BUSI 682 Midterm Examination Answers
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/busi-682-midterm-examination-answers/
For More Information Visit Our Website ( https://homeworklance.com/ )
Email us At: Support@homeworklance.com or lancehomework@gmail.com
 Question 1
4 out of 4 points
Formal project planning begins after project signoff.
 Question 2
4 out of 4 points
A cultural audit is a way to determine how culture may be an advantage or a challenge.
 Question 3
4 out of 4 points
Project scope is the what of the project and the product scope is the how of the project.
 Question 4
4 out of 4 points
Projects that aim to increase operational efficiency, capacity, and improved process quality
provide tactical value.
 Question 5
4 out of 4 points
Albeit anecdotal, most projects fail due to communication problems and lack of understanding.
 Question 6
4 out of 4 points
Project leaders can talk about their projects and what they need to do next, but project managers
need to be able to communicate how their projects deliver value.
 Question 7
4 out of 4 points
In a low context culture, one must be prepared for rational, professional arguments, and
presentations that push for agreements.
 Question 8
4 out of 4 points
66% of projects fail because the team leaders and team members do not manage the interaction
with global participants skillfully.
 Question 9
4 out of 4 points
Formal project portfolio management tends to reside in companies that have a decentralized
project management office (PMO) and an institutionalized project management organization.
 Question 10
4 out of 4 points
Communication is defined as the process by which persons share information meanings and
feelings through the exchange of verbal and nonverbal messages.
 Question 11
4 out of 4 points
Communication always means understanding. Even when two individuals agree that they are
communicating or talking to each other, it means that they understand each other.
 Question 12
4 out of 4 points
In a predictability –oriented culture, one needs to be prepared for vagueness in communication.
 Question 13
4 out of 4 points
Strategy, at its essence, is the process of formulating a set of objectives and then deciding on
how we will achieve the objectives.
 Question 14
4 out of 4 points
The project vision describes what’s in it for those who receive the benefits of the project
deliverables and what’s in it for those who receive the benefits of the project deliverables and
what’s in it for those doing the project work.
 Question 15
4 out of 4 points
Transferring risk is more likely to protect financial interests that ensure the success of the
project.
 Question 16
4 out of 4 points
The ability to seek understanding by understanding cultural differences and being willing to
view project interactions and communications through another’s lens separates global project
leaders from otherwise highly capable project managers.
 Question 17
4 out of 4 points
A strategic project manager’s mindset begins with the realization that we have too many people
and not enough project ideas, and budget to act on every idea for new project or initiative.
 Question 18
4 out of 4 points
Power distance indicates “the extent to which a society accepts that power in institutions and
organizations is distributed equally”.
 Question 19
4 out of 4 points
One of the goals in project risk management is to push more unknown unknowns to known
unknowns.
 Question 20
4 out of 4 points
Estimates carry uncertainty; therefore, it is essential to seek as much expertise and past data as
possible when making schedule and cost estimates.
 Question 21
4 out of 4 points
It is important to recognize that it may take longer to make decisions in uncertainty tolerant
cultures.
 Question 22
4 out of 4 points
The essence of the strategic project management mindset is to realize that emphasis on the
project itself is more important than strategy.
 Question 23
4 out of 4 points
Masculinity implies “the extent to which the dominant values in society are assertiveness,
money and material things, not caring for others, quality of life, and people”.
 Question 24
4 out of 4 points
In essence, all forms of value ultimately contribute to the strategic value of a firm.
 Question 25
4 out of 4 points
Ultimately, the extend of risk management deployed depends on risk tolerance and awareness
of the potential upside impacts of risks.
 Question 26
4 out of 4 points
Financial data gathered during the execution of a project can be used to determine whether or
not the project is within the budget and on schedule.
 Question 27
4 out of 4 points
Successful organizations invest time in detailed project planning and spend a disproportionate
amount of time rethinking project scope and reacting to events.
 Question 28
4 out of 4 points
Projects for a bridge between strategy and results.
 Question 29
4 out of 4 points
Professional or intentional project managers far outnumber accidental project managers. Most
people managing projects and initiatives originally intended to be project managers.
 Question 30
0 out of 4 points
Gathering data from prior similar projects and relying on experienced estimators will not go a
long way toward avoiding schedule surprises.
 Question 31
4 out of 4 points
Projects contributing to a great deal of strategic and financial value merit more risk assessment
than those delivering little value.
 Question 32
4 out of 4 points
Successful leaders of global projects must not be ethnocentric.
 Question 33
4 out of 4 points
A project is a temporary endeavor aimed at achieving some unique set of outcomes that meet or
exceed the needs and expectations of key project stakeholders.
 Question 34
4 out of 4 points
Relationships are generally subordinate to schedules in polychromic cultures.
 Question 35
4 out of 4 points
Executives, managers, and subject matter experts working in multinational organizations spend
less than75% of their time working on a portfolio of large and small projects and initiatives
with extensive cross-functional and cross-cultural collaboration.
 Question 36
4 out of 4 points
There is a body of research that suggests that a person’s stereotypes “may contain an element of
truth”.
 Question 37
4 out of 4 points
Budget and human resources constrain most projects.
 Question 38
4 out of 4 points
Net present value (NPV) is simply a number that takes into account the time value of
discounted cashflows, both expenses and returns, over a given period of time such as 5 years.
 Question 39
4 out of 4 points
Scope creep refers to the tendency to add to the scope of the project over time.
 Question 40
4 out of 4 points
Constraints are any factors that limit our options in pursuing the project objectives.
 Question 41
4 out of 4 points
Projects done for environmental and safety reasons or to comply with government regulations
fall under the category of compliance value.
 Question 42
4 out of 4 points
Doing some detailed risk assessment during scope planning is irrelevant and unbeneficial as
thoughts about what could go wrong stem from what needs to be done and how it needs to be
done.
 Question 43
4 out of 4 points
When estimating how long any piece of work will take, availability of resources, skill levels,
and the experience of those who provide the estimates are key factors to consider.
 Question 44
4 out of 4 points
Six Sigma initiatives, new production plants, offshoring, shared services, and similar projects
provide tactical value.
 Question 45
4 out of 4 points
Low context cultures are characterized by respect for a person’s title, age, and background
connections
 Question 46
4 out of 4 points
Culture is learned and individuals from the same culture have exactly the same learning
experiences.
 Question 47
4 out of 4 points
Uncertainty avoidance indicates “the extent to which a society feels threatened by uncertain or
ambiguous situations.
 Question 48
4 out of 4 points
Leaders of global projects need to develop the skill of looking at important projects/issues
through “multiple lens” not just their own lens.
 Question 49
4 out of 4 points
In a monochromic culture, it is important to keep appointments strictly, schedule in advance,
and not to run late.
 Question 50
4 out of 4 points
A negative net present value (NPV) is generally unacceptable, especially in compliance projects
in which the return of the project is penalty avoidance.

Contenu connexe

Tendances (6)

Final year project (standardized factors)
Final year project (standardized factors)Final year project (standardized factors)
Final year project (standardized factors)
 
Three Trends in Project Management Presentation
Three Trends in Project Management PresentationThree Trends in Project Management Presentation
Three Trends in Project Management Presentation
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11
 
Project Management Final Exam
Project Management Final ExamProject Management Final Exam
Project Management Final Exam
 
PMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBook
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10
 

En vedette

Video educativo ceci sol ailu
Video educativo ceci sol ailuVideo educativo ceci sol ailu
Video educativo ceci sol ailu
AilenTics
 
Exposición gerencia
Exposición gerenciaExposición gerencia
Exposición gerencia
Frank Paliza
 

En vedette (9)

TCI 2015 Green Lights & Red Lights. The Practicalities of Cluster Development
TCI 2015 Green Lights & Red Lights.  The Practicalities of Cluster DevelopmentTCI 2015 Green Lights & Red Lights.  The Practicalities of Cluster Development
TCI 2015 Green Lights & Red Lights. The Practicalities of Cluster Development
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Service Quality and Passengers Satisfaction of Southern Railways by SERVQUAL ...
Service Quality and Passengers Satisfaction of Southern Railways by SERVQUAL ...Service Quality and Passengers Satisfaction of Southern Railways by SERVQUAL ...
Service Quality and Passengers Satisfaction of Southern Railways by SERVQUAL ...
 
4.3.2 - Nouvelles plateformes d'opérations antiacridiennes
4.3.2 - Nouvelles plateformes d'opérations antiacridiennes4.3.2 - Nouvelles plateformes d'opérations antiacridiennes
4.3.2 - Nouvelles plateformes d'opérations antiacridiennes
 
cti_22_3718
cti_22_3718cti_22_3718
cti_22_3718
 
Ruby
RubyRuby
Ruby
 
Video educativo ceci sol ailu
Video educativo ceci sol ailuVideo educativo ceci sol ailu
Video educativo ceci sol ailu
 
Exposición gerencia
Exposición gerenciaExposición gerencia
Exposición gerencia
 
Technisat
TechnisatTechnisat
Technisat
 

Similaire à Busi 682 midterm examination answers

Project Management C4 -leadership_and_the_project_manager
Project Management C4  -leadership_and_the_project_managerProject Management C4  -leadership_and_the_project_manager
Project Management C4 -leadership_and_the_project_manager
Izah Asmadi
 
The work of HR part two the flow ofinformation and work.docx
The work of HR part two the flow ofinformation and work.docxThe work of HR part two the flow ofinformation and work.docx
The work of HR part two the flow ofinformation and work.docx
christalgrieg
 
Unit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documenUnit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documen
hariharankh1
 
Developing Talent for Strategic Impact from Human Systems International
Developing Talent for Strategic Impact from Human Systems InternationalDeveloping Talent for Strategic Impact from Human Systems International
Developing Talent for Strategic Impact from Human Systems International
Mark Toben
 
Assessment center for_project_managers
Assessment center for_project_managersAssessment center for_project_managers
Assessment center for_project_managers
karishma143
 

Similaire à Busi 682 midterm examination answers (20)

Project Management C4 -leadership_and_the_project_manager
Project Management C4  -leadership_and_the_project_managerProject Management C4  -leadership_and_the_project_manager
Project Management C4 -leadership_and_the_project_manager
 
Caroline Bishop Digital Health Assembly 2015
Caroline Bishop Digital Health Assembly 2015Caroline Bishop Digital Health Assembly 2015
Caroline Bishop Digital Health Assembly 2015
 
t’s Never Too Early: How, When, and Why Consultancy Adds Value to Strategic L...
t’s Never Too Early: How, When, and Why Consultancy Adds Value to Strategic L...t’s Never Too Early: How, When, and Why Consultancy Adds Value to Strategic L...
t’s Never Too Early: How, When, and Why Consultancy Adds Value to Strategic L...
 
The work of HR part two the flow ofinformation and work.docx
The work of HR part two the flow ofinformation and work.docxThe work of HR part two the flow ofinformation and work.docx
The work of HR part two the flow ofinformation and work.docx
 
Consensus Building for Strategic Planning
Consensus Building for Strategic PlanningConsensus Building for Strategic Planning
Consensus Building for Strategic Planning
 
HECA 2017: THE GIG ECONOMY
HECA 2017: THE GIG ECONOMYHECA 2017: THE GIG ECONOMY
HECA 2017: THE GIG ECONOMY
 
Unit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documenUnit 2_PM.pptx download in notes documen
Unit 2_PM.pptx download in notes documen
 
L&D Trend Report_2023
L&D Trend Report_2023L&D Trend Report_2023
L&D Trend Report_2023
 
Leadership development June 2014
Leadership development June 2014Leadership development June 2014
Leadership development June 2014
 
Organizing for Strategy Planning
Organizing for Strategy Planning Organizing for Strategy Planning
Organizing for Strategy Planning
 
Organizing for strategic planning
Organizing for strategic planningOrganizing for strategic planning
Organizing for strategic planning
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Thesis Topics by Dr Heathcote.pptx
Thesis Topics by Dr Heathcote.pptxThesis Topics by Dr Heathcote.pptx
Thesis Topics by Dr Heathcote.pptx
 
Backward Thing Evaluation Essay
Backward Thing Evaluation EssayBackward Thing Evaluation Essay
Backward Thing Evaluation Essay
 
Developing Talent for Strategic Impact from Human Systems International
Developing Talent for Strategic Impact from Human Systems InternationalDeveloping Talent for Strategic Impact from Human Systems International
Developing Talent for Strategic Impact from Human Systems International
 
Organizing for strategic planning
Organizing for strategic planning Organizing for strategic planning
Organizing for strategic planning
 
Meeting the Digital Capacity Challenge: A HECA Perspective
Meeting the Digital Capacity Challenge: A HECA PerspectiveMeeting the Digital Capacity Challenge: A HECA Perspective
Meeting the Digital Capacity Challenge: A HECA Perspective
 
Organizing for Strategic Planning
Organizing for Strategic Planning Organizing for Strategic Planning
Organizing for Strategic Planning
 
Learning & development May 2014
Learning & development May 2014Learning & development May 2014
Learning & development May 2014
 
Assessment center for_project_managers
Assessment center for_project_managersAssessment center for_project_managers
Assessment center for_project_managers
 

Plus de Walter Bartlett (11)

Cis336 (introduction to database w lab – oracle) complete class
Cis336 (introduction to database w lab – oracle) complete classCis336 (introduction to database w lab – oracle) complete class
Cis336 (introduction to database w lab – oracle) complete class
 
Cis 499 project deliverable 2
Cis 499 project deliverable 2Cis 499 project deliverable 2
Cis 499 project deliverable 2
 
Cis 333 case study 1 the officer and the drug arrest
Cis 333 case study 1  the officer and the drug arrestCis 333 case study 1  the officer and the drug arrest
Cis 333 case study 1 the officer and the drug arrest
 
Busn 5200 managerial finance complete class
Busn 5200 managerial finance complete classBusn 5200 managerial finance complete class
Busn 5200 managerial finance complete class
 
Busn 412 business policy complete class
Busn 412 business policy complete classBusn 412 business policy complete class
Busn 412 business policy complete class
 
Busn 410 midterm exam answers
Busn 410 midterm exam answersBusn 410 midterm exam answers
Busn 410 midterm exam answers
 
Bsop 330 all weeks discussion questions
Bsop 330 all weeks discussion questionsBsop 330 all weeks discussion questions
Bsop 330 all weeks discussion questions
 
Bshs 395 final exam answers
Bshs 395 final exam answersBshs 395 final exam answers
Bshs 395 final exam answers
 
Bshs 375 information management systems
Bshs 375 information management systemsBshs 375 information management systems
Bshs 375 information management systems
 
Bos 3651 unit viii course project
Bos 3651 unit viii course projectBos 3651 unit viii course project
Bos 3651 unit viii course project
 
Bmgt 364 case study 3
Bmgt 364 case study 3Bmgt 364 case study 3
Bmgt 364 case study 3
 

Dernier

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Dernier (20)

Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 

Busi 682 midterm examination answers

  • 1. BUSI 682 Midterm Examination Answers  Follow Below Link to Download Tutorial https://homeworklance.com/downloads/busi-682-midterm-examination-answers/ For More Information Visit Our Website ( https://homeworklance.com/ ) Email us At: Support@homeworklance.com or lancehomework@gmail.com  Question 1 4 out of 4 points Formal project planning begins after project signoff.  Question 2 4 out of 4 points A cultural audit is a way to determine how culture may be an advantage or a challenge.  Question 3 4 out of 4 points Project scope is the what of the project and the product scope is the how of the project.  Question 4 4 out of 4 points Projects that aim to increase operational efficiency, capacity, and improved process quality provide tactical value.
  • 2.  Question 5 4 out of 4 points Albeit anecdotal, most projects fail due to communication problems and lack of understanding.  Question 6 4 out of 4 points Project leaders can talk about their projects and what they need to do next, but project managers need to be able to communicate how their projects deliver value.  Question 7 4 out of 4 points In a low context culture, one must be prepared for rational, professional arguments, and presentations that push for agreements.  Question 8 4 out of 4 points 66% of projects fail because the team leaders and team members do not manage the interaction with global participants skillfully.  Question 9 4 out of 4 points Formal project portfolio management tends to reside in companies that have a decentralized project management office (PMO) and an institutionalized project management organization.  Question 10
  • 3. 4 out of 4 points Communication is defined as the process by which persons share information meanings and feelings through the exchange of verbal and nonverbal messages.  Question 11 4 out of 4 points Communication always means understanding. Even when two individuals agree that they are communicating or talking to each other, it means that they understand each other.  Question 12 4 out of 4 points In a predictability –oriented culture, one needs to be prepared for vagueness in communication.  Question 13 4 out of 4 points Strategy, at its essence, is the process of formulating a set of objectives and then deciding on how we will achieve the objectives.  Question 14 4 out of 4 points The project vision describes what’s in it for those who receive the benefits of the project deliverables and what’s in it for those who receive the benefits of the project deliverables and what’s in it for those doing the project work.  Question 15
  • 4. 4 out of 4 points Transferring risk is more likely to protect financial interests that ensure the success of the project.  Question 16 4 out of 4 points The ability to seek understanding by understanding cultural differences and being willing to view project interactions and communications through another’s lens separates global project leaders from otherwise highly capable project managers.  Question 17 4 out of 4 points A strategic project manager’s mindset begins with the realization that we have too many people and not enough project ideas, and budget to act on every idea for new project or initiative.  Question 18 4 out of 4 points Power distance indicates “the extent to which a society accepts that power in institutions and organizations is distributed equally”.  Question 19 4 out of 4 points One of the goals in project risk management is to push more unknown unknowns to known unknowns.  Question 20
  • 5. 4 out of 4 points Estimates carry uncertainty; therefore, it is essential to seek as much expertise and past data as possible when making schedule and cost estimates.  Question 21 4 out of 4 points It is important to recognize that it may take longer to make decisions in uncertainty tolerant cultures.  Question 22 4 out of 4 points The essence of the strategic project management mindset is to realize that emphasis on the project itself is more important than strategy.  Question 23 4 out of 4 points Masculinity implies “the extent to which the dominant values in society are assertiveness, money and material things, not caring for others, quality of life, and people”.  Question 24 4 out of 4 points In essence, all forms of value ultimately contribute to the strategic value of a firm.  Question 25
  • 6. 4 out of 4 points Ultimately, the extend of risk management deployed depends on risk tolerance and awareness of the potential upside impacts of risks.  Question 26 4 out of 4 points Financial data gathered during the execution of a project can be used to determine whether or not the project is within the budget and on schedule.  Question 27 4 out of 4 points Successful organizations invest time in detailed project planning and spend a disproportionate amount of time rethinking project scope and reacting to events.  Question 28 4 out of 4 points Projects for a bridge between strategy and results.  Question 29 4 out of 4 points Professional or intentional project managers far outnumber accidental project managers. Most people managing projects and initiatives originally intended to be project managers.  Question 30
  • 7. 0 out of 4 points Gathering data from prior similar projects and relying on experienced estimators will not go a long way toward avoiding schedule surprises.  Question 31 4 out of 4 points Projects contributing to a great deal of strategic and financial value merit more risk assessment than those delivering little value.  Question 32 4 out of 4 points Successful leaders of global projects must not be ethnocentric.  Question 33 4 out of 4 points A project is a temporary endeavor aimed at achieving some unique set of outcomes that meet or exceed the needs and expectations of key project stakeholders.  Question 34 4 out of 4 points Relationships are generally subordinate to schedules in polychromic cultures.  Question 35 4 out of 4 points
  • 8. Executives, managers, and subject matter experts working in multinational organizations spend less than75% of their time working on a portfolio of large and small projects and initiatives with extensive cross-functional and cross-cultural collaboration.  Question 36 4 out of 4 points There is a body of research that suggests that a person’s stereotypes “may contain an element of truth”.  Question 37 4 out of 4 points Budget and human resources constrain most projects.  Question 38 4 out of 4 points Net present value (NPV) is simply a number that takes into account the time value of discounted cashflows, both expenses and returns, over a given period of time such as 5 years.  Question 39 4 out of 4 points Scope creep refers to the tendency to add to the scope of the project over time.  Question 40 4 out of 4 points
  • 9. Constraints are any factors that limit our options in pursuing the project objectives.  Question 41 4 out of 4 points Projects done for environmental and safety reasons or to comply with government regulations fall under the category of compliance value.  Question 42 4 out of 4 points Doing some detailed risk assessment during scope planning is irrelevant and unbeneficial as thoughts about what could go wrong stem from what needs to be done and how it needs to be done.  Question 43 4 out of 4 points When estimating how long any piece of work will take, availability of resources, skill levels, and the experience of those who provide the estimates are key factors to consider.  Question 44 4 out of 4 points Six Sigma initiatives, new production plants, offshoring, shared services, and similar projects provide tactical value.  Question 45 4 out of 4 points
  • 10. Low context cultures are characterized by respect for a person’s title, age, and background connections  Question 46 4 out of 4 points Culture is learned and individuals from the same culture have exactly the same learning experiences.  Question 47 4 out of 4 points Uncertainty avoidance indicates “the extent to which a society feels threatened by uncertain or ambiguous situations.  Question 48 4 out of 4 points Leaders of global projects need to develop the skill of looking at important projects/issues through “multiple lens” not just their own lens.  Question 49 4 out of 4 points In a monochromic culture, it is important to keep appointments strictly, schedule in advance, and not to run late.  Question 50 4 out of 4 points
  • 11. A negative net present value (NPV) is generally unacceptable, especially in compliance projects in which the return of the project is penalty avoidance.