As a SAP Consultant in MMWM and SDCS with China’s SAP Service Line with more than 8 years experience in operation and maintenance about ERP. Responsible for handling project lifecycles, setting up projects, managing results delivery, mapping client requirements, developing test scripts, and providing training and technical assistance to team members.Deeply understanding the Supply chain management and SAP ECC logistics.Having implemented multiple system integration projects and knowing the complex business process and the mechanism of the interface.
Implemented different types of SAP ERP project, including Rollout and non-rollout project, some of them are from oversea and others are domestic.Some rollout projects strictly require follow the template, others allow deviating from the template.
Having enough knowledge optimize business process according to the as-is and having rich experience to host and organize meetings.Skills at managing and guiding business requirements. Willing to accept the challenges and dig out solutions for a streamlined process.
As a SAP logistics consultant, the comprehensive knowledge for logistics management and clearly know SAP logistics logical is mandatory, such as PP PS PM QM ABAP and basic knowledge in FI&CO.
Hereby sharing some basic abilities of the modules I prefer to implement
· SAP MM|WM module
· Purchasing
· External Service management
· Inventory management
· Evaluation
· Logistics Invoice management
· Goods Receipt Process for Inbound Deliveries
· Warehouse Management System (WMS)
· SAP SD|CS module
· Sales
· Pricing and Conditions
· Scheduling Agreements for Component Suppliers
· Availability Check and Requirements in Sales and Distribution Processing
· Credit and Risk Management
· Output Determination
· Customer Service Processing
· Electronic Data Interchange / IDoc Interface
· Billing
· Shipping
· Transportation
· SAP ABAP module
· Enhancement price requirement & calculation type
· Debug program
· Program simple ALV report
· program print document
1. SAP Logistics Consultant
1 Personal Details
Name:
Wilson Xing
Contact information
Tel: + 86 13675108583
Email:wilsonxyl@Hotmail.com
Gender
Man
Birthday
May 23, 1985
Current Location
Country: China
Province: Jiang Su
City: Nanjing
2 Summary
As a SAP Consultant in MMWM and SDCS with China’s SAP Service Line with more than 8 years
experience in operation and maintenance about ERP. Responsible for handling project lifecycles, setting up
projects, managing results delivery, mapping client requirements, developing test scripts, and providing
training and technical assistance to team members.Deeply understanding the Supply chain management and
SAP ECC logistics.Having implemented multiple systemintegration projects and knowing the complex
business process and the mechanism of the interface.
Implemented different types of SAP ERP project, including Rollout and non-rollout project, some of them
are from oversea and others are domestic.Some rollout projects strictly require follow the template, others
allow deviating from the template.
2. Having enough knowledge optimize business process according to the as -is and having rich experience to
host and organize meetings.Skills at managing and guiding business requirements. Willing to accept the
challenges and dig out solutions for a streamlined process.
As a SAP logistics consultant,the comprehensive knowledge for logistics management and clearly know
SAP logistics logical is mandatory, such as PP PS PM QM ABAP and basic knowledge in FI&CO.
Hereby sharing some basic abilities of the modules I prefer to implement
SAP MM|WM module
Purchasing
External Service management
Inventory management
Evaluation
Logistics Invoice management
Goods Receipt Process for Inbound Deliveries
Warehouse Management System (WMS)
SAP SD|CS module
Sales
Pricing and Conditions
Scheduling Agreements for Component Suppliers
Availability Check and Requirements in Sales and Distribution Processing
Credit and Risk Management
Output Determination
Customer Service Processing
Electronic Data Interchange / IDoc Interface
Billing
Shipping
Transportation
SAP ABAP module
Enhancement price requirement & calculation type
Debug program
Program simple ALV report
program print document
3 Career Preference
Work Area:
SD CS
3. MM WM
QM PM PP PS ABAP FICO Application support for these modules
Expection Salary: Negotiable
Expected Project Location:
Expected China , Once in a while travelling Other Countries is fine
Experienced Industry:
Discrete Manufacturing
Power Station
Electrical Appliance Manufacturing
Pharmaceutical
Automotive
Pneumostop
Hydraulic seal
Large equipment
Industrial vehicles
Forestry
Chemical
4 Educational Experience
Duration:2005.09-2009.07
University:Anhui Polytechnic University
Major:Mechanical Design manufacture and Automation Major
Degree:Bachelor
5 Language Level
English
Spoken / Written
Chinese
Native Language
4. 6 Work Experience
6.1 ATOS
Atos SE (Societas Europaea) is a leader in digital transformation with circa 100,000 employees in 72
countries and pro forma annual revenue of circa € 12 billion. Serving a global client base, the Group is
the European leader in Big Data, Cybersecurity, and Digital Workplace and provides Cloud services,
Infrastructure & Data Management, Business & Platform solutions,as well as transactionalservices
through Worldline, the European leader in the payment industry. With its cutting edge technologies,
digital expertise and industry knowledge, the Group supports the digital transformation of its clients
across different business sectors:Defense,Financial Services, Health, Manufacturing, Media, Utilities,
Public sector, Retail, Telecommunications, and Transportation.The Group is the Worldwide Information
Technology Partner for the Olympic & Paralympic Games and is listed on the Euronext Paris market.
Atos operates underthe brands Atos,Atos Consulting,Atos Worldgrid, Bull, Canopy, Unify and
Worldline.
Type of Company: Foreign capital enterprise
Size of Company: 5000-10000
Industry: Consulting industry
6.1.1 SAP Logistics Consultant 2013.03-Now
Company Locations: ShangHai
Department: CN SI SAP MNC_HCM
Responsibilities: Implement the SAP Logistic project
6.2 NARI Group
NARI Group Corporation is directly under the State Grid Corporation of comprehensive scientific
research institutions,professionalcover new energy power generation, power systemautomation, high -
voltage technology,smart distribution of electricity, information and communication, water conservancy
and hydropowermonitoring and control of rail traffic monitoring and other fields.
Type of Company: State-owned Institution
Size of Company: 5000-10000
Industry: Information communication
6.2.1 SAP Logistics Consultant 2012.03-2013.03
Company Locations: NanJing
Department: ERP
5. Responsibilities: Implement the SAP Logistic project
6.3 Anhui HELI
Anhui HeLi Co., Ltd.is mainly engaged in R&D and manufacturing of industrial vehicles, construction
machinery and key components and its registered capital is RMB 4.28 billion.
Type of Company: State-owned Institution
Size of Company: 5000-10000
Industry: Industrial vehicle
6.3.1 SAP MM Consultant 2009.07-2012.03
Company Locations: HeFei
Department: Information and communication
Responsibilities: Implement the ERP project
7 Application Maintenance
7.1 2016/2~Now Aventics APAC
After the project Go-Live, an AM contract signed. Playing the role of MM|SD consultant to support daily
business.
7.2 2015/8~ Now Stora Enso
After the project Go-Live, an AM contract signed. Playing the role of MM|SD|RE-FX consultant to
support daily business.
8 Project Experience
8.1 2016/10-2017/2 DSP Kylin Project
Project Backgroud
This Business Need Memorandum summarizes the main items of the foreseen SAP implementation in
YUSHU during 2016-2017, a project named Kylin (In ancient Chinese mythology, the Kylin is one of
the "Four Divine Creatures", it was regarded as a celestial animal, a benevolent animal and a symbol of
auspiciousness).
<Scala> was in the early 2000’s the de-facto DSM standard for ERP systems in China. The Scala system
has evolved over time and in early 2013 I-Scala has been implemented. However, the systemis getting
outdated and no longer fit to support professionally further growth in BU CHINA. Also, the support is
getting diminished, both by DSM ICT and by the software vendor.
6. The DSP IT strategy is to implement SAP on all its units.BU China took a big step with ZIBO SAP
implementation project and it is now ready for next challenge by doing it so, in Yushu site, in order to
extend the gaining benefits of standardized processes in SAP in the whole BU China. Preparation
activities that are typical for PMP phase 1 and 2 have been executed
The project approach is to implement the standard DSP business process and basically not deviate from
these.After Cuju project in ZIBO, most of the local fiscal/legal Chinese requirements are already in
place, so no more changes are expected at country specific (no-nonsense approach!).This will ensure
timely delivery, right first time and within budget.
Role: SD Consultant & Project manager
Industry: Pharmaceutical
Scope: SD|MM|WM|PP|QM|FICO|PM|BW
Key Activites:
Assists in gathering and analysis requirements for a harmonized business process.Drafts and
maintains the URS & FRS document.
Follows up and closes open issues; drives decision-making process
Supports detailed configuration design activities
Learns the systemto be able to provide support after Go-Live
Participates in functional testing throughout the project life cycle
Assists the end usertrainer in training of core users
Facilitates timely issue resolution and escalation
Provides post-implementation support.
Supports the project manager for project activities
Ensures the project milestones and deliverables are met Various
8.2 2016/8-2016/10 Shanghai Electric Group Company Migration & Optimize
Project
Project Backgroud
Two separated sap systemare used between the power station and electric shares.
It is not easy management and the database and server are very old for the power station.Finally,
Customer decide uses one sap systems.
Atos is ShangHai Electric’s trusted supplier and invited to implement the sap migration project.
Role: MM consultant
Industry: Large equipment
7. Scope: SD|MM|WM|PP|QM|FICO|PM|PS
Key Activites:
Collect AS-IS
GAP Analysis
Organize unit test
Organize integration test
Help local consult fix tricky issues
Train changes to key user
Prepare Authorization matrix
Correct the enhancement
Prepare uploading date program by LSMW
Prepare Cut over strategy
Data migration
8.3 2016/6-2016/8 Presales For Jebsen-TCG
Project Backgroud
The customer is the automotive component supplier, which is a joint venture by Jensen and TCG
Unitech.Customer search a qualified vendor to help them implement the ERP project and there are four
candidates bidding the project.
There is not template to follow as the Jebasen using oracle and TCG Unitech using SAP ECC with
EhP5. So it is a new project.
Role: SDMM Consultant
Industry: Automotive
Scope: SD|MM|WM |FICO|QM|PP
Key Activites:
Collect AS-IS
Get expectation
Scope of the project
Present solution
Result
Win the project
8. 8.4 2016/5-2016/6 Stora Enso China Localization Project GTI Project
Project Backgroud
The Industry Company 880 is set up in SAP system, business requires to use the SAP China localization
function GTI.
Role: SD consultant
Industry: Packaging
Scope: SD|FICO|
Key Activites:
Enhance the GTI functions
Work with users to coordinate information exchange for support of systems changes.
Develop and administer support documentation and provide training and coaching to end-users.
Gathered business requirements from process owners & configured Sales order, billing documents
for intercompany.
Worked with client core team members to design & develop output determination procedure for
Sales order & Billing application. Complied business process masterlist and designed test script
for order to cash cycle for new SAP system. Created master list for Open Sales Order data from
legacy systemand mapped them to IDOC.
Performed Integration and Unit test for Order Management in Dev. & QA environment.
Worked with key business users to determine the scope of transactional data requirement for
Open Sales Order conversation in to SAP system
8.5 2015/10~2016/4 Rollout DSP Sinochem Pharmaceutical(Zibo)Co., Ltd.
Project Backgroud
This Business Need Memorandum summarizes the main project items of the foreseen SAP
implementation in BU CHINA during 2015.
Scala was in the early 2000’s the de-facto DSM standard for ERP systems in China. The Scala system
has evolved over time and in early 2013 I-Scala has been implemented. However, the systemis getting
outdated and no longer fit to support professionally further growth in BU CHINA. Also, the support is
getting diminished, both by DSM ICT and by the software vendor.
The DSP IT strategy is to implement SAP on all its units.This option has been investigated and seen
feasible for BU CHINA. Preparation activities that are typical for PMP phase 1 and 2 have been
executed.
9. There is a clear commitment by BU CHINA management as well as by Key and End users to implement
SAP as a major step forward towards business process improvement.
Meanwhile, BU CHINA management has nominated an entire project team, IT organization is fully in
preparation and supplier, Atos has committed itself to a clear offer for supporting the SAP
implementation.
The project approach is to implement the standard DSP business process and basically not deviate from
these unless local fiscal/legal Chinese requirements so dictate (no-nonsense approach!).This will ensure
timely delivery, right first time and within budget.
The objective is to implement the standard DSP business processes embedded in the DSP SAP systemin
such a way that the current ERP systemSCALA of DSP Zibo is replaced.
Team members come from different countries,which are France, India, Spain, Barcelona, Turkey,
Singapore, the Netherlands.
Role: SD Consultant & Project manager
Industry: Pharmaceutical
Scope: SD|MM|WM|PP|QM|FICO|PM|BW|DSP|IBP
Key Activites:
As – Is Document
Gap Analysis
Enterprise Model (That covers the legal entities of DSP ZiBO & high level flows)
Change List
MasterData in specific formats files
Country Specific Documents identified
A Validated SAP System in full compliance with DSP requirements, implemented, maintained &
supported in a controlled environment. OQ, PQ reports delivered and signed off.
Compliance with local fiscal/legal requirements in an automatic way (no manual workaround
and/orExcel).
Reports set up via SAP Business Warehouse and a reduced use of manual work around and Excel
files.
Applicable SOP’s, work instructions and manuals.
Trained End- and Key Users on SAP.
Maintenance & Support properly arranged and documented via a global IT organization, ensuring
exchange of best practices with otherunits
8.6 2015/9~2016/2 Aventics Singapore Cave-In
Project Backgroud
10. AVENTICS is one of the world’s leading manufacturers of pneumatic components,systems,and
customer-specific applications. The pneumatic engineering company provides products and services for
industrial automation, additionally focusing on the sectors of commercial vehicles, food and beverage,
railway technology,life sciences, energy,and marine technology.By integrating electronics, the use of
innovative materials and prioritizing trends such as machine safety and the Internet of Things,
AVENTICS is a pioneer in intelligent and easy-to-use solutions.
The branch compnahy Singapore business is Cave-In the Aventics sap systemfrom Bosch Rexroth.
Role: SDMM Consultant
Industry: Pneumostop
Scope: SD|MM|FICO|
Key Activites:
Study of business processes,process mapping and preparation of ready-to-use templates.
Defined plants, purchase organization and storage locations, assigned purchasing organization to
company codes and plants,assigned plants to company code.
Customized new material types and material groups and assigned number ranges for new material
types.
Managed master data for Material Master, Vendor Master, Customer Master, Info Records,
Source Lists, and BOMs.
Performed configuration enhancements for MM module (Purchasing, Inventory Management,
Physical Inventory,and Invoice Verification) to meet the Business needs for the plant.
Worked on GI/GR for Purchase Orders, Sales Orders, Stock transport orders, Inbound and
Outbound deliveries.
Configured the Inter & Intra company stocktransfer and handling of special stocks and special
procurement types like Sub-contracting,and Consignment.
Configured Logistics invoice verification with over and under limits, and established ERS
(Evaluated Receipt Settlement) for preferred vendors.
Configured Shipping Point determination and Route determination.
Defined various Sales Order types such as standard sales order, sample orders, rush orders,
contracts etc.
Configured Item categories and Schedule Line Categories for sales order, delivery and etc.
Worked with ABAP/4 programmers to develop new structure of customreports.
Prepared Change Request which included functional specs and ensured that the transport was
moved across otherenvironments.
Performed unit testing and integration testing for customtransactions.
Worked with end users and prepared training material for Purchasing and Inventory Management
process.
Provided support and solved userissues,ensured configuration changes and ABAP development
activities to fulfill the requirements
11. 8.7 2015/8~2015/12 UK Edrington ShangHai Rollout GTI Implementation
Project Backgroud
Edringtons current success stems from a heritage of exceptional people dedicated to quality, integrity,
independence and innovation.The origins of the company stretch back to the mid-nineteenth century,
when William Robertson founded the Robertson & Baxter Company in Glasgow.
The customer decides to upagrad SAP ERP systemfrom 4.7 to ECC6 EhP7 and adpot some New
functions,the project is leaded by Atos India, SAP localization package is implemented by Atos
Branches in different countries.
Role: SD consultant
Industry: Trading
Scope: SD|MM|PP|QM|FICO|
Key Activites:
Collect As-is for the invoice
Manage and guide business to summarize the requirements
Report process to customer
Write Function specification
Enhance the GTI functions
Enhance to change the MWST to adopt the tax difference
Test GTI functions
Train business howto process customermaster data
Train Business for the GTI functions
Go-live and support
8.8 2015/7~ 2015/8 Jones Tech PLC
Project Backgroud
A new company is set up in Wuxi for the customer and the new company's business is included in sap.
The SAP ERP version is 4.7. Atos as the vendor to implement the project as Jones’s Long-term partner.
Role: MM consultant
Industry: Intelligent Electronic Device
Scope: SD|MM|PP|FICO|
Key Activites:
12. Used RICEF (Report, Interface, Conversions, Enhancements, and Forms) knowledge to prepare
User requirement specification (URS) and convert the URS to Functional specification (FS)
Used SAP Solution Manager to manage all configuration processes for tracing purposes of
various transport request
Defined client specific layout for purchasing documents such as Request for Quotation(RFQ),
Contracts, Purchase Order (PO)
Prepared test cases and test scripts so that client can run unit test and integration test based on
their business process needsby using validated templates
Configured inter-plant stocktransport order (STO) and inter-company STO by collaborating with
SAP sales and distribution (SD) and Finance (FI) team
Solution for how to process the subcontracting process in one SAP system
Configured release procedures for purchase requisition using account assignment category 'K' and
purchase order for five different levels of releases
Uploaded Material MasterData and Vendor MasterData in various SAP client by giving
specification to the ABAP team for LSMW upload
Trained end users/clients on purchasing (direct and indirect procurement)
8.9 2015/7~ 2015/7 Trelleborg Vibracoustic
Project Backgroud
This is a rollout project, customer requires a local consultant to support processing the packing and the
EDI.The project sie located Wuxin, team members are from China, Germany India.
Role: MM consultant
Industry: Automotive
Scope: SD|MM|WM|PP|QM|FICO|
Key Activites:
Discuss the Packing process
Support the processing the print label for different ship to party
Discuss the web EDI solution
Collection customer label requirement
Support training
13. 8.10 2015/4~ 2015/8 Stora Enso RE-FX Implementation
Project Backgroud
Not exactly know the project background as i take over the project all the initial implement consultants
leave the project even if the project not go-live.Only two hours Knowledge transfer and I am with the
customer togetherto proceed. Finally, we do a successfulgo live and get customer's SAP project
manager's Recognition.
Role: MM|RE-FX consultant
Industry: Forestry
Scope: MM|RE-FX
Key Activites:
Test the logic of how to fill the contract master data
Train business to collect the business partner,land, contract etc data
Test the data migration tool (IDOC solution)
Organization the integration test scenarios
Fix the test issue and update systemconfiguration
Coordinate developer to do enhancement (customized CPI adjustment )
Compile Cut over plan
Upload the data to ENS (PRD)
Go-Live and support
8.11 2014/4~2015/3 BEKO Electrical Appliances Co. Ltd. Project
Project Backgroud
The project is from Turkey to implement branch compnay locating Changzhou .there are two key phases
for the project. at the begin the headquaterdecides to separate the china sap sytem from the headquater,
but after the Business blue print signed , the decision changed that Chiese sap systemruns in the existing
sap headquatersystem,the decisiiont makes the project to be a roll out project. Some of the Knowledge
transfer actions are processed .The customer internal SAP team come to china to do two week’s KT and
provide subsequent supports.
Role: MM|SD
Industry: Electrical Appliance Manufacturing
Scope: MM|SD|CS|PP|FICO
Key Activites:
14. Conducting workshops to gather the business requirements.
Meeting with business process owners and departmental heads to identify the business
requirement.
Analyzing the client’s as-is business process and mapping it to to-be business processes by
identifying the gaps.
Drafted functional requirement specifications (FRSs) for customer master, quotation processing,
sales order processing,consignment processing,billing, returns processing,contract processing,
rebates processing,and backorder processing
Prepared dataflow diagram for all of the business processes to be included in FRSs.
Drafted user requirement specification (URS) for MMSD.
Identified RICEFW objects to meet the client specific requirement.
Prepared functional specification for the development of Reports, Interface, Conversion,
Enhancement, and Forms. Prepared unit test scripts and checklist to be included in the functional
specification. Tested RICEF objects.
Configured customer master and partner determination. Added customized partners in the
customer master record.
Designed customer master and customer account group.
Worked in customer master conversion.Analyzed legacy customer records to map properly to the
SAP systems and successfully migrated the customer master records using LSMW.
Successfully worked on pricing conversion,material listing conversion,open sales order
conversion,contract conversion, and CMIR conversion.
Worked on designing the pricing procedure.
Configured pricing procedure, condition types,access sequence,and built custompricing tables.
Configured account determination, and identified account keys to post to the related G/L.
Prepared test scripts for the Sales and Distribution.
Trained testers to execute the test steps in SAP and recording the test results in HP Quality
Center.
Designed smart forms for order acknowledgement, invoice, and rebate credit memo
Defined user roles and security matrix for SD activities.
Fixing configuration to support testing activities.
Working on integration testing and mock 2 preparation.
Working on training business subject matter experts (SMEs) on SAP functionality to train them as
trainers.
Working with developers to make the RICEF objects fully functional.
8.12 2013/8~2014/1 Eagleburgmann Trading Co., Ltd. Project
Project Backgroud
15. It is a rollout project and conlultans go to Singapore getting the knowledge transfer, China IT
infrastructure manipulated by APAC IT Singapore .EagleBurgmann Germany, a Joint Venture of the
German Freudenberg Group and the Japanese Eagle Industry Group. Shanhai has two branch companies,
one is manufacturing the otheris trading company.
Role: MM
Industry: Hydraulic seal
Scope: MM|SD|FICO
Key Activites:
Design and discuss the MM related business BBP
Configure MM and optimize procurement and inventory modules
Design the ETO process and process configuration product
Design the process of vendorconsignment and invoice processing
Organize unit testing and integration testing
Support key user to train end user
Guide users simulation Go-live testing
Check part of the ABAP code logic
Design authorization matrix and test the authorization
Collect static and business data for cut over
Integration test
Develop Uploading program and test
Go-live Support and month close
8.13 2013/4~2014/4 Eagleburgmann Shanghai Co., Ltd. Project
Project Backgroud
It is a rollout project and conlultans go to Singapore getting the knowledge transfer, China IT
infrastructure manipulated by APAC IT Singapore .EagleBurgmann Germany, a Joint Venture of the
German Freudenberg Group and the Japanese Eagle Industry Group. Shanhai has two branch companies,
one is manufacturing the otheris trading company.
Role: MM
Industry: Hydraulic seal
Scope: MM|SD|CS|PP|FICO
Key Activites:
16. Involved in design, gap analysis,configuration, authorization and conflict management in other
modules including FI/CO and PP area.
Involved in full life cycle implementation of the SAP Systems in MM (IM/Purchasing) module.
Involved in PP - Master data like BOM, Work centers, Routing, Shift sequence,Production
version, shop floor control, MRP parameters.
Performed configuration in MM for Purchase Requisition, Purchase Orders, Contracts, Stock
Transport orders, Goods Receipts and Goods Issues.
Implementation of procurement processes with FI integration to maintain material master, vendor
master and info record.
Configured Purchasing documents: Purchasing info records, RFQ/Quotation, purchase
requisition, purchase orders,source lists, Quota Arrangements.
Configured Outline Agreements by creating Creation Profile for Scheduling Agreements.
Configured Message determination and Output determination for all the Purchasing documents.
Configured Pricing Determination Creating Calculation Schema, Condition Type, Tables and
Records and assigning Access Sequence to the Condition tables.
Setup Release Procedures for purchasing documents.Defined release conditions,pre-requisites,
codes,indicators, and strategies.
Configured Material master data (material groups,material types,field selection groups)and
Vendor master data (field status for vendorgroups,partner determination schema, account
groups,partner functions,Info terms & Number ranges).
Configured Vendor Evaluation for on time delivery and Quality rating.
Work the consignement and subcontract process
Configured consumption based planning for creating planned orders and Inventory based
Purchase orders.
Involved in automating the Invoice Verification process through ERS for Services Mgmt.
Supporting the physical inventory verification process in finished goods -returns.
Responsible for complex contract implementation.
Implementation and ensuring the working of the MM area.
Attending to break issues and providing solutions as per the priority and within stipulated time
frame.
Configuration modifications as per changing requirements and providing technical specifications
to ABAP programmers for new developments.
Debugging of ABAP programs and troubleshooting of SAP end users problems on SAP ECC6 in
MM Module
8.14 2012/12~2013/3 Jiang Su- WMS Project
Project Backgroud
It is a rollout WM implement project after Nanjing electric power station implemented the WM
module.The project was sponsored by the headquarters of Jiangsu electric power. It is decided that all the
branch companies locating different city with Jiangsu province start to use SAP WM to bettermanage
stock. The project is led by Jiangsu electric power information assisted by IBM and NARI information
communication technology co., LTD.
17. Role: WM
Industry: Power Station
Scope: WM
Key Activites:
Compile the project plan and arrange consultant to different site
Configuration WM systemto map different site physical area
Report the WM work status
Supported day to day activities by providing inputs and solution to the errors made in the
warehousing activities.
Conducted user training to enable employees to get familiar with the systemand develop hands
on experience which is the most crucial phase of a project.
Used functional knowledge in MM, WM, SD, Logistics, IDOC's, EDI and LSMW to solve issues.
Involved in the configuration of output determination by creating Output types,Access sequences,
Assigning output types to output determination procedure, Configuring print parameters, setting
up plant specific condition records.
Plan Cut over and give data migration strategy
Successfully supported Go Live for 13 Implants and 5 warehouses
8.15 2012/7~2012/12 Jiang Su- Material Intensive Management
Project Backgroud
The headquaterlocating Beijing requires each branch companies to execute the material intensive
management by collecting the total material requirement. Then execute the implementation of the
tendering program to selected better quality suppliers
Role: MM
Industry: Power Station
Scope: MM|FICO
Key Activites:
Discuss the total design solution togetherwith all other branch companies.
Discussing business flow design
Discussing and designing the communication key information between SAP systemand another
system
Compiling business process flow according to new development system
Designing customizing table and fields
Design GR functions like MIGO transport the info.to Headquarter SAP system
18. Design Group the requirement elements to one contract and transport the info.to Headquarter SAP
system
Completing specification and testing
Compiling data migration strategy
Training key user
Go live and support
8.16 2012/4~2012/11 Jiang Su- Easy To Use Project
Project Backgroud
Ease of use of the systemcan help the domestic power enterprises to solve common problems in the use
of information technology and promote the effective management of SAP systems,give full play to the
effectiveness of the systemto help businesses achieve business growth.From the practical experience of
"Easy SAP", Gansu Electric Power Company summed up the solution of SAP system's easy-to-use
construction and improved the system's easy-to-use,easy-to-use,standard language,help support,
business optimization and process improvement. Usability. The practice has proved that the program is
effective for other companies also have some reference.The proejct is highly integrated the WEB.
Role: MM
Industry: Power Station
Scope: MM|PS|FICO|
Key Activites:
Design the MM related business process
Align with business forthe newly UI
Provide the Function speciation to program the function module as a service
Work with ABAPer to fix program bugs
Test the integration process between Web and SAP
Train the end user
Go-Live Support
8.17 2012/4~2012/4 One Coca Cola SAP Project
Project Backgroud
Coca-Cola is working with SAP to develop software to improve efficiency in the drinks firm's supply
chain. Technology produced by the collaboration could be used across the beverage industry,analy sts
have predicted.
The aim of the implementation is to give Coca-Cola more information at the store and account level to
improve its retail customer relationships.
19. Role: MM
Industry: Beverage
Scope: MM|PP|SD|PM|QM|FICO
Key Activites:
Assist key consultant to design the STO process
Test the STO process
Train the end user
Test the development program
Support end user
8.18 2011/10~2012/3 Anhui Sales Corporation SAP Project
Project Backgroud
It is the fifth information innovation for HELI and the managers give high expectation on this
changes. There are trading company and Manufacture Company to implement sap project,
which are taken as the first phase. The implement venison is Atos origin.
Role: MM
Industry: Industrial vehicles
Scope: MM|SD|FICO
Key Activites:
Worked on maintenance of Purchase Requisitions and Services and analyzed the data by
extracting Data from Purchasing, Service master and Plant maintenance Tables and prepared the
Reports using ABAP Query Report tools.
Prepared functional specifications and worked with developers for minor enhancements.
Involved in User Acceptance Testing and End User training.
Extensively worked on RICEF Objects Testing
Coordination with Technical Team in creating programs for mass upload of Masterdata &
Transaction data related to PTP cycle during implementation cutover phase.
Providing functional inputs for portal development by sharing the current practice followed in
master data upload using LSMW and BDC
Preparation & execution of test scenarios to fulfill various kind of functional requirements
Obtained value addition to the tool by sharing the best practices during data upload
20. 8.19 2011/05~2011/09 Anhui Parts Company SAP Project
Project Backgroud
It is the fifth information innovation for HELI and the managers give high expectation on this
changes. There are trading company and Manufacture Company to implement sap project,
which are taken as the first phase. The implement venison is Atos origin.
Role: MM
Industry: Industrial vehicles
Scope: MM|PP|SD|FICO
Key Activites:
Involved in the live implementation of SAP ECC6.
Configuring master data. e.g., Material master, Bill of Materials, work centers.
Developing an Interactive list for plant via purchase requisitions.
Customizing different purchasing documents such as PR, RFQ and POs. Preparation of contracts,
scheduling agreements, quota arrangements, external service management, release procedures and
pricing conditions.Prepared the userdocuments for the MM module, giving presentation and
demos.
Trained to the user’s executives about the working of MM module and collecting feedback.
Go-live and support
8.20 2009/7~2011/04 Anhui HELI Co, LTD
Project Backgroud
In the ERP area, the joint efforts of independent research and development of the ERP system - HMS,
and the establishment of the Hefei Harmony Software Management Co., Ltd. specifically for the
development of custommanagement software, HMS togetherto run on December 31, 2011.The HMS is
extended to all branches,such as Hefei, Baoji, Hengyang, Anqing.
Role: MM
Industry: Industrial vehicles
Scope: MM|SD|PP|FICO
Key Activites:
Provided training to the end users and ensured they are comfortable working on the HMS
software
21. Conducted preliminary technical research in identifying the cause of inefficiencies in HMS
software and business systems
Kept track of the improved versions of HMS that are launched in market over a period of time
Liaised with the business systems administrator from time to ti
Providing HMS solutions to the requirements and problems faced by the organization
Analyzing the functions carried out in several departments of the organization and identifying
their HMS software needs
Customizing the existing enterprise software to improve its data management capacity
Determining the configuration and development for HMS workflow and managing the interface
with external systems
Monitoring the performance of the serverand supporting HMS software interface
Helping chief HMS consultant in supervising trainee HMS team
Monitoring software's performance, and optimizing the utility of the software