SlideShare une entreprise Scribd logo
1  sur  7
WALEED AWAD
MOHAMMED
PHOTO
Saudi Arabia-Riyadh
+557679402
Waleed.awad77@hotmail.com; waleedawad77.wa@gmail.com
“Over thirteen years, Mechanical Engineering experience in refrigeration,
specialized in related mechanical devices and structural elements. Developed
prototypes, blueprints and technical concepts and manufacturing
documentation. Seeking a job that demonstrates my competences, skills and
strengths”
Core Strengths  Attention to details and problem solving
 Good communication skills and advanced organizational skills
 Expertise in Computer aided design software
 Expertise in preparing drafts and sketches
 Ability to work within teams with mixed backgrounds
 Fluent English language (Arabic as mother tongue)
 Coordination with vendors and resources planning
 Quality control oriented
 Good in costing, budgeting and time estimations
Education Bachelor degree in Mechanical engineering
Sudan University, 2002
Courses &
Training
 FRIGOREX Coolers assembly ,& Ware house control & production
planning (INDONESIA)
 Human resources management
 Commercial awareness
 Negotiation skills
 Business correspondence
 Communication Skills & Effective supervision
 Coaching & developing Employee
 Time management
 FRIGOREX Cooler Quality & Assembly Supervision Training
Work Experience DAL REFRIGERATION
Assembly of Coolers & Cold Stores
(Coca Cola Sudan) & (DAL Dairy Food Sudan)
July 2009 to11 act 2015– Cooler Manager
 Installation of the Frigorex coolers assembly line for coolers sizes of
1000 , 650 and 400 sq. inches
 Manufacture Frigorex Coolers within the specifications laid down by
DFI and Coca Cola and quantities required by (DAL Food Industries
Coca Cola) and DAL Dairy Food (Capo)
 Plan production aiming at constant improvement of cost and quality
of Cooler
 Keep economical stock of spare parts to avoid shortage and
overstocking
 Prepare and monitor annual budget of the Cooler plant.
 Track Spare parts stock levels & Monthly stock taking of spare parts
 HSE Management: To implement the HSE activities within the agreed
timeframes and ensure compliance with all laws and regulations
governing the plant operations.
 Train manpower in a way to widen their Knowledge and experience.
 Plan and set procedures for cooler maintenance and movement to
satisfy customers and achieve sales targets.
 Report weekly monthly or daily as required all activities of crate and
cooler plants.
 Coordinate with production engineers for the maintenance of
production chillers
 Full responsibility of all factory appliances (Air conditioners cooling
units
 Track and perform preventative maintenance for coolers and cold
stores
 Track and report Key Performance Indicators of Assembly line
operators
 Develop and follow up the implementation of training programs for
the department’s staff
 Participate in the successful completion of special projects by
managing the assigned resources effectively
 Keep up to date with the latest technical developments in order to
identify and propose means to increase and optimize the operation
DAL MANUFACTURE FOR COOLERS & COLD STORES
(Coca Cola Sudan )
July 2007 to July 2009 – Maintenance & QC Engineer
 Responsible for the spare parts tools and equipment .
 Ensure efficient delivery of ordered spare parts
 Report product customer demands to the production and service
engineer
 Supervise service operation with high efficiency and labor control
 Refer to Manufacturer technical presentation & Manuals
 Responsible for the supervision of the cleanliness of the workshop.
 Maintain personal hygiene standards
 Provide guidance to a team of service technicians and helpers
 Ability to train personnel and provide direction
 Collate and supply data to facilitate preparation of daily /monthly
service coverage reports
 Report any equipment malfunction to the maintenance engineers
 Secures the efficiency and the quality set targets
 Coordinates, supervises and secures the correct execution of all the
required quality controls checks at the areas of the incoming
materials, production processes and Finish Product.
 Secures that in all the positions is available the correct
documentation/drawings
 Secures that all the production quality control forms are completed
correctly
 Keeps all the Quality Control department records
 Performs the insulation quality check in the lab
 Ensures the smooth operation of the department-split of the
department jobs between him and quality control operator
 Handles and solves problems of the production process or products
in cooperation with the Production Supervisor.
 Supervises the good operation of the quality Control equipment.
Supervise the calibration program of the tools and measuring means.
ARAAK ENGINEERING INDUSTRIES (Pepsi Cola Sudan)
May 2003 to July 2004 – Maintenance & Production Supervisor
  Optimize the technical processes and its elements within the
production area and ensure the proper operation of equipment in
order to support the achievement of the qualitative and quantitative
production targets
 Manage the alignment of product specifications considering the
plant’s manufacturing capabilities so as to ensure the most practical
and effective production methods
 Ensure that the maintenance schedules for all equipment, machinery
and installations are followed and executed in order to assure
technical safety and quality.
 Continuously monitor all production activities in an effort to ensure
optimum operation and appropriate use of technology
 Propose technical plans and manage the approved ones to facilitate
optimization of production support
 Approve spare parts requirements for equipment and supply plans
so as to monitor compliance with the budget and avoid delays in
production caused by technical reasons
 Ensure optimum adjustment of technology for the production of
newly developed products and supervise pilot production runs in
order to minimize errors and lengthy trial periods
 Perform weekly preventive maintenance on all production
machinery and equipment in order to ensure the proper operation of
all production lines
 Develop and implement small projects in order to improve the
quality of the finished products, increase productivity and
production employees’ performance
 Optimize the costs of the repairs by controlling the quality and the
technical specifications of spare parts and materials by performing
regular inventory checks
 Prepare the department’s budget proposal and monitor compliance
with the plant’s approved budget
 Implement approved CAPEX in order to ensure the efficiency of the
department’s infrastructure
 Keep up to date with the latest technical developments in order to
identify and propose means to increase and optimize operation
 Train, support and motivate the technical & production staff in order
to ensure safety, quality and commitment
 Develop and follow up the implementation of training programs
for the department’s staff so as to secure diffusion of technical
know-how within the plant.
 Participate in the successful completion of special projects by
managing the assigned resources effectively and efficiently
 Provides all the necessary tools to the operators to perform their
tasks.
 Secures the compliance with the health and safety regulations within
his responsibility area
 Controls and checks the usage/consumption of the materials in his
dpt.
 Calculates daily the needs of the materials for his dpt and requests
them from the Warehouse
 Ensures the flow of the material and semi-finished items from one
position/production dpt to the other.
 establish sort term activities directed towards production continuity
and balance
 Good knowledge of the operation, the needed adjustment and the
required daily checks of the machines in his dpt (training)
 Daily check and completion of the respective production forms and
KPIs

 Universal Power as project Engineer (1/5/2002 TO 1/5/2003)
 Planning & defining Scope , Activity planning, Sequencing & Resource
planning
 Cost &timing Estimation
 Documentation
 Creating charts & Schedules
 Monitoring and reporting progress
 Working with vendors
 Quality Control
 Engineering Arm as Maintenance Engineer (Heavy Equipment)(During
Military Service)
 Heavy machinery maintenance
 Code of Command and discipline
 Team building
Other
Information
Date of Birth: January 1st
1977
Marital Status: Married
References

Contenu connexe

Tendances (20)

Joel Ramos Resume
Joel Ramos ResumeJoel Ramos Resume
Joel Ramos Resume
 
C.V. William 15
C.V. William 15C.V. William 15
C.V. William 15
 
Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
Senior management professional technical
Senior management professional  technicalSenior management professional  technical
Senior management professional technical
 
resume G.Roul
resume G.Roulresume G.Roul
resume G.Roul
 
U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...
U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...
U.S. Department of the Navy - Alameda Naval Aviation Depot - Production Engin...
 
Thiru.resume.doc
Thiru.resume.docThiru.resume.doc
Thiru.resume.doc
 
production engineer
production engineerproduction engineer
production engineer
 
Subrota ghosh.doc resume
Subrota ghosh.doc resumeSubrota ghosh.doc resume
Subrota ghosh.doc resume
 
Resume new Yogesh
Resume new YogeshResume new Yogesh
Resume new Yogesh
 
gary santos Resume
gary santos Resumegary santos Resume
gary santos Resume
 
Altakavir adam makandar_engineering_professional
Altakavir adam makandar_engineering_professional  Altakavir adam makandar_engineering_professional
Altakavir adam makandar_engineering_professional
 
Sop of ie
Sop of ieSop of ie
Sop of ie
 
Satish resume
Satish  resume Satish  resume
Satish resume
 
debasish 2nd cv
debasish 2nd cvdebasish 2nd cv
debasish 2nd cv
 
12
1212
12
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 
Resume Divyesh B. Patel
Resume Divyesh B. PatelResume Divyesh B. Patel
Resume Divyesh B. Patel
 
Linked in attach
Linked in attachLinked in attach
Linked in attach
 

Similaire à Waleed

Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVsanjay kumar A M
 
Shivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Yadav
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxpicklesvalery
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)VINOTH S
 
Resume - Mohammad Mousa Mabrouk
Resume - Mohammad Mousa MabroukResume - Mohammad Mousa Mabrouk
Resume - Mohammad Mousa MabroukMOHAMMAD MABROUK
 
Deepu Gupta-CV(Mix) (1)
Deepu Gupta-CV(Mix) (1)Deepu Gupta-CV(Mix) (1)
Deepu Gupta-CV(Mix) (1)deepu gupta
 

Similaire à Waleed (20)

Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
 
Key duties
Key dutiesKey duties
Key duties
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Abdelhameed - Resume 2016
Abdelhameed - Resume 2016Abdelhameed - Resume 2016
Abdelhameed - Resume 2016
 
Mohammad Bahafzalla CV
Mohammad Bahafzalla CVMohammad Bahafzalla CV
Mohammad Bahafzalla CV
 
Anthony gachie c.v
Anthony gachie c.v  Anthony gachie c.v
Anthony gachie c.v
 
Shivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety ProfessionalShivendra Gopal Yadav Safety Professional
Shivendra Gopal Yadav Safety Professional
 
COLLEEN WENZEL resume
COLLEEN WENZEL resumeCOLLEEN WENZEL resume
COLLEEN WENZEL resume
 
Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015
 
CV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, AaronCV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, Aaron
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
CV - K. Raja Narender Reddy
CV - K. Raja Narender ReddyCV - K. Raja Narender Reddy
CV - K. Raja Narender Reddy
 
SUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docxSUMMARY OF SKILLSAn experienced professional with a divers.docx
SUMMARY OF SKILLSAn experienced professional with a divers.docx
 
Williams Dery Resume word
Williams Dery Resume wordWilliams Dery Resume word
Williams Dery Resume word
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
Resume - Mohammad Mousa Mabrouk
Resume - Mohammad Mousa MabroukResume - Mohammad Mousa Mabrouk
Resume - Mohammad Mousa Mabrouk
 
Deepu Gupta-CV(Mix) (1)
Deepu Gupta-CV(Mix) (1)Deepu Gupta-CV(Mix) (1)
Deepu Gupta-CV(Mix) (1)
 

Waleed

  • 1. WALEED AWAD MOHAMMED PHOTO Saudi Arabia-Riyadh +557679402 Waleed.awad77@hotmail.com; waleedawad77.wa@gmail.com “Over thirteen years, Mechanical Engineering experience in refrigeration, specialized in related mechanical devices and structural elements. Developed prototypes, blueprints and technical concepts and manufacturing documentation. Seeking a job that demonstrates my competences, skills and strengths” Core Strengths  Attention to details and problem solving  Good communication skills and advanced organizational skills  Expertise in Computer aided design software  Expertise in preparing drafts and sketches  Ability to work within teams with mixed backgrounds  Fluent English language (Arabic as mother tongue)  Coordination with vendors and resources planning  Quality control oriented  Good in costing, budgeting and time estimations Education Bachelor degree in Mechanical engineering Sudan University, 2002 Courses & Training  FRIGOREX Coolers assembly ,& Ware house control & production planning (INDONESIA)  Human resources management  Commercial awareness
  • 2.  Negotiation skills  Business correspondence  Communication Skills & Effective supervision  Coaching & developing Employee  Time management  FRIGOREX Cooler Quality & Assembly Supervision Training Work Experience DAL REFRIGERATION Assembly of Coolers & Cold Stores (Coca Cola Sudan) & (DAL Dairy Food Sudan) July 2009 to11 act 2015– Cooler Manager  Installation of the Frigorex coolers assembly line for coolers sizes of 1000 , 650 and 400 sq. inches  Manufacture Frigorex Coolers within the specifications laid down by DFI and Coca Cola and quantities required by (DAL Food Industries Coca Cola) and DAL Dairy Food (Capo)  Plan production aiming at constant improvement of cost and quality of Cooler  Keep economical stock of spare parts to avoid shortage and overstocking  Prepare and monitor annual budget of the Cooler plant.  Track Spare parts stock levels & Monthly stock taking of spare parts  HSE Management: To implement the HSE activities within the agreed timeframes and ensure compliance with all laws and regulations governing the plant operations.  Train manpower in a way to widen their Knowledge and experience.  Plan and set procedures for cooler maintenance and movement to satisfy customers and achieve sales targets.  Report weekly monthly or daily as required all activities of crate and cooler plants.
  • 3.  Coordinate with production engineers for the maintenance of production chillers  Full responsibility of all factory appliances (Air conditioners cooling units  Track and perform preventative maintenance for coolers and cold stores  Track and report Key Performance Indicators of Assembly line operators  Develop and follow up the implementation of training programs for the department’s staff  Participate in the successful completion of special projects by managing the assigned resources effectively  Keep up to date with the latest technical developments in order to identify and propose means to increase and optimize the operation DAL MANUFACTURE FOR COOLERS & COLD STORES (Coca Cola Sudan ) July 2007 to July 2009 – Maintenance & QC Engineer  Responsible for the spare parts tools and equipment .  Ensure efficient delivery of ordered spare parts  Report product customer demands to the production and service engineer  Supervise service operation with high efficiency and labor control  Refer to Manufacturer technical presentation & Manuals  Responsible for the supervision of the cleanliness of the workshop.  Maintain personal hygiene standards  Provide guidance to a team of service technicians and helpers  Ability to train personnel and provide direction  Collate and supply data to facilitate preparation of daily /monthly
  • 4. service coverage reports  Report any equipment malfunction to the maintenance engineers  Secures the efficiency and the quality set targets  Coordinates, supervises and secures the correct execution of all the required quality controls checks at the areas of the incoming materials, production processes and Finish Product.  Secures that in all the positions is available the correct documentation/drawings  Secures that all the production quality control forms are completed correctly  Keeps all the Quality Control department records  Performs the insulation quality check in the lab  Ensures the smooth operation of the department-split of the department jobs between him and quality control operator  Handles and solves problems of the production process or products in cooperation with the Production Supervisor.  Supervises the good operation of the quality Control equipment. Supervise the calibration program of the tools and measuring means. ARAAK ENGINEERING INDUSTRIES (Pepsi Cola Sudan) May 2003 to July 2004 – Maintenance & Production Supervisor   Optimize the technical processes and its elements within the production area and ensure the proper operation of equipment in order to support the achievement of the qualitative and quantitative production targets  Manage the alignment of product specifications considering the plant’s manufacturing capabilities so as to ensure the most practical and effective production methods  Ensure that the maintenance schedules for all equipment, machinery and installations are followed and executed in order to assure
  • 5. technical safety and quality.  Continuously monitor all production activities in an effort to ensure optimum operation and appropriate use of technology  Propose technical plans and manage the approved ones to facilitate optimization of production support  Approve spare parts requirements for equipment and supply plans so as to monitor compliance with the budget and avoid delays in production caused by technical reasons  Ensure optimum adjustment of technology for the production of newly developed products and supervise pilot production runs in order to minimize errors and lengthy trial periods  Perform weekly preventive maintenance on all production machinery and equipment in order to ensure the proper operation of all production lines  Develop and implement small projects in order to improve the quality of the finished products, increase productivity and production employees’ performance  Optimize the costs of the repairs by controlling the quality and the technical specifications of spare parts and materials by performing regular inventory checks  Prepare the department’s budget proposal and monitor compliance with the plant’s approved budget  Implement approved CAPEX in order to ensure the efficiency of the department’s infrastructure  Keep up to date with the latest technical developments in order to identify and propose means to increase and optimize operation  Train, support and motivate the technical & production staff in order to ensure safety, quality and commitment  Develop and follow up the implementation of training programs for the department’s staff so as to secure diffusion of technical know-how within the plant.  Participate in the successful completion of special projects by
  • 6. managing the assigned resources effectively and efficiently  Provides all the necessary tools to the operators to perform their tasks.  Secures the compliance with the health and safety regulations within his responsibility area  Controls and checks the usage/consumption of the materials in his dpt.  Calculates daily the needs of the materials for his dpt and requests them from the Warehouse  Ensures the flow of the material and semi-finished items from one position/production dpt to the other.  establish sort term activities directed towards production continuity and balance  Good knowledge of the operation, the needed adjustment and the required daily checks of the machines in his dpt (training)  Daily check and completion of the respective production forms and KPIs   Universal Power as project Engineer (1/5/2002 TO 1/5/2003)  Planning & defining Scope , Activity planning, Sequencing & Resource planning  Cost &timing Estimation  Documentation  Creating charts & Schedules  Monitoring and reporting progress  Working with vendors  Quality Control  Engineering Arm as Maintenance Engineer (Heavy Equipment)(During Military Service)  Heavy machinery maintenance  Code of Command and discipline  Team building
  • 7. Other Information Date of Birth: January 1st 1977 Marital Status: Married References