SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
1
160902 Wilson Sapien_CV
PERSONAL INFORMATION
EMAIL: wilsonsapien@kramerausenco.com/ wilsonsapien@gmail.com
EDUCATIONAL QUALIFICATIONS
BACHELOR OF ENGINEERING IN CIVIL ENGINEERING
2013 PAPUA NEW GUINEA
UNIVERSITY OF TECHNOLOGY
HIGHER SCHOOL CERTIFICATE (GRADE 12)
2008 SAINT IGNATIUS SECONDARY SCHOOL, SANDAUN
PROVINCE.
HIGH SCHOOL CERTIFICATE (GRADE 10) 2006
VANIMO HIGH SCHOOL, SANDAUN PROVINCE.
PRIMARY SCHOOL CERTIFICATE (GRADE 8)
2004 UTU SECONDARY SCHOOL, New Ireland PROVINCE.
FIRST NAME: WILSON SURNAME: SAPIEN
DATE OF BIRTH: 09TH
SEPTEMBER, 1989 GENDER: MALE
NATIONALITY:
RELIGION:
CONTACT DETAILS
PAPUA NEW GUINEA HOME PROVINCE:
CHRISTIANITY
NEW IRELAND
ADDRESS: WILSON SAPIEN
P.O. BOX 358
UNIVERSITY
NATIONAL CAPITAL DISTRICT
PAPUA NEW GUINEA
PHONE:
MOBILE:
(675) 325 6033
(675) 739 21927
WILSON SAPIEN
Civil Engineer
Bachelor of Engineering in Civil Engineering
2
160902 Wilson Sapien_CV
PROFESSIONAL AFFILIATIONS
INSTITUTE OF ENGINEERS PNG INC. (IEPNG)
GRADUATE MEMBER – GIEPNG (No. 5250)
SOUTH PACIFIC ENGINEERS ASSOCIATION (SPEA)
REGISTERED MEMBER
SKILLS AND ABILITIES
COMMUNICATION AND ORGANIZATIONAL SKILLS
• EXCELLENT COMMUNICATIVE SKILLS – WRITTEN AND ORAL
• GOOD WORK ETHICS AND PEOPLE SKILLS
• STRONG ANALYTICAL & PROBLEM SOLVING SKILLS
• STRONG LEADERSHIP SKILLS & TEAM PLAYER
• ABILITY TO WORK WITH LESS SUPERVISION
• JOB ORIENTATED AND COMMITED TO ANY GIVEN TASK
• HIGH ORGANIZATIONAL AND TIME MANAGEMENT SKILLS
INFORMATION TECHNOLOGY SKILLS
• PROFICIENT IN MICROSOFT WORD, POWER POINT, EXCEL & PROJECT
• STRONG KNOWLEDGE IN DRAFTING, CIVIL AND SURVEY ANALYSIS SOFTWARE
- TOPCON CIVIL CAD/MAGNET
- 12D MODEL (BASIC)
- AUTOCAD CIVIL 3D (BASIC)
- AUTOCAD 2007 – 2012
3
160902 Wilson Sapien_CV
PROFESSIONAL EXPERIENCE
FIRM: KRAMER AUSENCO – PORT MORESBY, NCD.
DATE: 26th NOVEMBER 2012 – PRESENT.
POSITION: GRADUATE CIVIL/STRUCTURAL ENGINEER.
PROJECT: LATTER-DAY SAINTS GOROKA GABION WALL & ASSOCIATED CIVIL WORKS
CLIENT: LATTER-DAY SAINTS (LDS)
Kramer Ausenco is Project Manager for this ongoing project in Goroka. I am tasked as the project
engineer for this project.
PROJECT: FLOOD ESTIMATION & DESIGN VERICATION OF BOROKO CREEK
CLIENT: NATIONAL AIRPORTS COOPERATION (NAC)
Kramer Ausenco was instructed by The National Airports Cooperation of Papua New Guinea to review
the Flood Analysis Report prepared by Brisbane Stormwater Management for PNG Consultant
Management Resource Solutions (MRS) for possible steel bridge options over Boroko Creek for PEAL
Fuel Cart Access.
I was tasked to do an independent flood estimation of Boroko Creek and produce a report evaluating
the viability of the selected bridge crossing option with respect to environmental risks, flood levels,
traffic volume, the construction and long term maintenance costs of the preferred option by MRS.
PROJECT: MAGISTERIAL SERVICES HEADQUARTERS MASTER PLAN – WAIGANI, NCD.
CLIENT: COX ARCHITECT PTY LTD.
Kramer Ausenco was required to provided services such as Structural, Civil, Traffic, Electrical,
Mechanical, Fire Protection and Hydraulic Services Engineering Consultancy for the Proposed
Magisterial Services Headquarters Master Plan. Undertook a site investigation and prepared a viability
report for the site with respect to civil works/services. I am currently assigned to do all proposed civil
engineering design and layout plans for the master plan.
PROJECT: PANGIA AIRSTRIP UPGRADE – PANGIA, SOUTHERN HIGHLANDS.
CLIENT: WILD CAT DEVELOPMENT.
This project is located in Pangia Station, Southern Highlands Province, Papua New Guinea. The
project site is currently occupied by a decommissioned dirt airstrip approximately 1200m long. The
airstrip is to be upgraded to DHC-8-200 standard sealed runway including stopway, RESA, turning
node, taxiway, apron, NAVAIDS and pavement markings in accordance with the specifications
required for operation of DHC-8-200.
Undertook the conceptual and the detailed design of the airport
The scope of my design included;
 General Overall Layout for the runway, turning node, stopway, RESA and taxiway/apron
 Geometric Design for the runway, turning node, stopway, RESA and taxiway/apron
 Earthworks Cross Sections
 Typical Sections for the runway, turning node, stopway, RESA and taxiway/apron
 Drainage Design including catchments and calculations
 Coordinated set out of the above
 Plan and Longitudinal sections of the above
 Terminal Earthworks Plan
 Pavement Marking Plan
 Windsock and Strip Cone Location Plan
 Schedule of Quantities
4
160902 Wilson Sapien_CV
PROJECT: ERIMA SERVICE STATION – ERIMA, NCD.
CLIENT: TOTAL OIL ASIA PACIFIC PTE LTD.
Kramer Ausenco was responsible for the master plan of the service station. Supervised and assisted
in the stormwater design for the service station.
PROJECT: ELEVALA ROAD – KIUNGA, WESTERN PROVINCE.
CLIENT: WILD CAT GOLDING JOINT VENTURE.
This is an Early Contractor Involvement project undertaken by Wild Cat Golding Joint Venture for
Horizon Oil. Kramer Ausenco was tasked to produce a preliminary road design and earthworks for
this 80km road. I undertook a preliminary design and earthworks calculation for a 30km portion of the
road.
PROJECT: JACKSONS PARADE UPGRADE AND EXTENSION – JACKSONS AIRPORT, NCD.
CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD.
Under this design and construct project, Kramer Ausenco was tasked by the contractor (Hebou) to
redesign the existing Jacksons Airport Road to merge neatly with the Kookaburra Fly Over. The project
involved upgrading the existing two lane road into four lane road and resizing the size of its exiting
roundabouts. The engineering design involved realignment of the existing road alignment including
some areas of greenfield, road geometry and pavement design, stormwater and drainage design and
intersection design. The total length of the road is approximately 1.1km
Undertook all stormwater design and assisted the senior civil design engineers in the geometry design
for the roundabout intersections. The design and construction of this road project is has been
completed
PROJECT: SIX MILE TO BAUTAMA JUNCTION PRELIMINARY DESIGN – MAGI HIGHWAY,
CENTRAL PROV.
CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD.
This is a design and construct project tendered by NCDC. Kramer Ausenco was engaged by Hebou
to produce a preliminary four (4) lane road design and build up of quantities to assist them in their cost
estimation for this portion of Magi Highway.
I assisted the senior civil engineer in the field scoping of existing road & services to road, Road
alignment and Storm-water Drainage assessment. Site investigations include identification of existing
services and utilities, drains and other necessary points of interests.
Carried out the preliminary road design and build up of quantities for the road section at Dogura Bridge
to Bautama Roundabout which is approximately 6km.
5
160902 Wilson Sapien_CV
PROJECT: CHIEF JUSTICE SENIOR EXECUTIVE RESIDENCE – PORT MORESBY, NCD.
CLIENT: NATIONAL JUDICIAL STAFF SERVICES.
For this project I worked as a site clerk of works at the construction site on behalf of Kramer Ausenco.
My duty involved ensuring that construction drawings, relevant codes, standards and specifications
are being followed. Carryout structural and civil inspections at hold points and reporting all major
design changes to senior engineers and all project management issues to the senior project manager.
Other duties include ensuring safety regulations and practices are being adhered to at all times,
responding to RFIs, attending site meetings, responding to contractor’s queries, ensuring contractor
was performing to standard practices with its construction methods, workmanship and safety.
Verifying contractor’s claims on site prior to paying the contractor.
PROJECT: RAMU 2 FEASIBILITY STUDY.
CLIENT: INDEPENDENT PUBLIC BUSINESS CORPORATION.
Parsons Brinckerhoff (Principal Consultant) and Kramer Ausenco (Sub Consultant) were engaged by
The Independent Public Business Corporation (IPBC) and PNG Energy Developments Ltd (PNG EDL)
to produce a proposal for the PNG Ramu 2 (Yonki) Hydropower Project – Feasibility Study and Social
& Environmental Impact Assessments with respect to the feasibility engineering and environmental
impact of the Ramu 2 Hydro project which is located in Papua New Guinea.
I was assigned as a site/project engineer on a four weeks on-two weeks off rotational basis. My task
involved but was not limited to assisting the senior engineer to;
 Provide the Principal Consultant with weekly reports on staffing, observations, progress,
health and safety, environmental and social issues that need to be raised to higher level.
 Provide communications coordination and field work coordination
 Supervise and ensure efficiency and coordination only and is based on companies performing
the actual works such as drilling, geotech investigation, etc…
PROJECT: POLICE HOUSING BOMANA SUBDIVISION – PORT MORESBY, NCD.
CLIENT: RED SEA HOUSING SERVICES.
Kramer Ausenco was engaged by Red Sea Development to design a subdivision that will cater for
three hundred police houses at Bomana. The engineering design for this 20 hectare subdivision
involved roads, water supply and sewer design and building services.
I was tasked to do the stormwater and drainage design for this project and assisted the senior engineer
to do weekly inspections on the civil works done during construction.
PROJECT: MOREA TOBO AND ASSOCIATED ROADS D&C – PORT MORESBY, NCD.
CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD.
Kramer Ausenco was engaged Hebou Construction for this design and construct project to carry out
a detailed design for the roads along Morea Tobo & Associated Roads between 7 Mile & 6 Mile. The
engineering design involved road alignment and geometry design pavement design, stormwater and
drainage design and intersection design. The total length of the road is approximately 1.1km
Undertook the above designs on Saraga road (0.8km) and Jacksons Parade Roads (0.8km). Both of
the road designs were completed with Saraga already constructed and Jackson’s Parade yet to be
constructed. I also assisted in carrying out geotechnical investigation for all these Roads.
6
160902 Wilson Sapien_CV
PROJECT: NCDC ROAD PACKAGES (PRELIMINARY DESIGN) – PORT MORESBY, NCD.
CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD.
Kramer Ausenco was engaged by Hebou to produce a preliminary road design and cost estimate for
roads tendered by NCDC.
- Morea Tobo and Associated Roads
- Four Lane Dogura Rd. Upgrade (6Mile Market to Dogura Bridge)
- Four Lane Upgrade of Hubert Murray Highway (Erima to 9 Mile Market)
- Proposed Fly over (kookaburra Street Upgrading)
I assisted senior civil engineers in field scoping of existing road & services to road, road alignment
and storm-water drainage assessment. Site investigations include identification of existing services
and utilities, drains and other necessary points of interests. Preliminary Design and Cost Estimate for
proposed roads above.
PROJECT: MIRIGINI HAUS ROAD DESIGN (PRIME MINISTER’S RESIDENCE) – NCD PORT
MORESBY.
CLIENT: L&A CONSTRUCTION.
I was Involved in site investigation, geotechnical investigation and assisted in the documentation of
this project.
PROJECT: ELA MOTORS LOGISTICS CENTER – LAE, MOROBE PROVINCE.
CLIENT: TOYOTA TSUSHO PACIFIC HOLDINGS PTY. LTD.
I assisted the senior engineer in design and detailing of drainage systems and documentation of this
project.
PROJECT: MAREA HOUSE REDEVELOPMENT, NCD.
CLIENT: GOVERNMENT of PAPUA NEW GUINEA (GoPNG).
I assisted the senior structural engineer in the investigation of the existing beams, columns and slabs.
OTHER PROJECTS
Listed below are some of the major projects undertaken by Kramer Ausenco as Project Managers. I
assisted the senior civil & structural engineers in onsite Inspections & Supervision.
 - Era Dorina (Civil Works)
 - Windward Apartments Stage 2 (Structural)
 - Steamship Harbor Offices (Structural)
 - NJSS Housing (Civil/Structural)
 - Holiday Inn (Civil/Structural)
 - BSP Bank Projects, Waigani & Gordons (Civil/Structural)
 - Kookaburra Flyover (Structural)
 - Roads in Western Province - Pampenai and Aimbak Roads(Civil)
7
160902 Wilson Sapien_CV
FIRM: DEPARTMENT OF WORKS – KAVIENG, NEW IRELAND PROVINCE.
DATE: 7th NOVEMBER 2011 – 3RD FEBRUARY 2012.
POSITION: TRAINEE ENGINEER.
During my three months with DOW, I spent two months on the field with Works Supervisors and a
month in the office with the Provincial Works Manager and his team of engineers.
I was assigned to the road maintenance team to;
- Patch potholes and carryout bridge maintenance works along the Buluminsky Highway.
- Carryout river bank, coastal and shore line protection works using sandbags along the
Buluminsky Highway
- Assisted in supervising the Patrol Grading along the Buluminsky Highway (Namatanai).
I also spent two months assisting the Provincial Works Manager and Provincial Civil Engineer;
- Carry out bridge and road inspections and identify projects to include in proposals and
proposed project scope of works.
- Inspect different stages of ongoing renovation of health centers around New Ireland Province
to verify and approve a claim
- Check BOQ’s and evaluation of tenders for building and civil works project around New Ireland
Province.
- Other office administration work as directed by the PWM.
FIRM: MARKHAM CULVERTS – LAE, MOROBE PROVINCE.
DATE: 3rd NOVEMBER 2008 – 1st FEBRUARY 2009.
POSITION: CASUAL WORKER.
Spent three months working as a casual worker at the production line of Markham Culverts producing
and packaging different size corrugated metal culverts (CMP) and other company’s products as per
the customer’s order.
8
160902 Wilson Sapien_CV
REFEREES
1. Mr Robert Francis Aup
Manager/Senior Civil Design Engineer
Kramer Ausenco
P.O Box 1948
Boroko, NCD.
Ph #: (675) 325 6033
Mb #: (675) 723 88877
2. Mr Bernard Kipit
BPK & Associates Ltd
P.O. Box 980
Waigani, NCD
Ph #: (675) 323 9555
Mb #: 72232494/76895212
3. Mr Albert Peter Sapien
Provincial Project Supervisor (Cardno)
Department of Works
P.O Box 106
Wewak
East Sepik Province
Ph #: (675) 456 2566/2446
Mb #: (675) 701 88892

Contenu connexe

Tendances

CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
Paul Magee
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
Eric Girod
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
Dave Hoover
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
Moayad Qblawi
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
Paul Blaetz
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
John Adams
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18
Ken Bossung
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
Ross Ullman
 
JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07
Joanne Perez
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
Nshaat Hafez
 

Tendances (20)

CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Sasha Rodriguez_Nov_2016
Sasha Rodriguez_Nov_2016Sasha Rodriguez_Nov_2016
Sasha Rodriguez_Nov_2016
 
Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015Career History - Ross Ullman - March 2015
Career History - Ross Ullman - March 2015
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitae
 
JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07JLPEREZ_CV_2016.06.07
JLPEREZ_CV_2016.06.07
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Khan.CV
Khan.CVKhan.CV
Khan.CV
 

Similaire à WILSON SAPIEN CV

Similaire à WILSON SAPIEN CV (20)

2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs2016-07-28 Martin Jacobs
2016-07-28 Martin Jacobs
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2
 
Ves GORECKI MIEAust Resume 2015-01-06
Ves GORECKI MIEAust Resume 2015-01-06Ves GORECKI MIEAust Resume 2015-01-06
Ves GORECKI MIEAust Resume 2015-01-06
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
GOPAL
GOPALGOPAL
GOPAL
 

WILSON SAPIEN CV

  • 1. 1 160902 Wilson Sapien_CV PERSONAL INFORMATION EMAIL: wilsonsapien@kramerausenco.com/ wilsonsapien@gmail.com EDUCATIONAL QUALIFICATIONS BACHELOR OF ENGINEERING IN CIVIL ENGINEERING 2013 PAPUA NEW GUINEA UNIVERSITY OF TECHNOLOGY HIGHER SCHOOL CERTIFICATE (GRADE 12) 2008 SAINT IGNATIUS SECONDARY SCHOOL, SANDAUN PROVINCE. HIGH SCHOOL CERTIFICATE (GRADE 10) 2006 VANIMO HIGH SCHOOL, SANDAUN PROVINCE. PRIMARY SCHOOL CERTIFICATE (GRADE 8) 2004 UTU SECONDARY SCHOOL, New Ireland PROVINCE. FIRST NAME: WILSON SURNAME: SAPIEN DATE OF BIRTH: 09TH SEPTEMBER, 1989 GENDER: MALE NATIONALITY: RELIGION: CONTACT DETAILS PAPUA NEW GUINEA HOME PROVINCE: CHRISTIANITY NEW IRELAND ADDRESS: WILSON SAPIEN P.O. BOX 358 UNIVERSITY NATIONAL CAPITAL DISTRICT PAPUA NEW GUINEA PHONE: MOBILE: (675) 325 6033 (675) 739 21927 WILSON SAPIEN Civil Engineer Bachelor of Engineering in Civil Engineering
  • 2. 2 160902 Wilson Sapien_CV PROFESSIONAL AFFILIATIONS INSTITUTE OF ENGINEERS PNG INC. (IEPNG) GRADUATE MEMBER – GIEPNG (No. 5250) SOUTH PACIFIC ENGINEERS ASSOCIATION (SPEA) REGISTERED MEMBER SKILLS AND ABILITIES COMMUNICATION AND ORGANIZATIONAL SKILLS • EXCELLENT COMMUNICATIVE SKILLS – WRITTEN AND ORAL • GOOD WORK ETHICS AND PEOPLE SKILLS • STRONG ANALYTICAL & PROBLEM SOLVING SKILLS • STRONG LEADERSHIP SKILLS & TEAM PLAYER • ABILITY TO WORK WITH LESS SUPERVISION • JOB ORIENTATED AND COMMITED TO ANY GIVEN TASK • HIGH ORGANIZATIONAL AND TIME MANAGEMENT SKILLS INFORMATION TECHNOLOGY SKILLS • PROFICIENT IN MICROSOFT WORD, POWER POINT, EXCEL & PROJECT • STRONG KNOWLEDGE IN DRAFTING, CIVIL AND SURVEY ANALYSIS SOFTWARE - TOPCON CIVIL CAD/MAGNET - 12D MODEL (BASIC) - AUTOCAD CIVIL 3D (BASIC) - AUTOCAD 2007 – 2012
  • 3. 3 160902 Wilson Sapien_CV PROFESSIONAL EXPERIENCE FIRM: KRAMER AUSENCO – PORT MORESBY, NCD. DATE: 26th NOVEMBER 2012 – PRESENT. POSITION: GRADUATE CIVIL/STRUCTURAL ENGINEER. PROJECT: LATTER-DAY SAINTS GOROKA GABION WALL & ASSOCIATED CIVIL WORKS CLIENT: LATTER-DAY SAINTS (LDS) Kramer Ausenco is Project Manager for this ongoing project in Goroka. I am tasked as the project engineer for this project. PROJECT: FLOOD ESTIMATION & DESIGN VERICATION OF BOROKO CREEK CLIENT: NATIONAL AIRPORTS COOPERATION (NAC) Kramer Ausenco was instructed by The National Airports Cooperation of Papua New Guinea to review the Flood Analysis Report prepared by Brisbane Stormwater Management for PNG Consultant Management Resource Solutions (MRS) for possible steel bridge options over Boroko Creek for PEAL Fuel Cart Access. I was tasked to do an independent flood estimation of Boroko Creek and produce a report evaluating the viability of the selected bridge crossing option with respect to environmental risks, flood levels, traffic volume, the construction and long term maintenance costs of the preferred option by MRS. PROJECT: MAGISTERIAL SERVICES HEADQUARTERS MASTER PLAN – WAIGANI, NCD. CLIENT: COX ARCHITECT PTY LTD. Kramer Ausenco was required to provided services such as Structural, Civil, Traffic, Electrical, Mechanical, Fire Protection and Hydraulic Services Engineering Consultancy for the Proposed Magisterial Services Headquarters Master Plan. Undertook a site investigation and prepared a viability report for the site with respect to civil works/services. I am currently assigned to do all proposed civil engineering design and layout plans for the master plan. PROJECT: PANGIA AIRSTRIP UPGRADE – PANGIA, SOUTHERN HIGHLANDS. CLIENT: WILD CAT DEVELOPMENT. This project is located in Pangia Station, Southern Highlands Province, Papua New Guinea. The project site is currently occupied by a decommissioned dirt airstrip approximately 1200m long. The airstrip is to be upgraded to DHC-8-200 standard sealed runway including stopway, RESA, turning node, taxiway, apron, NAVAIDS and pavement markings in accordance with the specifications required for operation of DHC-8-200. Undertook the conceptual and the detailed design of the airport The scope of my design included;  General Overall Layout for the runway, turning node, stopway, RESA and taxiway/apron  Geometric Design for the runway, turning node, stopway, RESA and taxiway/apron  Earthworks Cross Sections  Typical Sections for the runway, turning node, stopway, RESA and taxiway/apron  Drainage Design including catchments and calculations  Coordinated set out of the above  Plan and Longitudinal sections of the above  Terminal Earthworks Plan  Pavement Marking Plan  Windsock and Strip Cone Location Plan  Schedule of Quantities
  • 4. 4 160902 Wilson Sapien_CV PROJECT: ERIMA SERVICE STATION – ERIMA, NCD. CLIENT: TOTAL OIL ASIA PACIFIC PTE LTD. Kramer Ausenco was responsible for the master plan of the service station. Supervised and assisted in the stormwater design for the service station. PROJECT: ELEVALA ROAD – KIUNGA, WESTERN PROVINCE. CLIENT: WILD CAT GOLDING JOINT VENTURE. This is an Early Contractor Involvement project undertaken by Wild Cat Golding Joint Venture for Horizon Oil. Kramer Ausenco was tasked to produce a preliminary road design and earthworks for this 80km road. I undertook a preliminary design and earthworks calculation for a 30km portion of the road. PROJECT: JACKSONS PARADE UPGRADE AND EXTENSION – JACKSONS AIRPORT, NCD. CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD. Under this design and construct project, Kramer Ausenco was tasked by the contractor (Hebou) to redesign the existing Jacksons Airport Road to merge neatly with the Kookaburra Fly Over. The project involved upgrading the existing two lane road into four lane road and resizing the size of its exiting roundabouts. The engineering design involved realignment of the existing road alignment including some areas of greenfield, road geometry and pavement design, stormwater and drainage design and intersection design. The total length of the road is approximately 1.1km Undertook all stormwater design and assisted the senior civil design engineers in the geometry design for the roundabout intersections. The design and construction of this road project is has been completed PROJECT: SIX MILE TO BAUTAMA JUNCTION PRELIMINARY DESIGN – MAGI HIGHWAY, CENTRAL PROV. CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD. This is a design and construct project tendered by NCDC. Kramer Ausenco was engaged by Hebou to produce a preliminary four (4) lane road design and build up of quantities to assist them in their cost estimation for this portion of Magi Highway. I assisted the senior civil engineer in the field scoping of existing road & services to road, Road alignment and Storm-water Drainage assessment. Site investigations include identification of existing services and utilities, drains and other necessary points of interests. Carried out the preliminary road design and build up of quantities for the road section at Dogura Bridge to Bautama Roundabout which is approximately 6km.
  • 5. 5 160902 Wilson Sapien_CV PROJECT: CHIEF JUSTICE SENIOR EXECUTIVE RESIDENCE – PORT MORESBY, NCD. CLIENT: NATIONAL JUDICIAL STAFF SERVICES. For this project I worked as a site clerk of works at the construction site on behalf of Kramer Ausenco. My duty involved ensuring that construction drawings, relevant codes, standards and specifications are being followed. Carryout structural and civil inspections at hold points and reporting all major design changes to senior engineers and all project management issues to the senior project manager. Other duties include ensuring safety regulations and practices are being adhered to at all times, responding to RFIs, attending site meetings, responding to contractor’s queries, ensuring contractor was performing to standard practices with its construction methods, workmanship and safety. Verifying contractor’s claims on site prior to paying the contractor. PROJECT: RAMU 2 FEASIBILITY STUDY. CLIENT: INDEPENDENT PUBLIC BUSINESS CORPORATION. Parsons Brinckerhoff (Principal Consultant) and Kramer Ausenco (Sub Consultant) were engaged by The Independent Public Business Corporation (IPBC) and PNG Energy Developments Ltd (PNG EDL) to produce a proposal for the PNG Ramu 2 (Yonki) Hydropower Project – Feasibility Study and Social & Environmental Impact Assessments with respect to the feasibility engineering and environmental impact of the Ramu 2 Hydro project which is located in Papua New Guinea. I was assigned as a site/project engineer on a four weeks on-two weeks off rotational basis. My task involved but was not limited to assisting the senior engineer to;  Provide the Principal Consultant with weekly reports on staffing, observations, progress, health and safety, environmental and social issues that need to be raised to higher level.  Provide communications coordination and field work coordination  Supervise and ensure efficiency and coordination only and is based on companies performing the actual works such as drilling, geotech investigation, etc… PROJECT: POLICE HOUSING BOMANA SUBDIVISION – PORT MORESBY, NCD. CLIENT: RED SEA HOUSING SERVICES. Kramer Ausenco was engaged by Red Sea Development to design a subdivision that will cater for three hundred police houses at Bomana. The engineering design for this 20 hectare subdivision involved roads, water supply and sewer design and building services. I was tasked to do the stormwater and drainage design for this project and assisted the senior engineer to do weekly inspections on the civil works done during construction. PROJECT: MOREA TOBO AND ASSOCIATED ROADS D&C – PORT MORESBY, NCD. CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD. Kramer Ausenco was engaged Hebou Construction for this design and construct project to carry out a detailed design for the roads along Morea Tobo & Associated Roads between 7 Mile & 6 Mile. The engineering design involved road alignment and geometry design pavement design, stormwater and drainage design and intersection design. The total length of the road is approximately 1.1km Undertook the above designs on Saraga road (0.8km) and Jacksons Parade Roads (0.8km). Both of the road designs were completed with Saraga already constructed and Jackson’s Parade yet to be constructed. I also assisted in carrying out geotechnical investigation for all these Roads.
  • 6. 6 160902 Wilson Sapien_CV PROJECT: NCDC ROAD PACKAGES (PRELIMINARY DESIGN) – PORT MORESBY, NCD. CLIENT: HEBOU CONSTRUCTIONS (PNG) LTD. Kramer Ausenco was engaged by Hebou to produce a preliminary road design and cost estimate for roads tendered by NCDC. - Morea Tobo and Associated Roads - Four Lane Dogura Rd. Upgrade (6Mile Market to Dogura Bridge) - Four Lane Upgrade of Hubert Murray Highway (Erima to 9 Mile Market) - Proposed Fly over (kookaburra Street Upgrading) I assisted senior civil engineers in field scoping of existing road & services to road, road alignment and storm-water drainage assessment. Site investigations include identification of existing services and utilities, drains and other necessary points of interests. Preliminary Design and Cost Estimate for proposed roads above. PROJECT: MIRIGINI HAUS ROAD DESIGN (PRIME MINISTER’S RESIDENCE) – NCD PORT MORESBY. CLIENT: L&A CONSTRUCTION. I was Involved in site investigation, geotechnical investigation and assisted in the documentation of this project. PROJECT: ELA MOTORS LOGISTICS CENTER – LAE, MOROBE PROVINCE. CLIENT: TOYOTA TSUSHO PACIFIC HOLDINGS PTY. LTD. I assisted the senior engineer in design and detailing of drainage systems and documentation of this project. PROJECT: MAREA HOUSE REDEVELOPMENT, NCD. CLIENT: GOVERNMENT of PAPUA NEW GUINEA (GoPNG). I assisted the senior structural engineer in the investigation of the existing beams, columns and slabs. OTHER PROJECTS Listed below are some of the major projects undertaken by Kramer Ausenco as Project Managers. I assisted the senior civil & structural engineers in onsite Inspections & Supervision.  - Era Dorina (Civil Works)  - Windward Apartments Stage 2 (Structural)  - Steamship Harbor Offices (Structural)  - NJSS Housing (Civil/Structural)  - Holiday Inn (Civil/Structural)  - BSP Bank Projects, Waigani & Gordons (Civil/Structural)  - Kookaburra Flyover (Structural)  - Roads in Western Province - Pampenai and Aimbak Roads(Civil)
  • 7. 7 160902 Wilson Sapien_CV FIRM: DEPARTMENT OF WORKS – KAVIENG, NEW IRELAND PROVINCE. DATE: 7th NOVEMBER 2011 – 3RD FEBRUARY 2012. POSITION: TRAINEE ENGINEER. During my three months with DOW, I spent two months on the field with Works Supervisors and a month in the office with the Provincial Works Manager and his team of engineers. I was assigned to the road maintenance team to; - Patch potholes and carryout bridge maintenance works along the Buluminsky Highway. - Carryout river bank, coastal and shore line protection works using sandbags along the Buluminsky Highway - Assisted in supervising the Patrol Grading along the Buluminsky Highway (Namatanai). I also spent two months assisting the Provincial Works Manager and Provincial Civil Engineer; - Carry out bridge and road inspections and identify projects to include in proposals and proposed project scope of works. - Inspect different stages of ongoing renovation of health centers around New Ireland Province to verify and approve a claim - Check BOQ’s and evaluation of tenders for building and civil works project around New Ireland Province. - Other office administration work as directed by the PWM. FIRM: MARKHAM CULVERTS – LAE, MOROBE PROVINCE. DATE: 3rd NOVEMBER 2008 – 1st FEBRUARY 2009. POSITION: CASUAL WORKER. Spent three months working as a casual worker at the production line of Markham Culverts producing and packaging different size corrugated metal culverts (CMP) and other company’s products as per the customer’s order.
  • 8. 8 160902 Wilson Sapien_CV REFEREES 1. Mr Robert Francis Aup Manager/Senior Civil Design Engineer Kramer Ausenco P.O Box 1948 Boroko, NCD. Ph #: (675) 325 6033 Mb #: (675) 723 88877 2. Mr Bernard Kipit BPK & Associates Ltd P.O. Box 980 Waigani, NCD Ph #: (675) 323 9555 Mb #: 72232494/76895212 3. Mr Albert Peter Sapien Provincial Project Supervisor (Cardno) Department of Works P.O Box 106 Wewak East Sepik Province Ph #: (675) 456 2566/2446 Mb #: (675) 701 88892