SlideShare une entreprise Scribd logo
1  sur  10
Contact Centre Technology Project
Vendor Update
July 2012
Briefing purpose

    VicRoads issued an EOI for contact centre technology in April
     2011.

    The procurement process for replacement of contact centre
     technology was temporarily placed on hold in mid-2011
     pending determination of a number of strategic and operating
     issues in both a VicRoads and Victorian government context.

    Approval has now been obtained to proceed with the
     replacement of existing contact centre technology.

    A decision has been reached to close the EOI and proceed with
     an open RFT due to VicRoads’ having further refined its
     requirements and identified its preferred service delivery
     model.
Project procurement objective

    VicRoads is committed to procuring a call centre solution for the
     VicRoads Customer Contact Centre and Service Desk, to
     replace existing technology used across the 2 current locations,
     Ballarat and Kew, and include:

      – An integrated robust, reliable, dynamic, scalable,
        geographically independent call centre solution that meets
        the current and future business needs of the VicRoads
        Contact Centre and Service Desk.
      – A value for money solution that meets VicRoads’ functional
        and non-functional requirements.
      – A transition approach from the current system to the new
        system.
      – Additional functionality and improved service levels.
Importance of project for VicRoads


   VicRoads current call centre technology is supported by 5
    different vendors.

   All existing support contracts were recently extended to June
    2013 on the assumption this project will deliver a replacement
    prior to this time.

   The current set of technology utilised by the Call Centre is
    provided by a number of vendors, is poorly integrated, and in
    some cases nearing or at end life, and as a whole no longer
    meets business requirements.

   It is anticipated that new technology with increase operational
    efficiency and improve customer service.
Project Procurement scope

   The approval to proceed with the strategic replacement of
    Contact Centre technology includes:

    – Stage 1 - replacement for the following:
       • Call Management (including Call Routing, voice
         recording, PABX and Telephony equipment)
       • IVR
       • Workforce Management

    – Stage 2 – optional for replacement for the following:
       • Speech recognition
       • Quality management
Procurement Approach


   Open RFT will be issued with detailed requirements and
    threshold criteria.

   Ensure procurement process is open and fair to all vendors.

   Recognise the burden procurement processes impose on
    vendors.

   Wish to minimise the overhead for vendors not aligned to
    VicRoads’ detailed requirements.

   Procurement process will offer vendors the opportunity to self
    select.
Next Steps

   Draft RFT on Consultation Hub:

    – A draft of the proposed RFT will be posted on VicRoads’
      Consultation Hub in early August for a two week period.

    – Vendors are invited to review and provide suggestions for
      change.

    – Queries from vendors are also encouraged during this
      period via the Consultation Hub.
Next Steps cont.


   Open RFT
     – An open RFT will be issued in late August 2012.
     – A vendor briefing will be held after issue of the RFT.
     – Vendors can ask clarification questions for two weeks after
       the RFT has been issued.

   Tenders Submitted
     – Tenders will be due in late September

   Contract Award
     – Contract Award is intended in late 2012
Project probity

   The procurement approach has been determined based on
    considerations of probity and to be open and fair to all
    vendors.

   Vendors who provide existing services to VicRoads will not be
    provided with information about the Contact Centre
    Technology Project by VicRoads staff other than via the
    Consultation Hub.

   Notice of the upcoming RFT will be provided to the market
    following today’s briefing. A subset of slides from today’s
    powerpoint presentation will be available via the Consultation
    Hub.

   A separate briefing will be held after the RFT is issued.
VicRoads Contact


  • Questions can be posted via the Consultation Hub.

Contenu connexe

Tendances

From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...Piotr Kowalski
 
2 the service lifecycle
2 the service lifecycle2 the service lifecycle
2 the service lifecyclesagaroceanic11
 
4. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.54. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.5ssusereb347d
 
17. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.117. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.1ssusereb347d
 
Selected Significant Projects
Selected Significant ProjectsSelected Significant Projects
Selected Significant ProjectsSChobbs88
 
5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmtssusereb347d
 

Tendances (7)

From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
 
2 the service lifecycle
2 the service lifecycle2 the service lifecycle
2 the service lifecycle
 
4. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.54. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.5
 
17. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.117. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.1
 
Selected Significant Projects
Selected Significant ProjectsSelected Significant Projects
Selected Significant Projects
 
Sap Eng Presentation Win It07 Project Managment02
Sap Eng Presentation Win It07 Project Managment02Sap Eng Presentation Win It07 Project Managment02
Sap Eng Presentation Win It07 Project Managment02
 
5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt
 

Similaire à Contact Centre Technology Project

Rfp cis implementation v3
Rfp cis implementation v3Rfp cis implementation v3
Rfp cis implementation v3iambilal14
 
Managed Services: Yielding Excellent Results at Videocon
Managed Services: Yielding Excellent Results at VideoconManaged Services: Yielding Excellent Results at Videocon
Managed Services: Yielding Excellent Results at VideoconComverse, Inc.
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmDNVGLEnergy
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docxZiyad Zaidi
 
Norway_Sub sea business 2015
Norway_Sub sea business 2015Norway_Sub sea business 2015
Norway_Sub sea business 2015Business Finland
 
Clipper 2.0 planning
Clipper 2.0 planningClipper 2.0 planning
Clipper 2.0 planningAdina Levin
 
ScaleFocus Telecom Roaming Regulations
ScaleFocus Telecom Roaming RegulationsScaleFocus Telecom Roaming Regulations
ScaleFocus Telecom Roaming RegulationsScaleFocus
 
Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...KTN
 
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATIONNEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATIONEze Igwe
 
Managed Services Portfolio
Managed Services PortfolioManaged Services Portfolio
Managed Services PortfolioQuintin Smith
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK
 
State of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy ModernizationState of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy ModernizationAlexander Doré
 
IT Services Management
IT Services ManagementIT Services Management
IT Services ManagementChetan Goenka
 
Mobile number protability
Mobile number protability  Mobile number protability
Mobile number protability Praveen Sidola
 
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...Digital Queensland
 
Electric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingElectric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingJohn William
 

Similaire à Contact Centre Technology Project (20)

Rfp cis implementation v3
Rfp cis implementation v3Rfp cis implementation v3
Rfp cis implementation v3
 
Managed Services: Yielding Excellent Results at Videocon
Managed Services: Yielding Excellent Results at VideoconManaged Services: Yielding Excellent Results at Videocon
Managed Services: Yielding Excellent Results at Videocon
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docx
 
Norway_Sub sea business 2015
Norway_Sub sea business 2015Norway_Sub sea business 2015
Norway_Sub sea business 2015
 
Norwegian subsea
Norwegian subseaNorwegian subsea
Norwegian subsea
 
Clipper 2.0 planning
Clipper 2.0 planningClipper 2.0 planning
Clipper 2.0 planning
 
A. Feigl_Level-UpProject.pdf
A. Feigl_Level-UpProject.pdfA. Feigl_Level-UpProject.pdf
A. Feigl_Level-UpProject.pdf
 
Jonathan Newton - Vodafone
Jonathan Newton - VodafoneJonathan Newton - Vodafone
Jonathan Newton - Vodafone
 
ScaleFocus Telecom Roaming Regulations
ScaleFocus Telecom Roaming RegulationsScaleFocus Telecom Roaming Regulations
ScaleFocus Telecom Roaming Regulations
 
Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...
 
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATIONNEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
 
Managed Services Portfolio
Managed Services PortfolioManaged Services Portfolio
Managed Services Portfolio
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing pack
 
State of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy ModernizationState of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy Modernization
 
IT Services Management
IT Services ManagementIT Services Management
IT Services Management
 
Mobile number protability
Mobile number protability  Mobile number protability
Mobile number protability
 
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
 
Cloud Navigator
Cloud NavigatorCloud Navigator
Cloud Navigator
 
Electric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingElectric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon Sourcing
 

Dernier

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 

Dernier (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 

Contact Centre Technology Project

  • 1. Contact Centre Technology Project Vendor Update July 2012
  • 2. Briefing purpose  VicRoads issued an EOI for contact centre technology in April 2011.  The procurement process for replacement of contact centre technology was temporarily placed on hold in mid-2011 pending determination of a number of strategic and operating issues in both a VicRoads and Victorian government context.  Approval has now been obtained to proceed with the replacement of existing contact centre technology.  A decision has been reached to close the EOI and proceed with an open RFT due to VicRoads’ having further refined its requirements and identified its preferred service delivery model.
  • 3. Project procurement objective  VicRoads is committed to procuring a call centre solution for the VicRoads Customer Contact Centre and Service Desk, to replace existing technology used across the 2 current locations, Ballarat and Kew, and include: – An integrated robust, reliable, dynamic, scalable, geographically independent call centre solution that meets the current and future business needs of the VicRoads Contact Centre and Service Desk. – A value for money solution that meets VicRoads’ functional and non-functional requirements. – A transition approach from the current system to the new system. – Additional functionality and improved service levels.
  • 4. Importance of project for VicRoads  VicRoads current call centre technology is supported by 5 different vendors.  All existing support contracts were recently extended to June 2013 on the assumption this project will deliver a replacement prior to this time.  The current set of technology utilised by the Call Centre is provided by a number of vendors, is poorly integrated, and in some cases nearing or at end life, and as a whole no longer meets business requirements.  It is anticipated that new technology with increase operational efficiency and improve customer service.
  • 5. Project Procurement scope  The approval to proceed with the strategic replacement of Contact Centre technology includes: – Stage 1 - replacement for the following: • Call Management (including Call Routing, voice recording, PABX and Telephony equipment) • IVR • Workforce Management – Stage 2 – optional for replacement for the following: • Speech recognition • Quality management
  • 6. Procurement Approach  Open RFT will be issued with detailed requirements and threshold criteria.  Ensure procurement process is open and fair to all vendors.  Recognise the burden procurement processes impose on vendors.  Wish to minimise the overhead for vendors not aligned to VicRoads’ detailed requirements.  Procurement process will offer vendors the opportunity to self select.
  • 7. Next Steps  Draft RFT on Consultation Hub: – A draft of the proposed RFT will be posted on VicRoads’ Consultation Hub in early August for a two week period. – Vendors are invited to review and provide suggestions for change. – Queries from vendors are also encouraged during this period via the Consultation Hub.
  • 8. Next Steps cont.  Open RFT – An open RFT will be issued in late August 2012. – A vendor briefing will be held after issue of the RFT. – Vendors can ask clarification questions for two weeks after the RFT has been issued.  Tenders Submitted – Tenders will be due in late September  Contract Award – Contract Award is intended in late 2012
  • 9. Project probity  The procurement approach has been determined based on considerations of probity and to be open and fair to all vendors.  Vendors who provide existing services to VicRoads will not be provided with information about the Contact Centre Technology Project by VicRoads staff other than via the Consultation Hub.  Notice of the upcoming RFT will be provided to the market following today’s briefing. A subset of slides from today’s powerpoint presentation will be available via the Consultation Hub.  A separate briefing will be held after the RFT is issued.
  • 10. VicRoads Contact • Questions can be posted via the Consultation Hub.