Speaker’s Name, SAP
Month 00, 2017
Project Kickoff
Partner logo
2INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Agenda
Time Topic Presenter
00:00 – 00:00 Introduction and Welcome Executive Sponsor
00:00 – 00:00 Goals Customer Project Manager
Lunch
00:00 – 00:00 Solution Scope SAP Application Lead
00:00 – 00:00 Delivery Approach SAP Project Manager
Break
00:00 – 00:00 Team Roles and Responsibilities SAP Project Manager
00:00 – 00:00 Critical Success Factors and Communication SAP Project Manager
00:00 – 00:00 Next Steps All
End of the day
3INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
Agenda
4INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Confirm the Project Scope
• Understand the Delivery Approach
• Review the system landscape
• Introduce roles and responsibilities
• Learn about the enablement approach
• Examine critical success factors
Workshop Objectives
5INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP Client Partner
• <Name> , Contact Information
SAP Delivery Executive
• <Name> , Contact Information
SAP Project Manager
• <Name> , Contact Information
SAP Team Member(s)
• <Name> , Application Lead, Contact Information
• <Name> , Technology Lead, Contact Information
SAP Team Introduction
6INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Customer/Executive Sponsor
• <Name> , Department, Role, Contact Info
Customer Core Project Team Members
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
Customer Extended Project Team Members
• <Name> , Department, Super User, Contact Info
• <Name> , Department, UAT Tester, Contact Info
Customer Team Introduction
7INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
What Does Project Success Really Mean?
Business Goals
Achieving the requested modifications
or improvements in the business
Budget Compliance
Schedule Compliance
Functional Goals
Project Goals
8INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Success Depends on Everybody Involved
Processes
TechnologyTeam
Organization
Management
Project
Key Users
Project success is the sum of everybody’s daily work and decisions.
We look forward to realize a successful project with you.
9INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
Agenda
10INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Solution Scope
11INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Service Scope
12INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Integration Points in Scope
Integration Point From Product/Solution To Product/Solution Type Description
Short description of
integration point
From SAP product that
integrates
To SAP product that
integrates
Technical nature of
integration e.g. ALE
Longer description of scope of integration perhaps covering
business objects or data
Customer Master
Data
CRM ERP CRM Middleware Optional download and delta loads of customer master data from
ERP to Business Partners in CRM
13INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Landscape
14INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
15INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project Planning
Prepare Realize Deploy
Prepare Project
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
Steps
SAP involvement
Customer involvement
X Weeks X Weeks X Weeks
Explore
Go-Live
XXX Key Activities
16INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project duration varies based on implementation scope, project resources, and desired speed of
implementation. The below chart represents a general guidance.
SAP S/4HANA Cloud Phase Duration
PhaseProject Size Small Medium Large
Prepare 5 10 20<
Explore 23 45 60<
Realize 17 30 50<
Deploy 5 12 20<
Numbers represent working days
17INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project Schedule
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
Phase Description 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
1 Prepare
1.1
1.2.
1.3
1.4
1.5
2 Explore
2.1
2.2
3 Realize
3.1
3.2
3.3
3.4
3.5
4 Deploy
4.1
4.2
18INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Prepare Phase
Key Prepare Activities:
• Define project goals, high-level scope, and a project plan
• Identify and quantify business value objectives
• Secure executive sponsorship
• Establish project standards, organization, and governance
• Define and secure approval for the implementation/upgrade strategy
• Define roles and responsibilities for the project team
• Validate the project objectives
• Establish project management, tracking, and reporting mechanisms for value delivery
• Begin self-enablement
• Receive and access the system
• Kick off the project
19INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Explore Phase
Key Explore Activities:
• Project Management Execution, Monitoring, and Controlling
• Customer Project Team Enablement
• Solution Validation
• Configuration Definition
• Integration Prerequisites Confirmation
• Solution Extension Preparation
• Data Load Preparation
• Phase Closure
20INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Realize Phase
Key Realize Activities:
• Establish the solution landscape
• Implement the solution in the quality environment using incremental build in time-boxed iterations
• Conduct overall end-to-end testing of the solution
• Setup production environment
• Prepare for data migration and data archiving
• Conduct project team and key user training
• Finalize end user training materials and documentation
• Track and report on value delivery
21INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Deploy Phase
Key Deploy Activities:
• Finalize the solution and business processes for production go-live
• Resolve all crucial open issues
 Conduct system tests
 Proceed with cutover activities including data migration
• Execute transition and cutover plans including organizational change management (OCM) plans
• Complete all scheduled end user training
• Track and report on value delivery
22INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Testing Approach
• Unit Testing – Performed by Configurator – Performed in Development Landscape
• Integration Testing – Performed by the Customer –Performed in Quality Assurance
Landscape
• User Acceptance Testing – Performed by the Customer – Performed in Quality
Assurance Landscape
 Who and When will Test Plans and Scripts be written
 Who will participate in Testing from the Customer?
 How long should User Acceptance Testing last?
23INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
24INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project Team and Roles
Activity, Resource, Risk and Issue Management
Configuration Design
Configuration Validation
Training Design and Delivery
Architecture, Connectivity and Migration
Consultant
Project Manager
Functional
ExpertConsultants
Technical
Resource
Business
Resource
Trainer
Champion, Critical Decisions, Escalations
Project Sponsor(s) Project Sponsor
Process Owners /
SMEs
Technical
Resources
Business
Stakeholders
Trainers
Consultants
Customer
Project
Management
25INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Customer Role Details
Project Manager Technical
Resource
• 25 – 40% dedication
for landscape setup
• 10 – 15% dedication
during test phase
• Confirm prerequisite
components, add-ons,
SPs, notes
Key Users
• 30 – 40% dedication
throughout project
• Explain business
requirements &
processes
• Perform & confirm
configuration
• Drive decisions
Testers
• 10-15% dedication for
configuration
validation
• Confirm configuration
• Support decisions
Trainers
• 25-50% dedication for
end user training
• Create and execute
training plan
• Create training
content
26INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP Role Details
Consultants
• Manage project
• Responsible for knowledge
transfer to key users
• Perform/guide the system
configuration
• Introduce integration concept
• Perform integration setup
and support integration
testing
• Coordinate additional
resources as required
Custom Development
• Provide
Project Manager
• Provide support for incidents
reported via self-service
tools, web and phone
Customer Engagement
Ensure
27INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• The SC is responsible for project control and project coordination as well as the efficient bringing
about of technical and organizational decisions.
• In SC meetings, project management reports on the project status and introduces relevant
issues that have to be decided by the SC.
• The SC assures that resources necessary for the project‘s success are available.
• The SC is the last escalation level for problems (conflict management).
• The SC assumes highest-level control on costs and budget, and is responsible for budget
release.
• The SC is responsible for inspection and approval of results and of the overall project.
Responsibilities of the Steering Committee
28INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
What is expected of key users during a SAP solution implementation project?
• Make knowledgeable business decisions in your respective area of expertise and help to define
the solution
• Complete the implementation activities as assigned
• Act as a multiplier within your organization to train and support end users
• Learn how to configure the new system.
Key Users
29INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Key User Responsibilities After Go-Live
Incident Management
• Search for solutions and process incidents from end users directly and when necessary, request
help from SAP
Manage Users and Task Assignment
• Deal with user authorization requests
• Maintain responsibilities for users in your company
• Resolve any unassigned business tasks
Manage Background Jobs, Input and Output
• Monitor background jobs
• Monitor internal/external communications such as printers and integration with third-parties
Knowledge Transfer
• Act as a multiplier within your organization to train and support new users of the SAP solution
30INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
31INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Critical Success Factors
•Scope changes will likely impact the project timeline, your required effort and consulting costs
Stay within the agreed scope
•Adjust your processes to fit the standard system functionality in order to simplify future upgrades and scope expansion.
•It doesn’t have to be perfect. You can always improve a solution later.
Have a pragmatic mindset
•The quicker you can make decisions, the quicker your project will be able to proceed into the right direction.
Make quick decisions
•Identify and involve your stakeholder early - executives, employees, labor unions, key customers,…
Involve stakeholders early
•The better you represent your business area, the better the SAP cloud solution will support your processes.
•Work with your manager to secure sufficient availability for the project.
As a key user, actively contribute to the project
•Start cleansing your data as soon as possible to prevent project issues and delays.
Start preparing data early
•Only thorough testing will result in a successful go-live and stable system.
Never cut corners on testing
32INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Standards of Project Communication
Information
Information
Sender
Information
Recipient
Frequency Form
Status Report Customer PM SAP PM, SC Weekly Project Status Report
Workshop Protocol SAP
Key User, SAP PM,
Customer PM
After each meeting
Result Protocol
Steering Committee Report Customer PM
Customer PM, SAP PM,
Board
After each meeting Steering Committee Meeting Minutes
PM - Project Management SC - Steering Committee
33INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
Thank you.
Contact information:
F name L name
Title
Address
Phone number
Partner logo

Contenu connexe

Tendances

Take the Next Step to S/4HANA with "RISE with SAP"
Take the Next Step to S/4HANA with "RISE with SAP"Take the Next Step to S/4HANA with "RISE with SAP"
Take the Next Step to S/4HANA with "RISE with SAP"
panayaofficial
 
S4 h 188 sap s4hana cloud implementation with sap activate
S4 h 188 sap s4hana cloud implementation with sap activateS4 h 188 sap s4hana cloud implementation with sap activate
S4 h 188 sap s4hana cloud implementation with sap activate
Lokesh Modem
 

Tendances (20)

SAP Sapsuccessfactors Introduction
SAP Sapsuccessfactors  Introduction SAP Sapsuccessfactors  Introduction
SAP Sapsuccessfactors Introduction
 
SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementation
 
SAP's Business Technology Platform: A Game-Changer for Intelligent Enterprises
SAP's Business Technology Platform: A Game-Changer for Intelligent EnterprisesSAP's Business Technology Platform: A Game-Changer for Intelligent Enterprises
SAP's Business Technology Platform: A Game-Changer for Intelligent Enterprises
 
Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New Implementation
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANA
 
SAP Project Systems with Success Factors
SAP Project Systems with Success FactorsSAP Project Systems with Success Factors
SAP Project Systems with Success Factors
 
Best Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectBest Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation Project
 
SAP Implementation Phase!!
SAP Implementation Phase!!SAP Implementation Phase!!
SAP Implementation Phase!!
 
Benefit SAP S4HANA.pptx
Benefit SAP S4HANA.pptxBenefit SAP S4HANA.pptx
Benefit SAP S4HANA.pptx
 
ITChamps HCM and SuccessFactors Solutions
ITChamps HCM and SuccessFactors SolutionsITChamps HCM and SuccessFactors Solutions
ITChamps HCM and SuccessFactors Solutions
 
Project Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation SlidesProject Governance Model Powerpoint Presentation Slides
Project Governance Model Powerpoint Presentation Slides
 
Take the Next Step to S/4HANA with "RISE with SAP"
Take the Next Step to S/4HANA with "RISE with SAP"Take the Next Step to S/4HANA with "RISE with SAP"
Take the Next Step to S/4HANA with "RISE with SAP"
 
projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation template
 
Asap roadmap
Asap roadmapAsap roadmap
Asap roadmap
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration Cockpit
 
“Migration to Suite of HANA”
“Migration to Suite of HANA”“Migration to Suite of HANA”
“Migration to Suite of HANA”
 
Introduction Into SAP Fiori
Introduction Into SAP FioriIntroduction Into SAP Fiori
Introduction Into SAP Fiori
 
Template kick off-meeting
Template kick off-meeting Template kick off-meeting
Template kick off-meeting
 
Testing Guide for SAP SuccessFactors
Testing Guide for SAP SuccessFactorsTesting Guide for SAP SuccessFactors
Testing Guide for SAP SuccessFactors
 
S4 h 188 sap s4hana cloud implementation with sap activate
S4 h 188 sap s4hana cloud implementation with sap activateS4 h 188 sap s4hana cloud implementation with sap activate
S4 h 188 sap s4hana cloud implementation with sap activate
 

Similaire à Kickoff meeting template

SAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_Resume
Swetha J
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
David Niles
 

Similaire à Kickoff meeting template (20)

SAP overview.pptx
SAP overview.pptxSAP overview.pptx
SAP overview.pptx
 
Transition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdfTransition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdf
 
Focused build overview
Focused build overviewFocused build overview
Focused build overview
 
Savic executive summary sm
Savic executive summary smSavic executive summary sm
Savic executive summary sm
 
S4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfS4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdf
 
SAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful project
 
SAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationSAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for Innovation
 
Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate Presentation
 
VaidyanathKK
VaidyanathKKVaidyanathKK
VaidyanathKK
 
S4H_059.pptx
S4H_059.pptxS4H_059.pptx
S4H_059.pptx
 
PM_210 (1).pptx
PM_210 (1).pptxPM_210 (1).pptx
PM_210 (1).pptx
 
Agile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAPAgile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAP
 
LABS PURE Executive Presentation
LABS PURE Executive PresentationLABS PURE Executive Presentation
LABS PURE Executive Presentation
 
Arago Company presentation_en
Arago Company presentation_enArago Company presentation_en
Arago Company presentation_en
 
SAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_Resume
 
Presentation_1373778041831
Presentation_1373778041831Presentation_1373778041831
Presentation_1373778041831
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
 
Succeed with Your SAP Hybris Cloud for Customer Implementation
Succeed with Your SAP Hybris Cloud for Customer ImplementationSucceed with Your SAP Hybris Cloud for Customer Implementation
Succeed with Your SAP Hybris Cloud for Customer Implementation
 
SAP Cutover Strategy with details becomes Cutover Kickoff)
SAP Cutover Strategy with details becomes Cutover Kickoff)SAP Cutover Strategy with details becomes Cutover Kickoff)
SAP Cutover Strategy with details becomes Cutover Kickoff)
 
Maximize Quality with SAP Hybris Expert Services
Maximize Quality with SAP Hybris Expert ServicesMaximize Quality with SAP Hybris Expert Services
Maximize Quality with SAP Hybris Expert Services
 

Plus de Van Chau

Plus de Van Chau (20)

Chapter 13 building information system
Chapter 13 building information systemChapter 13 building information system
Chapter 13 building information system
 
Chapter 10 ecommerce digital markets digital goods
Chapter 10 ecommerce digital markets digital goodsChapter 10 ecommerce digital markets digital goods
Chapter 10 ecommerce digital markets digital goods
 
Chapter 12 enhancing decision making
Chapter 12 enhancing decision makingChapter 12 enhancing decision making
Chapter 12 enhancing decision making
 
Chapter 11 managing knowledge
Chapter 11 managing knowledgeChapter 11 managing knowledge
Chapter 11 managing knowledge
 
Chapter 9 achieving operational excellence and customer intimacy enterprise a...
Chapter 9 achieving operational excellence and customer intimacy enterprise a...Chapter 9 achieving operational excellence and customer intimacy enterprise a...
Chapter 9 achieving operational excellence and customer intimacy enterprise a...
 
Chapter 8 securing information systems
Chapter 8 securing information systemsChapter 8 securing information systems
Chapter 8 securing information systems
 
Chapter 7 telecommunications the internet and wireless technology
Chapter 7 telecommunications the internet and wireless technologyChapter 7 telecommunications the internet and wireless technology
Chapter 7 telecommunications the internet and wireless technology
 
Chapter 6 foundations of business intelligence
Chapter 6 foundations of business intelligenceChapter 6 foundations of business intelligence
Chapter 6 foundations of business intelligence
 
Chapter 5 it infrastructure and emerging technologies
Chapter 5 it infrastructure and emerging technologiesChapter 5 it infrastructure and emerging technologies
Chapter 5 it infrastructure and emerging technologies
 
Chapter 4 ethical and social issues in information systems
Chapter 4 ethical and social issues in information systemsChapter 4 ethical and social issues in information systems
Chapter 4 ethical and social issues in information systems
 
Chapter 02 Global ebusiness and collaboration
Chapter 02 Global ebusiness and collaborationChapter 02 Global ebusiness and collaboration
Chapter 02 Global ebusiness and collaboration
 
Chapter 3 information systems organizations and strategy
Chapter 3 information systems organizations and strategyChapter 3 information systems organizations and strategy
Chapter 3 information systems organizations and strategy
 
Chapter 01 Information systems in global business today
Chapter 01 Information systems in global business todayChapter 01 Information systems in global business today
Chapter 01 Information systems in global business today
 
Hunam and machine reimagining work in the age of ai (pptx)
Hunam and machine reimagining work in the age of ai (pptx)Hunam and machine reimagining work in the age of ai (pptx)
Hunam and machine reimagining work in the age of ai (pptx)
 
Cntt org thadico final 12.06.2020
Cntt org thadico final  12.06.2020Cntt org thadico final  12.06.2020
Cntt org thadico final 12.06.2020
 
CẨM NANG CHUYỂN ĐỔI SỐ
CẨM NANG CHUYỂN ĐỔI SỐCẨM NANG CHUYỂN ĐỔI SỐ
CẨM NANG CHUYỂN ĐỔI SỐ
 
DIGITAL TRANSFORMATION
DIGITAL TRANSFORMATIONDIGITAL TRANSFORMATION
DIGITAL TRANSFORMATION
 
UML Thiết kế CSDL
UML Thiết kế CSDLUML Thiết kế CSDL
UML Thiết kế CSDL
 
Foodorder 170421160507 (1)
Foodorder 170421160507 (1)Foodorder 170421160507 (1)
Foodorder 170421160507 (1)
 
8815346
88153468815346
8815346
 

Dernier

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Dernier (20)

Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Kickoff meeting template

  • 1. INTERNAL Speaker’s Name, SAP Month 00, 2017 Project Kickoff Partner logo
  • 2. 2INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Agenda Time Topic Presenter 00:00 – 00:00 Introduction and Welcome Executive Sponsor 00:00 – 00:00 Goals Customer Project Manager Lunch 00:00 – 00:00 Solution Scope SAP Application Lead 00:00 – 00:00 Delivery Approach SAP Project Manager Break 00:00 – 00:00 Team Roles and Responsibilities SAP Project Manager 00:00 – 00:00 Critical Success Factors and Communication SAP Project Manager 00:00 – 00:00 Next Steps All End of the day
  • 3. 3INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication Agenda
  • 4. 4INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Confirm the Project Scope • Understand the Delivery Approach • Review the system landscape • Introduce roles and responsibilities • Learn about the enablement approach • Examine critical success factors Workshop Objectives
  • 5. 5INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP Client Partner • <Name> , Contact Information SAP Delivery Executive • <Name> , Contact Information SAP Project Manager • <Name> , Contact Information SAP Team Member(s) • <Name> , Application Lead, Contact Information • <Name> , Technology Lead, Contact Information SAP Team Introduction
  • 6. 6INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Customer/Executive Sponsor • <Name> , Department, Role, Contact Info Customer Core Project Team Members • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info Customer Extended Project Team Members • <Name> , Department, Super User, Contact Info • <Name> , Department, UAT Tester, Contact Info Customer Team Introduction
  • 7. 7INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ What Does Project Success Really Mean? Business Goals Achieving the requested modifications or improvements in the business Budget Compliance Schedule Compliance Functional Goals Project Goals
  • 8. 8INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Success Depends on Everybody Involved Processes TechnologyTeam Organization Management Project Key Users Project success is the sum of everybody’s daily work and decisions. We look forward to realize a successful project with you.
  • 9. 9INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication Agenda
  • 10. 10INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Solution Scope
  • 11. 11INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Service Scope
  • 12. 12INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Integration Points in Scope Integration Point From Product/Solution To Product/Solution Type Description Short description of integration point From SAP product that integrates To SAP product that integrates Technical nature of integration e.g. ALE Longer description of scope of integration perhaps covering business objects or data Customer Master Data CRM ERP CRM Middleware Optional download and delta loads of customer master data from ERP to Business Partners in CRM
  • 13. 13INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Landscape
  • 14. 14INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 15. 15INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project Planning Prepare Realize Deploy Prepare Project XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX Steps SAP involvement Customer involvement X Weeks X Weeks X Weeks Explore Go-Live XXX Key Activities
  • 16. 16INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project duration varies based on implementation scope, project resources, and desired speed of implementation. The below chart represents a general guidance. SAP S/4HANA Cloud Phase Duration PhaseProject Size Small Medium Large Prepare 5 10 20< Explore 23 45 60< Realize 17 30 50< Deploy 5 12 20< Numbers represent working days
  • 17. 17INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project Schedule W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Phase Description 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 Prepare 1.1 1.2. 1.3 1.4 1.5 2 Explore 2.1 2.2 3 Realize 3.1 3.2 3.3 3.4 3.5 4 Deploy 4.1 4.2
  • 18. 18INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Prepare Phase Key Prepare Activities: • Define project goals, high-level scope, and a project plan • Identify and quantify business value objectives • Secure executive sponsorship • Establish project standards, organization, and governance • Define and secure approval for the implementation/upgrade strategy • Define roles and responsibilities for the project team • Validate the project objectives • Establish project management, tracking, and reporting mechanisms for value delivery • Begin self-enablement • Receive and access the system • Kick off the project
  • 19. 19INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Explore Phase Key Explore Activities: • Project Management Execution, Monitoring, and Controlling • Customer Project Team Enablement • Solution Validation • Configuration Definition • Integration Prerequisites Confirmation • Solution Extension Preparation • Data Load Preparation • Phase Closure
  • 20. 20INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Realize Phase Key Realize Activities: • Establish the solution landscape • Implement the solution in the quality environment using incremental build in time-boxed iterations • Conduct overall end-to-end testing of the solution • Setup production environment • Prepare for data migration and data archiving • Conduct project team and key user training • Finalize end user training materials and documentation • Track and report on value delivery
  • 21. 21INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Deploy Phase Key Deploy Activities: • Finalize the solution and business processes for production go-live • Resolve all crucial open issues  Conduct system tests  Proceed with cutover activities including data migration • Execute transition and cutover plans including organizational change management (OCM) plans • Complete all scheduled end user training • Track and report on value delivery
  • 22. 22INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Testing Approach • Unit Testing – Performed by Configurator – Performed in Development Landscape • Integration Testing – Performed by the Customer –Performed in Quality Assurance Landscape • User Acceptance Testing – Performed by the Customer – Performed in Quality Assurance Landscape  Who and When will Test Plans and Scripts be written  Who will participate in Testing from the Customer?  How long should User Acceptance Testing last?
  • 23. 23INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 24. 24INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project Team and Roles Activity, Resource, Risk and Issue Management Configuration Design Configuration Validation Training Design and Delivery Architecture, Connectivity and Migration Consultant Project Manager Functional ExpertConsultants Technical Resource Business Resource Trainer Champion, Critical Decisions, Escalations Project Sponsor(s) Project Sponsor Process Owners / SMEs Technical Resources Business Stakeholders Trainers Consultants Customer Project Management
  • 25. 25INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Customer Role Details Project Manager Technical Resource • 25 – 40% dedication for landscape setup • 10 – 15% dedication during test phase • Confirm prerequisite components, add-ons, SPs, notes Key Users • 30 – 40% dedication throughout project • Explain business requirements & processes • Perform & confirm configuration • Drive decisions Testers • 10-15% dedication for configuration validation • Confirm configuration • Support decisions Trainers • 25-50% dedication for end user training • Create and execute training plan • Create training content
  • 26. 26INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP Role Details Consultants • Manage project • Responsible for knowledge transfer to key users • Perform/guide the system configuration • Introduce integration concept • Perform integration setup and support integration testing • Coordinate additional resources as required Custom Development • Provide Project Manager • Provide support for incidents reported via self-service tools, web and phone Customer Engagement Ensure
  • 27. 27INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • The SC is responsible for project control and project coordination as well as the efficient bringing about of technical and organizational decisions. • In SC meetings, project management reports on the project status and introduces relevant issues that have to be decided by the SC. • The SC assures that resources necessary for the project‘s success are available. • The SC is the last escalation level for problems (conflict management). • The SC assumes highest-level control on costs and budget, and is responsible for budget release. • The SC is responsible for inspection and approval of results and of the overall project. Responsibilities of the Steering Committee
  • 28. 28INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ What is expected of key users during a SAP solution implementation project? • Make knowledgeable business decisions in your respective area of expertise and help to define the solution • Complete the implementation activities as assigned • Act as a multiplier within your organization to train and support end users • Learn how to configure the new system. Key Users
  • 29. 29INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Key User Responsibilities After Go-Live Incident Management • Search for solutions and process incidents from end users directly and when necessary, request help from SAP Manage Users and Task Assignment • Deal with user authorization requests • Maintain responsibilities for users in your company • Resolve any unassigned business tasks Manage Background Jobs, Input and Output • Monitor background jobs • Monitor internal/external communications such as printers and integration with third-parties Knowledge Transfer • Act as a multiplier within your organization to train and support new users of the SAP solution
  • 30. 30INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 31. 31INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Critical Success Factors •Scope changes will likely impact the project timeline, your required effort and consulting costs Stay within the agreed scope •Adjust your processes to fit the standard system functionality in order to simplify future upgrades and scope expansion. •It doesn’t have to be perfect. You can always improve a solution later. Have a pragmatic mindset •The quicker you can make decisions, the quicker your project will be able to proceed into the right direction. Make quick decisions •Identify and involve your stakeholder early - executives, employees, labor unions, key customers,… Involve stakeholders early •The better you represent your business area, the better the SAP cloud solution will support your processes. •Work with your manager to secure sufficient availability for the project. As a key user, actively contribute to the project •Start cleansing your data as soon as possible to prevent project issues and delays. Start preparing data early •Only thorough testing will result in a successful go-live and stable system. Never cut corners on testing
  • 32. 32INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Standards of Project Communication Information Information Sender Information Recipient Frequency Form Status Report Customer PM SAP PM, SC Weekly Project Status Report Workshop Protocol SAP Key User, SAP PM, Customer PM After each meeting Result Protocol Steering Committee Report Customer PM Customer PM, SAP PM, Board After each meeting Steering Committee Meeting Minutes PM - Project Management SC - Steering Committee
  • 33. 33INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 34. Thank you. Contact information: F name L name Title Address Phone number Partner logo