Objective
The objective of our project is to determine a mixing model
for the continuous stir tank (Reactor 1). In order to do so, the
behavior of the water’s temperature inside R1 is analyzed in
two cases which are ideal and non-ideal CST.
Rationale
To obtain a better understanding of basic characteristics of
industrial process equipment by independently
comprehending mixing process in continuous stir tank
reactors (CSTR).
CSTR Mixing Equations
Ideal Model:
𝜃 𝑡 = 𝜃 𝑜 𝑒
−
𝐹
𝑉 𝑇
∗𝑡
Non-ideal Model:
𝑇𝑎 𝑖+1
= 𝑇𝑎 𝑖
+
Δ𝑡
𝑉𝑎
𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖
+ 𝑓(𝑇𝑑 𝑖
− 𝑇𝑎 𝑖
)
Equipment Process Flow Diagram
Experimental Equipment
Electrical SwitchboardCSTR Unit
Experimental Equipment (continued)
Mixer 1 (M1) Metering Pump 1 (P1) Reactor 1 (R1) Tank 1 (T1)
EHS & LP
Our project entails minimal environmental and safety risks.
• However, things to be conscious of include:
• Slipping hazards could occur from water leaking out on the floor
• All liquid water must be carefully carried away from electrical equipment to
prevent electrical shock
• Potential energy waste by excess usage of the CST without running
experiments
ExperimentalTesting for Ideality/Non-ideality
130ºF100ºF
100% 85%85% 100%
5 5 57 7 75
Reactor 1 Initial Temperatures:
% of Pump 1 Flow Rate:
Mixer 1 Speed: 7
Note: Data was measured every 6 seconds for a total of 6 minutes. (60 data points per trial )
Reactor 1 total volume was measured with a graduated cylinder
8Total ExperimentalTrials
Ideal and Non-Ideal Factors
Ideal
• No ambient losses
• Perfect Mixing
• Uniform and constant cooling
Non-Ideal
• Ambient Heat Losses
• Non-perfect mixing
• Baffles
• Conduction from water
to metal reactor/reactor
to water
Expectations
88
90
92
94
96
98
100
102
104
0 10 20 30 40 50 60
Temperature(ᵒF)
Time Counter
Temperature vsTime
Ideal Model
Non-Ideal Model
Theory: Ideal Model
Newton’s Law of Cooling:
𝑑𝑇
𝑑𝑡
= −𝑘(𝑇 − 𝑇𝑖𝑛)
Where:
• t is time
• T is the temperature of the water within Reactor 1 (R1) at time t
• Tin is the temperature of inlet cold water fromTank 1 (TK1)
• k is the heat transfer coefficient
Theory: Ideal Model
Ideal Model:
𝜃 𝑡 = 𝜃 𝑜 𝑒
−
𝐹
𝑉 𝑇
∗𝑡
where
• θ (t) is the temperature deviation from the nominal at time t
• θo is the temperature difference between the inlet cold water fromTK1 and the
initial hot water inside R1.
• F is the volume flow rate of the inlet cold water to R1
• VT is the total volume of water in R1
Theory: Non-ideal Model
Energy balance in temperature:
Active zone:
𝑉𝑎
𝑑𝑇𝑎
𝑑𝑡
= 𝐹 𝑇𝑖𝑛 − 𝑇𝑎 + 𝑓(𝑇𝑑 − 𝑇𝑎)
Dead zone:
𝑉𝑑
𝑑𝑇𝑑
𝑑𝑡
= 𝑓(𝑇𝑎 − 𝑇𝑑)
Dead Zone
Active Zone
Baffle
Theory: Non-ideal Model
Non-ideal Model:
Active zone:
𝑇𝑎 𝑖+1
= 𝑇𝑎 𝑖
+
Δ𝑡
𝑉𝑎
𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖
+ 𝑓(𝑇𝑑 𝑖
− 𝑇𝑎 𝑖
)
Dead zone:
𝑇𝑑 𝑖+1
= 𝑇𝑑 𝑖
+
Δ𝑡
𝑉𝑑
𝑓(𝑇𝑎 𝑖
− 𝑇𝑑 𝑖
)
Theory
Ideal Model:
𝜃 𝑡 = 𝜃 𝑜 𝑒
−
𝐹
𝑉 𝑇
∗𝑡
Non-ideal Model:
𝑇𝑎 𝑖+1
= 𝑇𝑎 𝑖
+
Δ𝑡
𝑉𝑎
𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖
+ 𝑓(𝑇𝑑 𝑖
− 𝑇𝑎 𝑖
)
Data Processing
MIXER LEVEL 5
Total Volume VT (cm3
)
3350
Pump % 85
Tin (ᵒF) 75.9
Target Temp. To (ᵒF) 103.1
∆t (minutes) 0.1
use
Solver
F (cm3/min) 378.0
f (cm3/min) 0.195
Vd (cm3) 0.010
Va (cm3) = VT - Vd 3350.0
Results
88
90
92
94
96
98
100
102
104
0 20 40 60
Temperature(ᵒF)
Time Counter
Temperature vsTime
Experimental data
Non-Ideal
Ideal
*Above Graph Conditions: Mixer 5, 85% Pump,To=103.1ᵒF
86
88
90
92
94
96
98
100
102
104
0 10 20 30 40 50 60
Temperature(ᵒF)
Mixer 5, 100% Pump, To=101.9ᵒF
Measured Data
Ideal Model
Non-ideal Model
95
100
105
110
115
120
125
130
135
0 10 20 30 40 50 60
Temperature(ᵒF)
Mixer 7 ,100% Pump, To=131.4ᵒF
Time CounterTime Counter
Uncertainty
𝜀 𝑇,95% = 0.8
𝑑𝑇
𝑑𝑉 𝑇
2
𝜀 𝑉 𝑇
2 +
𝑑𝑇
𝑑𝑡1
2
𝜀𝑡1
2 +
𝑑𝑇
𝑑𝑡2
2
𝜀𝑡2
2 +
𝑑𝑇
𝑑𝑇 𝑖𝑛
2
𝜀 𝑇 𝑖𝑛
2 +
𝑑𝑇
𝑑𝑇𝑜
2
𝜀 𝑇𝑜
2 = 0.793
2 sigma limit = 0.789
T-test
𝑡 =
𝑟−0
𝑠/ 𝑁
= 2.89
Two-tailed
95% confidence level
Degree of freedom 60
t critical = 2.00
N = the number of residuals
𝑟 = the average residual
s = standard deviation of the residuals
Terms Critical value
R-lag-1Test
-1
0
1
0 10 20 30 40 50 60
Residuals
Time Counter
R-lag 1 Mixer 5, 85% Pump, To=103.1ᵒF
Conclusions
• Model fails to passT-test and r-lag-1 tests but illustrates CST temperature behavior
• Flow rate Temperature Drop
• Mixing Speed Temperature Drop
• Due to baffles in all experimental trials, ambiguity exists between Ideal and non-
ideal models.
𝑇𝑎 𝑖+1
= 𝑇𝑎 𝑖
+
Δ𝑡
𝑉𝑎
𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖
+ 𝑓(𝑇𝑑 𝑖
− 𝑇𝑎 𝑖
)
Suggestions
Accounting for conduction between the water and Reactor 1 as well as ambient heat
losses could potentially make it acceptable for us not to statistically reject our
model.
Conduction Between Reactor 1 andWater
• Initially hot water in Reactor 1 exchanges heat with Reactor 1.
• As cold water flows in, the water in the reactor becomes colder than R1 walls
• Reactor 1 then conducts heat to the water.
Reactor 1 Ambient Heat Loss
80
90
100
110
120
130
140
0 50 100 150 200 250
Temperature(ºF)
Time (min)
Ambient Heat loss vsTime
127
127.5
128
128.5
129
129.5
130
130.5
131
131.5
132
0 1 2 3 4 5 6
Temperature(ºF)
Time (min)
130F Ambient losses
95
96
97
98
99
100
0 1 2 3 4 5 6
Temperature(ºF)
Time (min)
100 ºF Ambient Heat lossVsTime
Effects of Ambient losses
100 ºF Heat Loss 130 ºF Heat Loss
Average experimental losses (ºF): 14.15 ºF 27.75 ºF
Ambient Heat loss (ºF): 0.6 ºF 2.75 ºF
Percent of Ambient Losses: 4.25 % 10 %
Conclusion: Negligible Not Negligible
References
• Murrell, Kaston (2015). Standard Operating Procedure: CST Unit & Batch Reactor
Experiments. Oklahoma State University
• Myers, Kevin J., Mark F. Reeder, and Julian B. Fasano. "Optimize Mixing by Using the
Proper Baffles." People.clarckson.edu, Feb. 2002. Web. Feb. 2016.
<http://people.clarkson.edu/~wwilcox/Design/mixopt.pdf>.
• Rhinehart, R. R. (2016). Sketch CST with Dead Zone. Oklahoma State University.
• Skogestad, Sigurd.Chemical and Energy Process Engineering, 1st order. Boca Raton:
CRC Press,Taylor and Francis Group, 2009. pp. 274-280. Print.
Mixing Dynamics Non-IdealCST
88
90
92
94
96
98
100
102
104
0 20 40 60
Temperature(ᵒF)
Time Counter
Temperature vsTime
Austin Canaday Dalton Dunlap Yen Nguyen

Contenu connexe

Tendances

Summer 2015 Intern Report
Summer 2015 Intern ReportSummer 2015 Intern Report
Summer 2015 Intern Report
Vivek Srivatsa
 
Energy conversion engineering lab manual full
Energy conversion engineering lab manual fullEnergy conversion engineering lab manual full
Energy conversion engineering lab manual full
Farhan8885
 
Vapor Combustor Improvement Project LinkedIn Presentation February 2016
Vapor Combustor Improvement Project LinkedIn Presentation February 2016Vapor Combustor Improvement Project LinkedIn Presentation February 2016
Vapor Combustor Improvement Project LinkedIn Presentation February 2016
Tim Krimmel, MEM
 
presentation wisa 2010 15 April 2010 2
presentation wisa 2010 15 April 2010 2presentation wisa 2010 15 April 2010 2
presentation wisa 2010 15 April 2010 2
Werner Rössle
 
Thermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCMThermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCM
jlrapter
 

Tendances (20)

Hmt lab manual
Hmt lab manualHmt lab manual
Hmt lab manual
 
Summer 2015 Intern Report
Summer 2015 Intern ReportSummer 2015 Intern Report
Summer 2015 Intern Report
 
Ht 7
Ht 7Ht 7
Ht 7
 
Section 3 multistage separation processes
Section 3   multistage separation processesSection 3   multistage separation processes
Section 3 multistage separation processes
 
Me2202 engineering thermodynamics uq - april may 2010
Me2202 engineering thermodynamics   uq - april may 2010Me2202 engineering thermodynamics   uq - april may 2010
Me2202 engineering thermodynamics uq - april may 2010
 
Energy conversion engineering lab manual full
Energy conversion engineering lab manual fullEnergy conversion engineering lab manual full
Energy conversion engineering lab manual full
 
Impact of Fouling on VCR System
Impact of Fouling on VCR SystemImpact of Fouling on VCR System
Impact of Fouling on VCR System
 
Vapor Combustor Improvement Project LinkedIn Presentation February 2016
Vapor Combustor Improvement Project LinkedIn Presentation February 2016Vapor Combustor Improvement Project LinkedIn Presentation February 2016
Vapor Combustor Improvement Project LinkedIn Presentation February 2016
 
Lab 3 boiler efficiency & condensers
Lab 3   boiler efficiency & condensersLab 3   boiler efficiency & condensers
Lab 3 boiler efficiency & condensers
 
Thermodynamic, examples b
Thermodynamic, examples bThermodynamic, examples b
Thermodynamic, examples b
 
Conductivity measurement in CSTR water-base(according to temperature)
Conductivity measurement in CSTR water-base(according to temperature)Conductivity measurement in CSTR water-base(according to temperature)
Conductivity measurement in CSTR water-base(according to temperature)
 
Module 9 (second law &amp; carnot cycle)
Module 9 (second law &amp; carnot cycle)Module 9 (second law &amp; carnot cycle)
Module 9 (second law &amp; carnot cycle)
 
Hmt lab manual (heat and mass transfer lab manual)
Hmt lab manual (heat and mass transfer lab manual)Hmt lab manual (heat and mass transfer lab manual)
Hmt lab manual (heat and mass transfer lab manual)
 
Insights from field experiments to conduct thermal response tests with heatin...
Insights from field experiments to conduct thermal response tests with heatin...Insights from field experiments to conduct thermal response tests with heatin...
Insights from field experiments to conduct thermal response tests with heatin...
 
FINAL2 PPT3
FINAL2 PPT3FINAL2 PPT3
FINAL2 PPT3
 
Separating and throttling calorimeter for steam
Separating and throttling calorimeter for steamSeparating and throttling calorimeter for steam
Separating and throttling calorimeter for steam
 
presentation wisa 2010 15 April 2010 2
presentation wisa 2010 15 April 2010 2presentation wisa 2010 15 April 2010 2
presentation wisa 2010 15 April 2010 2
 
CAPE PENINSULA UNIVERSITY OF TECHONOLOGY DEPARTMENT OF MECHENICAL ENGINEERIN...
CAPE PENINSULA UNIVERSITY OF TECHONOLOGY  DEPARTMENT OF MECHENICAL ENGINEERIN...CAPE PENINSULA UNIVERSITY OF TECHONOLOGY  DEPARTMENT OF MECHENICAL ENGINEERIN...
CAPE PENINSULA UNIVERSITY OF TECHONOLOGY DEPARTMENT OF MECHENICAL ENGINEERIN...
 
Thermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCMThermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCM
 
Heat transfer experiment for chemical engineering student
Heat transfer experiment for chemical engineering studentHeat transfer experiment for chemical engineering student
Heat transfer experiment for chemical engineering student
 

Similaire à Mixing Dynamics Non-ideal CST final Mar 7th

IRES_ Final_Presenation
IRES_ Final_PresenationIRES_ Final_Presenation
IRES_ Final_Presenation
Holden Ranz
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
Gopi Chand
 
Carnot cycle
Carnot cycleCarnot cycle
Carnot cycle
Ayaz Khan
 

Similaire à Mixing Dynamics Non-ideal CST final Mar 7th (20)

IRES_ Final_Presenation
IRES_ Final_PresenationIRES_ Final_Presenation
IRES_ Final_Presenation
 
Temp-meas-sem.pdf
Temp-meas-sem.pdfTemp-meas-sem.pdf
Temp-meas-sem.pdf
 
ShellAndTube-Ed
ShellAndTube-EdShellAndTube-Ed
ShellAndTube-Ed
 
Cooling of electric motors
Cooling of electric motors Cooling of electric motors
Cooling of electric motors
 
ATE_MAO_2010_Jun
ATE_MAO_2010_JunATE_MAO_2010_Jun
ATE_MAO_2010_Jun
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
 
Thermtest THW-L1
Thermtest THW-L1Thermtest THW-L1
Thermtest THW-L1
 
Dsc instrument 1
Dsc instrument 1Dsc instrument 1
Dsc instrument 1
 
Ocean Thermal Energy Conversion
Ocean Thermal Energy ConversionOcean Thermal Energy Conversion
Ocean Thermal Energy Conversion
 
Carnot cycle
Carnot cycleCarnot cycle
Carnot cycle
 
11 things to check before buying a Heat pump
11 things to check before buying a Heat pump  11 things to check before buying a Heat pump
11 things to check before buying a Heat pump
 
Humidity and temperature sensor module htg3535 ch
Humidity and temperature sensor module   htg3535 chHumidity and temperature sensor module   htg3535 ch
Humidity and temperature sensor module htg3535 ch
 
Chemical Kinetics in Unit Processes
Chemical Kinetics in Unit ProcessesChemical Kinetics in Unit Processes
Chemical Kinetics in Unit Processes
 
HTR Lab - Exp-02b - G-A2.pdf
HTR Lab - Exp-02b - G-A2.pdfHTR Lab - Exp-02b - G-A2.pdf
HTR Lab - Exp-02b - G-A2.pdf
 
CSTR study - RTD for Calciner.ppt
CSTR study - RTD for Calciner.pptCSTR study - RTD for Calciner.ppt
CSTR study - RTD for Calciner.ppt
 
HR.pptx
HR.pptxHR.pptx
HR.pptx
 
HTR Lab - Exp-01 - G-A1.pdf
HTR Lab - Exp-01 - G-A1.pdfHTR Lab - Exp-01 - G-A1.pdf
HTR Lab - Exp-01 - G-A1.pdf
 
Radial heat conduction
Radial heat conductionRadial heat conduction
Radial heat conduction
 
Thermo-Economic Optimization of Subcritical and Transcritical ORC Systems
Thermo-Economic Optimization of Subcritical and Transcritical ORC SystemsThermo-Economic Optimization of Subcritical and Transcritical ORC Systems
Thermo-Economic Optimization of Subcritical and Transcritical ORC Systems
 
carnot cycle.ppt
carnot cycle.pptcarnot cycle.ppt
carnot cycle.ppt
 

Mixing Dynamics Non-ideal CST final Mar 7th

  • 1. March 8, 2016 Austin Canaday Dalton Dunlap Yen Nguyen
  • 2. Objective The objective of our project is to determine a mixing model for the continuous stir tank (Reactor 1). In order to do so, the behavior of the water’s temperature inside R1 is analyzed in two cases which are ideal and non-ideal CST.
  • 3. Rationale To obtain a better understanding of basic characteristics of industrial process equipment by independently comprehending mixing process in continuous stir tank reactors (CSTR).
  • 4. CSTR Mixing Equations Ideal Model: 𝜃 𝑡 = 𝜃 𝑜 𝑒 − 𝐹 𝑉 𝑇 ∗𝑡 Non-ideal Model: 𝑇𝑎 𝑖+1 = 𝑇𝑎 𝑖 + Δ𝑡 𝑉𝑎 𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖 + 𝑓(𝑇𝑑 𝑖 − 𝑇𝑎 𝑖 )
  • 7. Experimental Equipment (continued) Mixer 1 (M1) Metering Pump 1 (P1) Reactor 1 (R1) Tank 1 (T1)
  • 8. EHS & LP Our project entails minimal environmental and safety risks. • However, things to be conscious of include: • Slipping hazards could occur from water leaking out on the floor • All liquid water must be carefully carried away from electrical equipment to prevent electrical shock • Potential energy waste by excess usage of the CST without running experiments
  • 9. ExperimentalTesting for Ideality/Non-ideality 130ºF100ºF 100% 85%85% 100% 5 5 57 7 75 Reactor 1 Initial Temperatures: % of Pump 1 Flow Rate: Mixer 1 Speed: 7 Note: Data was measured every 6 seconds for a total of 6 minutes. (60 data points per trial ) Reactor 1 total volume was measured with a graduated cylinder 8Total ExperimentalTrials
  • 10. Ideal and Non-Ideal Factors Ideal • No ambient losses • Perfect Mixing • Uniform and constant cooling Non-Ideal • Ambient Heat Losses • Non-perfect mixing • Baffles • Conduction from water to metal reactor/reactor to water
  • 11. Expectations 88 90 92 94 96 98 100 102 104 0 10 20 30 40 50 60 Temperature(ᵒF) Time Counter Temperature vsTime Ideal Model Non-Ideal Model
  • 12. Theory: Ideal Model Newton’s Law of Cooling: 𝑑𝑇 𝑑𝑡 = −𝑘(𝑇 − 𝑇𝑖𝑛) Where: • t is time • T is the temperature of the water within Reactor 1 (R1) at time t • Tin is the temperature of inlet cold water fromTank 1 (TK1) • k is the heat transfer coefficient
  • 13. Theory: Ideal Model Ideal Model: 𝜃 𝑡 = 𝜃 𝑜 𝑒 − 𝐹 𝑉 𝑇 ∗𝑡 where • θ (t) is the temperature deviation from the nominal at time t • θo is the temperature difference between the inlet cold water fromTK1 and the initial hot water inside R1. • F is the volume flow rate of the inlet cold water to R1 • VT is the total volume of water in R1
  • 14. Theory: Non-ideal Model Energy balance in temperature: Active zone: 𝑉𝑎 𝑑𝑇𝑎 𝑑𝑡 = 𝐹 𝑇𝑖𝑛 − 𝑇𝑎 + 𝑓(𝑇𝑑 − 𝑇𝑎) Dead zone: 𝑉𝑑 𝑑𝑇𝑑 𝑑𝑡 = 𝑓(𝑇𝑎 − 𝑇𝑑) Dead Zone Active Zone Baffle
  • 15. Theory: Non-ideal Model Non-ideal Model: Active zone: 𝑇𝑎 𝑖+1 = 𝑇𝑎 𝑖 + Δ𝑡 𝑉𝑎 𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖 + 𝑓(𝑇𝑑 𝑖 − 𝑇𝑎 𝑖 ) Dead zone: 𝑇𝑑 𝑖+1 = 𝑇𝑑 𝑖 + Δ𝑡 𝑉𝑑 𝑓(𝑇𝑎 𝑖 − 𝑇𝑑 𝑖 )
  • 16. Theory Ideal Model: 𝜃 𝑡 = 𝜃 𝑜 𝑒 − 𝐹 𝑉 𝑇 ∗𝑡 Non-ideal Model: 𝑇𝑎 𝑖+1 = 𝑇𝑎 𝑖 + Δ𝑡 𝑉𝑎 𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖 + 𝑓(𝑇𝑑 𝑖 − 𝑇𝑎 𝑖 )
  • 17. Data Processing MIXER LEVEL 5 Total Volume VT (cm3 ) 3350 Pump % 85 Tin (ᵒF) 75.9 Target Temp. To (ᵒF) 103.1 ∆t (minutes) 0.1 use Solver F (cm3/min) 378.0 f (cm3/min) 0.195 Vd (cm3) 0.010 Va (cm3) = VT - Vd 3350.0
  • 18. Results 88 90 92 94 96 98 100 102 104 0 20 40 60 Temperature(ᵒF) Time Counter Temperature vsTime Experimental data Non-Ideal Ideal *Above Graph Conditions: Mixer 5, 85% Pump,To=103.1ᵒF
  • 19. 86 88 90 92 94 96 98 100 102 104 0 10 20 30 40 50 60 Temperature(ᵒF) Mixer 5, 100% Pump, To=101.9ᵒF Measured Data Ideal Model Non-ideal Model 95 100 105 110 115 120 125 130 135 0 10 20 30 40 50 60 Temperature(ᵒF) Mixer 7 ,100% Pump, To=131.4ᵒF Time CounterTime Counter
  • 20. Uncertainty 𝜀 𝑇,95% = 0.8 𝑑𝑇 𝑑𝑉 𝑇 2 𝜀 𝑉 𝑇 2 + 𝑑𝑇 𝑑𝑡1 2 𝜀𝑡1 2 + 𝑑𝑇 𝑑𝑡2 2 𝜀𝑡2 2 + 𝑑𝑇 𝑑𝑇 𝑖𝑛 2 𝜀 𝑇 𝑖𝑛 2 + 𝑑𝑇 𝑑𝑇𝑜 2 𝜀 𝑇𝑜 2 = 0.793 2 sigma limit = 0.789
  • 21. T-test 𝑡 = 𝑟−0 𝑠/ 𝑁 = 2.89 Two-tailed 95% confidence level Degree of freedom 60 t critical = 2.00 N = the number of residuals 𝑟 = the average residual s = standard deviation of the residuals Terms Critical value
  • 22. R-lag-1Test -1 0 1 0 10 20 30 40 50 60 Residuals Time Counter R-lag 1 Mixer 5, 85% Pump, To=103.1ᵒF
  • 23. Conclusions • Model fails to passT-test and r-lag-1 tests but illustrates CST temperature behavior • Flow rate Temperature Drop • Mixing Speed Temperature Drop • Due to baffles in all experimental trials, ambiguity exists between Ideal and non- ideal models. 𝑇𝑎 𝑖+1 = 𝑇𝑎 𝑖 + Δ𝑡 𝑉𝑎 𝐹 𝑇𝑖𝑛 − 𝑇𝑎 𝑖 + 𝑓(𝑇𝑑 𝑖 − 𝑇𝑎 𝑖 )
  • 24. Suggestions Accounting for conduction between the water and Reactor 1 as well as ambient heat losses could potentially make it acceptable for us not to statistically reject our model.
  • 25. Conduction Between Reactor 1 andWater • Initially hot water in Reactor 1 exchanges heat with Reactor 1. • As cold water flows in, the water in the reactor becomes colder than R1 walls • Reactor 1 then conducts heat to the water.
  • 26. Reactor 1 Ambient Heat Loss 80 90 100 110 120 130 140 0 50 100 150 200 250 Temperature(ºF) Time (min) Ambient Heat loss vsTime 127 127.5 128 128.5 129 129.5 130 130.5 131 131.5 132 0 1 2 3 4 5 6 Temperature(ºF) Time (min) 130F Ambient losses 95 96 97 98 99 100 0 1 2 3 4 5 6 Temperature(ºF) Time (min) 100 ºF Ambient Heat lossVsTime
  • 27. Effects of Ambient losses 100 ºF Heat Loss 130 ºF Heat Loss Average experimental losses (ºF): 14.15 ºF 27.75 ºF Ambient Heat loss (ºF): 0.6 ºF 2.75 ºF Percent of Ambient Losses: 4.25 % 10 % Conclusion: Negligible Not Negligible
  • 28. References • Murrell, Kaston (2015). Standard Operating Procedure: CST Unit & Batch Reactor Experiments. Oklahoma State University • Myers, Kevin J., Mark F. Reeder, and Julian B. Fasano. "Optimize Mixing by Using the Proper Baffles." People.clarckson.edu, Feb. 2002. Web. Feb. 2016. <http://people.clarkson.edu/~wwilcox/Design/mixopt.pdf>. • Rhinehart, R. R. (2016). Sketch CST with Dead Zone. Oklahoma State University. • Skogestad, Sigurd.Chemical and Energy Process Engineering, 1st order. Boca Raton: CRC Press,Taylor and Francis Group, 2009. pp. 274-280. Print.
  • 29. Mixing Dynamics Non-IdealCST 88 90 92 94 96 98 100 102 104 0 20 40 60 Temperature(ᵒF) Time Counter Temperature vsTime Austin Canaday Dalton Dunlap Yen Nguyen