SlideShare une entreprise Scribd logo
1  sur  3
Wesley E. Plaisted, PE
EXPERIENCE SUMMARY
Mr. Plaisted is a Chemical/Civil Engineer with over 25 years of engineering
experience ranging from Pulp and Paper, Municipal Water/Wastewater,
Industrial and Environmental sectors and has an extensive background in
sewer collection and water distribution systems, hydraulic modeling,
pumping stations, groundwater, system operations, permitting, Inflow and
Infiltration investigations, project management and client relations. He is
looking for a position in a progressive company to fully utilize his expertise
in the water/wastewater field.
REPRESENTATIVE ACCOMPLISHMENTS
WATER
• Prepared and designs and construction oversight of an industrial stormwater treatment facility upgrade. Designed industrial
water pre-treatment and treatment facilities for the removal of petroleum product (LNAPL), VOC’s and metals for discharge to
both groundwater and surface water..
• Prepared models of industrial water system for major Pulp and Paper facility for water reuse project.
• Developed water system hydraulic models for application in water system planning studies (including population projections,
storage needs, supply needs).
• Designed and permitted water system including the evaluation of supply capacity, need for a new water supply well and treatment
facility. The project included design of modifications to existing wells and treatment facilities, supervision of a 72-hour aquifer test,
site selection and design of a new 0.6 MG elevated tank and design of 7,700 feet of water transmission main and preparation of
construction specifications and a Safe Drinking Water permit.
• Assisted clients in the preparation of PENNVest and H2O grants.
• Prepared Consumer Confidence Reports (CCR) and Act 220 reports.
• Reviewed designs and performed construction management functions for water distribution system, storage and booster
pumping facilities for water systems.
• Prepared a hydraulic model of industrial park water system to size mains, booster stations and determine fire flows.
• Prepared hydraulic model of water system for 2,000 unit residential development to determine main sizing, supply and storage
requirements.
• Performed water system evaluations for permitting of revised chemical treatment for well supplies.
• Served as the primary Project Manager for the lining and covering of a 7 million gallon finished water reservoir, responsibilities
included permitting, design oversight and construction management. Project manager for installation of new SCADA system.
• Served as project manager for the evaluation and purchase recommendations of water systems.
• Lead engineer for the design and construction of a 10,000 foot water main replacement in Route 611.
• Served as the primary Project Manager for design and construction of 2 MGD water booster station and the construction of a 1.0
MG water storage facility. Responsibilities included site selection, review of design and construction management.
• Served as Project Manager and primary design engineer for the design and construction of water supply well field and
groundwater treatment plant. Work performed included review of test well data, design and permitting of transmission mains,
design of booster pumping and treatment facility.
• Developed operating operation protocol for managing withdrawals from different aquifers.
• Served as primary engineer for the drilling and development of a new production well and booster pumping facility.
Responsibilities included well site selection, test drilling, permitting with PADER and DRBC, well pump testing, design review,
presentation at public meeting, and testimony at an Administrative Law hearing and construction management.
• Served as the lead engineer for the design and installation of an air stripper treatment facility for PCE removal, responsibilities
included evaluation of contaminated well, preliminary design, permitting, presentations at public meetings, field inspection and
construction management.
CONTACT INFORMATION
50 Howley Drive
Morrisville, PA 19067
(267) 566-2677
weplaisted@comcast.net
EDUCATION
 B.S./Chemical Engineering/University of Maine
 M.S./Chemical Engineering/University of Maine
 Management Certificate/University of Maine
PROFESSIONAL
REGISTRATIONS/CERTIFICATIONS
Registered Professional Engineer NJ/PA/DE
40-hr HAZWOPER
LPS
PROFESSIONAL AFFILIATIONS
 AWWA, WEF, PMAA
CONTACT INFORMATION
50 Howley Drive
Morrisville, PA 19067
(267) 566-2677
weplaisted@comcast.net
EDUCATION
 B.S./Chemical Engineering/University of Maine
 M.S./Chemical Engineering/University of Maine
 Management Certificate/University of Maine
PROFESSIONAL
REGISTRATIONS/CERTIFICATIONS
Registered Professional Engineer NJ/PA/DE
40-hr HAZWOPER
LPS
PROFESSIONAL AFFILIATIONS
 AWWA, WEF, PMAA
Wesley E. Plaisted, PE
• Performed numerous reviews of developer plans for water main extensions.
SEWER/WASTEWATER
• Prepared permits (PADEP and NJDEP TWA, NJPDES, Act 537 Planning Modules, GP-5, GP-11, MS4 and Industrial Wastewater
discharge to POTW).
• Evaluated wastewater stream from landfill operation for recommendation for pretreatment requirements prior discharge to client’s
POTW.
• In charge of reconstruction of a stormwater treatment plant destroyed after Hurricane Sandy.
• Evaluated and recommended pretreatment facilities for discharges to meet client’s pretreatment program for discharge to a public
sewer system
• Conducted metering studies and performed sewer system Inflow and Infiltration studies.
• Prepared permits (PADEP, Bucks County Conservation) for construction of access roads for major sewer lining project.
• Prepared plans and specifications for construction of metering stations including the design and construction of sewer relief/by-
pass mains.
• Evaluated and designed sewage pump station re-build.
• As lead engineer, designed and supervised the construction of stream bank stabilization projects to protect exposed sewer
mains.
• Performed studies of system capacities including inverted siphon calculations for future growth projects.
• Prepared Tapping Fee calculations based on Act 57 criteria.
• Developed hydraulic models of pumping stations, force mains, gravity collection main and sewer interceptors.
• Reviewed in-house sewer designs and performed construction management functions for several sewer collection systems.
• Reviewed developer’s sewer system plans,
• Designed an influent pumping station for a sewage treatment plant.
• Performed evaluation of a proposed sewer surge tank to eliminate sewer overflow and presented findings to Board of
Supervisor’s and citizen’s committees.
• Served as lead engineer for the hydraulic modeling and design of a grinder pump sewer system for 2,000 unit development.
• Served as the Authority Engineer for a municipal sewer Authority with responsibilities for all engineering services for the Authority
including sewage pump station operation, sewer system Inflow and Infiltration studies, television inspection of collection system,
plans and specifications for sewer main construction/repairs, preparation and review of capital/operation budgets, preparation of
annual Certifications.
• Prepared the designs and permits (Act 537, Water Quality Management) for sewage pumping stations and collection systems in
Berks and Montgomery Counties.
• Prepared the design and permits for spray irrigation system for wastewater disposal.
• Prepared evaluation of sewage lagoon and sewage disposal spray field.
EMPLOYMENT HISTORY
• Tri-State Engineers and land Surveyors, Inc, Feasterville, PA, 2015 - 2016
o Sr. Engineer in charge of the water/wastewater work. Designed systems and prepared plans and specification. Served
as the municipal sewer engineer for a local municipality with client management and public meeting responsibilities.
Prepared and submitted permits and engineering reports.
• Groundwater and Environmental Service, Inc., Neptune, NJ 2012 – 2015
o Senior process Engineer in the industrial Processes Group with process design, project management and supervisory
responsibilities for senior and junior professionals and technicians.
• Pennoni Associates Inc., Doylestown, PA, 2005 - 2012
o Senior engineer in the Municipal Division with project management and supervisory responsibilities for junior staff and
client relations.
• Boucher & James, Inc., Fountainville, PA, 2005
o Manager of Water/Wastewater department.
• Pennoni Associates Inc. Doylestown, PA, 2004 – 2005
o Project engineer in the Municipal Division with responsibilities for water and wastewater projects.
• Consumers NJ Water Company, Hamilton, NJ 1993 - 2004
o Manager of Engineering with promotions to Division Manager in charge of two operating divisions with approximately
20,000 customers with responsibilities for daily operations, customer service, long-range planning and budgets and
assistance in the preparation of rate cases.
• Gannett-Fleming Engineers, King of Prussia, PA. 1988 – 1993
o Project engineer in the Water Resources Division serving municipal and private clients.
• Union Camp Corporation, Princeton, NJ, 1983 – 1988
o Engineer in the applied R&D department conducting mill evaluations of processes for production improvement.
• Albany International Corp. Albany, NY, 1973 – 1983
Wesley E. Plaisted, PE
o Project engineer with promotions to Group leader for an applied engineering department Published and presented
technical papers’.
References available upon request

Contenu connexe

Tendances

Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12Jerry Williams
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz HabidFeroz Habid
 
resume-garychu
resume-garychuresume-garychu
resume-garychuGary Chu
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST ResumeJose Muraira
 
Jvs resume' word chronological format r5tasks
Jvs  resume' word chronological format r5tasksJvs  resume' word chronological format r5tasks
Jvs resume' word chronological format r5tasksJohn V. Sandbothe
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103Kenneth Horner
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resumeJerry Pinder
 
CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015Andrew Tan
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Malcolm Kiper
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 
Roy Ong CV (2015)
Roy Ong CV (2015)Roy Ong CV (2015)
Roy Ong CV (2015)Roy Ong
 

Tendances (20)

Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
MANEESH resume
MANEESH resumeMANEESH resume
MANEESH resume
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
ramCV
ramCVramCV
ramCV
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
RMC - Green
RMC - GreenRMC - Green
RMC - Green
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Jvs resume' word chronological format r5tasks
Jvs  resume' word chronological format r5tasksJvs  resume' word chronological format r5tasks
Jvs resume' word chronological format r5tasks
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
Mallikarjun.S.D_original
Mallikarjun.S.D_originalMallikarjun.S.D_original
Mallikarjun.S.D_original
 
jerry-pinder-resume
jerry-pinder-resumejerry-pinder-resume
jerry-pinder-resume
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_Reume
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 
Roy Ong CV (2015)
Roy Ong CV (2015)Roy Ong CV (2015)
Roy Ong CV (2015)
 

En vedette

CIO Summit 2015 - Keynote Freek Bomhof - TNO
CIO Summit 2015 - Keynote Freek Bomhof - TNOCIO Summit 2015 - Keynote Freek Bomhof - TNO
CIO Summit 2015 - Keynote Freek Bomhof - TNOCIOnl
 
Hacer deporte
Hacer deporte Hacer deporte
Hacer deporte MFYC
 
захисники україни
захисники українизахисники україни
захисники україниИришка Ой
 
presentación cuerpo humano ejemplo
presentación cuerpo humano ejemplopresentación cuerpo humano ejemplo
presentación cuerpo humano ejemploCésar Solís
 
Corporate Presentation CPFL Energia - Março 2016
Corporate Presentation CPFL Energia - Março 2016Corporate Presentation CPFL Energia - Março 2016
Corporate Presentation CPFL Energia - Março 2016CPFL RI
 
Corporate Presentation CPFL Energia - Janeiro 2016
Corporate Presentation CPFL Energia - Janeiro 2016Corporate Presentation CPFL Energia - Janeiro 2016
Corporate Presentation CPFL Energia - Janeiro 2016CPFL RI
 
La Réforme protestants vs catholiques
La Réforme protestants vs catholiquesLa Réforme protestants vs catholiques
La Réforme protestants vs catholiquescoriolan76
 

En vedette (14)

Estadistica
EstadisticaEstadistica
Estadistica
 
CIO Summit 2015 - Keynote Freek Bomhof - TNO
CIO Summit 2015 - Keynote Freek Bomhof - TNOCIO Summit 2015 - Keynote Freek Bomhof - TNO
CIO Summit 2015 - Keynote Freek Bomhof - TNO
 
35588.16
35588.1635588.16
35588.16
 
ASHVEER CV updated
ASHVEER CV updatedASHVEER CV updated
ASHVEER CV updated
 
Foshan report
Foshan reportFoshan report
Foshan report
 
Hacer deporte
Hacer deporte Hacer deporte
Hacer deporte
 
Pruebas de-hipótesis
Pruebas de-hipótesisPruebas de-hipótesis
Pruebas de-hipótesis
 
Kelompok 3
Kelompok 3Kelompok 3
Kelompok 3
 
захисники україни
захисники українизахисники україни
захисники україни
 
presentación cuerpo humano ejemplo
presentación cuerpo humano ejemplopresentación cuerpo humano ejemplo
presentación cuerpo humano ejemplo
 
Corporate Presentation CPFL Energia - Março 2016
Corporate Presentation CPFL Energia - Março 2016Corporate Presentation CPFL Energia - Março 2016
Corporate Presentation CPFL Energia - Março 2016
 
Corporate Presentation CPFL Energia - Janeiro 2016
Corporate Presentation CPFL Energia - Janeiro 2016Corporate Presentation CPFL Energia - Janeiro 2016
Corporate Presentation CPFL Energia - Janeiro 2016
 
rHB_71
rHB_71rHB_71
rHB_71
 
La Réforme protestants vs catholiques
La Réforme protestants vs catholiquesLa Réforme protestants vs catholiques
La Réforme protestants vs catholiques
 

Similaire à 2016 Wesley Plaisted

Similaire à 2016 Wesley Plaisted (20)

SanazSarafrazResumeMay2015
SanazSarafrazResumeMay2015SanazSarafrazResumeMay2015
SanazSarafrazResumeMay2015
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
PM Resume 9_30_15
PM Resume 9_30_15PM Resume 9_30_15
PM Resume 9_30_15
 
robert mcgregor 006865u 25Apr2016
robert mcgregor 006865u 25Apr2016robert mcgregor 006865u 25Apr2016
robert mcgregor 006865u 25Apr2016
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Ahmed Elsonbaty Resume Oct_2016
Ahmed Elsonbaty Resume Oct_2016Ahmed Elsonbaty Resume Oct_2016
Ahmed Elsonbaty Resume Oct_2016
 
PROFESSIONAL EXPERIENCE for Hamid AL-Nuaimi
PROFESSIONAL EXPERIENCE for Hamid AL-NuaimiPROFESSIONAL EXPERIENCE for Hamid AL-Nuaimi
PROFESSIONAL EXPERIENCE for Hamid AL-Nuaimi
 
SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
1. Melissa Fagan 2017 - Geosyntec
1. Melissa Fagan 2017 - Geosyntec1. Melissa Fagan 2017 - Geosyntec
1. Melissa Fagan 2017 - Geosyntec
 
Eng Malek C V
Eng  Malek C VEng  Malek C V
Eng Malek C V
 
KONI RESUME
KONI RESUMEKONI RESUME
KONI RESUME
 
Ezekiel Robles Resume
Ezekiel Robles ResumeEzekiel Robles Resume
Ezekiel Robles Resume
 
Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineer
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 

2016 Wesley Plaisted

  • 1. Wesley E. Plaisted, PE EXPERIENCE SUMMARY Mr. Plaisted is a Chemical/Civil Engineer with over 25 years of engineering experience ranging from Pulp and Paper, Municipal Water/Wastewater, Industrial and Environmental sectors and has an extensive background in sewer collection and water distribution systems, hydraulic modeling, pumping stations, groundwater, system operations, permitting, Inflow and Infiltration investigations, project management and client relations. He is looking for a position in a progressive company to fully utilize his expertise in the water/wastewater field. REPRESENTATIVE ACCOMPLISHMENTS WATER • Prepared and designs and construction oversight of an industrial stormwater treatment facility upgrade. Designed industrial water pre-treatment and treatment facilities for the removal of petroleum product (LNAPL), VOC’s and metals for discharge to both groundwater and surface water.. • Prepared models of industrial water system for major Pulp and Paper facility for water reuse project. • Developed water system hydraulic models for application in water system planning studies (including population projections, storage needs, supply needs). • Designed and permitted water system including the evaluation of supply capacity, need for a new water supply well and treatment facility. The project included design of modifications to existing wells and treatment facilities, supervision of a 72-hour aquifer test, site selection and design of a new 0.6 MG elevated tank and design of 7,700 feet of water transmission main and preparation of construction specifications and a Safe Drinking Water permit. • Assisted clients in the preparation of PENNVest and H2O grants. • Prepared Consumer Confidence Reports (CCR) and Act 220 reports. • Reviewed designs and performed construction management functions for water distribution system, storage and booster pumping facilities for water systems. • Prepared a hydraulic model of industrial park water system to size mains, booster stations and determine fire flows. • Prepared hydraulic model of water system for 2,000 unit residential development to determine main sizing, supply and storage requirements. • Performed water system evaluations for permitting of revised chemical treatment for well supplies. • Served as the primary Project Manager for the lining and covering of a 7 million gallon finished water reservoir, responsibilities included permitting, design oversight and construction management. Project manager for installation of new SCADA system. • Served as project manager for the evaluation and purchase recommendations of water systems. • Lead engineer for the design and construction of a 10,000 foot water main replacement in Route 611. • Served as the primary Project Manager for design and construction of 2 MGD water booster station and the construction of a 1.0 MG water storage facility. Responsibilities included site selection, review of design and construction management. • Served as Project Manager and primary design engineer for the design and construction of water supply well field and groundwater treatment plant. Work performed included review of test well data, design and permitting of transmission mains, design of booster pumping and treatment facility. • Developed operating operation protocol for managing withdrawals from different aquifers. • Served as primary engineer for the drilling and development of a new production well and booster pumping facility. Responsibilities included well site selection, test drilling, permitting with PADER and DRBC, well pump testing, design review, presentation at public meeting, and testimony at an Administrative Law hearing and construction management. • Served as the lead engineer for the design and installation of an air stripper treatment facility for PCE removal, responsibilities included evaluation of contaminated well, preliminary design, permitting, presentations at public meetings, field inspection and construction management. CONTACT INFORMATION 50 Howley Drive Morrisville, PA 19067 (267) 566-2677 weplaisted@comcast.net EDUCATION  B.S./Chemical Engineering/University of Maine  M.S./Chemical Engineering/University of Maine  Management Certificate/University of Maine PROFESSIONAL REGISTRATIONS/CERTIFICATIONS Registered Professional Engineer NJ/PA/DE 40-hr HAZWOPER LPS PROFESSIONAL AFFILIATIONS  AWWA, WEF, PMAA CONTACT INFORMATION 50 Howley Drive Morrisville, PA 19067 (267) 566-2677 weplaisted@comcast.net EDUCATION  B.S./Chemical Engineering/University of Maine  M.S./Chemical Engineering/University of Maine  Management Certificate/University of Maine PROFESSIONAL REGISTRATIONS/CERTIFICATIONS Registered Professional Engineer NJ/PA/DE 40-hr HAZWOPER LPS PROFESSIONAL AFFILIATIONS  AWWA, WEF, PMAA
  • 2. Wesley E. Plaisted, PE • Performed numerous reviews of developer plans for water main extensions. SEWER/WASTEWATER • Prepared permits (PADEP and NJDEP TWA, NJPDES, Act 537 Planning Modules, GP-5, GP-11, MS4 and Industrial Wastewater discharge to POTW). • Evaluated wastewater stream from landfill operation for recommendation for pretreatment requirements prior discharge to client’s POTW. • In charge of reconstruction of a stormwater treatment plant destroyed after Hurricane Sandy. • Evaluated and recommended pretreatment facilities for discharges to meet client’s pretreatment program for discharge to a public sewer system • Conducted metering studies and performed sewer system Inflow and Infiltration studies. • Prepared permits (PADEP, Bucks County Conservation) for construction of access roads for major sewer lining project. • Prepared plans and specifications for construction of metering stations including the design and construction of sewer relief/by- pass mains. • Evaluated and designed sewage pump station re-build. • As lead engineer, designed and supervised the construction of stream bank stabilization projects to protect exposed sewer mains. • Performed studies of system capacities including inverted siphon calculations for future growth projects. • Prepared Tapping Fee calculations based on Act 57 criteria. • Developed hydraulic models of pumping stations, force mains, gravity collection main and sewer interceptors. • Reviewed in-house sewer designs and performed construction management functions for several sewer collection systems. • Reviewed developer’s sewer system plans, • Designed an influent pumping station for a sewage treatment plant. • Performed evaluation of a proposed sewer surge tank to eliminate sewer overflow and presented findings to Board of Supervisor’s and citizen’s committees. • Served as lead engineer for the hydraulic modeling and design of a grinder pump sewer system for 2,000 unit development. • Served as the Authority Engineer for a municipal sewer Authority with responsibilities for all engineering services for the Authority including sewage pump station operation, sewer system Inflow and Infiltration studies, television inspection of collection system, plans and specifications for sewer main construction/repairs, preparation and review of capital/operation budgets, preparation of annual Certifications. • Prepared the designs and permits (Act 537, Water Quality Management) for sewage pumping stations and collection systems in Berks and Montgomery Counties. • Prepared the design and permits for spray irrigation system for wastewater disposal. • Prepared evaluation of sewage lagoon and sewage disposal spray field. EMPLOYMENT HISTORY • Tri-State Engineers and land Surveyors, Inc, Feasterville, PA, 2015 - 2016 o Sr. Engineer in charge of the water/wastewater work. Designed systems and prepared plans and specification. Served as the municipal sewer engineer for a local municipality with client management and public meeting responsibilities. Prepared and submitted permits and engineering reports. • Groundwater and Environmental Service, Inc., Neptune, NJ 2012 – 2015 o Senior process Engineer in the industrial Processes Group with process design, project management and supervisory responsibilities for senior and junior professionals and technicians. • Pennoni Associates Inc., Doylestown, PA, 2005 - 2012 o Senior engineer in the Municipal Division with project management and supervisory responsibilities for junior staff and client relations. • Boucher & James, Inc., Fountainville, PA, 2005 o Manager of Water/Wastewater department. • Pennoni Associates Inc. Doylestown, PA, 2004 – 2005 o Project engineer in the Municipal Division with responsibilities for water and wastewater projects. • Consumers NJ Water Company, Hamilton, NJ 1993 - 2004 o Manager of Engineering with promotions to Division Manager in charge of two operating divisions with approximately 20,000 customers with responsibilities for daily operations, customer service, long-range planning and budgets and assistance in the preparation of rate cases. • Gannett-Fleming Engineers, King of Prussia, PA. 1988 – 1993 o Project engineer in the Water Resources Division serving municipal and private clients. • Union Camp Corporation, Princeton, NJ, 1983 – 1988 o Engineer in the applied R&D department conducting mill evaluations of processes for production improvement. • Albany International Corp. Albany, NY, 1973 – 1983
  • 3. Wesley E. Plaisted, PE o Project engineer with promotions to Group leader for an applied engineering department Published and presented technical papers’. References available upon request