SlideShare une entreprise Scribd logo
1  sur  55
Télécharger pour lire hors ligne
The Blowout Contingency Plan:
Contingency and Response
Planning
Bill Mahler, Wild Well Control
Monday, 19 October 2015
2
The most catastrophic
occurrence during
wellsite operations is a
blowout.
A blowout is an
uncontrolled flow of
reservoir fluids from the
wellbore to the Earth’s
surface.
What Is A Blowout?
When Can A Blowout Occur?
5
Documented facts show that over 80% of major
catastrophes involve a chain of 7-11 separate
contributing factors (or warning signs) before a
catastrophe occurs.
Blowouts Are NO Different!
Blowouts Do Not “Just Happen”
6
Offshore drilling
operations in deepwater
are generally safe
operations – when
working with a trained,
experienced crew.
7
During the drilling operation, control of the well is lost
unexpectedly resulting in hydrocarbons igniting at the
rig floor.
The rig is safely evacuated.
What happens next?
8
• Operator declares an Emergency and
immediately activates the company’s Blowout
Contingency Plan.
• The Blowout Contingency Plan is an emergency
response document, pre-authorized at the
Corporate level, that provides an integrated and
systematic approach to well control incident
management. It is designed to provide guidance
to the Company’s response efforts.
• The Blowout Contingency Plan is crucial to an
effective and efficient response during a well
control incident.
What happens next?
9
The Blowout Contingency Plan (BCP)
• Defines and establishes an Incident Command
Structure (ICS)
• Assigns responsibilities and duties
• Outlines the Well Control Incident Action Plan
• Identifies resources that may be required for an
effective response
• Integrates with other information
The Blowout Contingency Plan
10
Benefits of having a BCP in place include:
• Reduces risks to personnel, property and
population
• Designates the response structure
• Minimizes or eliminates costly time delays
• Provides a written reference in times of
indecisiveness
• Enhances communication
• Minimizes environmental impact
• Projects a proactive position to the public
The Blowout Contingency Plan
11
The Incident Command
Structure is designated
by the BCP to manage
the emergency
response.
The Incident
Command Structure
• Clearly identifies the
decision makers
• Assigns tasks and
responsibilities
• Gives structure to the
response effort
• Enhances the efficiency
for the emergency
response
12
Typical ICS found in Blowout Contingency Plans
The Incident Command Structure
13
The Operations Section
14
Operationally, the
ICS is focused on:
• Oil Spill Response
• Source Control
Incident Command Structure
While both Oil Spill
Response and Source
Control are equally
important, Source
Control efforts are
viewed as being
proactive – seeking to
eliminate pollution by
halting the uncontrolled
flow of hydrocarbons.
15
High Level Source Control
16
Focused on:
Controlling the source at the wellhead
» May be subsea or surface
Operationally, Source Control is the priority.
Until it is successful in its efforts, the Oil Spill
Response will continue.
This priority requires resources dedicated solely
to Source Control efforts.
Source Control
17
Detailed Source Control
18
Outlines the Actions for:
• Debris Clearing
• Dispersant Injection
• Well Capping
• Well Containment
• Relief Well Efforts
Well Control Incident Plan
19
• Vessels
• ROVs
• Air Support
• Dispersant Injection
Equipment
• Debris Clearing
Equipment
• Well Intervention
(Capping Stack)
Equipment
• Drilling Rig for Relief
Well
• Engineering Support
Resource
Requirements
20
All Vessels
» DP 2/3
» Deck Space: 1,500 – 2,000 sq ft
» 2 x ROV
Debris
» 150T crane
Dispersant
» 100T crane
Capping Stack
» 200T crane
» Tower
» Drilling Rig?
Vessel Specifications
21
Under Source Control Operations, you will have
the following Simultaneous Operations
(SimOps):
• Oil Spill Response
• Source Control Response
» Completing assessment
» Commencing debris clearing
» Commencing dispersant injection
» Identifying well intervention (well capping) assets and
mobilizing same to wellsite
» Planning for relief well
Identifies / Outlines SimOps
22
Example of SimOps
during Subsea
Source Control efforts
• Surface and subsea SimOps
• ROV survey and assessment
• Secondary function/troubleshooting of ‘failed’ BOP
• Subsea debris removal (gain access to wellbore)
• Capping stack install/operation
• Subsea dispersant application
• Relief well drilling/intercept/well kill
• Controlled flowback to surface for capture/disposal
SOURCE CONTROL
Response
Methodology
24
Within the first hour of the
event happening,
Operator’s Well Control
provider is contacted and
response put into effect
based on Operator’s
Blowout Contingency
Plan …
Response Overview –
Source Control
• Well Control Engineers
mobilized to Operator’s offices
• Well Control Specialists
mobilized to wellsite
• Well Control Response
Specialists begin mobilization
process for capping equipment,
debris clearing tools and
dispersant injection equipment
• Relief Well Engineers mobilized
to Operator’s office to
commence Relief Well Planning
25
Rig Remains Floating
Surface Intervention
to be Attempted
Scenario 1
26
Rig Sinks
On Top Of BOPs and
Wellhead
Relief Well
Only Viable Solution –
To be Commenced
Immediately
Scenario 2
27
Rig Sinks At Distance
From BOPs and Wellhead
Commence Subsea
Intervention and Relief
Well Simultaneously
Scenario 3
28
• Determine the status of the wellhead
• Identify flow paths
• Determine status of flowlines
• Determine status of riser assembly
• Identify location of rig if sank
• Determine/identify hazards around wellhead
• Determine/identify hazards on surface
• Assess condition/status of seabed around
wellhead
• Identify viable well intervention options
Initial Assessment
29
If assessment identifies rig
components/debris around
wellhead or other critical
components of the
wellhead, clearing around
the wellhead must be done
before well intervention
activities can commence.
Debris clearing shears or
diamond wire cutters are
deployed to depth and used
to remove any debris.
Debris Clearing
Resources required
• Large hydraulic subsea shears
• Hydraulic power packs and
hydraulic hose reels
• Hydraulically operated
Diamond Wire Cutters
• ROVs, Work Class
• Dedicated vessel as a work
platform
30
Debris Clearing Illustration
Up to 35-in. Diameter
Shear Force 5,000psi
31
If it is determined that
dispersant injected at
the initial flow path is
possible, then efforts
should be made to get
the dispersant injection
equipment deployed
as quickly as possible.
Dispersant Injection
Resources required
• Injection Equipment –
multiple wands, subsea
hoses
• Coiled Tubing unit for
conveying dispersant to
subsea injection
equipment
• Dispersant
• ROVs, Work Class
• Dedicated vessel as a
work platform
32
Dispersant Injection Illustration
33
If the assessment
determines that Well
Intervention is possible,
the Capping Stack is
mobilized to the nearest
docks, assembled and
tested., then mobilized to
the well site. The Well
Control company will
oversee the deployment
of the capping stack.
When successful, the well
is shut in or diverted to
the surface for capturing.
Well Intervention Assets Required
Resources required
• Well Intervention
Equipment – Capping
Stack
• Subsea Hydraulic Power
Unit
• Flow to Surface
Equipment
• ROVs, Work Class
• Dedicated vessel as a
work platform
34
Front View
Front View
Well Intervention Assets –
Capping Stack
35
Well Intervention Assets –
Subsea Hydraulic Power Unit
Subsea HPU General Specifications
Rated to 10,000 fsw
Built on existing technology
(millennium Class ROV)
Allows for rapid closure/function of the
capping stack
Supplies adequate power for all
subsea tooling
17H high-flow hot stab
36
Regardless of the blowout scenario, Relief Well
Planning is automatically initiated.
Working simultaneously with Well Intervention
efforts, but operating autonomously, the Relief Well
Team begins:
• Collecting well data of the target well
• Commence dynamic kill modeling
• Commence casing/well design of the relief well
• Identifying the best location/site for relief well
• Identifying potential rigs for relief well efforts
Relief Well Planning
37
38
Within the Blowout
Contingency Plan are
many other Plans, each
equally important, that
will enhance the overall
effectiveness and
efficiency of the
response.
.
The Blowout
Contingency Plan
The Blowout Contingency Plan also
includes –
• Dynamic Kill Plans
• Broaching Analysis
• Gas Dispersion Analysis
• Shallow Water Capping
Deployment Procedures
• Company Specific Technical
Checklists that are Position
Specific for Source Control
Emergency Response positions
• Customized Subsea Well
Containment Equipment
Deployment Plans
• Logistical Deployment Plans
Training, Drills and
Exercises
40
• It is important that the Blowout Contingency plan
is followed to minimize disruptions and
unnecessary delays. It is most important that the
ICS personnel and First Responders are trained in
their response.
• It is critical that drills and exercises be performed
to ensure a response will be completed in a
consistent, effective and efficient manner.
Training, Drills and Exercises
Training, drills and exercises are
critical to the success of an
emergency response.
CONCERNS
42
Where will the Source Control Resources come
from:
» Debris clearing tools?
» Dispersant injection tools?
» Well intervention (capping stack) equipment?
» Relief well rig?
» Vessels?
Where will the Dispersant come from?
What is the Quantity of Dispersant needed? Is it approved?
Mobilization Concerns for
Source Control Resources
43
Operator?
OSRL?
Wild Well?
Well Intervention
Equipment
If the Operator does
not own his own
Well Intervention /
Capping Stack, then
the Operator must
have contractual
access to OSRL or
Wild Well subsea
capping equipment.
44
Wild Well’s
Subsea Capping Stack
Capping Stack –
General Specifications
Internal diameter: 18 3/4 in.
Pressure rating: 15,000psi
Temp. range: -20 to 250of
Weight: +/- 110s/t
Height: 23 ft
Interfaces:
• Primary bore:
• Upper interface: 18 3/4 in. 15M HC
Hub/mandrel
• Lower interface: 18 ¾ in. 15M HC, H4 or
Drillquip DX-15 connector
• Wing:
• (4x) Vector Optima mechanical connector
mandrels
• ROV functions:
• Manifolds: 17H high flow
• Chokes: Class IV torque tool
• Vector connectors: Class V torque tool
45
Move From Staging Point to
Freight Forwarder
36 - 48 hrs Dependent on Plane Availability
Air Charter – Prestwick to Cuba /
US
34 - 38 hrs
10 - 12 hrs
Based on Antonov
Based on 747s
Airport to Port of Mariel 4 - 6 hrs Includes Loading and Unloading
Assembly / Testing at Dock 24 - 48 hrs
Seafastening 24 - 48 hrs
Transit to Wellsite 8 - 10 hrs
Total Time to Wellsite 130 -198 hrs Assuming no delays
Estimated Timing for Mobilization of
Well Intervention (Well Capping) Assets
Estimated 5.4 – 8.3 days to move Subsea Well
Capping Assets from Staging Point to Well Site.
46
• Cuban authorization for the mobilization and importation
of response personnel and equipment.
• Cuban authorization for response personnel to be
deployed offshore.
• US Authorization for deployment of eqiupment and
personnel to assist.
• Approval of well intervention plans and procedures by
Cuban government/regulatory agencies.
• Validation/vetting of support equipment/services to be
provided from local resources.
• Granting of immunity for emergency responders
• Lack of multinational training, drills and exercises
• Introduction/insertion of Unified Command
What Are The Concerns for a Multinational
Emergency Response
47
The UC may be used whenever multiple
jurisdictions are involved in a response effort.
These jurisdictions could be represented by:
• Geographic boundaries
• Governmental levels
• Functional responsibilities
• Statutory responsibilities
• Some combination of the above
Unified Command (UC)
48
A Joint Contingency Plan between Mexico and the
United States regarding pollution of the marine
environment by discharges.
Establishes cooperative processes that promotes
joint utilization of transboundary reservoirs and
establishes guidelines for transboundary
developments.
Could be model of Joint Contingency Plan between
Cuba and the United States.
MEXUS
49
The Gulf Loop Current
50
Well Control Specialists Must Be Allowed
to Do Their Job
CONCLUSION
53
For Cuba
• Pre-authorization for the temporary importation of emergency
response equipment to Cuba in the event of an emergency.
• Pre-approved work visas for travel by emergency response
personnel to Cuba.
• Develop policies for the indemnification and protection of emergency
response personnel.
• Holding of joint US-Cuba exercises to develop plans and procedures
in order to have an effective and efficient response (Not just Oil Spill
Drills, but also Emergency Well Intervention Drills).
• Permit transfer of technology / information that will enhance an
effective response.
• Encourage joint meetings of each country’s regulatory bodies to
confirm the availability of mutual aid should it be needed in a
response.
What Would be Our Recommendations
54
For the US
• Pre-approve licenses for the temporary export of emergency
response equipment to Cuba in the event of an emergency.
• Pre-approve licenses for the travel by emergency response
personnel to Cuba.
• Holding of joint US-Cuba exercises to develop plans and procedures
in order to have an effective and efficient response.
• Permit transfer of technology / information that will enhance an
effective response.
• Encourage joint meetings of each country’s regulatory bodies to
confirm the availability of mutual aid should it be needed in a
response.
What Would be Our Recommendations
55
For the COMPANY
BE PREPARED for a Well Control Emergency
» Develop a comprehensive Blowout Contingency Plan with the help of the
Company’s designated Well Control Company.
PRACTICE - Conduct Drills / Exercises for the Rig Crew and Office
Personnel, using the BCP as a guideline. Annually or sooner.
MAINTAIN RELATIONSHIPS with all regulatory agencies, well
control company, other Operators as to the requirements and
expectations of them in the event of a well control incident.
What Would be Our Recommendations
Questions?
Thank You
THANK YOU!
www.wildwell.com

Contenu connexe

Similaire à dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf

Webinar well integrity management Webinar
Webinar well integrity management WebinarWebinar well integrity management Webinar
Webinar well integrity management WebinarPetroTeach1
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluidsAAPG SU SC
 
How to Dewater a Construction Site.pdf
How to Dewater a Construction Site.pdfHow to Dewater a Construction Site.pdf
How to Dewater a Construction Site.pdfJefferyMason1
 
Safety-Moment-SIMOPS-gas-venting.pptx
Safety-Moment-SIMOPS-gas-venting.pptxSafety-Moment-SIMOPS-gas-venting.pptx
Safety-Moment-SIMOPS-gas-venting.pptxMoHSEn Ahamdiani
 
Hydraulic frac webinar
Hydraulic frac webinarHydraulic frac webinar
Hydraulic frac webinarPetroTeach1
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsMatthew Clemens
 
Lessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptxLessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptxq46bcx2y5j
 
Charles Taylor Mold Prevention Program 07.03.23.pptx
Charles Taylor Mold Prevention Program 07.03.23.pptxCharles Taylor Mold Prevention Program 07.03.23.pptx
Charles Taylor Mold Prevention Program 07.03.23.pptxDavidKudlinski2
 
Final risk workshop Dec 2019
Final risk workshop Dec 2019Final risk workshop Dec 2019
Final risk workshop Dec 2019Sarah Younes
 
GJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RHGJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RHDavid Bries
 
HazWaste: Ten RCRA Compliance Issues that Can Trip You Up
HazWaste:  Ten RCRA Compliance Issues that Can Trip You UpHazWaste:  Ten RCRA Compliance Issues that Can Trip You Up
HazWaste: Ten RCRA Compliance Issues that Can Trip You UpGeoEngineers, Inc.
 
FINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdfFINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdfRiyaVerma969022
 
Qbe flood advice
Qbe flood adviceQbe flood advice
Qbe flood adviceJo Kennedy
 

Similaire à dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf (20)

Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
R. J. Macdonald, M. Christison & G. Hovens
R. J. Macdonald, M. Christison & G. HovensR. J. Macdonald, M. Christison & G. Hovens
R. J. Macdonald, M. Christison & G. Hovens
 
Webinar well integrity management Webinar
Webinar well integrity management WebinarWebinar well integrity management Webinar
Webinar well integrity management Webinar
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Human Factors in Barrier Thinking
Human Factors in Barrier ThinkingHuman Factors in Barrier Thinking
Human Factors in Barrier Thinking
 
How to Dewater a Construction Site.pdf
How to Dewater a Construction Site.pdfHow to Dewater a Construction Site.pdf
How to Dewater a Construction Site.pdf
 
Safety-Moment-SIMOPS-gas-venting.pptx
Safety-Moment-SIMOPS-gas-venting.pptxSafety-Moment-SIMOPS-gas-venting.pptx
Safety-Moment-SIMOPS-gas-venting.pptx
 
Trg slides safety
Trg slides safetyTrg slides safety
Trg slides safety
 
Human Factors in Barrier Thinking
Human Factors in Barrier ThinkingHuman Factors in Barrier Thinking
Human Factors in Barrier Thinking
 
Hydraulic frac webinar
Hydraulic frac webinarHydraulic frac webinar
Hydraulic frac webinar
 
Water audit for a school
Water audit for a schoolWater audit for a school
Water audit for a school
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Lessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptxLessons Learnt from Root Cause Analysis of Gulf.pptx
Lessons Learnt from Root Cause Analysis of Gulf.pptx
 
Charles Taylor Mold Prevention Program 07.03.23.pptx
Charles Taylor Mold Prevention Program 07.03.23.pptxCharles Taylor Mold Prevention Program 07.03.23.pptx
Charles Taylor Mold Prevention Program 07.03.23.pptx
 
Final risk workshop Dec 2019
Final risk workshop Dec 2019Final risk workshop Dec 2019
Final risk workshop Dec 2019
 
GJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RHGJ Conference Valve Exercise FINAL - RH
GJ Conference Valve Exercise FINAL - RH
 
HazWaste: Ten RCRA Compliance Issues that Can Trip You Up
HazWaste:  Ten RCRA Compliance Issues that Can Trip You UpHazWaste:  Ten RCRA Compliance Issues that Can Trip You Up
HazWaste: Ten RCRA Compliance Issues that Can Trip You Up
 
FINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdfFINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdf
 
Qbe flood advice
Qbe flood adviceQbe flood advice
Qbe flood advice
 
Wild Well Control
Wild Well ControlWild Well Control
Wild Well Control
 

Plus de XolaniRadebeRadebe

dokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdfdokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdfXolaniRadebeRadebe
 
21_tips_of_telephone_etiquettes_157.ppt
21_tips_of_telephone_etiquettes_157.ppt21_tips_of_telephone_etiquettes_157.ppt
21_tips_of_telephone_etiquettes_157.pptXolaniRadebeRadebe
 
Day 1 Leadership and Change Management Tunisia Hmam[1].ppt
Day 1 Leadership and Change Management Tunisia Hmam[1].pptDay 1 Leadership and Change Management Tunisia Hmam[1].ppt
Day 1 Leadership and Change Management Tunisia Hmam[1].pptXolaniRadebeRadebe
 
10803_Laying_The_Groundwork.pdf
10803_Laying_The_Groundwork.pdf10803_Laying_The_Groundwork.pdf
10803_Laying_The_Groundwork.pdfXolaniRadebeRadebe
 
private_equity_fund_portofolio.pdf
private_equity_fund_portofolio.pdfprivate_equity_fund_portofolio.pdf
private_equity_fund_portofolio.pdfXolaniRadebeRadebe
 
CSAE-Programme-Review-2021.pdf
CSAE-Programme-Review-2021.pdfCSAE-Programme-Review-2021.pdf
CSAE-Programme-Review-2021.pdfXolaniRadebeRadebe
 
Peer Educator Programme - Wits University.pdf
Peer Educator Programme - Wits University.pdfPeer Educator Programme - Wits University.pdf
Peer Educator Programme - Wits University.pdfXolaniRadebeRadebe
 
Pres-GALLO-SA-IT-Summit-2015.pdf
Pres-GALLO-SA-IT-Summit-2015.pdfPres-GALLO-SA-IT-Summit-2015.pdf
Pres-GALLO-SA-IT-Summit-2015.pdfXolaniRadebeRadebe
 
School Safety Framework 2016.pdf
School Safety Framework 2016.pdfSchool Safety Framework 2016.pdf
School Safety Framework 2016.pdfXolaniRadebeRadebe
 

Plus de XolaniRadebeRadebe (20)

5-27-09 Presentation2.ppt
5-27-09 Presentation2.ppt5-27-09 Presentation2.ppt
5-27-09 Presentation2.ppt
 
Module4 - Session1.ppt
Module4 - Session1.pptModule4 - Session1.ppt
Module4 - Session1.ppt
 
egg laying.pdf
egg laying.pdfegg laying.pdf
egg laying.pdf
 
dokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdfdokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdf
 
2005_baraza_wake_up.ppt
2005_baraza_wake_up.ppt2005_baraza_wake_up.ppt
2005_baraza_wake_up.ppt
 
21_tips_of_telephone_etiquettes_157.ppt
21_tips_of_telephone_etiquettes_157.ppt21_tips_of_telephone_etiquettes_157.ppt
21_tips_of_telephone_etiquettes_157.ppt
 
1.ppt
1.ppt1.ppt
1.ppt
 
Day 1 Leadership and Change Management Tunisia Hmam[1].ppt
Day 1 Leadership and Change Management Tunisia Hmam[1].pptDay 1 Leadership and Change Management Tunisia Hmam[1].ppt
Day 1 Leadership and Change Management Tunisia Hmam[1].ppt
 
10803_Laying_The_Groundwork.pdf
10803_Laying_The_Groundwork.pdf10803_Laying_The_Groundwork.pdf
10803_Laying_The_Groundwork.pdf
 
private_equity_fund_portofolio.pdf
private_equity_fund_portofolio.pdfprivate_equity_fund_portofolio.pdf
private_equity_fund_portofolio.pdf
 
Public-Art-201-compressed.pdf
Public-Art-201-compressed.pdfPublic-Art-201-compressed.pdf
Public-Art-201-compressed.pdf
 
King-IV-Register-2021.pdf
King-IV-Register-2021.pdfKing-IV-Register-2021.pdf
King-IV-Register-2021.pdf
 
Schools Greening Project.pdf
Schools Greening Project.pdfSchools Greening Project.pdf
Schools Greening Project.pdf
 
CSAE-Programme-Review-2021.pdf
CSAE-Programme-Review-2021.pdfCSAE-Programme-Review-2021.pdf
CSAE-Programme-Review-2021.pdf
 
bayman.pdf
bayman.pdfbayman.pdf
bayman.pdf
 
Peer Educator Programme - Wits University.pdf
Peer Educator Programme - Wits University.pdfPeer Educator Programme - Wits University.pdf
Peer Educator Programme - Wits University.pdf
 
OLIVERO-Paolo.pdf
OLIVERO-Paolo.pdfOLIVERO-Paolo.pdf
OLIVERO-Paolo.pdf
 
Pres-GALLO-SA-IT-Summit-2015.pdf
Pres-GALLO-SA-IT-Summit-2015.pdfPres-GALLO-SA-IT-Summit-2015.pdf
Pres-GALLO-SA-IT-Summit-2015.pdf
 
School Safety Framework 2016.pdf
School Safety Framework 2016.pdfSchool Safety Framework 2016.pdf
School Safety Framework 2016.pdf
 
Introduction to PRICSA_AJ.pdf
Introduction to PRICSA_AJ.pdfIntroduction to PRICSA_AJ.pdf
Introduction to PRICSA_AJ.pdf
 

Dernier

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 

Dernier (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 

dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf

  • 1. The Blowout Contingency Plan: Contingency and Response Planning Bill Mahler, Wild Well Control Monday, 19 October 2015
  • 2. 2 The most catastrophic occurrence during wellsite operations is a blowout. A blowout is an uncontrolled flow of reservoir fluids from the wellbore to the Earth’s surface. What Is A Blowout?
  • 3. When Can A Blowout Occur?
  • 4. 5 Documented facts show that over 80% of major catastrophes involve a chain of 7-11 separate contributing factors (or warning signs) before a catastrophe occurs. Blowouts Are NO Different! Blowouts Do Not “Just Happen”
  • 5. 6 Offshore drilling operations in deepwater are generally safe operations – when working with a trained, experienced crew.
  • 6. 7 During the drilling operation, control of the well is lost unexpectedly resulting in hydrocarbons igniting at the rig floor. The rig is safely evacuated. What happens next?
  • 7. 8 • Operator declares an Emergency and immediately activates the company’s Blowout Contingency Plan. • The Blowout Contingency Plan is an emergency response document, pre-authorized at the Corporate level, that provides an integrated and systematic approach to well control incident management. It is designed to provide guidance to the Company’s response efforts. • The Blowout Contingency Plan is crucial to an effective and efficient response during a well control incident. What happens next?
  • 8. 9 The Blowout Contingency Plan (BCP) • Defines and establishes an Incident Command Structure (ICS) • Assigns responsibilities and duties • Outlines the Well Control Incident Action Plan • Identifies resources that may be required for an effective response • Integrates with other information The Blowout Contingency Plan
  • 9. 10 Benefits of having a BCP in place include: • Reduces risks to personnel, property and population • Designates the response structure • Minimizes or eliminates costly time delays • Provides a written reference in times of indecisiveness • Enhances communication • Minimizes environmental impact • Projects a proactive position to the public The Blowout Contingency Plan
  • 10. 11 The Incident Command Structure is designated by the BCP to manage the emergency response. The Incident Command Structure • Clearly identifies the decision makers • Assigns tasks and responsibilities • Gives structure to the response effort • Enhances the efficiency for the emergency response
  • 11. 12 Typical ICS found in Blowout Contingency Plans The Incident Command Structure
  • 13. 14 Operationally, the ICS is focused on: • Oil Spill Response • Source Control Incident Command Structure While both Oil Spill Response and Source Control are equally important, Source Control efforts are viewed as being proactive – seeking to eliminate pollution by halting the uncontrolled flow of hydrocarbons.
  • 15. 16 Focused on: Controlling the source at the wellhead » May be subsea or surface Operationally, Source Control is the priority. Until it is successful in its efforts, the Oil Spill Response will continue. This priority requires resources dedicated solely to Source Control efforts. Source Control
  • 17. 18 Outlines the Actions for: • Debris Clearing • Dispersant Injection • Well Capping • Well Containment • Relief Well Efforts Well Control Incident Plan
  • 18. 19 • Vessels • ROVs • Air Support • Dispersant Injection Equipment • Debris Clearing Equipment • Well Intervention (Capping Stack) Equipment • Drilling Rig for Relief Well • Engineering Support Resource Requirements
  • 19. 20 All Vessels » DP 2/3 » Deck Space: 1,500 – 2,000 sq ft » 2 x ROV Debris » 150T crane Dispersant » 100T crane Capping Stack » 200T crane » Tower » Drilling Rig? Vessel Specifications
  • 20. 21 Under Source Control Operations, you will have the following Simultaneous Operations (SimOps): • Oil Spill Response • Source Control Response » Completing assessment » Commencing debris clearing » Commencing dispersant injection » Identifying well intervention (well capping) assets and mobilizing same to wellsite » Planning for relief well Identifies / Outlines SimOps
  • 21. 22 Example of SimOps during Subsea Source Control efforts • Surface and subsea SimOps • ROV survey and assessment • Secondary function/troubleshooting of ‘failed’ BOP • Subsea debris removal (gain access to wellbore) • Capping stack install/operation • Subsea dispersant application • Relief well drilling/intercept/well kill • Controlled flowback to surface for capture/disposal
  • 23. 24 Within the first hour of the event happening, Operator’s Well Control provider is contacted and response put into effect based on Operator’s Blowout Contingency Plan … Response Overview – Source Control • Well Control Engineers mobilized to Operator’s offices • Well Control Specialists mobilized to wellsite • Well Control Response Specialists begin mobilization process for capping equipment, debris clearing tools and dispersant injection equipment • Relief Well Engineers mobilized to Operator’s office to commence Relief Well Planning
  • 24. 25 Rig Remains Floating Surface Intervention to be Attempted Scenario 1
  • 25. 26 Rig Sinks On Top Of BOPs and Wellhead Relief Well Only Viable Solution – To be Commenced Immediately Scenario 2
  • 26. 27 Rig Sinks At Distance From BOPs and Wellhead Commence Subsea Intervention and Relief Well Simultaneously Scenario 3
  • 27. 28 • Determine the status of the wellhead • Identify flow paths • Determine status of flowlines • Determine status of riser assembly • Identify location of rig if sank • Determine/identify hazards around wellhead • Determine/identify hazards on surface • Assess condition/status of seabed around wellhead • Identify viable well intervention options Initial Assessment
  • 28. 29 If assessment identifies rig components/debris around wellhead or other critical components of the wellhead, clearing around the wellhead must be done before well intervention activities can commence. Debris clearing shears or diamond wire cutters are deployed to depth and used to remove any debris. Debris Clearing Resources required • Large hydraulic subsea shears • Hydraulic power packs and hydraulic hose reels • Hydraulically operated Diamond Wire Cutters • ROVs, Work Class • Dedicated vessel as a work platform
  • 29. 30 Debris Clearing Illustration Up to 35-in. Diameter Shear Force 5,000psi
  • 30. 31 If it is determined that dispersant injected at the initial flow path is possible, then efforts should be made to get the dispersant injection equipment deployed as quickly as possible. Dispersant Injection Resources required • Injection Equipment – multiple wands, subsea hoses • Coiled Tubing unit for conveying dispersant to subsea injection equipment • Dispersant • ROVs, Work Class • Dedicated vessel as a work platform
  • 32. 33 If the assessment determines that Well Intervention is possible, the Capping Stack is mobilized to the nearest docks, assembled and tested., then mobilized to the well site. The Well Control company will oversee the deployment of the capping stack. When successful, the well is shut in or diverted to the surface for capturing. Well Intervention Assets Required Resources required • Well Intervention Equipment – Capping Stack • Subsea Hydraulic Power Unit • Flow to Surface Equipment • ROVs, Work Class • Dedicated vessel as a work platform
  • 33. 34 Front View Front View Well Intervention Assets – Capping Stack
  • 34. 35 Well Intervention Assets – Subsea Hydraulic Power Unit Subsea HPU General Specifications Rated to 10,000 fsw Built on existing technology (millennium Class ROV) Allows for rapid closure/function of the capping stack Supplies adequate power for all subsea tooling 17H high-flow hot stab
  • 35. 36 Regardless of the blowout scenario, Relief Well Planning is automatically initiated. Working simultaneously with Well Intervention efforts, but operating autonomously, the Relief Well Team begins: • Collecting well data of the target well • Commence dynamic kill modeling • Commence casing/well design of the relief well • Identifying the best location/site for relief well • Identifying potential rigs for relief well efforts Relief Well Planning
  • 36. 37
  • 37. 38 Within the Blowout Contingency Plan are many other Plans, each equally important, that will enhance the overall effectiveness and efficiency of the response. . The Blowout Contingency Plan The Blowout Contingency Plan also includes – • Dynamic Kill Plans • Broaching Analysis • Gas Dispersion Analysis • Shallow Water Capping Deployment Procedures • Company Specific Technical Checklists that are Position Specific for Source Control Emergency Response positions • Customized Subsea Well Containment Equipment Deployment Plans • Logistical Deployment Plans
  • 39. 40 • It is important that the Blowout Contingency plan is followed to minimize disruptions and unnecessary delays. It is most important that the ICS personnel and First Responders are trained in their response. • It is critical that drills and exercises be performed to ensure a response will be completed in a consistent, effective and efficient manner. Training, Drills and Exercises Training, drills and exercises are critical to the success of an emergency response.
  • 41. 42 Where will the Source Control Resources come from: » Debris clearing tools? » Dispersant injection tools? » Well intervention (capping stack) equipment? » Relief well rig? » Vessels? Where will the Dispersant come from? What is the Quantity of Dispersant needed? Is it approved? Mobilization Concerns for Source Control Resources
  • 42. 43 Operator? OSRL? Wild Well? Well Intervention Equipment If the Operator does not own his own Well Intervention / Capping Stack, then the Operator must have contractual access to OSRL or Wild Well subsea capping equipment.
  • 43. 44 Wild Well’s Subsea Capping Stack Capping Stack – General Specifications Internal diameter: 18 3/4 in. Pressure rating: 15,000psi Temp. range: -20 to 250of Weight: +/- 110s/t Height: 23 ft Interfaces: • Primary bore: • Upper interface: 18 3/4 in. 15M HC Hub/mandrel • Lower interface: 18 ¾ in. 15M HC, H4 or Drillquip DX-15 connector • Wing: • (4x) Vector Optima mechanical connector mandrels • ROV functions: • Manifolds: 17H high flow • Chokes: Class IV torque tool • Vector connectors: Class V torque tool
  • 44. 45 Move From Staging Point to Freight Forwarder 36 - 48 hrs Dependent on Plane Availability Air Charter – Prestwick to Cuba / US 34 - 38 hrs 10 - 12 hrs Based on Antonov Based on 747s Airport to Port of Mariel 4 - 6 hrs Includes Loading and Unloading Assembly / Testing at Dock 24 - 48 hrs Seafastening 24 - 48 hrs Transit to Wellsite 8 - 10 hrs Total Time to Wellsite 130 -198 hrs Assuming no delays Estimated Timing for Mobilization of Well Intervention (Well Capping) Assets Estimated 5.4 – 8.3 days to move Subsea Well Capping Assets from Staging Point to Well Site.
  • 45. 46 • Cuban authorization for the mobilization and importation of response personnel and equipment. • Cuban authorization for response personnel to be deployed offshore. • US Authorization for deployment of eqiupment and personnel to assist. • Approval of well intervention plans and procedures by Cuban government/regulatory agencies. • Validation/vetting of support equipment/services to be provided from local resources. • Granting of immunity for emergency responders • Lack of multinational training, drills and exercises • Introduction/insertion of Unified Command What Are The Concerns for a Multinational Emergency Response
  • 46. 47 The UC may be used whenever multiple jurisdictions are involved in a response effort. These jurisdictions could be represented by: • Geographic boundaries • Governmental levels • Functional responsibilities • Statutory responsibilities • Some combination of the above Unified Command (UC)
  • 47. 48 A Joint Contingency Plan between Mexico and the United States regarding pollution of the marine environment by discharges. Establishes cooperative processes that promotes joint utilization of transboundary reservoirs and establishes guidelines for transboundary developments. Could be model of Joint Contingency Plan between Cuba and the United States. MEXUS
  • 48. 49 The Gulf Loop Current
  • 49. 50 Well Control Specialists Must Be Allowed to Do Their Job
  • 51. 53 For Cuba • Pre-authorization for the temporary importation of emergency response equipment to Cuba in the event of an emergency. • Pre-approved work visas for travel by emergency response personnel to Cuba. • Develop policies for the indemnification and protection of emergency response personnel. • Holding of joint US-Cuba exercises to develop plans and procedures in order to have an effective and efficient response (Not just Oil Spill Drills, but also Emergency Well Intervention Drills). • Permit transfer of technology / information that will enhance an effective response. • Encourage joint meetings of each country’s regulatory bodies to confirm the availability of mutual aid should it be needed in a response. What Would be Our Recommendations
  • 52. 54 For the US • Pre-approve licenses for the temporary export of emergency response equipment to Cuba in the event of an emergency. • Pre-approve licenses for the travel by emergency response personnel to Cuba. • Holding of joint US-Cuba exercises to develop plans and procedures in order to have an effective and efficient response. • Permit transfer of technology / information that will enhance an effective response. • Encourage joint meetings of each country’s regulatory bodies to confirm the availability of mutual aid should it be needed in a response. What Would be Our Recommendations
  • 53. 55 For the COMPANY BE PREPARED for a Well Control Emergency » Develop a comprehensive Blowout Contingency Plan with the help of the Company’s designated Well Control Company. PRACTICE - Conduct Drills / Exercises for the Rig Crew and Office Personnel, using the BCP as a guideline. Annually or sooner. MAINTAIN RELATIONSHIPS with all regulatory agencies, well control company, other Operators as to the requirements and expectations of them in the event of a well control incident. What Would be Our Recommendations