
Resume as Procurement Engineer
Resume as Procurement EngineerResume as Procurement Engineer
Resume as Procurement Engineer
 
Resume for Store incharge
Resume for Store inchargeResume for Store incharge
Resume for Store incharge
 
Resume
ResumeResume
Resume
 
Accountant CV (1)
Accountant CV (1)Accountant CV (1)
Accountant CV (1)
 
Resume-Mech.Store Keeper-10.8.15
Resume-Mech.Store Keeper-10.8.15Resume-Mech.Store Keeper-10.8.15
Resume-Mech.Store Keeper-10.8.15
 
Resume 2014
Resume 2014Resume 2014
Resume 2014
 
Sachin Resume -Procurement engineer (1)
Sachin Resume -Procurement engineer (1)Sachin Resume -Procurement engineer (1)
Sachin Resume -Procurement engineer (1)
 
Resume for Purchase & procurement
Resume for Purchase & procurementResume for Purchase & procurement
Resume for Purchase & procurement
 
Renato New Cv Updated october2014
Renato New Cv Updated october2014Renato New Cv Updated october2014
Renato New Cv Updated october2014
 
Saifuddaulah Store keeper cv.Original
Saifuddaulah Store  keeper cv.OriginalSaifuddaulah Store  keeper cv.Original
Saifuddaulah Store keeper cv.Original
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Supply Chain Manager Resume
Supply Chain Manager ResumeSupply Chain Manager Resume
Supply Chain Manager Resume
 
PM-Store
PM-StorePM-Store
PM-Store
 
Mechanical Design Engineer
Mechanical Design EngineerMechanical Design Engineer
Mechanical Design Engineer
 
1. cv of s.s. ansari. 7.3 yr (store keeper)
1. cv of s.s. ansari.  7.3 yr (store keeper)1. cv of s.s. ansari.  7.3 yr (store keeper)
1. cv of s.s. ansari. 7.3 yr (store keeper)
 
Usman Gul Store Incharge
Usman Gul Store InchargeUsman Gul Store Incharge
Usman Gul Store Incharge
 
PURCHASING MANAGER - CV - WORD
PURCHASING MANAGER - CV - WORDPURCHASING MANAGER - CV - WORD
PURCHASING MANAGER - CV - WORD
 
CV (Document Controller)
CV (Document Controller)CV (Document Controller)
CV (Document Controller)
 
Curriculum Vitae - Store Keeper - 28-12-2016
Curriculum Vitae - Store Keeper - 28-12-2016Curriculum Vitae - Store Keeper - 28-12-2016
Curriculum Vitae - Store Keeper - 28-12-2016
 

En vedette

Mechanical engineer cover letter
Mechanical engineer cover letterMechanical engineer cover letter
Mechanical engineer cover letterclairerobin425
 
Mechanical engineer curriculum vitae
Mechanical engineer curriculum vitaeMechanical engineer curriculum vitae
Mechanical engineer curriculum vitaeNuno Freitas
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cvmustafaghazy
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 

En vedette (10)

Chaitanya
ChaitanyaChaitanya
Chaitanya
 
Richa_Resume
Richa_ResumeRicha_Resume
Richa_Resume
 
Resume- Mani
Resume- ManiResume- Mani
Resume- Mani
 
RESUME Pharande Photo
RESUME Pharande PhotoRESUME Pharande Photo
RESUME Pharande Photo
 
CV of Munish Kaushik
CV of Munish KaushikCV of Munish Kaushik
CV of Munish Kaushik
 
Mechanical engineer cover letter
Mechanical engineer cover letterMechanical engineer cover letter
Mechanical engineer cover letter
 
Mechanical engineer curriculum vitae
Mechanical engineer curriculum vitaeMechanical engineer curriculum vitae
Mechanical engineer curriculum vitae
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 

Similaire à RS VIKRAM RESUME PPC (20)

Rs vikram PPC CV
Rs vikram PPC CVRs vikram PPC CV
Rs vikram PPC CV
 
Ahmed- Resume-CPIM
Ahmed- Resume-CPIMAhmed- Resume-CPIM
Ahmed- Resume-CPIM
 
Anand_Kaulwar_Resume_V2[1]
Anand_Kaulwar_Resume_V2[1]Anand_Kaulwar_Resume_V2[1]
Anand_Kaulwar_Resume_V2[1]
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRP
 
Resume new
Resume newResume new
Resume new
 
CV-Vipin Verma.doc
CV-Vipin Verma.docCV-Vipin Verma.doc
CV-Vipin Verma.doc
 
Ajit_02
Ajit_02Ajit_02
Ajit_02
 
12
1212
12
 
12
1212
12
 
Sathishbabu
SathishbabuSathishbabu
Sathishbabu
 
Resume
ResumeResume
Resume
 
Sai PP-QM
Sai PP-QMSai PP-QM
Sai PP-QM
 
Sunil_latest
Sunil_latestSunil_latest
Sunil_latest
 
CHARANYA MANIKANDAN
CHARANYA MANIKANDANCHARANYA MANIKANDAN
CHARANYA MANIKANDAN
 
Resume sarang C Ghawde
Resume sarang C GhawdeResume sarang C Ghawde
Resume sarang C Ghawde
 
Haitham Seleem
Haitham SeleemHaitham Seleem
Haitham Seleem
 
varsha arora (2)
varsha arora (2)varsha arora (2)
varsha arora (2)
 
Rajeev jindal mm_sd_ewm
Rajeev jindal mm_sd_ewmRajeev jindal mm_sd_ewm
Rajeev jindal mm_sd_ewm
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
Resume
ResumeResume
Resume
 

RS VIKRAM RESUME PPC

  • 1. RESUME RS VIKRAM Mobile: +91-8903116666 E-Mail: vikram.swamykannu@gmail.com Seeking Middle Level Assignments in Production Planning & Supply Chain Management with a reputed organisation. PROFESSIONAL PROFILE  A Result oriented professional With Over 4 Years of Experience in Production Planning  Experience in delegating work schedule, Capacity & production Planning  Proficient in implementing new technique for improving reducing Inventory, Maintaining FIFO CORE COMPETENCIES Production Planning, Material Management  Preparing Daily production plans and monitoring the production plan execution  Preparing after sales (spares) requirement schedule  Preparing Export Part requirement schedule  Inventory control, FIFO implementation, JIT implementation, Kanban system implementation CAREER HIGHLIGHTS:- AUG-2012 TO TILL – GESTAMP AUTOMOTOVE CHENNAI PRIVATE LTD. SPAIN BASED AUTO ANCILLARY ENGINEER (PRODUCTION PLANNING & INVENTORY CONTROL) – KEY RESPONSIBILITIES:  Formulating production planning schedule based on actual W.I.P. Stock & finish goods  To coordinate with all concerned departments for smooth production as per schedule.  Check production plan priority for the day based on latest customer plan, stock situation and production backlog.  Maintaining zero shortage for RM, BOP, & Packing material  Coordinating with logistics & Production (press & weld) team to plan vehicles as per MRD  Controlling Excess supply of material and Reducing Backlogs.  Follow-up / check the progress of actual production against plan.  Monthly Capacity analysis based on customer volume  Maintaining inventory in WIP area  Monitoring FIFO of SFG goods  Daily/Monthly Report Preparation for Operations meeting.  Special focus on VOR order completion  Invoice generation through SAP for customer(Ford/Nissan)  GRN booking for BOP parts  Material movement to assembly production line Significant Accomplishments  Reduced the inventory of 27 SFG parts from 10 days to 5 days by formulating the production plan based on the daily requirement  Analysed and freezed the press parts turnaround time for simplifying the press loading plan  Implemented the Kanban system between the SFG to Weld assy line KNOWLEDGE PURVIEW  Customer invoice generation in SAP system  Stock monitoring in SAP system  Inventory reduction in SFG & RM & FG through ABC analysis.
  • 2. TRAINING PROGRAMME  SAP PP MODULE conducted by IBM Spain Project Involved  Nissan MICRA (X02A),Nissan SUNNY (L02B),  Renault DUSTER (H79),Datsun GO (K2,K2 SAF)  Ford ECOSPORTS(B515),Ford FIGO(B517) EDUCATIONAL INFORMATION  B.E in Mechanical Engineering (2008-2012) from SSIET (Sree Sastha Institute of Engineering & Tech, Affiliated to Anna University), Chennai got First Class with 7.58 CGPA.  Got 85% in Higher Sec Education Examination in 2008. TECHNICAL SKILL  MS OFFICE 2010  SAP  CAPTOR V3  AUTOCAD 2010 PERSONAL DETAILS Address : Plot no:13, EVP Sri Ram Nagar, Mangadu, Chennai -122 Date of Birth : 03th June 1991 Father’s name : R.Swamy kannu Languages Known : English, Tamil Marital Status : Single Personal Traits : Optimistic, Hardworking, Team player. DECLARATION;- I hereby declare that the above furnished information is true to best of my knowledge. DATE: Yours faithfully PLACE: (RS VIKRAM)