Steps for conceptualization of a solar power plant vivaan solar v2
1. Steps of Installation| Vivaan Solar Private Limited
Harnessing the power of Sun to Energy
2. Steps of installation of solar power plant
Note : All photos used in the presentation are actual site photographs.
3. SITE PREPARATION
Inspection of site - topographical features.
Markings are made as per the prepared design and bored on particular points
In case of highly irregular surface, where leveling cost is too high, disk and roll technique is used
Disk and Roll technique: Soil is locally distributed to maintain minimum embedment, and distance from ground.
Site Preparation, Levelling and Boring
Disk and Roll Technique
Note : All photos used in the presentation are actual site photographs.
4. POST CASTING
Posts are casted on the marked points for mounting panel structures
Minimum Embedment of poles/posts is necessary:1 m
Embedment depends on Soil Strata( after soil testing)
1 m- 1.8 m : Hard Soil ; More than 1.8 m: Soft Soil
Right Entrenchment provides strength to overall structure during heavy wind flow
Width of post : Width: 1 50 mm- 200mm
Initial Post Casting at Site
Ground Level
Min Embedment: 1 m
Width : 150-200 mm
Note : All photos used in the presentation are actual site photographs.
5. MOUNTING OF PANEL STRUCTURES
Panel structures are mounted on the casted posts
Posts are checked for their right vertical alignment using SPIRIT LEVEL TECHNIQUE (a magnetic method)
Technique helps in leveled panel – with zero wave formation and correctly fitted panels on tile structures
Mounting of panel structures
Note : All photos used in the presentation are actual site photographs.
6. STRUCTRE ALIGNMENT AND TORQUING PROCESS
Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket driver to finish tightening
Loose fastening : may not withstand wind pressure ; Tight Fastening : may damage the threads of nuts and bolts
Structure alignment
Bolt Tightening Technique
Note : All photos used in the presentation are actual site photographs.
7. Cables, Pipes and Joints
CEMENTED PIPE
For easy travelling of vehicles
Ensures strength of pipe for long run
Minimizes losses due to breakage of
pipes
DWC PIPE
Minimizes wear and tear of pipe due to sun
exposure
Augment life of cables and wires
Thus, increasing life-span of park
T-JOINTS +DWC PIPES
Protection of cables @ detailed
level
Enhances longevity of plant
Boost strength of overall
structure
Note : All photos used in the presentation are actual site photographs.
8. Installation of Junction Box
SEALED CAPS
Protection from rodents/insects
Augment life of cables and wires
Note : All photos used in the presentation are actual site photographs.
9. MODULES CONNECTION AND PLACEMENT
Modules in wooden box/iron boxes are placed in front of structures before placing them on tilt structures
Panels are vertically aligned in the packed boxes- after stripping of packed boxes, modules are first stacked.
Stacking of panels becomes necessary as module sheet may damage due to weight on consecutive modules once
first comes out
Safety Gloves and helmets are used for electrical connections of panels
Placement of Modules
Note : All photos used in the presentation are actual site photographs.
10. First Solar Thin Film
Place: Ujjain, Zone 1
Solar Frontier CIS
Place: Ujjain Zone 2
Polycrystalline,
Canadain Solar
Place: Uttarakhand
Note : All photos used in the presentation are actual site photographs.
We researched thoroughly across the globe for the panels to use of best technology available
Polycrystalline(Candian Solar)
Thin Fim Techonology (First Solar, US)
CIS Frontier (Solar Frontier, Japan)
11. Inverter Rooms
Matt- fitted inverter rooms to soak dust and water
Place: Ujjain, M.P., Inside Inverter Room
Tier 1 Inverter Supplier: AEG/ ABB/TMEIC(Japan)
Enhances longevity of plant
Reduces maintenance work
Proper Ventilation in Inverter rooms
Net covering provides protection from
rodents/insects
Ventilation maintains temperature of inverter rooms
Note : All photos used in the presentation are actual site photographs.
12. PV Switchgear and Substation
Lightening Conductor
Prevention from lighting
13. SEARCH PROTECTION DEVICE FITTED COMBINER BOX
Tier 1 Supplier: AEG/Skytron
Detects output of each panel
Locates any faulty panel
Helps in maintaining output levels Note : All photos used in the presentation are actual site photographs.
14. WEEKLY MAINTENANCE OF INVERTERS
Specialised vacuum cleaners for inverter rooms
Regular cleaning increases life of inverters
Reduces breakdowns due to blockage of dust Note : All photos used in the presentation are actual site photographs.
15. Yes, the life of a solar park is minimum 25 years…
provided we follow systematic, meticulous
procedures during installation!!