SlideShare une entreprise Scribd logo
1  sur  22
Techno Economic
appraisal of Prospects
A Case Study on CB-ONN-2009/8 Block ( Cambay Basin )
Vedant Makwana ( 45 )
Shashank Pandey ( 36 )
Aditya Harsh ( 03 )
Background
▪ The concerned block CB-ONN-2009/8 measuring 136 sq. km was
awarded to JPIL by Govt. of India under NELPVIII.
▪ Jay Polychem India Ltd. (JPIL) is an integrated Energy Company
having interest in Oil and Gas Exploration.
▪ The Production Sharing Contract PSC between JPIL and GoI was
signed on 30 June 2010.
▪ Block CB-ONN-2009/8 falls in DholkaTaluka ofAhmedabad and
TarapurTaluka of Anand district of Gujarat State.
On site Location
Source : S.S.Merh
The Project
▪ JPIL has identified 12 wells in Ahmedabad and one in Anand district.
▪ Proposed operation are covered under category 1B of EIA Notification 2006.
▪ JPIL plans to carry out accelerated development programmes on the basis of
recent 3D seismic data acquired.
▪ JPIL intends to drill wells to a depth ranging 800 to 2500 metres.
▪ There is a possibility of drilling a number of wells from a single site which is
termed as cluster well drilling.
▪ Some of the wells may be drilled horizontal to increase sweep efficiency.
Technical Aspects
The Sedimentary Basin
▪ The Cambay rift basin is a rich petroleum province majorly lying in the state
of Gujarat, India
▪ It is a narrow elongated rift grabben extending North to south from
Sanchore to Surat.
▪ In the North the basin narrows , tectonically continuing beyond Sanchore
to pass into the Barmer Basin of Rajasthan
▪ On the southern side the basin merges with Bombay offshore basin in the
Arabian Sea.
▪ Seismic and drilled well data indicate a thickness of about 8 km of tertiary
sediments resting over DeccanVolcanic basalt
Geology
▪ Cambay Basin in the western Indian state of Gujarat is a fairly well explored
productive basin
▪ The Broach sub block lies in the southern part of the basin. It is bounded on the
north by the Mahisagar River and in the south by Narmada River.
▪ It is bounded by basin marginal faults in the east and west. Most of the
discovered oil in this block is in Hazad sands of the Ankleshwar Formation, but
oil is also produced from deeper pays in the Cambay Shale and Olpad Formation
of Palaeocene to Early Eocene age.
▪ In a basin with geological history of deltaic sedimentation, entrapment
conditions formed in time and space witnesses varying degree of structural and
stratigraphic control over hydrocarbon accumulations.
Cont…
▪ Cambay Shale below Hazad base includes the
following succession from top to bottom:
– A monotonous fissile shaly interval, occasionally
carbonaceous, 100 to 200 m thick deposited in low
energy conditions.
– A thickening upward silty interval often associated
with a few meters thick coal seam. This interval is
widely correlatable in the Jambusar-Broach block.
– Another monotonous shale interval, often
carbonaceous, thickening from 50 to 150 m in Nada
Malpur area, to 700-800 m in Gandhar and Jambusar
wells.
– Deeper, the shales includes 9 to 12 layers of lithic
dirty sands, 2 to 10 m thick.
Source : GMRC
Petroleum Systems
▪ Source Rock
– Thick Cambay Shale has been the main Hydrocarbon Source Rock for oil fields in the
Cambay Basin.
– The TOC ( Total Organic Carbon ) and maturation studies suggest that Olpad Formation
Shale is organically rich and thermally mature.
▪ Reservoir Rock
– The reservoir majorly consists of sand sized Basalt fragments although localised sandstone
lenses occur in the Cambay Shale.
▪ Cap Rock
– Transgressive Shale within the deltaic sequences provide a good cap rock.
Operations
▪ Drilling of well
– Based on the drilling Methodology
adopted by JPIL the size of the
Drill bit and other equipment
would vary.
– However a schematic cross-
section of proposed well is
displayed alongside.
– Detail of drilling programme is
under finalization , but is expected
to follow the general sequence
outlined below
Cont…
▪ Spud and Drill 17.5 inch section
▪ Run and cement 13.36 inch casing
▪ Install and test BOP
▪ Drill 12.25 inch section
▪ Run and cement 9.62 inch casing
▪ Drill 8.5 inch section
▪ Record well logs
▪ Run and cement 5.5 inch casing
▪ Finally the well will either be completed as producer or plugged and abandoned.
Oil Characteristics
▪ Unlike other oil fields of Cambay Basin the oil from the concerned
block is heavy and sour.
▪ The API gravity of oil as obtained from discovery samples is
approximately 14.0 ( SPGR = 0.95 )
▪ The sulphur content ranges form 1.6 % to 2.2 %.
▪ This oil is waxy with pour points ranging from -8 to -3 °C.
Well Testing
▪ While Drilling rock core samples will be taken from the strata.
▪ Well log data will be recorded simultaneously.
▪ If Hydrocarbons are encountered , composition and reservoir permeability
would be warranted.
▪ A production test might proceed through the final completion valves in place
Economic Aspects
Drilling Requirements
▪ Drilling Facilities
– Drill Bit
– Drill String
– Drill Collars
– Kelly
– Top Drive Mechanism
– Swivel with high pressure drilling hose
– Diesel Engines
– Blow Out Preventer
– Storage tanks for Drilling Mud
Raw Materials For Slurries
▪ The main component of Drilling fluid is slurry
of inert solids suspended in a liquid phase
which will be made up of water.
▪ The anticipated chemicals used in the mud
preparation of each well is given in table
along side.
▪ JPIL may also explore use of synthetic based
mud to achieve higher drilling efficiency.
▪ Schlumberger and Halliburton would be the
consultants in case this option is tried.
▪ Another important raw material is cement
slurry. On an average 200-250 thousand
tonnes of cement is likely to be used for each
well.
Sr.No Chemical Quantity
(Tonnes )
1 Bentonite 0.7
2 Caustic Soda 0.4
3 Soda Ash 0.05
4 Lignite 5.05
5 Barites 120.75
6 PAC UL 0.6
7 PAC R 0.5
8 Spersene 0.9
9 Aluminium Stearate 0.03
10 Chrome Lignite 2.875
11 SulphonatedAsphalt 0.5
Economic Aspects
▪ WorkforceArrangement
– During the drilling operations and pilot assessment phase about 20-30 people may be
working in three shifts of 8 hours each.
– 8-10 technical personnel will be present at the site during drilling period.
– Once drilling is over no person is required at site except security cover through
contractor.
▪ Power Requirement
– Diesel Engines shall be utilized as prime movers
– Capacity of the engines that shall be used for operating the rig and the circulation
system should be in the range of 440 KVA ( 2 in number , 1 standby ).The Engines
would consume high speed diesel at the rate of 20 litre per hour.
– A power generator shall be installed for lighting
– The generator shall consume approximately 150 litres per hour.
Cont…
▪ Water Requirement
– Water is required for mud preparation , cement preparation , engine cooling , floor /
equipment washing , sanitation , fire fighting storage , and personal uses of crew.
– The emergency fire fighting provision water facility would be initially 150,000 litres.
– According to CGWA ( Central Ground Water Authority ) , Tarapur of Anand District is
decided as safe area.
Sr.No Purpose Water Requirement
1 Construction and Site Preparation 4.7 Kl
2 Mud Preparation 10 Kl
3 EngineCooling 0.8 Kl
4 Washing 5 Kl
5 Fire Fighting Make-up 0.8 Kl
6 Domestic Requirements 2.55 Kl
Total 19.5 Kl
Bottom Line
Pros Cons
Conclusion
▪ The decision of putting in full investment for complete development of the
oil fields of the Block CB-ONN-2009/8 depends heavily on the IOIP ( Initial
Oil in Place ) assessment
▪ As concluded from the technical aspects the oil is difficult to produce
because of low API gravity and supposed to be low flow rate ( No Primary
permeability as reservoir rock is basalt )
▪ Hence a lot will depend on the commercial quantities of oil that can be
produced.
Reference
1) "Geology of Gujarat" by S.S.Merh published by Geological Society of India
2) "Geology of Gujarat" byV.N.Kulkarni (1985) published by Irrigation, R&B Deptt.
Gujarat State in Journal "NAVNIRMAN" Vol. No.XXVII No.2
3) "Geology and Mineral Resources of Gujarat, Daman and Diu published by
Geological Survey of India. Publication No.30 Part XIV-2001
Thank You

Contenu connexe

Tendances

SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
John Downs
 
Hpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1stHpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1st
Pritish Mukherjee
 
Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013
Company Spotlight
 
Heavy oil article final_AKG 30 Dec 2013
Heavy oil article final_AKG 30 Dec 2013Heavy oil article final_AKG 30 Dec 2013
Heavy oil article final_AKG 30 Dec 2013
ASIM KUMAR GHOSH
 
Presentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClubPresentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClub
David Greer
 

Tendances (20)

Dr Ian Campbell: Background and environmental impacts
Dr Ian Campbell: Background and environmental impactsDr Ian Campbell: Background and environmental impacts
Dr Ian Campbell: Background and environmental impacts
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
 
Steering committee draft policy note 2 (1)
Steering committee draft policy note 2 (1)Steering committee draft policy note 2 (1)
Steering committee draft policy note 2 (1)
 
Oil & Gas Disciplines
Oil & Gas DisciplinesOil & Gas Disciplines
Oil & Gas Disciplines
 
Marginal oil fields
Marginal oil fieldsMarginal oil fields
Marginal oil fields
 
SPE 199286 - Profiling the Production Performance of Five HPHT Gas Condensate...
SPE 199286 - Profiling the Production Performance of Five HPHT Gas Condensate...SPE 199286 - Profiling the Production Performance of Five HPHT Gas Condensate...
SPE 199286 - Profiling the Production Performance of Five HPHT Gas Condensate...
 
Hpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1stHpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1st
 
Fabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconi
 
Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013Half yearly results for the six months to June 2013
Half yearly results for the six months to June 2013
 
Reportongc
ReportongcReportongc
Reportongc
 
Impacts of CBM Extraction in Cauvery Delta
Impacts of CBM Extraction in Cauvery DeltaImpacts of CBM Extraction in Cauvery Delta
Impacts of CBM Extraction in Cauvery Delta
 
4 eor 4-gasmethods,
4 eor 4-gasmethods,4 eor 4-gasmethods,
4 eor 4-gasmethods,
 
Heavy oil article final_AKG 30 Dec 2013
Heavy oil article final_AKG 30 Dec 2013Heavy oil article final_AKG 30 Dec 2013
Heavy oil article final_AKG 30 Dec 2013
 
Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019Canada cobalt-presentation-october-16-2019
Canada cobalt-presentation-october-16-2019
 
Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...
Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...
Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...
 
Presentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClubPresentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClub
 

En vedette (11)

Pricing in Economics
Pricing in Economics Pricing in Economics
Pricing in Economics
 
Pricing Decisions
Pricing DecisionsPricing Decisions
Pricing Decisions
 
Pricing Decisions & Strategies
Pricing Decisions & StrategiesPricing Decisions & Strategies
Pricing Decisions & Strategies
 
Price decisions
Price decisionsPrice decisions
Price decisions
 
Pricing decision
Pricing decisionPricing decision
Pricing decision
 
cross polar microscopy on crude
cross polar microscopy on crudecross polar microscopy on crude
cross polar microscopy on crude
 
Pricing decisions
Pricing decisionsPricing decisions
Pricing decisions
 
Inflation and Deflation
Inflation and DeflationInflation and Deflation
Inflation and Deflation
 
Managerial Economics Cost PPT
Managerial Economics Cost PPTManagerial Economics Cost PPT
Managerial Economics Cost PPT
 
Health Economics
Health EconomicsHealth Economics
Health Economics
 
Cost Concepts
Cost ConceptsCost Concepts
Cost Concepts
 

Similaire à Techno-Economic Appraisal

jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
saifuddinkhan34
 
HCK AJM Paper May 03 (Double Space)
HCK AJM Paper May 03 (Double Space)HCK AJM Paper May 03 (Double Space)
HCK AJM Paper May 03 (Double Space)
John Coughlan
 
Shaletekk M Brochure
Shaletekk M BrochureShaletekk M Brochure
Shaletekk M Brochure
naturetekk
 

Similaire à Techno-Economic Appraisal (20)

Basics for ugs
Basics for ugsBasics for ugs
Basics for ugs
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Nitin
NitinNitin
Nitin
 
US-Albania Investment Forum
US-Albania Investment ForumUS-Albania Investment Forum
US-Albania Investment Forum
 
Electromech
Electromech Electromech
Electromech
 
Logging While Drilling.pdf
Logging While Drilling.pdfLogging While Drilling.pdf
Logging While Drilling.pdf
 
14 OIDB Hydrocarbon Exploration-Indian Perspective 20-12-2011.pptx
14 OIDB Hydrocarbon Exploration-Indian Perspective 20-12-2011.pptx14 OIDB Hydrocarbon Exploration-Indian Perspective 20-12-2011.pptx
14 OIDB Hydrocarbon Exploration-Indian Perspective 20-12-2011.pptx
 
Unconventional reservoir
Unconventional reservoirUnconventional reservoir
Unconventional reservoir
 
The discovery and evaluation of AK6
The discovery and evaluation of AK6The discovery and evaluation of AK6
The discovery and evaluation of AK6
 
Tar sands and oil shale
Tar sands and oil shaleTar sands and oil shale
Tar sands and oil shale
 
Burgen greater 1
Burgen greater 1Burgen greater 1
Burgen greater 1
 
Burgen greater 1
Burgen greater 1Burgen greater 1
Burgen greater 1
 
HCK AJM Paper May 03 (Double Space)
HCK AJM Paper May 03 (Double Space)HCK AJM Paper May 03 (Double Space)
HCK AJM Paper May 03 (Double Space)
 
Khalaspir coal field
Khalaspir coal fieldKhalaspir coal field
Khalaspir coal field
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states
 
Training report of ONGC Ahmedabad
Training report of ONGC AhmedabadTraining report of ONGC Ahmedabad
Training report of ONGC Ahmedabad
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
Shaletekk M Brochure
Shaletekk M BrochureShaletekk M Brochure
Shaletekk M Brochure
 
Internship report
Internship reportInternship report
Internship report
 

Techno-Economic Appraisal

  • 1. Techno Economic appraisal of Prospects A Case Study on CB-ONN-2009/8 Block ( Cambay Basin ) Vedant Makwana ( 45 ) Shashank Pandey ( 36 ) Aditya Harsh ( 03 )
  • 2. Background ▪ The concerned block CB-ONN-2009/8 measuring 136 sq. km was awarded to JPIL by Govt. of India under NELPVIII. ▪ Jay Polychem India Ltd. (JPIL) is an integrated Energy Company having interest in Oil and Gas Exploration. ▪ The Production Sharing Contract PSC between JPIL and GoI was signed on 30 June 2010. ▪ Block CB-ONN-2009/8 falls in DholkaTaluka ofAhmedabad and TarapurTaluka of Anand district of Gujarat State.
  • 4. The Project ▪ JPIL has identified 12 wells in Ahmedabad and one in Anand district. ▪ Proposed operation are covered under category 1B of EIA Notification 2006. ▪ JPIL plans to carry out accelerated development programmes on the basis of recent 3D seismic data acquired. ▪ JPIL intends to drill wells to a depth ranging 800 to 2500 metres. ▪ There is a possibility of drilling a number of wells from a single site which is termed as cluster well drilling. ▪ Some of the wells may be drilled horizontal to increase sweep efficiency.
  • 6. The Sedimentary Basin ▪ The Cambay rift basin is a rich petroleum province majorly lying in the state of Gujarat, India ▪ It is a narrow elongated rift grabben extending North to south from Sanchore to Surat. ▪ In the North the basin narrows , tectonically continuing beyond Sanchore to pass into the Barmer Basin of Rajasthan ▪ On the southern side the basin merges with Bombay offshore basin in the Arabian Sea. ▪ Seismic and drilled well data indicate a thickness of about 8 km of tertiary sediments resting over DeccanVolcanic basalt
  • 7. Geology ▪ Cambay Basin in the western Indian state of Gujarat is a fairly well explored productive basin ▪ The Broach sub block lies in the southern part of the basin. It is bounded on the north by the Mahisagar River and in the south by Narmada River. ▪ It is bounded by basin marginal faults in the east and west. Most of the discovered oil in this block is in Hazad sands of the Ankleshwar Formation, but oil is also produced from deeper pays in the Cambay Shale and Olpad Formation of Palaeocene to Early Eocene age. ▪ In a basin with geological history of deltaic sedimentation, entrapment conditions formed in time and space witnesses varying degree of structural and stratigraphic control over hydrocarbon accumulations.
  • 8. Cont… ▪ Cambay Shale below Hazad base includes the following succession from top to bottom: – A monotonous fissile shaly interval, occasionally carbonaceous, 100 to 200 m thick deposited in low energy conditions. – A thickening upward silty interval often associated with a few meters thick coal seam. This interval is widely correlatable in the Jambusar-Broach block. – Another monotonous shale interval, often carbonaceous, thickening from 50 to 150 m in Nada Malpur area, to 700-800 m in Gandhar and Jambusar wells. – Deeper, the shales includes 9 to 12 layers of lithic dirty sands, 2 to 10 m thick. Source : GMRC
  • 9. Petroleum Systems ▪ Source Rock – Thick Cambay Shale has been the main Hydrocarbon Source Rock for oil fields in the Cambay Basin. – The TOC ( Total Organic Carbon ) and maturation studies suggest that Olpad Formation Shale is organically rich and thermally mature. ▪ Reservoir Rock – The reservoir majorly consists of sand sized Basalt fragments although localised sandstone lenses occur in the Cambay Shale. ▪ Cap Rock – Transgressive Shale within the deltaic sequences provide a good cap rock.
  • 10. Operations ▪ Drilling of well – Based on the drilling Methodology adopted by JPIL the size of the Drill bit and other equipment would vary. – However a schematic cross- section of proposed well is displayed alongside. – Detail of drilling programme is under finalization , but is expected to follow the general sequence outlined below
  • 11. Cont… ▪ Spud and Drill 17.5 inch section ▪ Run and cement 13.36 inch casing ▪ Install and test BOP ▪ Drill 12.25 inch section ▪ Run and cement 9.62 inch casing ▪ Drill 8.5 inch section ▪ Record well logs ▪ Run and cement 5.5 inch casing ▪ Finally the well will either be completed as producer or plugged and abandoned.
  • 12. Oil Characteristics ▪ Unlike other oil fields of Cambay Basin the oil from the concerned block is heavy and sour. ▪ The API gravity of oil as obtained from discovery samples is approximately 14.0 ( SPGR = 0.95 ) ▪ The sulphur content ranges form 1.6 % to 2.2 %. ▪ This oil is waxy with pour points ranging from -8 to -3 °C.
  • 13. Well Testing ▪ While Drilling rock core samples will be taken from the strata. ▪ Well log data will be recorded simultaneously. ▪ If Hydrocarbons are encountered , composition and reservoir permeability would be warranted. ▪ A production test might proceed through the final completion valves in place
  • 15. Drilling Requirements ▪ Drilling Facilities – Drill Bit – Drill String – Drill Collars – Kelly – Top Drive Mechanism – Swivel with high pressure drilling hose – Diesel Engines – Blow Out Preventer – Storage tanks for Drilling Mud
  • 16. Raw Materials For Slurries ▪ The main component of Drilling fluid is slurry of inert solids suspended in a liquid phase which will be made up of water. ▪ The anticipated chemicals used in the mud preparation of each well is given in table along side. ▪ JPIL may also explore use of synthetic based mud to achieve higher drilling efficiency. ▪ Schlumberger and Halliburton would be the consultants in case this option is tried. ▪ Another important raw material is cement slurry. On an average 200-250 thousand tonnes of cement is likely to be used for each well. Sr.No Chemical Quantity (Tonnes ) 1 Bentonite 0.7 2 Caustic Soda 0.4 3 Soda Ash 0.05 4 Lignite 5.05 5 Barites 120.75 6 PAC UL 0.6 7 PAC R 0.5 8 Spersene 0.9 9 Aluminium Stearate 0.03 10 Chrome Lignite 2.875 11 SulphonatedAsphalt 0.5
  • 17. Economic Aspects ▪ WorkforceArrangement – During the drilling operations and pilot assessment phase about 20-30 people may be working in three shifts of 8 hours each. – 8-10 technical personnel will be present at the site during drilling period. – Once drilling is over no person is required at site except security cover through contractor. ▪ Power Requirement – Diesel Engines shall be utilized as prime movers – Capacity of the engines that shall be used for operating the rig and the circulation system should be in the range of 440 KVA ( 2 in number , 1 standby ).The Engines would consume high speed diesel at the rate of 20 litre per hour. – A power generator shall be installed for lighting – The generator shall consume approximately 150 litres per hour.
  • 18. Cont… ▪ Water Requirement – Water is required for mud preparation , cement preparation , engine cooling , floor / equipment washing , sanitation , fire fighting storage , and personal uses of crew. – The emergency fire fighting provision water facility would be initially 150,000 litres. – According to CGWA ( Central Ground Water Authority ) , Tarapur of Anand District is decided as safe area. Sr.No Purpose Water Requirement 1 Construction and Site Preparation 4.7 Kl 2 Mud Preparation 10 Kl 3 EngineCooling 0.8 Kl 4 Washing 5 Kl 5 Fire Fighting Make-up 0.8 Kl 6 Domestic Requirements 2.55 Kl Total 19.5 Kl
  • 20. Conclusion ▪ The decision of putting in full investment for complete development of the oil fields of the Block CB-ONN-2009/8 depends heavily on the IOIP ( Initial Oil in Place ) assessment ▪ As concluded from the technical aspects the oil is difficult to produce because of low API gravity and supposed to be low flow rate ( No Primary permeability as reservoir rock is basalt ) ▪ Hence a lot will depend on the commercial quantities of oil that can be produced.
  • 21. Reference 1) "Geology of Gujarat" by S.S.Merh published by Geological Society of India 2) "Geology of Gujarat" byV.N.Kulkarni (1985) published by Irrigation, R&B Deptt. Gujarat State in Journal "NAVNIRMAN" Vol. No.XXVII No.2 3) "Geology and Mineral Resources of Gujarat, Daman and Diu published by Geological Survey of India. Publication No.30 Part XIV-2001