SlideShare une entreprise Scribd logo
1  sur  3
CURRICULUM VITAE
Mr. Veenu Sharma
A ENGINEER WITH EXPERIENCE IN PROJECT MANAGEMENT, EXECUTION, SALES & MARKETING
(CONTRACTS) IN POWER INDUSTRY (EPC SECTOR)
Job Objective
To pursue my career with a company of repute where my skills and knowledge can be applied to the maximum
and where hard work will be appreciated.
Work Experience
 Angelique International Limited As Senior Manager From April 2006 to Till Date
A company that exports small & medium sized projects (Infrastructure & Energy from India & sets them up in
developing countries on a turnkey basis.
LIVE PROJECT 1: SALMA HYDEL DAM PROJECT, AFGHANISTAN
Project Profile: A project completely funded by Ministry of External Affairs, Government of India as a friendship
gesture to help in Reconstruction & Rehabilitation of Afghanistan.
Height of Dam: 107.5 Mtr; Type of Dam: High earth and rock fill; Capacity: 3 X 14 MW = 42MW
CLIENT: Water & Power Consultancy Services Limited, India
PARTNER: SSJV Ltd, Bangalore
WORTH: 1400 crores
SCOPE OF WORK: Hydro Mechanical, Power House, Penstock, Tailrace, Switchyard, Instrumentation Works and
Operation & Maintenance of Diesel Generating Sets of Salma Dam Hydroelectric Power Project
► Project Planning and Management :
− Monitoring: Weekly & monthly progress reports & keeping track of the progress made as planned.
Tracking the progress of the project with respect to Cost, Resource Deployment, Time Over runs, Quality
compliance & Manpower Planning to ensure timely execution of project.
− To analyse the gaps between planned vs actual construction schedule and highlight the areas needing
immediate attention for action of the project team
− Conducting Project review meetings for evaluating project progress reports & taking adequate corrective actions
if required, Preparation of Progress Reports
− Preparation of Cash Flow Charts (Both Inflow & Outflow), Developing financial projections, preparing budgets
and performing extensive project costing.
− Calculation of Escalation prices in accordance with indices and the contract
− Preparation of Interim Payment Certificates in accordance with Terms of payment of Contract.
− Planning of machinery/manpower/materials and money ; Management of Human Resources, their allocation as
per requirement to be sent at site.
− Quantification or estimate of requirement of steel (penstock steel liner, reinforcement steel, structural steel),
cement, Statement of weight of fabricated components, Reinforcement & Encasement Details of Penstocks &
Grouting operations etc.
− Preparation of MIS reports to assist Vice President & General Manager in resource utilization, monitoring of
works, productivity studies etc.
− Study of tender documents, tender Scrutiny, Bill of Quantities, General Conditions of Contract, Particular
Conditions of Contract in accordance with FIDIC documents, Technical Specifications, Commercial & Payment
Terms and tender drawings for Salma Dam Project, Afghanistan issued by WAPCOS.
− Preparation of Construction methodologies with support from the Design Team.
− Negotiation of terms of L/C with Client / Bank.
► Execution :
− Inspection of Hydro Mechanical Items, Machineries and Bought out items.
− Handling project activities involving working out various requirements with respect to design, utilities, machines,
manpower & monitoring overall project operations for ensuring timely completion.
− Analyzing the welding procedures, welding methods in accordance with SFA 5.5, construction
methodologies, penstock fabrication & development drawings, penstock layout drawings, bifurcations,
bends & reducer pieces, hydrostatic shop testing, ultrasonic testing, relevant standards & codes.
− Inspection of welding electrodes & high tensile plates among client, supplier & Third Party Inspection
Agency.
− Search of vendors, contractors, consultants, fabricators & designers as per requirement of the project.
− Dealing with Vendors/ Sub vendors for raw material, sub contracting a particular component of project etc.
− Procurement of raw material like welding electrodes, cement, fabrication machinery, steel for steel liner
as per clients standards, etc. In process, have done correspondence with major steel manufacturers of the
world and their distributors.
− Coordination with site/client/consultants/vendors/Headquarters Departments on daily basis & keeping
Headquarters records updated.
− Finalization of consultants & Preparation of Purchase Orders / Work Orders of Consultants, Designers,
vendors related to Hydro mechanical Works, Penstock, Power House & Instrumentation Works (both for exports
& domestic, services & supply)
− Aware of INCO terms
− Release of Payments to Contractors, Consultants, Designers & Vendors at site and Headquarters.
− Controlling & Monitoring from getting Letter of Invitation for workforce from Ministry of External Affairs to visa
processing to sending workforce at site.
− Ensuring that site operations are carried out smoothly with erection, commissioning & procurement operations.
LIVE PROJECT 2 : KATENDE HYDEL DAM PROJECT, D.R.CONGO
Project Profile : A project completely funded by Ministry of External affairs, Government of India.
Capacity: 4 X 16M W= 64 MW
CLIENT : Ministry of Energy, D.R.Congo
WORTH : USD 280 million
PARTNER : B.H.E.L. India
SCOPE OF WORK : Dam, Hydro Mechanical, Power House, Penstock, Tailrace, Switchyard and Instrumentation
Works.
► Execution :
− Inspection of Hydro Mechanical Items, Machineries and Bought out items.
− Finalization of consultants & Preparation of Purchase Orders / Work Orders of Consultants, Designers,
vendors related to Hydro mechanical Works (both for exports & domestic, services & supply)
− Release of Payments to Contractors, Consultants, Designers & Vendors at Headquarters.
− Ensuring that site operations are carried out smoothly with erection & procurement operations
Previous Company :
 Water & Power Consultancy Services (I) Ltd., Bangalore As Engineer From Mar’2003 to Mar’2006
− Preparation of Detailed Scheme Reports for many villages in 15 GPs of 5 Taluks in Uttara Kannada District of
Karnataka state under Support agency component of World Bank assisted Jal Nirmal Project including Designs,
Estimates, Bill of Quantities and Tender Documents as per World Bank Norms including structures like OHT,
pump house, pumping machineries, etc.
− Conducting yield test for various sources such as, Open well and Bore well for MWS and piped water supply
schemes for project villages Jal Nirmal Project.
− Identification of locations for construction of various structures like OHT, WTP, MBT, etc. and conducting SBC
test to identify the sustainability of the soil.
− Preparation of Mechanical Estimate for WTP and also assessment of type and capacity of pumps and pumping
machinery.
− Preparation of Detailed Project Report for Establishment of Rail Neer Project for IRCTC, Chennai.
− Preparation of Detailed Scheme Report for conducting water quality monitoring of Bhadra River at Kudremukh
along with video documentary
− Involved in Business Development like preparation and submission of Expression of Interest, Tender
Proposals, attended many financial negotiations, etc.
 Kaveri Industries, New Delhi, As Astt. Engineer From July 2002 to Feb, 2003
Controlling Line Inspection & Production both. Headed responsibility of quality control, production and maintenance
of Machinery etc. comprising of Light Fittings Fabrication & Press Items for Railway Coaches and other
Automobiles.
Education :
 B.E. (Mech. Engineering) from Maharashtra College of Engineering, Nilanga (Swami Ramanand Teerth Marathwada
University, Nanded) in 2002.
 Computer Comfortability: AUTOCAD, Proficiency in MS OFFICE, Expertise in Email & Internet
Plant Training :
Gas Authority of India Limited, Noida : Project work: Role of planning in project execution.
Case Study: Jamnagar – Loni LPG Pipe line project.
Personal Details :
Father Name : Sh. R.K.Sharma
Nationality : Indian
Contact Address : 623, Krishi Apartment, D-Block, Vikaspuri, New Delhi – 110 018
Telephone : +91-9910981187
Email : veenu_sharma2001@yahoo.com.
Hobbies : Reading, Games, Listening to music, Social Work.

Contenu connexe

Tendances

Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
Mohamed ASalem
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
ahmed mansour
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
Jahangir R. Contractor
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
Fernando Villarojo
 

Tendances (20)

Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Rakhib Abdullah Civil Engineer
Rakhib Abdullah   Civil EngineerRakhib Abdullah   Civil Engineer
Rakhib Abdullah Civil Engineer
 
Resume
ResumeResume
Resume
 
CV_Civil_Engineer
CV_Civil_EngineerCV_Civil_Engineer
CV_Civil_Engineer
 
Latest Resume R S Verma
Latest Resume R S VermaLatest Resume R S Verma
Latest Resume R S Verma
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
En c.v
En c.v En c.v
En c.v
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 

En vedette (7)

Resume.
Resume.Resume.
Resume.
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Afroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OGAfroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OG
 
Ska5
Ska5Ska5
Ska5
 
CV Vinod Kumar Technip
CV Vinod Kumar TechnipCV Vinod Kumar Technip
CV Vinod Kumar Technip
 
TONY HERCEGl resume
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
 
Murali procurement
Murali procurementMurali procurement
Murali procurement
 

Similaire à Curriculum Vitae

Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
Sourav sengupta
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
Manish Sabane
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
ranganathan shankar
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
EmmanuelMatutu
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
DEVARAJ B C
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
Koshalendra Pandey
 

Similaire à Curriculum Vitae (20)

Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Cv amit
Cv amitCv amit
Cv amit
 
Cv amit
Cv amitCv amit
Cv amit
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 

Curriculum Vitae

  • 1. CURRICULUM VITAE Mr. Veenu Sharma A ENGINEER WITH EXPERIENCE IN PROJECT MANAGEMENT, EXECUTION, SALES & MARKETING (CONTRACTS) IN POWER INDUSTRY (EPC SECTOR) Job Objective To pursue my career with a company of repute where my skills and knowledge can be applied to the maximum and where hard work will be appreciated. Work Experience  Angelique International Limited As Senior Manager From April 2006 to Till Date A company that exports small & medium sized projects (Infrastructure & Energy from India & sets them up in developing countries on a turnkey basis. LIVE PROJECT 1: SALMA HYDEL DAM PROJECT, AFGHANISTAN Project Profile: A project completely funded by Ministry of External Affairs, Government of India as a friendship gesture to help in Reconstruction & Rehabilitation of Afghanistan. Height of Dam: 107.5 Mtr; Type of Dam: High earth and rock fill; Capacity: 3 X 14 MW = 42MW CLIENT: Water & Power Consultancy Services Limited, India PARTNER: SSJV Ltd, Bangalore WORTH: 1400 crores SCOPE OF WORK: Hydro Mechanical, Power House, Penstock, Tailrace, Switchyard, Instrumentation Works and Operation & Maintenance of Diesel Generating Sets of Salma Dam Hydroelectric Power Project ► Project Planning and Management : − Monitoring: Weekly & monthly progress reports & keeping track of the progress made as planned. Tracking the progress of the project with respect to Cost, Resource Deployment, Time Over runs, Quality compliance & Manpower Planning to ensure timely execution of project. − To analyse the gaps between planned vs actual construction schedule and highlight the areas needing immediate attention for action of the project team − Conducting Project review meetings for evaluating project progress reports & taking adequate corrective actions if required, Preparation of Progress Reports − Preparation of Cash Flow Charts (Both Inflow & Outflow), Developing financial projections, preparing budgets and performing extensive project costing. − Calculation of Escalation prices in accordance with indices and the contract − Preparation of Interim Payment Certificates in accordance with Terms of payment of Contract. − Planning of machinery/manpower/materials and money ; Management of Human Resources, their allocation as per requirement to be sent at site. − Quantification or estimate of requirement of steel (penstock steel liner, reinforcement steel, structural steel), cement, Statement of weight of fabricated components, Reinforcement & Encasement Details of Penstocks & Grouting operations etc. − Preparation of MIS reports to assist Vice President & General Manager in resource utilization, monitoring of works, productivity studies etc. − Study of tender documents, tender Scrutiny, Bill of Quantities, General Conditions of Contract, Particular Conditions of Contract in accordance with FIDIC documents, Technical Specifications, Commercial & Payment Terms and tender drawings for Salma Dam Project, Afghanistan issued by WAPCOS. − Preparation of Construction methodologies with support from the Design Team. − Negotiation of terms of L/C with Client / Bank. ► Execution : − Inspection of Hydro Mechanical Items, Machineries and Bought out items. − Handling project activities involving working out various requirements with respect to design, utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
  • 2. − Analyzing the welding procedures, welding methods in accordance with SFA 5.5, construction methodologies, penstock fabrication & development drawings, penstock layout drawings, bifurcations, bends & reducer pieces, hydrostatic shop testing, ultrasonic testing, relevant standards & codes. − Inspection of welding electrodes & high tensile plates among client, supplier & Third Party Inspection Agency. − Search of vendors, contractors, consultants, fabricators & designers as per requirement of the project. − Dealing with Vendors/ Sub vendors for raw material, sub contracting a particular component of project etc. − Procurement of raw material like welding electrodes, cement, fabrication machinery, steel for steel liner as per clients standards, etc. In process, have done correspondence with major steel manufacturers of the world and their distributors. − Coordination with site/client/consultants/vendors/Headquarters Departments on daily basis & keeping Headquarters records updated. − Finalization of consultants & Preparation of Purchase Orders / Work Orders of Consultants, Designers, vendors related to Hydro mechanical Works, Penstock, Power House & Instrumentation Works (both for exports & domestic, services & supply) − Aware of INCO terms − Release of Payments to Contractors, Consultants, Designers & Vendors at site and Headquarters. − Controlling & Monitoring from getting Letter of Invitation for workforce from Ministry of External Affairs to visa processing to sending workforce at site. − Ensuring that site operations are carried out smoothly with erection, commissioning & procurement operations. LIVE PROJECT 2 : KATENDE HYDEL DAM PROJECT, D.R.CONGO Project Profile : A project completely funded by Ministry of External affairs, Government of India. Capacity: 4 X 16M W= 64 MW CLIENT : Ministry of Energy, D.R.Congo WORTH : USD 280 million PARTNER : B.H.E.L. India SCOPE OF WORK : Dam, Hydro Mechanical, Power House, Penstock, Tailrace, Switchyard and Instrumentation Works. ► Execution : − Inspection of Hydro Mechanical Items, Machineries and Bought out items. − Finalization of consultants & Preparation of Purchase Orders / Work Orders of Consultants, Designers, vendors related to Hydro mechanical Works (both for exports & domestic, services & supply) − Release of Payments to Contractors, Consultants, Designers & Vendors at Headquarters. − Ensuring that site operations are carried out smoothly with erection & procurement operations Previous Company :  Water & Power Consultancy Services (I) Ltd., Bangalore As Engineer From Mar’2003 to Mar’2006 − Preparation of Detailed Scheme Reports for many villages in 15 GPs of 5 Taluks in Uttara Kannada District of Karnataka state under Support agency component of World Bank assisted Jal Nirmal Project including Designs, Estimates, Bill of Quantities and Tender Documents as per World Bank Norms including structures like OHT, pump house, pumping machineries, etc. − Conducting yield test for various sources such as, Open well and Bore well for MWS and piped water supply schemes for project villages Jal Nirmal Project. − Identification of locations for construction of various structures like OHT, WTP, MBT, etc. and conducting SBC test to identify the sustainability of the soil. − Preparation of Mechanical Estimate for WTP and also assessment of type and capacity of pumps and pumping machinery. − Preparation of Detailed Project Report for Establishment of Rail Neer Project for IRCTC, Chennai. − Preparation of Detailed Scheme Report for conducting water quality monitoring of Bhadra River at Kudremukh along with video documentary − Involved in Business Development like preparation and submission of Expression of Interest, Tender Proposals, attended many financial negotiations, etc.
  • 3.  Kaveri Industries, New Delhi, As Astt. Engineer From July 2002 to Feb, 2003 Controlling Line Inspection & Production both. Headed responsibility of quality control, production and maintenance of Machinery etc. comprising of Light Fittings Fabrication & Press Items for Railway Coaches and other Automobiles. Education :  B.E. (Mech. Engineering) from Maharashtra College of Engineering, Nilanga (Swami Ramanand Teerth Marathwada University, Nanded) in 2002.  Computer Comfortability: AUTOCAD, Proficiency in MS OFFICE, Expertise in Email & Internet Plant Training : Gas Authority of India Limited, Noida : Project work: Role of planning in project execution. Case Study: Jamnagar – Loni LPG Pipe line project. Personal Details : Father Name : Sh. R.K.Sharma Nationality : Indian Contact Address : 623, Krishi Apartment, D-Block, Vikaspuri, New Delhi – 110 018 Telephone : +91-9910981187 Email : veenu_sharma2001@yahoo.com. Hobbies : Reading, Games, Listening to music, Social Work.