SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
The Alpha & Omega Consulting
Group.
New technology for lateral drilling
Coiled-Tubing High-Pressure Jet Drilling System
For Enhanced oil and gas well productivity
Double your production
New technology from Canada hits the world
The Lateral Drilling Inc., offers a cutting edge jet drilling system to recomplete existing wellbores. This
results in increased production from oil and gas reservoirs in the near term, as well as increased
ultimate recovery over the longer term. We, utilizes proprietary tools that are deployed on coiled
tubing to install lateral wellbores that extend out up to 300 feet from the main wellbore. This
technology has the potential to reverse the declining production rates now found throughout the
industry.
Introduction
Oil well drilling and completion both have evolved through three generations of technology. The
evolution of a fourth generation of technology is at hand. The first generation involved near surface
production with little completion technology. The second involved drilling to modest depths with the
successive development of explosive hole enlargement, acidizing and perforation. The third
generation involved deep and directional drilling with sophisticated fracturing.
All of these technologies extended the effective wellbore diameter and markedly improved the well
life and effectiveness by providing a better oil pathway from the formation to the wellbore.
Many oil reserves, particularly those which have been heavily drilled and have pressure depleted or
damaged reservoirs, are entering a fourth generation of applied technology. This fourth generation
of technology in part includes horizontal drilling and extended completion. This paper discusses two
closely related horizontal drilling and extended completion technologies which combine water jet
drilling, coiled tubing, and real-time trajectory control to provide multiple radial extended
completions. Water Jet Radial Drilling with Coiled Tubing
INTRODUCTION
The Lateral Drilling specializes in well-stimulation services and solutions for oil and gas production
enhancement by way of Pressure Jet Radial Drilling Optimization, The main activity is the delivery of
radial drilling services, respectively these services are contracted directly to the oil and gas industry
with the provision of radial drilling systems including technical and operating personnel. This Lateral
Drilling offers to joint-venture with their clientele in that to decrease well owner's capital costs by
way of either Farm-in or Gross Overriding Royalty; as a result, the Lateral Drilling is prepared to
accept partial payment for services in production results; we are that confident in our deliverability.
Additionally, the company offers geological and reservoir technical assistance required for the
screening and selection of candidate wells that have potential to increase production through
application of radial drilling technology, as well, further stimulation such as fracturing and
completion / tie-in.
this Lateral Drilling is active in the technology development area with tool and equipment design,
manufacturing, testing and commercialization. has been involved in every aspect of our current and
upcoming technology and all of our operators have been expertly trained on actual well sites owned
by the company and undergo hours of safety compliance classes. We feel that in order to uphold our
high standard of operation knowledge is the key. Our technology has been used by a vast number of
oil companies small and large and has been incredibly successful with the optimization and
stimulation of wells, in Canada, and now the middle East and africa.
PROFESSIONAL
APPROACH
LATERAL DRILLING NEW TECH
LATERAL DRILLING NEW TECH
LATERAL DRILLING NEW TECH
LATERAL DRILLING NEW TECH
LATERAL DRILLING NEW TECH

Contenu connexe

Tendances

60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)Shafairan Ramly
 
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...Shafairan Ramly
 
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)Shafairan Ramly
 
SRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui Jinghua
SRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui JinghuaSRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui Jinghua
SRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui JinghuaSRET Equipment Co., Ltd
 
Turnkey hydraulics company profile email doc
Turnkey hydraulics company profile email docTurnkey hydraulics company profile email doc
Turnkey hydraulics company profile email docDave Mc Millan
 
FILTEK INDIA PVT LTD
FILTEK INDIA PVT LTDFILTEK INDIA PVT LTD
FILTEK INDIA PVT LTDninadpatkie
 
Engine honing technology
Engine honing technologyEngine honing technology
Engine honing technologyDavid Chobany
 
Muhammad haris cv
Muhammad haris cvMuhammad haris cv
Muhammad haris cvharis asif
 
tony burgess Resume
tony burgess Resumetony burgess Resume
tony burgess Resumetony burgess
 

Tendances (18)

60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm  (2 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 0.590mm (2 of 10)
 
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
20-13041-A1-115-R0.1-General Arragment Pipe Support and Maintenant Platform-L...
 
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm  (3 of 10)
60-13041-A1-104-R02 - Piping Plan - Stage 4 - Plan View EL. 1.472mm (3 of 10)
 
SRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui Jinghua
SRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui JinghuaSRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui Jinghua
SRET Completed the Commissioning of Ø219 Tube Mill Retrofit for Hengshui Jinghua
 
Turnkey hydraulics company profile email doc
Turnkey hydraulics company profile email docTurnkey hydraulics company profile email doc
Turnkey hydraulics company profile email doc
 
Hemant Sharma Resume 2015
Hemant Sharma Resume 2015Hemant Sharma Resume 2015
Hemant Sharma Resume 2015
 
FILTEK INDIA PVT LTD
FILTEK INDIA PVT LTDFILTEK INDIA PVT LTD
FILTEK INDIA PVT LTD
 
Presentation DOBE 2016
Presentation DOBE 2016Presentation DOBE 2016
Presentation DOBE 2016
 
Mohamed Zubair Sharieff
Mohamed Zubair SharieffMohamed Zubair Sharieff
Mohamed Zubair Sharieff
 
Engine honing technology
Engine honing technologyEngine honing technology
Engine honing technology
 
Company Presentation
Company PresentationCompany Presentation
Company Presentation
 
CV-2
CV-2CV-2
CV-2
 
Muhammad haris cv
Muhammad haris cvMuhammad haris cv
Muhammad haris cv
 
MOHAMMED SHAFI 18.12.2016
MOHAMMED SHAFI 18.12.2016MOHAMMED SHAFI 18.12.2016
MOHAMMED SHAFI 18.12.2016
 
Resume ck.
Resume ck.Resume ck.
Resume ck.
 
Resume1
Resume1Resume1
Resume1
 
tony burgess Resume
tony burgess Resumetony burgess Resume
tony burgess Resume
 
Amruta engineers
Amruta engineersAmruta engineers
Amruta engineers
 

Similaire à LATERAL DRILLING NEW TECH

STS GeoService Presentation (Gas Gun - Stimulation)
STS GeoService Presentation (Gas Gun - Stimulation)STS GeoService Presentation (Gas Gun - Stimulation)
STS GeoService Presentation (Gas Gun - Stimulation)mohamedhyassin
 
Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014Chris Haritou
 
Abfad ltd company profile november 2014
Abfad ltd company profile november 2014Abfad ltd company profile november 2014
Abfad ltd company profile november 2014Chris Haritou
 
Goltens Co. Ltd. Dubai Branch Company Profile
Goltens Co. Ltd. Dubai Branch Company Profile Goltens Co. Ltd. Dubai Branch Company Profile
Goltens Co. Ltd. Dubai Branch Company Profile Marco Vatteroni
 
Goltens co. ltd Dubai branch company profile (2015)
Goltens co. ltd Dubai branch company profile (2015)Goltens co. ltd Dubai branch company profile (2015)
Goltens co. ltd Dubai branch company profile (2015)Marco Vatteroni
 
Segment Presentation RES Oil and Gas Industry
Segment Presentation RES Oil and Gas IndustrySegment Presentation RES Oil and Gas Industry
Segment Presentation RES Oil and Gas IndustryStephen Furze
 
Mechanical and oil & gas
Mechanical and oil & gasMechanical and oil & gas
Mechanical and oil & gastechshore
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arbaaz Malik
 
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...The Images Group
 
Pharmachem Product Cata.pptx
Pharmachem Product Cata.pptxPharmachem Product Cata.pptx
Pharmachem Product Cata.pptxPharmaChem3
 
Roots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New Delhi
Roots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New DelhiRoots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New Delhi
Roots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New DelhiIndiaMART InterMESH Limited
 
Petrustech Brochure 2015
Petrustech Brochure 2015Petrustech Brochure 2015
Petrustech Brochure 2015Alberto Pena
 

Similaire à LATERAL DRILLING NEW TECH (20)

STS GeoService Presentation (Gas Gun - Stimulation)
STS GeoService Presentation (Gas Gun - Stimulation)STS GeoService Presentation (Gas Gun - Stimulation)
STS GeoService Presentation (Gas Gun - Stimulation)
 
Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014Abfad ltd Company Profile November 2014
Abfad ltd Company Profile November 2014
 
Abfad ltd company profile november 2014
Abfad ltd company profile november 2014Abfad ltd company profile november 2014
Abfad ltd company profile november 2014
 
Project_Report[2]
Project_Report[2]Project_Report[2]
Project_Report[2]
 
eni_EST_esecutivo
eni_EST_esecutivoeni_EST_esecutivo
eni_EST_esecutivo
 
Goltens Co. Ltd. Dubai Branch Company Profile
Goltens Co. Ltd. Dubai Branch Company Profile Goltens Co. Ltd. Dubai Branch Company Profile
Goltens Co. Ltd. Dubai Branch Company Profile
 
Goltens co. ltd Dubai branch company profile (2015)
Goltens co. ltd Dubai branch company profile (2015)Goltens co. ltd Dubai branch company profile (2015)
Goltens co. ltd Dubai branch company profile (2015)
 
Segment Presentation RES Oil and Gas Industry
Segment Presentation RES Oil and Gas IndustrySegment Presentation RES Oil and Gas Industry
Segment Presentation RES Oil and Gas Industry
 
Mechanical and oil & gas
Mechanical and oil & gasMechanical and oil & gas
Mechanical and oil & gas
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
 
Pharmachem Product Cata.pptx
Pharmachem Product Cata.pptxPharmachem Product Cata.pptx
Pharmachem Product Cata.pptx
 
PQ_SEC _2014
PQ_SEC _2014PQ_SEC _2014
PQ_SEC _2014
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
 
Our Capabilities
Our CapabilitiesOur Capabilities
Our Capabilities
 
Roots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New Delhi
Roots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New DelhiRoots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New Delhi
Roots Blowers And Vacuum Pumps by Everest Blowers Private Limited, New Delhi
 
Petrustech Brochure 2015
Petrustech Brochure 2015Petrustech Brochure 2015
Petrustech Brochure 2015
 
EnServ Profile
EnServ ProfileEnServ Profile
EnServ Profile
 
ST flyer
ST flyerST flyer
ST flyer
 
Danish Khan CV
Danish Khan CVDanish Khan CV
Danish Khan CV
 

LATERAL DRILLING NEW TECH

  • 1. The Alpha & Omega Consulting Group. New technology for lateral drilling Coiled-Tubing High-Pressure Jet Drilling System For Enhanced oil and gas well productivity Double your production New technology from Canada hits the world
  • 2. The Lateral Drilling Inc., offers a cutting edge jet drilling system to recomplete existing wellbores. This results in increased production from oil and gas reservoirs in the near term, as well as increased ultimate recovery over the longer term. We, utilizes proprietary tools that are deployed on coiled tubing to install lateral wellbores that extend out up to 300 feet from the main wellbore. This technology has the potential to reverse the declining production rates now found throughout the industry. Introduction Oil well drilling and completion both have evolved through three generations of technology. The evolution of a fourth generation of technology is at hand. The first generation involved near surface production with little completion technology. The second involved drilling to modest depths with the successive development of explosive hole enlargement, acidizing and perforation. The third generation involved deep and directional drilling with sophisticated fracturing. All of these technologies extended the effective wellbore diameter and markedly improved the well life and effectiveness by providing a better oil pathway from the formation to the wellbore. Many oil reserves, particularly those which have been heavily drilled and have pressure depleted or damaged reservoirs, are entering a fourth generation of applied technology. This fourth generation of technology in part includes horizontal drilling and extended completion. This paper discusses two closely related horizontal drilling and extended completion technologies which combine water jet drilling, coiled tubing, and real-time trajectory control to provide multiple radial extended completions. Water Jet Radial Drilling with Coiled Tubing INTRODUCTION
  • 3. The Lateral Drilling specializes in well-stimulation services and solutions for oil and gas production enhancement by way of Pressure Jet Radial Drilling Optimization, The main activity is the delivery of radial drilling services, respectively these services are contracted directly to the oil and gas industry with the provision of radial drilling systems including technical and operating personnel. This Lateral Drilling offers to joint-venture with their clientele in that to decrease well owner's capital costs by way of either Farm-in or Gross Overriding Royalty; as a result, the Lateral Drilling is prepared to accept partial payment for services in production results; we are that confident in our deliverability. Additionally, the company offers geological and reservoir technical assistance required for the screening and selection of candidate wells that have potential to increase production through application of radial drilling technology, as well, further stimulation such as fracturing and completion / tie-in. this Lateral Drilling is active in the technology development area with tool and equipment design, manufacturing, testing and commercialization. has been involved in every aspect of our current and upcoming technology and all of our operators have been expertly trained on actual well sites owned by the company and undergo hours of safety compliance classes. We feel that in order to uphold our high standard of operation knowledge is the key. Our technology has been used by a vast number of oil companies small and large and has been incredibly successful with the optimization and stimulation of wells, in Canada, and now the middle East and africa. PROFESSIONAL APPROACH