Steps of Installation| Vivaan Solar Private Limited
Harnessing the power of Sun to Energy
Steps of installation of solar power plant
Note : All photos used in the presentation are actual site photographs.
SITE PREPARATION
Inspection of site - topographical features.
Markings are made as per the prepared design and bored on particular points
In case of highly irregular surface, where leveling cost is too high, disk and roll technique is used
Disk and Roll technique: Soil is locally distributed to maintain minimum embedment, and distance from ground.
Site Preparation, Levelling and Boring
Disk and Roll Technique
Note : All photos used in the presentation are actual site photographs.
POST CASTING
Posts are casted on the marked points for mounting panel structures
Minimum Embedment of poles/posts is necessary:1 m
Embedment depends on Soil Strata( after soil testing)
1 m- 1.8 m : Hard Soil ; More than 1.8 m: Soft Soil
Right Entrenchment provides strength to overall structure during heavy wind flow
Width of post : Width: 1 50 mm- 200mm
Initial Post Casting at Site
Ground Level
Min Embedment: 1 m
Width : 150-200 mm
Note : All photos used in the presentation are actual site photographs.
MOUNTING OF PANEL STRUCTURES
Panel structures are mounted on the casted posts
Posts are checked for their right vertical alignment using SPIRIT LEVEL TECHNIQUE (a magnetic method)
Technique helps in leveled panel – with zero wave formation and correctly fitted panels on tile structures
Mounting of panel structures
Note : All photos used in the presentation are actual site photographs.
STRUCTRE ALIGNMENT AND TORQUING PROCESS
Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket driver to finish tightening
Loose fastening : may not withstand wind pressure ; Tight Fastening : may damage the threads of nuts and bolts
Structure alignment
Bolt Tightening Technique
Note : All photos used in the presentation are actual site photographs.
Cables, Pipes and Joints
CEMENTED PIPE
For easy travelling of vehicles
Ensures strength of pipe for long run
Minimizes losses due to breakage of
pipes
DWC PIPE
Minimizes wear and tear of pipe due to sun
exposure
Augment life of cables and wires
Thus, increasing life-span of park
T-JOINTS +DWC PIPES
Protection of cables @ detailed
level
Enhances longevity of plant
Boost strength of overall
structure
Note : All photos used in the presentation are actual site photographs.
Installation of Junction Box
SEALED CAPS
Protection from rodents/insects
Augment life of cables and wires
Note : All photos used in the presentation are actual site photographs.
MODULES CONNECTION AND PLACEMENT
Modules in wooden box/iron boxes are placed in front of structures before placing them on tilt structures
Panels are vertically aligned in the packed boxes- after stripping of packed boxes, modules are first stacked.
Stacking of panels becomes necessary as module sheet may damage due to weight on consecutive modules once
first comes out
Safety Gloves and helmets are used for electrical connections of panels
Placement of Modules
Note : All photos used in the presentation are actual site photographs.
First Solar Thin Film
Place: Ujjain, Zone 1
Solar Frontier CIS
Place: Ujjain Zone 2
Polycrystalline,
Canadain Solar
Place: Uttarakhand
Note : All photos used in the presentation are actual site photographs.
We researched thoroughly across the globe for the panels to use of best technology available
Polycrystalline(Candian Solar)
Thin Fim Techonology (First Solar, US)
CIS Frontier (Solar Frontier, Japan)
Inverter Rooms
Matt- fitted inverter rooms to soak dust and water
Place: Ujjain, M.P., Inside Inverter Room
Tier 1 Inverter Supplier: AEG/ ABB/TMEIC(Japan)
Enhances longevity of plant
Reduces maintenance work
Proper Ventilation in Inverter rooms
Net covering provides protection from
rodents/insects
Ventilation maintains temperature of inverter rooms
Note : All photos used in the presentation are actual site photographs.
PV Switchgear and Substation
Lightening Conductor
Prevention from lighting
SEARCH PROTECTION DEVICE FITTED COMBINER BOX
Tier 1 Supplier: AEG/Skytron
Detects output of each panel
Locates any faulty panel
Helps in maintaining output levels Note : All photos used in the presentation are actual site photographs.
WEEKLY MAINTENANCE OF INVERTERS
Specialised vacuum cleaners for inverter rooms
 Regular cleaning increases life of inverters
 Reduces breakdowns due to blockage of dust Note : All photos used in the presentation are actual site photographs.
Yes, the life of a solar park is minimum 25 years…
provided we follow systematic, meticulous
procedures during installation!!
Locations & Contact Details
Web: www.vivaansolar.com | Mail: info@vivaansolar.com
Instant Helpline: (91) 9999055452
Corporate Office- Haridwar
Second Floor, Heera Complex
Ranipur Modh, Haridwar – 249403
p: +91-133-4265178| f: +91-133-4265179
Registered Office- Gwalior
Bansal Office, Nehru colony
Thatipur, Gwalior- 474011
p: +91-751-2341195, f: +91-751-4014414
Get
Social:

Contenu connexe

Similaire à Steps for conceptualization of a solar power plant vivaan solar v2

Steps for conceptualization of a solar power plant vivaan solar v2
Steps for conceptualization of a solar power plant vivaan      solar v2Steps for conceptualization of a solar power plant vivaan      solar v2
Steps for conceptualization of a solar power plant vivaan solar v2Varsha Gupta
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
building services 1 presentation slides
building services 1 presentation slidesbuilding services 1 presentation slides
building services 1 presentation slideskellyxc
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lpsMahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lpsMahesh Chandra Manav
 
CLFR 1 MW THAILAND
CLFR 1 MW THAILANDCLFR 1 MW THAILAND
CLFR 1 MW THAILANDJack Wong
 
Flame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic IndustryFlame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic IndustryStefano Mancinelli
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemChintan Gandhi
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeIRJET Journal
 
Turbine blade faliure
Turbine blade faliureTurbine blade faliure
Turbine blade faliureskncoe86
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Mahesh Chandra Manav
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lpsMahesh Chandra Manav
 
IRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door SegmentIRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door SegmentIRJET Journal
 
Broschuere_Desert_Modul_12_2020-web (1).pdf
Broschuere_Desert_Modul_12_2020-web (1).pdfBroschuere_Desert_Modul_12_2020-web (1).pdf
Broschuere_Desert_Modul_12_2020-web (1).pdfsoportetecnico202693
 
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...Engineers Australia
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+ Sun Systems
 

Similaire à Steps for conceptualization of a solar power plant vivaan solar v2 (20)

Steps for conceptualization of a solar power plant vivaan solar v2
Steps for conceptualization of a solar power plant vivaan      solar v2Steps for conceptualization of a solar power plant vivaan      solar v2
Steps for conceptualization of a solar power plant vivaan solar v2
 
PORTFOLIO-Model
PORTFOLIO-ModelPORTFOLIO-Model
PORTFOLIO-Model
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
building services 1 presentation slides
building services 1 presentation slidesbuilding services 1 presentation slides
building services 1 presentation slides
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 
CLFR 1 MW THAILAND
CLFR 1 MW THAILANDCLFR 1 MW THAILAND
CLFR 1 MW THAILAND
 
Flame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic IndustryFlame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic Industry
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
 
Turbine blade faliure
Turbine blade faliureTurbine blade faliure
Turbine blade faliure
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
 
IRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door SegmentIRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door Segment
 
Broschuere_Desert_Modul_12_2020-web (1).pdf
Broschuere_Desert_Modul_12_2020-web (1).pdfBroschuere_Desert_Modul_12_2020-web (1).pdf
Broschuere_Desert_Modul_12_2020-web (1).pdf
 
Aluminum work
Aluminum workAluminum work
Aluminum work
 
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...
 
Jmv presentation solar
Jmv  presentation solarJmv  presentation solar
Jmv presentation solar
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile Structures
 

Dernier

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfEr. Suman Jyoti
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 

Dernier (20)

(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Steps for conceptualization of a solar power plant vivaan solar v2

  • 1. Steps of Installation| Vivaan Solar Private Limited Harnessing the power of Sun to Energy
  • 2. Steps of installation of solar power plant Note : All photos used in the presentation are actual site photographs.
  • 3. SITE PREPARATION Inspection of site - topographical features. Markings are made as per the prepared design and bored on particular points In case of highly irregular surface, where leveling cost is too high, disk and roll technique is used Disk and Roll technique: Soil is locally distributed to maintain minimum embedment, and distance from ground. Site Preparation, Levelling and Boring Disk and Roll Technique Note : All photos used in the presentation are actual site photographs.
  • 4. POST CASTING Posts are casted on the marked points for mounting panel structures Minimum Embedment of poles/posts is necessary:1 m Embedment depends on Soil Strata( after soil testing) 1 m- 1.8 m : Hard Soil ; More than 1.8 m: Soft Soil Right Entrenchment provides strength to overall structure during heavy wind flow Width of post : Width: 1 50 mm- 200mm Initial Post Casting at Site Ground Level Min Embedment: 1 m Width : 150-200 mm Note : All photos used in the presentation are actual site photographs.
  • 5. MOUNTING OF PANEL STRUCTURES Panel structures are mounted on the casted posts Posts are checked for their right vertical alignment using SPIRIT LEVEL TECHNIQUE (a magnetic method) Technique helps in leveled panel – with zero wave formation and correctly fitted panels on tile structures Mounting of panel structures Note : All photos used in the presentation are actual site photographs.
  • 6. STRUCTRE ALIGNMENT AND TORQUING PROCESS Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket driver to finish tightening Loose fastening : may not withstand wind pressure ; Tight Fastening : may damage the threads of nuts and bolts Structure alignment Bolt Tightening Technique Note : All photos used in the presentation are actual site photographs.
  • 7. Cables, Pipes and Joints CEMENTED PIPE For easy travelling of vehicles Ensures strength of pipe for long run Minimizes losses due to breakage of pipes DWC PIPE Minimizes wear and tear of pipe due to sun exposure Augment life of cables and wires Thus, increasing life-span of park T-JOINTS +DWC PIPES Protection of cables @ detailed level Enhances longevity of plant Boost strength of overall structure Note : All photos used in the presentation are actual site photographs.
  • 8. Installation of Junction Box SEALED CAPS Protection from rodents/insects Augment life of cables and wires Note : All photos used in the presentation are actual site photographs.
  • 9. MODULES CONNECTION AND PLACEMENT Modules in wooden box/iron boxes are placed in front of structures before placing them on tilt structures Panels are vertically aligned in the packed boxes- after stripping of packed boxes, modules are first stacked. Stacking of panels becomes necessary as module sheet may damage due to weight on consecutive modules once first comes out Safety Gloves and helmets are used for electrical connections of panels Placement of Modules Note : All photos used in the presentation are actual site photographs.
  • 10. First Solar Thin Film Place: Ujjain, Zone 1 Solar Frontier CIS Place: Ujjain Zone 2 Polycrystalline, Canadain Solar Place: Uttarakhand Note : All photos used in the presentation are actual site photographs. We researched thoroughly across the globe for the panels to use of best technology available Polycrystalline(Candian Solar) Thin Fim Techonology (First Solar, US) CIS Frontier (Solar Frontier, Japan)
  • 11. Inverter Rooms Matt- fitted inverter rooms to soak dust and water Place: Ujjain, M.P., Inside Inverter Room Tier 1 Inverter Supplier: AEG/ ABB/TMEIC(Japan) Enhances longevity of plant Reduces maintenance work Proper Ventilation in Inverter rooms Net covering provides protection from rodents/insects Ventilation maintains temperature of inverter rooms Note : All photos used in the presentation are actual site photographs.
  • 12. PV Switchgear and Substation Lightening Conductor Prevention from lighting
  • 13. SEARCH PROTECTION DEVICE FITTED COMBINER BOX Tier 1 Supplier: AEG/Skytron Detects output of each panel Locates any faulty panel Helps in maintaining output levels Note : All photos used in the presentation are actual site photographs.
  • 14. WEEKLY MAINTENANCE OF INVERTERS Specialised vacuum cleaners for inverter rooms  Regular cleaning increases life of inverters  Reduces breakdowns due to blockage of dust Note : All photos used in the presentation are actual site photographs.
  • 15. Yes, the life of a solar park is minimum 25 years… provided we follow systematic, meticulous procedures during installation!!
  • 16. Locations & Contact Details Web: www.vivaansolar.com | Mail: info@vivaansolar.com Instant Helpline: (91) 9999055452 Corporate Office- Haridwar Second Floor, Heera Complex Ranipur Modh, Haridwar – 249403 p: +91-133-4265178| f: +91-133-4265179 Registered Office- Gwalior Bansal Office, Nehru colony Thatipur, Gwalior- 474011 p: +91-751-2341195, f: +91-751-4014414 Get Social:

Notes de l'éditeur

  1. Each step has its own importance and can not be undermined. Every step takes its own time to execute and meticulously handled
  2. Wind flow is heavy due to open ground so, it becomes mandatory to provide strength to the panel structure at the very initial stage
  3. Varsha: change successfully installed panels
  4. Varsha: Change the content