‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 1 of 42
‫السعودي‬ ‫العربية‬ ‫المملكة‬‫ة‬
‫قالب‬‫اسة‬‫ر‬‫ك‬‫عروض‬ ‫طلب‬‫مشر‬‫و‬‫ع‬
"( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬High Availability)‫معلومات‬ ‫كز‬‫لمر‬------------"
Data Center)---------------(Providing a High Availability for
Put the Logo of the
Government Entity Here
( ‫قم‬‫ر‬ ‫عامة‬ ‫منافسة‬--/----)
)‫هامة‬ ‫اريخ‬‫و‬‫(ت‬
‫المتطلبات‬‫اليوم‬‫التاريخ‬
‫العروض‬ ‫لتقديم‬ ‫موعد‬ ‫آخر‬__/__/_341‫ـ‬‫ه‬__/__/_103‫م‬
‫األسئلة‬ ‫لتقديم‬ ‫موعد‬ ‫آخر‬
‫ا‬‫ر‬‫االستفسا‬‫و‬‫ت‬
__/__/_341‫ـ‬‫ه‬__/__/_103‫م‬
‫المظاريف‬ ‫فتح‬ ‫موعد‬__/__/_341‫ـ‬‫ه‬__/__/_103‫م‬
‫العروض‬ ‫وتقديم‬ ‫النسخ‬ ‫بيع‬ ‫مكان‬
:‫طريق‬ ‫عن‬ ‫الوثيقة‬ ‫هذه‬ ‫بخصوص‬ ‫ات‬‫ر‬‫استفسا‬ ‫أي‬ ‫أو‬ ‫أسئلة‬ ‫أي‬ ‫ح‬‫طر‬ ‫يمكن‬
:‫إلكتروني‬ ‫بريد‬.gov.sa---XYZ_RFP@
( ‫النسخة‬ ‫قيمة‬####)<‫المبلغ‬‫كتابة‬>‫سعودي‬ ‫لاير‬
‫وتاريخ‬ ) ( ‫رقم‬ ‫بإيصال‬ ‫مستندة‬__/__/_341‫ـ‬‫ه‬
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 2 of 42
‫ة‬‫ة‬‫مقدم‬:‫ة‬‫ة‬‫كراس‬‫ةر‬‫ة‬‫مش‬"‫ة‬‫ة‬ ‫ايةةي‬ ‫ة‬‫ة‬ ‫ااتة‬ ‫ا‬ ‫ةيم‬‫ة‬‫ت‬High Availability)‫ة‬‫ة‬‫يمرك‬
‫مةلومةت‬---------------"
‫يهـدف‬‫هـاا‬‫المشـدرع‬‫إلـ‬‫تشـيدددـدف‬ ‫عةـيمـة‬ ‫هدـدمة‬ ‫عة‬ ‫تعـدفاـ‬ ‫عةـيعـة‬ ‫وـي‬ ‫ع‬ ‫عتشـيددـدف‬ ‫عترييدددـدو‬ ‫توريدددـدف‬
‫حعسوبيـــدة‬(InfrastructureIT‫لمريـــم‬ )‫ـــعـ‬‫ـ‬‫تعلوت‬-----------‫ـــ‬‫ـ‬‫عذل‬‫تي‬ ‫ـــ‬‫ـ‬‫لت‬‫االتعحـــة‬‫ـــة‬‫ـ‬‫الععلي‬(High
Availability)‫للبوابــة‬‫االلكترعـيــة‬‫عالخــفتعـ‬‫المقفتــة‬‫تــ‬‫ــع‬‫ـ‬‫خالله‬.‫علتوقيــ‬‫ذلــ‬‫تــ‬‫توضــير‬‫ــرع‬‫ـ‬‫الش‬ ‫يراســة‬
‫هاه‬ ‫عالمواةفعـ‬‫لتقف‬‫عةف‬ ‫ي‬‫المشـرع‬ ‫هاا‬ ‫خالل‬ ‫ت‬ ‫توقيقهع‬ ‫المطلوب‬ ‫عاألهفا‬ ‫للمتطلبعـ‬‫يمـع‬‫ةــ‬‫تففيـا‬ ‫سـيت‬ ‫ه‬
‫حيــ‬ ‫ـرحلتي‬‫ـ‬‫ت‬ ‫ىلــ‬ ‫ـرع‬‫ـ‬‫المش‬‫ـتمف‬‫ـ‬‫ستش‬‫ـي‬‫ـ‬‫التخط‬ ‫ىلــ‬ ‫ـ‬‫ـ‬‫االعل‬ ‫المرحلــة‬‫يــة‬ ‫الفهع‬ ‫ـعتي‬‫ـ‬‫التم‬ ‫عاىــفاد‬‫عال‬‫توريدددــدف‬
‫ع‬‫ال‬‫ترييددددو‬‫ع‬‫ال‬‫تشـيدددف‬‫عالفوي‬‫ـة‬ ‫المعر‬ ‫عـقف‬ ‫عالتفريو‬‫مة‬‫ضةمة‬‫عةد‬‫توقة‬‫ايبوابة‬‫ة‬ ‫ن‬ ‫اإليكتر‬‫ايخةدمةت‬
‫ايمقدم‬‫ما‬‫خاليهة‬‫أثنةء‬‫ب‬ ‫ايترك‬‫ل‬ ‫ايتشغ‬‫ئ‬ ‫يلب‬‫ايجديدة‬‫عتشتمف‬‫ع‬ ‫الضـمع‬ ‫ىلـ‬ ‫الثعـيـة‬ ‫المرحلة‬‫خـفتعـ‬‫الـفى‬
.‫عالميعـة‬ ‫الففي‬
‫ا‬‫ا‬ ‫أ‬:‫نطةق‬‫ايةمل‬:
‫ىل‬‫الشريعـ‬‫التي‬‫لفيهع‬‫خبرة‬‫ي‬‫توريف‬‫عترييو‬‫عتشـيف‬‫ال‬ ‫وـي‬ ‫ع‬‫معـفاـ‬‫ع‬‫األ‬‫هـمة‬‫عةـيمـة‬‫ال‬‫تشــيف‬‫ال‬‫وعسـوبية‬
‫لمر‬‫ا‬‫يـم‬‫ال‬‫ـعـ‬‫ـ‬‫معلوت‬‫ت‬ ‫تـ‬ ‫ـي‬‫ـ‬‫عالت‬ ‫ـة‬‫ـ‬‫الوكوتي‬‫ـة‬‫ـ‬‫االتعح‬‫ـعـ‬‫ـ‬‫للبواب‬ ‫ـة‬‫ـ‬‫الععلي‬‫ا‬‫اللكترعـيـة‬‫ـفتعـ‬‫ـ‬‫عالخ‬‫ـة‬‫ـ‬‫المقفت‬‫ـ‬‫ـ‬‫ت‬‫ـع‬‫ـ‬‫خالله‬‫ة‬
‫تتقفم‬‫بعرعضهع‬‫عذل‬‫حسو‬‫المواةـفعـ‬‫الـواردة‬‫ـي‬‫عثيقـة‬‫لـو‬‫العـرع‬‫االسسـعم‬ ‫ـي‬‫رسـ‬‫ةربعـة‬‫ع‬‫عسـتة‬ ‫خمسـة‬
‫عالملو‬(‫ة‬A-)‫ع‬‫الععتة‬ ‫الشرع‬‫عالخعةة‬‫ي‬‫الملو‬(‫ب‬B-)‫عيشمف‬‫ـطعق‬‫العمف‬‫المهعم‬‫التعلية‬:
‫م‬ ‫ايتصم‬
o‫للمشرع‬ ‫التخطي‬
o‫عة‬ ‫ترا‬‫ي‬ ‫الواردة‬ ‫عالمواةفعـ‬ ‫المتطلبعـ‬‫عثيقة‬‫لو‬‫العرع‬‫االسسـعم‬ ‫ـي‬‫رسـ‬‫ةربعـة‬‫ع‬‫عسـتة‬ ‫خمسـة‬
‫التي‬‫ةىفتهع‬------------‫عالتوق‬.‫تفهع‬
o‫اىفاد‬‫ع‬‫ع‬‫التم‬ ‫ضع‬‫عتي‬‫التفميل‬‫ية‬‫ية‬ ‫الفهع‬‫للمشرع‬
o‫ف‬ ‫اىفاد‬‫ا‬‫عل‬‫ي‬ ‫الفهع‬ ‫الكميعـ‬‫ة‬‫للمشرع‬
‫ايبنةء‬
o‫عترييـو‬ ‫ـف‬‫ـ‬‫عتوري‬ ‫شـرا‬‫ــيف‬‫ـ‬‫عتش‬‫ـمة‬‫ـ‬‫ه‬ ‫األ‬ ‫ميـع‬‫عالبـرات‬‫ة‬‫ة‬‫ئ‬ ‫يلب‬‫ة‬‫ة‬ ‫ايةةي‬ ‫ة‬‫ة‬ ‫ااتة‬ ‫قةت‬ ‫ت‬ ‫ةح‬‫ة‬‫ايت‬ ‫ايجديةدة‬
‫تشمل‬:
‫الكهربع‬ ‫(ةـيمة‬ ‫البيعـعـ‬ ‫تريم‬ ‫توسع‬)‫عالمراسبة‬ ‫عاألت‬ ‫عالوري‬ ‫عالتكييف‬
‫البيعـع‬ ‫شبكة‬‫المعلوتعـ‬ ‫عحمعية‬ ‫عةت‬ ‫ـ‬
‫همة‬ ‫ة‬‫الخوادم‬‫التخميفية‬ ‫عالوسع‬
‫ي‬ ‫االحتيع‬ ‫الفسخ‬ ‫ـيعم‬
‫عالتوك‬ ‫المراسبة‬ ‫ـيعم‬
o‫ـف‬‫ـ‬‫ـق‬‫االتعحــة‬ ‫ذاـ‬ ‫ـفة‬‫ـ‬‫الافي‬ ‫ـة‬‫ـ‬‫البيل‬ ‫ـ‬‫ـ‬‫ال‬ ‫ـة‬‫ـ‬‫الوعلي‬ ‫ـة‬‫ـ‬‫البيل‬ ‫تــ‬ ‫ـعـ‬‫ـ‬‫عالبيعـ‬ ‫ـعـ‬‫ـ‬‫عالبرتاي‬ ‫ـة‬‫ـ‬‫االـيم‬ ‫ـع‬‫ـ‬‫مي‬ ‫ــيف‬‫ـ‬‫عتش‬
.‫الععلية‬
o. ‫عالبرات‬ ‫همة‬ ‫لأل‬ ‫الالزتة‬ ‫االختبعراـ‬ ‫ميع‬ ‫را‬ ‫إ‬
o. ‫المشرع‬ ‫لوثع‬ ‫يعتلة‬ ‫تاموىة‬ ‫تقفي‬
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 3 of 42
‫م‬ ‫ايتسل‬
o‫ـف‬‫ـ‬‫بع‬‫ترحلــة‬‫ـا‬‫ـ‬‫التففي‬‫ي‬‫اــو‬‫ىلــ‬‫ـورد‬‫ـ‬‫الم‬‫ضــمع‬‫ـعل‬‫ـ‬‫اـتق‬‫ا‬‫لمعــعر‬‫عالمهــعراـ‬‫ـة‬‫ـ‬‫الالزت‬‫الــفعراـ‬ ‫عتففيــا‬
‫التفريبية‬‫ل‬----------------‫ةع‬‫ةي‬‫ر‬‫آخر‬‫توفده‬------------------.
‫خدمةت‬‫ايدعم‬‫ةن‬ ‫ايص‬
o‫تقفي‬‫خـفتعـ‬‫هـمة‬ ‫عة‬ ‫سطـع‬ ‫لاميـع‬ ‫المطلوبـة‬ ‫عالمـيعـة‬ ‫الـفى‬‫الافيـفة‬ ‫البيلـة‬ ‫عةـيمـة‬‫سـفواـ‬ ‫ثـالس‬ ‫لمـفة‬
‫تع‬‫تقفي‬‫خيعر‬‫لمفة‬ ‫عالميعـة‬ ‫الفى‬ ‫ىل‬ ‫يشتمف‬ ‫تستقف‬. ‫يتع‬ ‫إضع‬ ‫سفتع‬
‫ا‬‫ة‬ ‫ثةن‬:‫ذ‬ ‫ايتنف‬ ‫مدة‬:
‫س‬‫تشـ‬ ‫االعلـ‬ ‫المرحلـة‬ ‫ة‬ ‫حيـ‬ ‫تـرحلتي‬ ‫ىلـ‬ ‫المشـرع‬ ‫هـاا‬ ‫تففيا‬ ‫يت‬‫التخطـي‬ ‫ىلـ‬ ‫تمف‬‫يـة‬ ‫الفهع‬ ‫التمـعتي‬ ‫عاىـفاد‬
‫عال‬‫توريدددـدف‬‫ع‬‫ال‬‫ـدو‬‫ـ‬‫ترييددد‬‫ع‬‫ال‬‫ـدف‬‫ـ‬‫تشـيدد‬‫ـي‬‫ـ‬‫عالفو‬‫ـة‬ ‫المعر‬ ‫ـف‬‫ـ‬‫عـق‬ ‫ـفريو‬‫ـ‬‫عالت‬‫ـلي‬‫ـ‬‫عالتس‬‫ى‬ ‫ـة‬‫ـ‬‫الثعـي‬ ‫ـة‬‫ـ‬‫المرحل‬ ‫ـوي‬‫ـ‬‫عتوت‬‫ـ‬‫ـ‬‫ل‬
‫الضمع‬‫الففي‬ ‫عالفى‬ ‫عالميعـة‬.
‫يى‬ ‫اا‬ ‫ل‬ ‫ايمر‬ ‫ذ‬ ‫تنف‬ ‫مدة‬:
o‫المرحلة‬ ‫هاه‬ ‫لتففيا‬ ‫الموفدة‬ ‫المفة‬‫هي‬14‫ةسبوىع‬‫العقف‬ ‫عتوسيع‬ ‫التعميف‬ ‫تعريخ‬ ‫ت‬ ‫تبفة‬
‫ايثةن‬ ‫ل‬ ‫ايمر‬ ‫ذ‬ ‫تنف‬ ‫مدة‬:
o‫المفة‬. ‫االعل‬ ‫المرحلة‬ ‫استالم‬ ‫تعريخ‬ ‫ت‬ ‫تبفة‬ ‫الماتية‬ ‫سفواـ‬ ‫ثالس‬ ‫هي‬ ‫المرحلة‬ ‫هاه‬ ‫لتففيا‬ ‫الموفدة‬
o.‫اختيعرية‬ ‫سفتع‬
‫عتوتوي‬‫هاه‬‫الوثيقة‬‫ىل‬‫المالح‬‫التعلية‬‫(ةفوة‬ ‫تفهع‬ ‫الثعت‬ ‫البفف‬ ‫ي‬41):-
‫رقم‬‫عنوا‬‫ت‬ ‫ايمل‬
3‫تلو‬:‫ة‬‫تعليمعـ‬‫تقفي‬‫العر‬‫عالتقيي‬
1‫تلو‬‫ب‬:‫الشرع‬‫الععتة‬
1‫تلو‬:‫ج‬‫تععيير‬‫المطعبقة‬
4‫تلو‬‫د‬:‫فاعل‬‫الكميعـ‬‫للعر‬‫الففي‬
5‫تلو‬‫هد‬:‫مة‬ ‫سع‬‫المشعريع‬‫عالخبراـ‬‫السعبقة‬
6‫تلو‬:‫ع‬‫فاعل‬‫الكميعـ‬‫عاألسععر‬(‫العر‬‫المعلي‬)
7‫تلو‬:‫ز‬‫تعلوتعـ‬‫هالـ‬ ‫عت‬‫تقفتي‬‫العرع‬
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 4 of 42
Table of Contents
Table of Contents ......................................................................................................................... 4
List of Figures .............................................................................................................................. 5
1 Introduction .......................................................................................................................... 7
1.1 Background .................................................................................................................... 7
1.2 Purpose........................................................................................................................... 7
1.3 RFP Organization............................................................................................................ 7
1.3.1 Section 2: Current Situation...................................................................................... 7
1.3.2 Section 3: Project Objectives.................................................................................... 7
1.3.3 Section 4: Scope of Work......................................................................................... 8
1.3.4 Section 5: Infrastructure High Availability Enhancement Requirements ...................... 8
1.3.5 Section 6: Proposal Format....................................................................................... 8
1.3.6 Section 7: Appendices.............................................................................................. 8
1.4 Requirements Numbering Scheme.................................................................................... 8
1.5 Definitions ...................................................................................................................... 8
2 Current Situation ................................................................................................................... 9
2.1 Current Infrastructure Architecture................................................................................... 9
2.1.1 Current Servers & Storage........................................................................................ 9
2.1.2 Current Portal applications Architecture.................................................................. 10
2.1.3 Current IT Services................................................................................................ 10
2.1.4 Current Networking & security............................................................................... 11
3 Project Objectives ............................................................................................................... 12
4 Scope of Work.................................................................................................................... 13
5 Infrastructure High Availability Enhancement Requirements.................................................. 15
5.1 General Requirements ................................................................................................... 15
5.2 Technical Solution Architecture Requirements ................................................................ 15
5.2.1 Servers, Storage and Portal Servers Technical Requirements .................................... 15
5.2.2 Network & Security Technical Requirements .......................................................... 15
5.2.3 Data Center Area Technical Requirements .............................................................. 16
5.3 Hardware Architecture Requirements ............................................................................. 16
5.4 Network Architecture Requirements ............................................................................... 17
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 5 of 42
5.5 Hardware Requirements................................................................................................. 17
5.5.1 Hardware Generic Requirements ............................................................................ 17
5.5.2 Servers, Storage, and Backup Hardware Requirements............................................. 17
5.5.3 Network & Security Hardware Requirements .......................................................... 18
5.5.4 Data Center Area Hardware Requirements .............................................................. 20
5.6 Implementation Requirements........................................................................................ 26
5.6.1 Project Management Requirements= ...................................................................... 27
5.6.2 Project Documentation Requirements ..................................................................... 30
5.6.3 Project Organization Requirements......................................................................... 30
5.6.4 Warranty Requirements ......................................................................................... 32
5.6.5 Quality Assurance and Acceptance Requirements.................................................... 33
6 Proposal Format.................................................................................................................. 34
6.1 General Instructions....................................................................................................... 34
6.2 Proposal Preparation...................................................................................................... 35
6.3 Technical Proposal Instructions ...................................................................................... 35
6.3.1 Mandatory and Optional Requirements ................................................................... 36
6.3.2 Required Sections .................................................................................................. 36
6.4 Financial Proposal Instructions....................................................................................... 39
7 Overview of appendices....................................................................................................... 40
8 The Appendices(‫)المالحق‬ ...................................................................................................... 42
List of Figures
Figure 1: --------------------------Current Server & Storage landscape.................................9
Figure 2: --------------------------Current Server & Storage Rack Layout.......................... 10
Figure 3: ---------------------------Current Portal Architecture................................................ 10
Figure 4: --------------------------Current Network & Security Architecture...................... 11
Figure 5: --------------------------Data Centre Room Layout .............................................. 11
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 6 of 42
DISCLAIMER
THIS DOCUMENT IS A REQUEST FOR PROPOSAL (RFP), AND SHALL
NOT CONSTRUED IN WHOLE OR PART AS A DIRECT OR INDIRECT
ORDER. IT SHALL NOT CONSTRUED AS A REQUEST OR
AUTHORIZATION TO PERFORM WORK AT THE EXPENSE OF --------------.
THE INFORMATION IN THIS RFP IS INTENDED TO ENABLE THE
RECIPIENT TO FORMULATE A PROPOSAL IN RESPONSE TO THE
PROJECT REQUIREMENTS SET FORTH. ALTHOUGH THIS RFP
CONTAINS SUCH ENABLING INFORMATION, BIDDERS MUST MAKE
THEIR OWN INDEPENDENT ASSESSMENTS AND INVESTIGATIONS
REGARDING THIS RFP’S SUBJECT MATTER. THE ------------- DOES NOT
GUARANTEE THE ACCURACY, RELIABILITY, CORRECTNESS OR
COMPLETENESS OF THE INFORMATION IN THIS RFP. THE BIDDER
REMAINS RESPONSIBLE FOR IDENTIFYING ANY FURTHER
INFORMATION THAT IT REQUIRES TO PREPARE THE PROPOSAL. THIS
RFP SHALL CONSTITUTE PART OF THE CONTRACT THAT ---------------
WILL SIGN WITH THE SUCCESSFUL BIDDER.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 7 of 42
1 Introduction
1.1 Background
--------------- is planning to procure install configure operate and test equipment
including servers networking & security and system software for its Data Center to
provide a high availability solution of IT Infrastructure for ---------------- Portal and
the services offered through the Portal.
This Request for Proposal (RFP) is prepared by ------------------, and the main goal of
this RFP is to provide Bidders with a description of the requirements and objectives to
be achieved by this project.
This Request for Proposal (RFP) issued for ---------------------. The Issuing Officer ----
----------------- requires all technical questions be submitted by e-mail to XYZ_RFP@-
----.gov.sa within two weeks of the RFP publish date. For all other issues related to
this RFP, the sole point of contact is -------------------- (via e-mail or see contact
information in invitation letter).
1.2 Purpose
This Request for Proposal (RFP) provides interested Bidders with the information
needed to prepare and submit their proposals that satisfy -----------------------
Infrastructure High Availability Enhancement Project’s requirements.
Information provided herein is solely intended to assist Bidders in the preparation of
their proposals. According to ----------------- and its partners' knowledge, the
information provided is accurate. However, ----------------------- and its partners do not
warrant such accuracy, and any variations subsequently determined shall not be
construed as a basis for invalidating this RFP. ------------------ Management reserves
the right to cancel this RFP at any time.
1.3 RFP Organization
1.3.1 Section 2: Current Situation
This section provides an executive-level overview of the current situation from
perspectives of ---------------- infrastructure domains including Servers, Storage,
Portal, Network, Security, and Data Center Area. This section discusses the ------------
infrastructure and associated components such as Portal, and IT services.
1.3.2 Section 3: Project Objectives
This section presents the -------------------- Infrastructure High Availability
Enhancement Project Objectives.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 8 of 42
1.3.3 Section 4: Scope of Work
This section details the project’s scope of work. For the project to be complete and
close, the Bidder must complete all items within the scope of work.
1.3.4 Section 5: Infrastructure High Availability Enhancement Requirements
This section provides the High Availability Infrastructure enhancement requirements.
1.3.5 Section 6: Proposal Format
This section provides the requirements for the Bidder’s proposal content and
submission.
1.3.6 Section 7: Appendices
This section lists the appendices in support of the RFP.
1.4 Requirements Numbering Scheme
The Requirements’ Numbering Scheme will facilitate referencing a specific
functionality throughout the project’s different phases. Bidders are encouraged to adopt
the numbering scheme when compiling their proposals.
The recommended requirements’ numbering scheme has the following format:
Requirement Type “” Number- Description Where:
Requirement Type is either “Req” for requirements concerning what the Bidder is
required to deliver, or “Info” additional information associated with certain
requirement(s) to aid the Bidder in their proposals.
Number is a sequence number starting from 1 (one) up to the total number of compiled
requirements;
Description is the part of the requirement (regardless of the type) describing the
requirement in more detail. Therefore, bidders must comply with the requirement and
its description.
1.5 Definitions
Capitalized terms and all capitalized acronyms used in this document will have the
following meaning:
Term Definition
Bidder A Bidder officially responding to the Request for Proposal by
submitting a bid proposal
BoQ Bill of Quantity
The Solution The total set of deliverables within the scope of the Request for
Proposal that the Bidder must deliver, whether Information
Technology, documentation, intangible deliverables such as
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 9 of 42
knowledge transfer, or any other deliverable included in the scope
HA High Availability
RFP Request for Proposal
Table 1- Definitions
2 Current Situation
This section provides general information about the existing solutions and services
within ---------------- that are relevant to the RFP scope of work. Bidders should
analyze the information within this section as an input to understand the current set up
at -------------- Data Center and need to propose new design in order to come up with
the best design that meets updated international best practices and capitalize on the use
of existing equipment.
2.1 Current Infrastructure Architecture
2.1.1 Current Servers & Storage
Describe Here the Government Entity infrastructure in terms of Servers & Storage.
Put Infrastructure Diagram here
Figure 1: ---------------------------------Current Server & Storage landscape
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 10 of 42
Put Server & Storage Physical Rack Layout here
Figure 2: --------------------------Current Server & Storage Rack Layout
2.1.2 Current Portal applications Architecture
Describe the current Portal Application Architecture in terms of Applications Servers,
Database Servers, Web Servers, Storage and networking
The figure below shows the existing portal application architecture at ----------------------.
Figure 3: ----------------------------Current Portal Architecture
2.1.3 Current IT Services
IT Services available at ------------------------ are listed below:
SL No. Host (Server) Name Location Application
1 SPSRV1 DC-LAN Rack1
SharePoint Intranet &
Application Server
2
3
4
5
6
7
8 APPSERVER2-21 DC-LAN Rack2
Dataflow & Doc Archiving
application
9 SRV1 DC-LAN Rack2 SQL2008 DB Server
Table 2- IT Services available in --------------------------------
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 11 of 42
2.1.4 Current Networking & security
2.1.4.1 Current Networking & Security Infrastructure
Describe Current Network & Security infrastructure details at this table.
SL No. Components Products
1 Proxy TMG 2010 Firewall is acting also as a Proxy Server.
2 Firewall Cisco ASA 5520 is the Internet perimeter Firewall.
3 Antispam
Symantec Antivirus Server for antispam protection and
Symantec Antivirus client on all PC's.
Table 3- Network & Security Current Infrastructure
2.1.4.2 Existing Networking Architecture Diagram
Diagram below shows a high-level view of the current network Infrastructure
Figure 4: ---------------------------Current Network & Security Architecture
Data Center Area
The overall current infrastructure is based on below mentioned architecture.
Figure 5: ----------------------------Data Centre Room Layout
The existing set up have the following infrastructure equipment,
 UPS : 40 KVA APC modular UPP

Access control system
 Backbone entry from entrance room at ground floor.

‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 12 of 42
3 ProjectObjectives
The main objectives of --------------------- Infrastructure High Availability
Enhancement Procurement and Implementation Project are to achieve the following:
 Provide a high availability solution of IT Infrastructure for ----------------------
Portal application and the services offered through the Portal in the following
domains:
o Servers & Storage
o Backup system
o Network & Security
o Data Center Area
 Provide Hardware & Software Monitoring Tools
 Enhance the performance of the Portal application and the services offered through
the Portal
 Build a reliable infrastructure which meets future requirements
 Increase operational efficiencies
 Enhance the network and secure infrastructure design
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 13 of 42
4 Scope of Work
This section documents the project’s scope of work. It outlines what will be required
from interested Bidders to successfully implementing the project.
The Infrastructure High Availability Enhancement Procurement and Implementation
Project scope of work will include the following:
1) Migrate all existing environment Hardware, Software, applications, and data to new
high available environment
2) Build new development & test environments
This includes the following infrastructure components:
 Data Center Area (Electrical system, Cooling system, Fire system, Security and
monitoring system etc.)
 Network & Security Infrastructure (Internet Routers, Firewalls, Switches etc.)
 Hardware Servers & Storage (Severs distribution cross Racks, SAN Switches,
Storage upgrade, Cluster implementation etc.)
 Applications (Web Portal & Services, backup, Microsoft etc.)
 Operating Systems (Windows)
 Hardware & software Monitoring Tools
 Backup Solution (backup management software)
In summary, the scope requires interested Bidders to deliver a turnkey solution for
procurement and implementation of --------------------------- High Availability
Enhancement Infrastructure. The Bidder is required to design, test and deploy the
Solution based on the following phased approach:
I. Phase 1: Design
 Perform project management planning.
 Review, verify and confirm the requirements included in this RFP document
 Prepare the detailed final design document (high and Low level) for the required
solution components (Data Center, Servers, storage & backup system, Network &
Security Infrastructure) along with its final BoQ
 Provide high availability for ---------------- portal and electronic services.
II. Phase 2: Build
 Provide all necessary hardware and software procurement, delivery and
installation (configuration) for the Solution.
 Implement and test all the Solution’s hardware and software components.
 Migrate & operate the systems, software, and data from the existing environment
to the new high available environment.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 14 of 42
 Develop and deliver a complete set of the Solution’s documentation; which
includes the installation and configuration settings, acceptance test procedure and
operations procedures.
III. Phase 3: Handover
 After the Implementation phase, the Vendor shall ensure smooth transfer of
knowledge and skills to ---------------- or any another party.
IV. Phase 4: Support & Maintenance
 Provide the required support and maintenance for all parts and systems of the
installed solution for three (3) years, with two (2) additional option years.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 15 of 42
5 Infrastructure High Availability Enhancement Requirements
This section lists additional requirements to be included in The Bidder’s proposal.
5.1 General Requirements
Info 1.The Solution will hosted in -------------------- Datacenter in.
Req 1.
Req 2.
5.2 Technical SolutionArchitecture Requirements
The Solution should built on sound architectural principles enabling fault-tolerance,
high availability, high-performance, and scalability. The solution architecture should
meet the following Requirements:
5.2.1 Servers, Storage and Portal Servers Technical Requirements
Req 3. The bidder should propose infrastructure solution free of any single
point of failure, and should provide Hardware & Software Monitoring
tools with the following requirements:
 The Bidder should provide a solution for hardware and software monitoring

Req 4.
Req 5.
Req 6.
Req 7.
5.2.2 Network & Security Technical Requirements
Req 8. The Bidder should provide ISP redundancy for public IP routing
Req 9.
Req 10.
Req 11.
Req 12.
Req 13.
Req 14.
Req 15.
Req 16.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 16 of 42
5.2.3 Data Center Area Technical Requirements
5.2.3.1 Data Center Layout Requirements
Req 17.The Bidder should provide rack placement as per standard practice of cold
aisle and hot aisle
Req 18.The Bidder should seal the false ceiling to prevent dust from entering the
server halls
5.2.3.2 Electrical System Requirements
Req 19.
Req 20.
Req 21.
Req 22.
Req 23.
Req 24.
Req 25.
Req 26.
5.2.3.3 Cooling System Requirements
Req 27.The Bidder should provide redundancy for PAC
Req 28.
5.2.3.4 Fire, Security and Monitoring Requirements
Req 29.The fire alarm and fire suppression system should be teste regularly for its
proper operations.
Req 30.CCTV surveillance system needs to installed for monitoring the entry and exit of
the Server room and the aisle.
Req 31.
Req 32.
Req 33.
Req 34.
Req 35.
5.3 Hardware Architecture Requirements
Bidder should provide a hardware solution architecture that responds to the following
requirements:
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 17 of 42
Req 36.
Req 37.
Req 38.
Req 39.
Req 40.
Req 41.
5.4 Network Architecture Requirements
Req 42.
Req 43.
Req 44.
Req 45.The Bidder’s proposed solution should have sufficient Management &
Administration Systems for service-level monitoring and problem diagnosis.
Req 46.The Bidder’s proposed solution should be modular based as the following:
o Core & Server Farm Network
o Access Network (which includes access switches for LAN users)
5.5 Hardware Requirements
The Bidder should provide all the hardware and infrastructure components needed to
deliver and operate the Solution, including servers, storage, backup, network
components & security devices, and data center hardware area.
The Bidders will be also responsible for the procurement of any extra component(s)
they provide in their architecture.
5.5.1 Hardware Generic Requirements
Req 47.
Req 48.
Req 49.
5.5.2 Servers, Storage, and Backup Hardware Requirements
5.5.2.1 Blade Chassis Requirements
Req 50. Blade Chassis shall accommodate the specified maximum number of Blade
Servers with hot swappable HDD, Interconnect Modules, Power supplies, Fans and
Management Modules.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 18 of 42
Req 51.
Req 52.
Req 53.
Req 54.
5.5.2.2 Standalone Blade Servers Requirements
Req 55. CPU: 1 x 3.0 GHz or above Hex-core Intel Xeon processor 12 MB shared
cache. Processor being quote should be of latest generation with latest Processor
speed. Server Blade should support maximum of Two physical processors
Req 56.
Req 57.
5.5.2.3 SAN Switch Requirements
Req 58. Number of FC Ports-Minimum 24
Req 59.
Req 60.
5.5.2.4 Storage Upgrade Requirements
Req 61.Number of Hard disks- 24* 600GB FC 15K RPM
Req 62.
Req 63.
Req 64.Number of Fiber Channel Enclosure Modules-2
5.5.2.5 Backup System Requirements
Req 65. Should have data Transfer Rate of 800GB/hour
Req 66. Should have minimum of 9TB usable capacity
Req 67.
Req 68.
Req 69.
5.5.3 Network & Security Hardware Requirements
5.5.3.1 Perimeter Zone and Extranet DMZ Router Requirements
Req 70.Minimum 3 integrated 10/100/1000 Ethernet ports
Req 71.
Req 72.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 19 of 42
5.5.3.2 DMZ Switch Requirements
Req 73.4 One Gigabit Ethernet SFP ports
Req 74.24
Req 75.
Req 76.
5.5.3.3 Perimeter Zone Firewall Requirements
Req 77.Minimum Firewall Throughput of at least 450Mbps
Req 78.
Req 79.
Req 80.
5.5.3.4 Fire Wall SSL VPN License Requirements
Req 81.
Req 82.
Req 83.
Req 84.Minimum 50 license for SSL based VPN and to be used with the proposed
security appliance.
5.5.3.5 AAA Server Requirements
Req 85.Ability to offer a centralized identity and access policy solution.
Req 86.
Req 87.
Req 88.
5.5.3.6 Perimeter Zone Switch Requirements
Req 89.4 One Gigabit Ethernet SFP ports
Req 90.24
Req 91.
5.5.3.7 Aggregation and Access Switch Requirements
Req 92.Layer 2 hardware forwarding at 960 Gbps or 714.24 mpps; Layer 3
performance of up to 160 Gbps or 240 mpps
Req 93.
Req 94.
5.5.3.8 Data Center UTM Requirements
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 20 of 42
Req 95.Wire-speed firewall performance for any size packets
Req 96.
Req 97.
5.5.3.9 SMTP Gateway Requirements
Req 98.Minimum 4 10/100/1000 Interfaces (Copper, RJ-45)
Req 99.
Req 100.
5.5.3.10 Load Balancer Requirements
Req 101. Static and dynamic load balancing methods, including Dynamic Ratio-
Least Connections, and Observed Load Balancing, which track dynamic
performance levels of servers in a group
Req 102.
Req 103.
5.5.4 Data Center Area Hardware Requirements
5.5.4.1 Electrical System Requirements
5.5.4.1.1 DistributionBoards:
Req 104. Distribution boards shall be of standard make with MCB’s (Miniature
Circuit Breakers) per approved make given and factory assembled with latching
covers flush lock.
Req 105.
Req 106.
Req 107.
Req 108.
5.5.4.1.2 MCB/RCCB(Residual-CurrentCircuitBreaker):
Req 109. MCB shall fully comply with latest standard IS 8828 – 1996 &
relevant test certificate shall be furnished.
Req 110.
Req 111.
Req 112.
Req 113.
5.5.4.1.3 Earthing:
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 21 of 42
Req 114.
Req 115.
Req 116. All electrical equipment is to be earthen by connecting two earth tapes
from the frame of the equipment ring will be connect via several earth electrodes.
Req 117. The cable arm our will be earthen through the cable glands.
5.5.4.2 UPS System Requirements
5.5.4.2.1 UPS SystemConnectedto Critical Area
Req 118. The UPS connected to the Critical Area shall be use to power critical
servers and other equipment installed in the critical section of the Data Center.
Req 119.
Req 120.
Req 121.
5.5.4.2.2 UPS SystemConnectedto Non-Critical Area
Req 122.
Req 123.
Req 124. The Non- Critical area UPS shall be use to provide power to
workstations and other equipment installed in the non-critical section of the Data
Center.
5.5.4.3 HVAC System Requirements
5.5.4.3.1 Purpose
Req 125. The Air conditioning system shall be deploy with the objective of
cooling the respective areas based on the application requirement.
Req 126.
Req 127.
5.5.4.3.2 PrecisionAirConditioningSystem
Req 128.
Req 129.
Req 130. The computer room air conditioning equipment shall be design
specifically for precision temperature and humidity control applications. It shall
automatically monitor and control cooling, heating, humidification, de-
humidification and filtering functions for the conditioned space. The system should
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 22 of 42
build to the highest quality engineering and manufacturing standards, and shall be
subject to a functional test prior to leaving the factory.
5.5.4.3.1 Features
5.5.4.3.1.1 Construction
Req 131. The Unit cabinets shall be manufacture from 0.9mm galvanized sheet
steel, Z2 G275N (BS2989) coated with epoxy baked powder paint to provide a
durable finish.
Req 132.
Req 133.
5.5.4.3.1.2 Evaporator
Req 134.
Req 135.
Req 136. Large surface area coil(s) should ideally positioned to optimize airflow
and heat transfer; they shall be manufactured from refrigeration quality copper
tubes with mechanically bonded aluminum fins. The factory test pressure shall be
not less than 40bar.
5.5.4.3.1.3 Condenser
Req 137.
Req 138.
Req 139. Shall be stainless steel high efficiency brazed plate heat exchanger(s)
shall allow optimum heat transfer between media and ensures low water/glycol
pressure drops.
5.5.4.3.1.4 Fan& Motor Assembly
Req 140.
Req 141.
Req 142. Units utilize a double inlet, forward curved, direct drive centrifugal fan
with integral shaft mounted motor, which statically and dynamically balanced for
quiet operation.
Req 143. Impellers and casings shall be galvanized for protection against
corrosion.
Req 144. The integral motor runs in sealed for life, lubricated bearings and
features automatic thermal overload protection.
Req 145. Fan speed, airflow and external static pressure should controlled by the
use of a voltage controller via the microprocessor display keypad, which maintains
optimum performance and offers easy on site adjustment.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 23 of 42
Req 146. Direct drive fan assemblies require minimal maintenance unlike the
traditional belt and pulley type in areas such as belt dust, slippage/realignment and
replacement
5.5.4.4 Access Control System Requirements
5.5.4.4.1 Purpose
Req 147. The Access Control System shall be deploy with the objective of
allowing entry and exit to and from the premises to authorized personnel only.
Req 148.
Req 149.
Req 150.
5.5.4.4.2 Complianceto Specification
5.5.4.4.2.1 ControllerServer
Req 151. The network server shall mean the access control system server.
Req 152.
Req 153.
Req 154.
5.5.4.4.2.2 ApplicationSoftware
Req 155.
Req 156.
Req 157.
5.5.4.4.2.3 DoorController
Req 158. The door controller shall mean the intelligent control unit that shall be
used to process & manage the entry & exit transactions through each of the access
controlled points, which may be doors (with electromagnetic locks).
Req 159.
Req 160.
Req 161.
Req 162.
Req 163.
5.5.4.4.2.4 Reader(FingerPrint)
Req 164. The finger print reader (FPR) shall mean a device, which shall be
capable of reading a fingerprint & comparing the same with a stored template
based on optic sensors.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 24 of 42
Req 165.
Req 166.
Req 167.
5.5.4.4.2.5 Proximity/Smartcardreader
Req 168. The proximity/Smart card reader shall mean the card-reading device,
connected to the door controller.
Req 169.
Req 170.
5.5.4.4.2.6 Proximity/Smartcard
Req 171. The proximity/Smart card shall mean the access card that is capable of
being read without a direct contact by the proximity card reader.
Req 172.
Req 173.
Req 174.
5.5.4.4.2.7 Electro MagneticLock
Req 175. The Electro Magnetic Lock (EML) shall mean a locking mechanism
that works on the principle of electromagnetic attraction.
Req 176.
Req 177.
Req 178.
5.5.4.4.2.8 Cables
Req 179. The cables shall mean appropriate data cables required for connecting
the door controllers to the PC. It shall also mean appropriate data & power cables
to connect the card readers, locks to the door controllers.
Req 180.
Req 181.
5.5.4.5 CCTV System Requirements
5.5.4.5.1 PurposeandCC CameraLocations
Req 182. The Critical Data Centre along with the Non Critical area needs to be
under constant video surveillance.
Req 183.
Req 184.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 25 of 42
Req 185.
Req 186.
Req 187.
5.5.4.5.2 ApplicationSoftware
Req 188. The application software shall mean the Video management software
that should supplied together with the system in order to provide a User Interface
(UI) for man machine interface.
Req 189.
Req 190.
5.5.4.5.3 DomeCamerawithAuto Iris, vari-focal lens.
Req 191. The proposed Camera shall have a 1/3” CCD Pickup device & be of
high resolution of 330 TVL and minimum lux level of 1.0 lux f1.4.
Req 192.
Req 193.
Req 194.
5.5.4.5.4 Monitor
Req 195. The monitor shall be suitable with the standards of the selected
cameras.
Req 196.
Req 197.
Req 198.
5.5.4.5.5 Keyboard
Req 199.
Req 200.
Req 201. .
5.5.4.5.6 CCTV MonitoringWorkstation
Req 202.
Req 203.
5.5.4.6 Water Leak Detection System Requirements
The water leak detector should installed to detect any seepage of water into the critical
area. It shall consist of water leak detection cable and an alarm module. The cable
should installed in the ceiling & floor areas around the periphery.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 26 of 42
5.5.4.6.1 Water leakagedetectioncable
Req 204. The Water leak detection cable shall the sensor cable typically used to
detect water leaks in the sub floor and above false ceiling areas.
Req 205.
Req 206.
5.5.4.6.2 Control Panel
Req 207. The control panel shall be computerized multi zone multiplex
controller. The system should programmed, armed or disarmed through a control
key pad.
Req 208.
Req 209.
Req 210.
Req 211.
5.5.4.6.3 Water Leak DetectionSensors
Req 212. Water Leak Detection sensors should mounted, where localized leak
detection is required.
Req 213.
Req 214.
5.5.4.6.4 Sounder
Req 215. The sounder shall give audible alarm when any sensor operates.
Req 216.
5.6 Implementation Requirements
The Solution implementation will require a highly qualified Bidder to undertake the
configuration, testing and deployment of all hardware, software, components and
tools to ensure successful delivery that meets the requirements within various
functional and technical areas. Given the Solution’s importance in terms of its
objectives to -------------, the following are the general implementation guidelines and
requirements:
Req 217. The Bidder should perform the Solution’s complete implementation
and deployment within (6) months of the project’s contract start date. The Bidder
can propose alternative project implementation phases and timelines that would
enable it to guarantee the Solution’s successful and complete implementation and
deployment.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 27 of 42
Req 218. The Bidder should perform required migration/upgrade for current
infrastructure (server, application, network HW, Security HW).
Req 219. The Bidder should develop the design (high level & low level) and
migration through technology vendor services.
Req 220. The Bidder should perform required knowledge transfer and handover
for the propose solution.
Req 221. The Bidder’s proposed knowledge transfer shouldn’t be less than one
week per component.
Req 222. The Bidder’s proposed knowledge transfer shouldn’t be less than 2
person per component and not necessarily at the same time.
Req 223. The Bidder’s proposed knowledge transfer should include all
Hardware (network, security, servers, storage, backup, data center).
Req 224. The Bidder should explain how they can be able to deliver the solution
successfully during the required (6) months period.
5.6.1 Project Management Requirements=
Req 225. The Bidder should provide an implementation plan illustrating all
development, testing, deployment, and transition activities. Transition activities
should at least include operational readiness review, operation model and
procedures. In addition, the Bidder should specify and describe its deliverables.
Req 226. The Bidder should comprehensively specify and describe the project’s
different phases and activities, etc. It is very important that the Bidder provide a
quality implementation plan covering all project aspects. The plan shall clearly
specify the start and end dates (relative to contract signing) for each of the project
phases and key milestones to increase visibility of the project progress.
The table below, Table 4, demonstrates the minimum stages
implementation Requirements
Phase Stage Activities Duration
Design Planning Conduct a Kick-off meeting
Define the project stages, milestones and
needed resources
Develop project control deliverables
Contract
signature Date +
1 week
Requirements &
Analysis
Review, verify and confirm the
requirements included in this RFP
document.
Contract
signature Date +
2 week
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 28 of 42
Architecture
Analysis
Define all architecture deliverables Contract
signature Date +
3 week
Design Propose solution design.
Produce Data center, servers, storage,
backup, network, security, monitoring
tools final High Level & Low level
design.
Produce The Solution Final Bill of
Quantity.
Prepare procurement documents
(Documents to verify that the equipment,
devices, and licenses are ordered or
purchased).
Produce installation, configuration
migration and upgrade plan & procedure.
Contract
signature Date +
4 weeks
Build Supply Supply equipment, devices, servers,
storage, and all required licenses
Contract
signature Date +
12 weeks
Implement data
center high
availability solution
Conduct electrical system installation,
configuration and running.
Conduct cooling system installation,
configuration and running.
Conduct fire, security, and monitoring
systems installation, configuration and
running.
Contract
signature Date +
16 weeks
Implement network
& security high
availability solution
Conduct network & security installation,
configuration and running.
Contract
signature Date +
18 weeks
Implement servers,
storage,backup
systems high
availability solution
Implement
Hardware &
Software
Monitoring Tools
Conduct servers,storage and backup
systeminstallation, configuration and
running.
Conduct hardware & software
monitoring tools installation,
configuration and running.
Contract
signature Date +
20 weeks
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 29 of 42
Migrate & operate
the systems,
software, and data
from the existing
environment to the
new high available
environment.
Conduct systems,software, and data
migration and operation from the
existing environment to the new high
available environment.
Contract
signature Date +
20 weeks
Documentation Document all procedures,system
documentations
Contract
signature Date +
24 weeks
Testing Perform System Testing.
Perform Stress Testing.
Ensure completeness of User Acceptance
Test.
Contract
signature Date +
24 weeks
Handover Handover Provide knowledge transfer.
Handover implemented and updated
systems.
Start maintenance & support period
Contract
signature Date +
24 weeks
Table 4 The Minimum Project Stages
The Bidder should follow an internationally recognized project management
methodology. For each of the items listed below, bidders must describe their approach
to project management during the project phases in their proposals:
Req 227. Provide a comprehensive project implementation plan covering, but
not limited to, tasks estimation, project planning, work allocation, progress
tracking, monitoring and reporting to ------------.
Req 228. Describe the project’s management team structure, along with roles
and responsibilities of all team members.
Req 229. Describe, in detail, project management processes, methodologies and
procedures.
Req 230. Describe ------------ resources necessary for the project to succeed.
Req 231. Describe how ----------- management will receive up-to-date reports on
project status.
Req 232. Describe the change management procedures to handle risks, such as
“out-of-scope” requests or change in ------------ business needs while the project is
underway.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 30 of 42
Req 233. Describe what procedures will be use to keep the project on track and
what escalation procedures will be employed to address any problems encountered
with the project progress.
Req 234. Describe what quality assurance processes, procedures, formal
reviews, etc. will be in place.
Req 235. Describe the proposed conflict resolution / escalation process between
the Bidder and ------------ to handle project or contractual disputes.
5.6.2 Project Documentation Requirements
Req 236. The Bidder should provide documentations for each phase as per the
following table:
Phase Deliverables
Design Detailed project management plan
Project charter
Detailed Scope of Work
Work Breakdown Structure
Project schedule
Design verification document
High level final design document
Low level final design document
The solution Bill of Quantity document
Failover and fail back methodology document
Build Deployment documentation
Operations Plan
Operations Policies and Procedures
System documentations
Test Plan.
User Acceptance Criteria
Problem reporting
Problem resolution testing
Operation Produce daily, weekly & monthly reports.
Handover Provide final versions of all documentations.
Provide full knowledge transfer documentation.
Table 5 Sample Phases Documentation
5.6.3 Project Organization Requirements
Req 237. The Bidder should describe the proposed project structure, identifying
all project individuals including senior project manager, QA engineers, hardware /
network engineers, administrators and others.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 31 of 42
Req 238. The Bidder should specify roles and qualifications of various team
members proposed for the project as well as identify the key roles ------------
technical staff is expected to play. Bidders should provide details of any sub-
contractors likely to be involved.
Req 239. The Bidder should indicate the number of full time staff that will be
required.
------------ requires that a strong technical team include a fulltime senior project
manager assigned to manage the entire project, technical team and contract, including
the performance of subcontractor(s) personnel if any. The following are the
requirements for the senior project manager:
Req 240. The senior project manager must be available full-time throughout the
project implementation duration.
Req 241. The senior project manager must ‘not reassigned during the
implementation period without ------------ written consent.
Req 242. The project manager will function as the Bidder’s authorized point of
contact with ------------ and must be available to respond promptly and fully to all
project requirements.
Req 243. The senior project manager’s responsibilities will include, but are not
limited to, providing administrative, supervisory and technical direction to project
personnel, monitoring work performance for accuracy, timeliness, efficiency and
adherence to contract requirements, coordinating the resolution of contract
problems as well as implementing and enforcing problem escalation procedures.
Req 244. The senior project manager must be a bidder’s employee and must
authorized to make decisions on behalf of the Bidder and all subcontractors; if any.
Req 245. The senior project manager shall have a minimum of (8) years’
experience managing similar projects (both in nature and scale) involving IT
deployment in the government sector, and application integration operations for
accounts similar in scope and complexity to this project. Furthermore, he must
have demonstrated effective oral and written communication skills.
Req 246. The senior project manager should be available on-site upon request at
------------ facility in Jeddah.
Req 247. For the senior project manager, the Bidder must provide a reference for
his last two (2) projects including company name, address, phone number and
contact person.
In addition to the senior project manager, ----------- requires the assignment of a
strong technical support team to the project. The technical team’s members must
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 32 of 42
have demonstrated sound experience in implementing similar projects. -----------
will review and approve the Bidder’s selected personnel for project assignment. ---
------- reserves the right to interview and approve the technical team members. In
addition, -------------- has the right to require replacement of the Bidder’s personnel
if dissatisfied with their performance.
Req 248. The Bidder should provide an organizational chart for the assigned
project team, resumes / CVs for all technical team members and a brief, one-half
page biography for each key employee assigned to the project. The information
provided shall include the following: name, classification, employment period with
the company, previous related experience (last three years), and reason for
assigning the individuals to the project and their responsibilities.
5.6.4 Warranty Requirements
Req 249. The Bidder should provide a comprehensive warranty that covers all
components it will provide (hardware and software) after the implementation
acceptance test. The warranty should cover all materials, licenses, services and
support for both hardware and software.
Req 250. The Bidder should provide SLA with (hardware & software) venders
on a 4 hours response time 24x7 & spare part delivery.
Req 251. The Bidder should administer warranties with serial number and
warranty period. Upon final acceptance of the solution, any OEM warranties will
transferred to --------- at no additional charge. All warranty documentation
(whether expired or not) will be delivered to -------- at the issuance of the final
acceptance certificate.
Req 252. The Bidder should provide the technology vendor’s Premium Level
warranty and support for all hardware and software used in The Solution.
Req 253. The Bidders’ warranty must cover all equipment and work activities
contained in the contract against all design, manufacturing, and environment faults
until issuance of final acceptance.
Req 254. The warranty’s/support duration shall be mandatory for three years and
shall be optional for the 4th and 5th years from the solution’s final acceptance date.
Req 255. The warranty shall include the Bidder’s repair or replacement of the
products / components during the warranty period. The replacement products /
components shall meet the related specifications without further repair or
modification.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 33 of 42
Req 256. The Bidder shall be liable for all costs including, but not limited to, the
costs of material, labor, travel, transport and living expenses associated with the
collection and return of the units covered by the warranty.
Req 257. The date of manufacture or assembly of any equipment, parts or
consumables, shall not be more than six months before delivery.
Req 258. -------- has the right to require a replacement if the repair is deemed to
be impractical.
Req 259. The Bidder must ensure the replacement components are available for
any failed component during the warranty period.
Req 260. The Bidder should guarantee availability of spare parts and technical
assistance for all components (or appropriate alternatives) to ensure the equipment
would run for at least five (5) years, without major changes, at the completion of
final acceptance. Six months advance notice is required for any discontinued
part(s) with a suggestion for alternatives.
Req 261. The Bidder should provide repair data and corresponding courses of
failure, which will kept in ------------ historical database system.
Req 262. The Bidder should define the maximum response time by which
engineers shall respond to a failure incident and the maximum time of resolving
the failure in their proposal
5.6.5 Quality Assurance and Acceptance Requirements
The QA control mechanism is the testing process that validates all claims made by the
team and proves that The Solution maps to the requirements and any other approved
change requests.
Req 263. The Bidder’s quality control framework must base on the best
practices and international standards to conform to all the solution’s
requirements; including functional and technical requirements, user
requirements. It will also provide the basis for the solution’s testing,
validation and acceptance.
Req 264. The Bidder should perform System Testing: Validation of the
solution’s functional and technical requirements.
Req 265. The Bidder should generate User Acceptance Testing (UAT) test
cases.
Req 266. The Bidder should describe the methods and procedures used to secure
the solution data integrity and consistency.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 34 of 42
Req 267. The Bidder should perform stress and performance testing: Load
testing enables the understanding of the solution’s performance and behavior under
large number of users and high-load conditions.
Req 268. The Bidder should perform security audit and system penetration
testing for the solution.
Req 269. The Bidder should describe their QA, testing approaches and
procedures as well as testing tools for conducting various tests in support of the
solution’s acceptance.
6 ProposalFormat
6.1 General Instructions
This section provides the requirements Bidders must abide by in preparing and
submitting their proposals, including the expected proposal content structures. Bidders
must comply with all items listed in Appendix A: “Instructions to Bidders”:
1. TECHNICAL PROPOSAL
2. FINANCIAL PROPOSAL
Each bidder’s proposal packages must contain the following information, as outlined in
table 5 below, to qualify for evaluation.
Technical Proposal Package Financial Proposal Package
Cover Letter
Technical Proposal Response
Appendix C
Appendix D
Appendix E
Appendix G
Curriculum Vitas
Cover Letter
Financial Proposal Response
Appendix F
Security Bond
Saudi Ministry of Commerce registration
certificate and any International
identification/registration
Chamber of Commerce Certificate
Certificate from Department of Zakat
and Income Tax (DZIT) outlining Zakat
and income tax payments
Social Insurance Certificate (GOSI)
Saudization Certificate
Table 6 Proposal Packages Content
Proposals shall be simple, providing a straightforward concise description of the
Bidder’s ability to meet this RFP’s requirements. Proposals should only address those
requirements specified in this RFP. Unnecessary marketing information, provided in
the response to this RFP, will unfavorably viewed, and could affect the Bidder’s
response evaluation.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 35 of 42
6.2 Proposal Preparation
Req 270. Bidders must conform to the following requirements. Failure to adhere
to these requirements will result in immediate elimination of the proposal.
Req 271. The Bidders’ proposals must contain a cover letter on company
letterhead with original signature(s) of an Authorized Signatory to bind Bidders to
the RFP provisions.
Req 272. The Bidders must confirm that their proposals will remain valid for 90
days after the submission date.
Req 273. The Technical proposal must be less than one hundred (100) A4 pages,
using 11 size Calibri or Arial font to be considered for evaluation
Req 274. The Technical Proposals must contain a completed “Requirements
Compliance Matrix” according to the format shown in Appendix C.
Req 275. The completed “Requirements Compliance Matrix” and other required
information must attached as appendices to the Technical Proposal as specified in
the table above.
Req 276. The Bidders can provide additional information as appendices, but it is
not guaranteed that these appendices will be considered for the purpose of
proposal's evaluation.
Req 277. No financial information should be included in the Technical Proposal.
Req 278. The Financial Proposal will have “Bill of Material & Pricing Tables”
according to the format specified in Appendix F; it should written in Arabic and
English with all the prices.
Req 279. The Financial information must be bound, sealed, identified as
“Financial Proposal”, and must be separate from the Technical Proposal.
Req 280. All copies of the Bidders’ proposal(s) must arrive at the Issuing Office
on or before the date and time specified in the RFP Terms and Conditions.
Req 281. The Bidders must acknowledge their attendance at the pre-contract
presentations when requested by ------------.
6.3 Technical Proposal Instructions
This section provides the detailed information that must be included in the Bidder’s
Technical Proposal. The Bidder must comply with all items listed in Appendix D. This
section of the Bidder’s proposal should identified as Technical Proposal and must be
bound and sealed separately. It must NOT include any financial data or information.
Financial data or information is defined as any information related, directly or
indirectly, to the Bidder’s proposed charges for products, services and deliverables.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 36 of 42
6.3.1 Mandatory and Optional Requirements
Bidders must confirm that their proposal(s) meets all the mandatory and optional
requirements. Non-acceptance of or noncompliance with any mandatory requirement,
or modification of, or the placing of conditions on acceptance or compliance with any
of the mandatory requirements in whole or in part, may result in immediate
disqualification.
6.3.2 Required Sections
The Technical Proposal should structure as follows:
6.3.2.1 Section 1: Executive Summary
This section should include a succinct statement and executive summary where the
Bidder highlights the technical proposal’s key aspects.
6.3.2.2 Section 2: Bidder’s Profile & Qualifications
This section should cover the Bidder’s profile including credentials and capabilities,
local presence, the project team composition and relevant experience and the tools and
products the vendors selected to deliver the proposed solution.
 Bidder’s credentials and capabilities:
Bidders will evaluated based on their commercial viability, market presence,
stability and experience in the project technical areas. Bidders should supplement
this section with the information requested as outlined in Appendix G General
Bidder Information and Qualifications.
 Local Presence
Although the bidding is open to bidders from any country, due to the project’s
critical nature, preference shall give to Bidders with active work and staff
presence in KSA.
 Bidder References
Bidders must submit the latest three project references where work similar to -----
------- solution in scope and technical nature has implemented. ------------ will
evaluate these references, based on the above criteria as well as client satisfaction
and project success. Bidders should use the project references table provided in
Appendix E “Bidder Projects References” to list their project references.
 Product Supplier
Bidders will be evaluated based on criteria related the Bidder’s product(s)
supplier’s profile, stability, financial and product viability. The key determinant
factor is for the Bidder to demonstrate that the product and products combinations
had successfully deployed in a similar environment preferably in government
entities or large organizations.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 37 of 42
 Project Team
Bidders will be evaluated based on the team overall capabilities, knowledge and
experience as demonstrated in the RFP. Bidders should list all companies or
subcontractors involved in delivering the RFP requirements. The overall team
must possess all the success factors for smooth project delivery and execution,
including a record of accomplishment within senior project management,
architecture, development and system administration. The team should clearly
demonstrate prior experience of senior project management and architecture.
6.3.2.3 Section 3: Technical Solution Architecture
This section should present the Bidders’ technical architecture solution meeting all
functional and technical requirements outlined in this RFP.
The Bidders should present sound, complete, and competent technical architecture
solution in details. The Bidders are expected to address the following technical
architecture aspects:
 Solution Architecture Overview
 Physical model overview
 Integration of Infrastructure and Security Architecture between ------- and the
Solution
 Monitoring and management of Solution
 Architecture scalability and performance
6.3.2.4 Section 4: Architecture Performance and Scalability
This section should present the sizing exercise results for the Solution’s performance
and scalability in accordance to the requirements outlined in the RFP. Bidders should
explain their sizing approach in determining the required hardware and software.
6.3.2.5 Section 5: Project Administration and Management
This section should present the Bidders’ detailed implementation plan outlining their
proposal’s different deliverables including the period each deliverable requires.
Bidders should respond to the requirements as outlined in the RFP.
Req 282. The Bidders should develop project work plans for ------------, that
include activities that will be undertaken to achieve the project objectives and
deliverables within the required time scales. The work plan shall clearly show who
will undertake the activity and the scheduled dates to start and complete each
activity.
Req 283. The Bidders should discuss their Quality Assurance framework and
testing plans in detail.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 38 of 42
Req 284. The Bidders should provide details on the required team that will be
involved in project management including structure, members and expertise.
Req 285. The Bidders should include CVs of the proposed implementation team
in Curricular Vitae document and provide description of the Bidder's ability to
mobilize the assigned resources.
Req 286. The Bidders should show the experiences required for this project in
the CVs, such as project management, quality assurance, DRP expertise, database
design and development, SOA architecture and design, integration architecture and
development, virtualization architect and configuration and configuration
management.
6.3.2.6 Section 7: Maintenance & Support
This section should present the Bidder’s detailed maintenance and support plan for
software and hardware including detailed information on these plans. Bidders should
respond to the requirements as outlined in this RFP.
6.3.2.7 Section 8: Operations
This section should present the Bidder’s detailed operations approach and plan to
operate the proposed solution. The Bidders should respond to the requirements
outlined in this RFP.
Req 287. The Bidders should submit CVs of the proposed operations team in
Curricular Vitae Proposal document.
6.3.3 RequiredAppendices
6.3.3.1 Appendix C: Bidder’sResponse to Compliance Matrix
This appendix should present the Bidders’ compliance to the “Requirements
Compliance Matrix” in Appendix C of this RFP. Bidders should follow the
instructions to provide accurate and detailed answers.
6.3.3.2 Appendix D: Solution Bill of Materials and Information Tables for Technical Proposal
This appendix should list all software and hardware products, components and tools
that implement the proposed technical architecture solution meeting all functional and
technical requirements outlined in this RFP. Bidders should use table formats in
Appendix D and must make sure that no financial information is included.
6.3.3.3 Appendix F: Solution Bill of Materials and Information Tables for Financial Proposal
This appendix should list all software and hardware products, components and tools
that will use to implement the proposed technical architecture solution meeting all
functional and technical requirements outlined in this RFP. Bidders should use table
formats in Appendix F and must make sure that no financial information is included.
6.3.3.4 Appendix E: Bidder References
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 39 of 42
Bidders should use the Bidder references template, provided in Appendix E, to
provide information on three relevant successfully completed projects with similar
scope and size to the one requested in this RFP.
6.3.3.5 Appendix G General Bidder Information and Qualifications
The Bidder must include the following required information in this appendix to help
assess the Bidder’s credentials and qualifications;
1. Short narrative description of the company’s organization, including
organizational charts, and indicating company officers where applicable.
2. Complete name and address.
3. Principal type of business.
4. Total number of years in business.
5. Total number of employees.
6. Number of years providing services similar to those requested in this RFP.
7. Total revenues received from similar engagement(s) during each of the last
three (3) fiscal years.
8. Audited profit and loss statement and balance sheet for the Bidder’s last three
(3) fiscal years. -------- will keep this information confidential during the
evaluation process.
9. Bidder’s copy of the company’s Articles of Association.
10. Representations and warranties that the Bidder: (i) is a legal entity duly
established and validly existing under the laws and regulations of the
Kingdom of Saudi Arabia; (ii) has the power to enter into and perform all
transactions contemplated hereby; (iii) is not currently under suspension or
debarment by any governmental body.
11. Acknowledgement stating that if the Bidder is currently under suspension,
debarment or has legal suit, then its proposal may not be considered.
12. Signed formal agreement (e.g. teaming agreement or any other legally binding
document) between the Bidder and each proposed subcontractor. These formal
agreements must be contained in a separate volume (Appendices supporting
the Technical Proposal.)
6.4 Financial Proposal Instructions
This section provides the detailed information required in the Bidder’s Financial
Proposal. Bidders must comply with all items specified in Appendix A: Instructions to
Bidder and Proposal Submission and Evaluation and Appendix B: Standard Terms &
Conditions. This section of the Bidder’s proposal must identified as Financial
Proposal and must be bound and sealed separately from the Technical Proposal.
Financial Data is defined as any information related, directly or indirectly, to the
Bidder’s proposed charges for products, services and deliverables. The Bidder must
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 40 of 42
use and complete the tables in Appendix F as part of its Financial Proposal to provide
the following:
1. Financial data or information must not presented in any portion of the
Technical Proposal. Financial data or information consists of, but is not
limited to, costs, fees, prices, rates, bonuses, discounts, rebates, or the
identification of free services, labor or materials.
2. All prices must be in Saudi Riyals (SAR).
3. All prices shall include all costs including procurement and on site delivery.
4. Pricing should also include software, hardware, implementation, training,
maintenance and support, and operations.
5. Itemized list for each of the required services: hardware, software, licenses,
customization, implementation, operations / management and training
components in support of their proposed solution.
6. Bidders must use tables provided in Appendix F to list and itemize their
solution cost including mandatory and optional items.
7. Financial Proposal envelope shall contain all required items as outlined in the
Financial Proposal Packages Content.
8. Bidders must abide by all requirements in this RFP.
7 Overview of appendices
The following are the appendices for supporting the RFP.
Appendix A: Instructions to Bidder, Proposal Submission and Evaluation
Appendix A provides Bidders with information regarding proposal review process,
content, format, evaluation, and communications.
Appendix B: Standard Terms & Conditions
Appendix B provides standard terms and conditions in Arabic.
Appendix C: Requirements Compliance Matrix for Technical Proposal
Bidders should fill-in this sheet in its entirety; this table will use to guide the technical
proposal’s evaluation process.
Appendix D: Bill ofMaterials & Information Tables for Technical Proposal
Appendix D provides all the software and hardware information tables that Bidders
must provide for the Technical Proposal.
Appendix E: Bidder Project References Templates for Technical Proposal
Appendix E provides the templates for Bidders’ references in support of their Technical
Proposals.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 41 of 42
Appendix F: Bill ofMaterials & Pricing Tables for Financial Proposal
Appendix F provides all the pricing table templates that Bidders should complete with
all required financial data and information for the Financial Proposal.
Appendix G: Bidders Qualifications
Appendix G provides the Bidders qualifications.
‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 42 of 42
8 The Appendices (‫ت‬ ‫)ايمال‬
‫تلو‬:‫ة‬‫تعليمعـ‬‫تقفي‬‫العر‬‫عالتقيي‬
AppendixA - Instructions to Bidder and Proposal Submission and Evaluation v04.rar
‫تلو‬‫ب‬:‫الشرع‬‫الععتة‬
Appendix B - Standard Terms and Conditions v0.3.rar
‫تلو‬:‫ج‬‫تععيير‬‫المطعبقة‬
Appendix C - Compliance Matrix v0.4.rar
‫تلو‬‫د‬:‫فاعل‬‫الكميعـ‬‫للعر‬‫الففي‬
Appendix D - Bill of Materials Information Tables for Technical Proposal V0.1.rar
‫تلو‬‫هد‬:‫مة‬ ‫سع‬‫المشعريع‬‫عالخبراـ‬‫السعبقة‬
Appendix E - Bidders References Template v0.2.rar
‫تلو‬:‫ع‬‫فاعل‬‫الكميعـ‬‫عاألسععر‬(‫العر‬‫المعلي‬)
Appendix F- Bill of Materials and Pricing Tables for Financial Proposal V 4.rar
‫تلو‬:‫ز‬‫تعلوتعـ‬‫هالـ‬ ‫عت‬‫تقفتي‬‫العرع‬
Appendix G- Bidders Qualifications and Information v0.2.rar

Contenu connexe

Tendances

كتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكومية
كتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكوميةكتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكومية
كتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكوميةYesserProgram
 
الدليل الاسترشادي لحصر ونشر الخدمات الحكومية
الدليل الاسترشادي لحصر ونشر الخدمات الحكوميةالدليل الاسترشادي لحصر ونشر الخدمات الحكومية
الدليل الاسترشادي لحصر ونشر الخدمات الحكوميةYesserProgram
 
نموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريع
نموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريعنموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريع
نموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريعYesserProgram
 
حصر الخدمات الحكومية ورفع مستوى نضجها الإلكتروني
حصر الخدمات الحكومية ورفع مستوى نضجها الإلكترونيحصر الخدمات الحكومية ورفع مستوى نضجها الإلكتروني
حصر الخدمات الحكومية ورفع مستوى نضجها الإلكترونيYesserProgram
 
الدليل الاسترشادي لحصر ونشر الخدمات الالكترونية
الدليل الاسترشادي لحصر ونشر الخدمات الالكترونيةالدليل الاسترشادي لحصر ونشر الخدمات الالكترونية
الدليل الاسترشادي لحصر ونشر الخدمات الالكترونيةYesserProgram
 
الهيكلية المؤسسية الوطنية
الهيكلية المؤسسية الوطنيةالهيكلية المؤسسية الوطنية
الهيكلية المؤسسية الوطنيةYesserProgram
 
البنية المؤسسية الوطنية
البنية المؤسسية الوطنيةالبنية المؤسسية الوطنية
البنية المؤسسية الوطنيةYesserProgram
 
الدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكومية
الدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكوميةالدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكومية
الدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكوميةYesserProgram
 
الخطة التنفيذية الاولى للتعاملات الالكترونية الحكومية
الخطة التنفيذية الاولى للتعاملات الالكترونية الحكوميةالخطة التنفيذية الاولى للتعاملات الالكترونية الحكومية
الخطة التنفيذية الاولى للتعاملات الالكترونية الحكوميةYesserProgram
 
المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...
المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...
المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...Dr. Ahmed Farag
 
الخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعودية
الخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعوديةالخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعودية
الخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعوديةYesserProgram
 
قياس التحول الرقمي الحكومي
قياس التحول الرقمي الحكوميقياس التحول الرقمي الحكومي
قياس التحول الرقمي الحكوميYesserProgram
 
نموذج استبيان مرحلة إتاحة الخدمات الالكترونية
نموذج استبيان مرحلة إتاحة الخدمات الالكترونيةنموذج استبيان مرحلة إتاحة الخدمات الالكترونية
نموذج استبيان مرحلة إتاحة الخدمات الالكترونيةYesserProgram
 
ادارة الجودة في المشاريع الصغيرة.pdf
ادارة الجودة في المشاريع الصغيرة.pdfادارة الجودة في المشاريع الصغيرة.pdf
ادارة الجودة في المشاريع الصغيرة.pdfmohamedezzat558304
 
عرض الأرشفة الالكترونية
عرض الأرشفة الالكترونيةعرض الأرشفة الالكترونية
عرض الأرشفة الالكترونيةAshraf Ghareeb
 
بيانات ومعلومات وتقارير أداء عمل المشروع Project Work Performance Data, Info...
بيانات ومعلومات وتقارير أداء عمل المشروع  Project Work Performance Data, Info...بيانات ومعلومات وتقارير أداء عمل المشروع  Project Work Performance Data, Info...
بيانات ومعلومات وتقارير أداء عمل المشروع Project Work Performance Data, Info...Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL
 
2- تخطيط المسار الوظيفي.pdf
2- تخطيط المسار الوظيفي.pdf2- تخطيط المسار الوظيفي.pdf
2- تخطيط المسار الوظيفي.pdfShamsMohammed21
 

Tendances (20)

كتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكومية
كتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكوميةكتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكومية
كتيب تعريفي عن قياس التحول للتعاملات الالكترونية الحكومية
 
الدليل الاسترشادي لحصر ونشر الخدمات الحكومية
الدليل الاسترشادي لحصر ونشر الخدمات الحكوميةالدليل الاسترشادي لحصر ونشر الخدمات الحكومية
الدليل الاسترشادي لحصر ونشر الخدمات الحكومية
 
نموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريع
نموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريعنموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريع
نموذج كراسة الشروط والمواصفات لمشروع تأسيس مكتب إدارة المشاريع
 
حصر الخدمات الحكومية ورفع مستوى نضجها الإلكتروني
حصر الخدمات الحكومية ورفع مستوى نضجها الإلكترونيحصر الخدمات الحكومية ورفع مستوى نضجها الإلكتروني
حصر الخدمات الحكومية ورفع مستوى نضجها الإلكتروني
 
الدليل الاسترشادي لحصر ونشر الخدمات الالكترونية
الدليل الاسترشادي لحصر ونشر الخدمات الالكترونيةالدليل الاسترشادي لحصر ونشر الخدمات الالكترونية
الدليل الاسترشادي لحصر ونشر الخدمات الالكترونية
 
الهيكلية المؤسسية الوطنية
الهيكلية المؤسسية الوطنيةالهيكلية المؤسسية الوطنية
الهيكلية المؤسسية الوطنية
 
البنية المؤسسية الوطنية
البنية المؤسسية الوطنيةالبنية المؤسسية الوطنية
البنية المؤسسية الوطنية
 
الدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكومية
الدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكوميةالدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكومية
الدليل الإرشادي لاستخدام أدوات المشاركة المجتمعية الإلكترونية في الجهات الحكومية
 
الخطة التنفيذية الاولى للتعاملات الالكترونية الحكومية
الخطة التنفيذية الاولى للتعاملات الالكترونية الحكوميةالخطة التنفيذية الاولى للتعاملات الالكترونية الحكومية
الخطة التنفيذية الاولى للتعاملات الالكترونية الحكومية
 
المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...
المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...
المتطلبات الوظيفية والمواصفات الفنية لأنظمة إدارة السجلات الكترونياً في مؤسسا...
 
الخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعودية
الخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعوديةالخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعودية
الخطة التنفيذية الثانية للتعاملات الالكترونية الحكومية بالسعودية
 
قياس التحول الرقمي الحكومي
قياس التحول الرقمي الحكوميقياس التحول الرقمي الحكومي
قياس التحول الرقمي الحكومي
 
نموذج استبيان مرحلة إتاحة الخدمات الالكترونية
نموذج استبيان مرحلة إتاحة الخدمات الالكترونيةنموذج استبيان مرحلة إتاحة الخدمات الالكترونية
نموذج استبيان مرحلة إتاحة الخدمات الالكترونية
 
ادارة الجودة في المشاريع الصغيرة.pdf
ادارة الجودة في المشاريع الصغيرة.pdfادارة الجودة في المشاريع الصغيرة.pdf
ادارة الجودة في المشاريع الصغيرة.pdf
 
عرض الأرشفة الالكترونية
عرض الأرشفة الالكترونيةعرض الأرشفة الالكترونية
عرض الأرشفة الالكترونية
 
بيانات ومعلومات وتقارير أداء عمل المشروع Project Work Performance Data, Info...
بيانات ومعلومات وتقارير أداء عمل المشروع  Project Work Performance Data, Info...بيانات ومعلومات وتقارير أداء عمل المشروع  Project Work Performance Data, Info...
بيانات ومعلومات وتقارير أداء عمل المشروع Project Work Performance Data, Info...
 
نموذج تقييم مؤسسي
نموذج تقييم مؤسسينموذج تقييم مؤسسي
نموذج تقييم مؤسسي
 
2- تخطيط المسار الوظيفي.pdf
2- تخطيط المسار الوظيفي.pdf2- تخطيط المسار الوظيفي.pdf
2- تخطيط المسار الوظيفي.pdf
 
دليل التخطيط التشغيلي
دليل التخطيط التشغيليدليل التخطيط التشغيلي
دليل التخطيط التشغيلي
 
حقيبة إعداد الخطة التشغيلية
حقيبة إعداد الخطة التشغيلية حقيبة إعداد الخطة التشغيلية
حقيبة إعداد الخطة التشغيلية
 

En vedette

مختبرات الابتكار الاجتماعي-عاطف الشبراوي
مختبرات الابتكار الاجتماعي-عاطف الشبراويمختبرات الابتكار الاجتماعي-عاطف الشبراوي
مختبرات الابتكار الاجتماعي-عاطف الشبراويatef Elshabrawy
 
تغذية الجماعات د/ هاني
  تغذية الجماعات د/  هاني  تغذية الجماعات د/  هاني
تغذية الجماعات د/ هانيHany Atef
 
الابتكار الوظيفي في عصر حكومة المستقبل
الابتكار الوظيفي في عصر حكومة المستقبلالابتكار الوظيفي في عصر حكومة المستقبل
الابتكار الوظيفي في عصر حكومة المستقبلSaeed Al Dhaheri
 
الابتكار الاجتماعي في العصر الرقمي
الابتكار الاجتماعي في العصر الرقميالابتكار الاجتماعي في العصر الرقمي
الابتكار الاجتماعي في العصر الرقميCharity Innovation
 
موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...
موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...
موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...YesserProgram
 
تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...
   تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...   تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...
تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...Hany Atef
 
الدليل التعريفي بالبيانات المفتوحة
الدليل التعريفي بالبيانات المفتوحةالدليل التعريفي بالبيانات المفتوحة
الدليل التعريفي بالبيانات المفتوحةYesserProgram
 
وثيقة النموذج المرجعي للتطبيقات الوطنية
وثيقة النموذج المرجعي للتطبيقات الوطنيةوثيقة النموذج المرجعي للتطبيقات الوطنية
وثيقة النموذج المرجعي للتطبيقات الوطنيةYesserProgram
 
AI: the new competitive advantage
AI: the new competitive advantageAI: the new competitive advantage
AI: the new competitive advantageSaeed Al Dhaheri
 
ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟
ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟
ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟YesserProgram
 
القيادة الإبداعية ورشة العمل الثالثة - Quotes
القيادة الإبداعية ورشة العمل الثالثة - Quotesالقيادة الإبداعية ورشة العمل الثالثة - Quotes
القيادة الإبداعية ورشة العمل الثالثة - Quotesد.الباهي جاد
 
سياسة التدريب التعاوني
سياسة التدريب التعاوني سياسة التدريب التعاوني
سياسة التدريب التعاوني YesserProgram
 
هاني عاطف قزمال سيره ذاتيه
هاني عاطف قزمال سيره ذاتيههاني عاطف قزمال سيره ذاتيه
هاني عاطف قزمال سيره ذاتيهHany Atef
 
الابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعي
الابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعيالابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعي
الابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعيSaeed Al Dhaheri
 
نموذج تقييم وتحكيم الفكرة المتميزة للابتكار وريادة ااعمال
نموذج تقييم وتحكيم  الفكرة المتميزة للابتكار وريادة ااعمالنموذج تقييم وتحكيم  الفكرة المتميزة للابتكار وريادة ااعمال
نموذج تقييم وتحكيم الفكرة المتميزة للابتكار وريادة ااعمالnawal al-matary
 
2عرض قوائم الطعام
2عرض قوائم الطعام2عرض قوائم الطعام
2عرض قوائم الطعامnajeyah
 
مقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكية
مقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكيةمقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكية
مقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكيةSaeed Al Dhaheri
 
Content strategies - استراتيجيات المحتويات
Content strategies - استراتيجيات المحتوياتContent strategies - استراتيجيات المحتويات
Content strategies - استراتيجيات المحتوياتMohamed Elsherif
 

En vedette (20)

مختبرات الابتكار الاجتماعي-عاطف الشبراوي
مختبرات الابتكار الاجتماعي-عاطف الشبراويمختبرات الابتكار الاجتماعي-عاطف الشبراوي
مختبرات الابتكار الاجتماعي-عاطف الشبراوي
 
تغذية الجماعات د/ هاني
  تغذية الجماعات د/  هاني  تغذية الجماعات د/  هاني
تغذية الجماعات د/ هاني
 
البيانات المفتوحة المترابطة
البيانات المفتوحة المترابطة البيانات المفتوحة المترابطة
البيانات المفتوحة المترابطة
 
الابتكار الوظيفي في عصر حكومة المستقبل
الابتكار الوظيفي في عصر حكومة المستقبلالابتكار الوظيفي في عصر حكومة المستقبل
الابتكار الوظيفي في عصر حكومة المستقبل
 
الابتكار الاجتماعي في العصر الرقمي
الابتكار الاجتماعي في العصر الرقميالابتكار الاجتماعي في العصر الرقمي
الابتكار الاجتماعي في العصر الرقمي
 
موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...
موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...
موجز الدليل الإرشادي لاستخدام أدوات المشاركة الالكترونية والتواصل الاجتماعي ف...
 
تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...
   تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...   تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...
تقييم تجربة سلاسل المطاعم المحلية مقارنه بالعالمية في مصر رسالة ماجستير خا...
 
الدليل التعريفي بالبيانات المفتوحة
الدليل التعريفي بالبيانات المفتوحةالدليل التعريفي بالبيانات المفتوحة
الدليل التعريفي بالبيانات المفتوحة
 
وثيقة النموذج المرجعي للتطبيقات الوطنية
وثيقة النموذج المرجعي للتطبيقات الوطنيةوثيقة النموذج المرجعي للتطبيقات الوطنية
وثيقة النموذج المرجعي للتطبيقات الوطنية
 
AI: the new competitive advantage
AI: the new competitive advantageAI: the new competitive advantage
AI: the new competitive advantage
 
ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟
ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟
ماذا يتعين على الجهات الحكومية لمواكبة ‏رؤية السعودية 2030‬ ؟
 
القيادة الإبداعية ورشة العمل الثالثة - Quotes
القيادة الإبداعية ورشة العمل الثالثة - Quotesالقيادة الإبداعية ورشة العمل الثالثة - Quotes
القيادة الإبداعية ورشة العمل الثالثة - Quotes
 
سياسة التدريب التعاوني
سياسة التدريب التعاوني سياسة التدريب التعاوني
سياسة التدريب التعاوني
 
هاني عاطف قزمال سيره ذاتيه
هاني عاطف قزمال سيره ذاتيههاني عاطف قزمال سيره ذاتيه
هاني عاطف قزمال سيره ذاتيه
 
الابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعي
الابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعيالابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعي
الابتكار في التواصل الحكومي مع الشعب عبر التواصل الاجتماعي
 
Linked Data Competency Index : Mapping the field for teachers and learners
 Linked Data Competency Index : Mapping the field for teachers and learners Linked Data Competency Index : Mapping the field for teachers and learners
Linked Data Competency Index : Mapping the field for teachers and learners
 
نموذج تقييم وتحكيم الفكرة المتميزة للابتكار وريادة ااعمال
نموذج تقييم وتحكيم  الفكرة المتميزة للابتكار وريادة ااعمالنموذج تقييم وتحكيم  الفكرة المتميزة للابتكار وريادة ااعمال
نموذج تقييم وتحكيم الفكرة المتميزة للابتكار وريادة ااعمال
 
2عرض قوائم الطعام
2عرض قوائم الطعام2عرض قوائم الطعام
2عرض قوائم الطعام
 
مقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكية
مقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكيةمقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكية
مقابلة د. سعيد الظاهري في مجلة أعمال الخليج عن موضوع الحكومة الذكية
 
Content strategies - استراتيجيات المحتويات
Content strategies - استراتيجيات المحتوياتContent strategies - استراتيجيات المحتويات
Content strategies - استراتيجيات المحتويات
 

Similaire à نموذج كراسة الشروط والمواصفات لمشروع "تأمين الاتاحة العالية لمراكز البيانات في الجهات الحكومية"

It infrastructure enhancement rfp template
It infrastructure enhancement rfp template It infrastructure enhancement rfp template
It infrastructure enhancement rfp template Adel Ali Alfeky
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3Embraer RI
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3Embraer RI
 
Board Deck Dashboard
Board Deck Dashboard Board Deck Dashboard
Board Deck Dashboard Jay Levy
 
Exportincentiveswesc1265
Exportincentiveswesc1265Exportincentiveswesc1265
Exportincentiveswesc1265ashkhare23
 
Export incentives & Exemptions
Export incentives & ExemptionsExport incentives & Exemptions
Export incentives & Exemptionseibindia
 
Gs503 vcf lecture 7 innovation finance i 300315
Gs503 vcf lecture 7 innovation finance i 300315Gs503 vcf lecture 7 innovation finance i 300315
Gs503 vcf lecture 7 innovation finance i 300315Stephen Ong
 
Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009Savanna Energy Services Corp.
 
Open Source Industry Promotion Project in Taiwan
Open Source Industry Promotion Project in TaiwanOpen Source Industry Promotion Project in Taiwan
Open Source Industry Promotion Project in TaiwanRyan Chung
 
Gs503 vcf lecture 3 valuation i 020215
Gs503 vcf lecture 3 valuation i  020215Gs503 vcf lecture 3 valuation i  020215
Gs503 vcf lecture 3 valuation i 020215Stephen Ong
 
Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...Fingrid Oyj
 
Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...Fingrid Oyj
 
High-Frequency Trading and 2010 Flash Crash
High-Frequency Trading and 2010 Flash CrashHigh-Frequency Trading and 2010 Flash Crash
High-Frequency Trading and 2010 Flash CrashYoshi S.
 
ASEI Valuation
ASEI ValuationASEI Valuation
ASEI Valuationskyguy102
 
Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016
Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016
Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016Bruce A. Cosgrove, MSc., mWGAW
 
A Flash Crash Simulator: Analyzing HFT's Impact on Market Quality
A Flash Crash Simulator: Analyzing HFT's Impact on Market QualityA Flash Crash Simulator: Analyzing HFT's Impact on Market Quality
A Flash Crash Simulator: Analyzing HFT's Impact on Market QualityYoshi S.
 

Similaire à نموذج كراسة الشروط والمواصفات لمشروع "تأمين الاتاحة العالية لمراكز البيانات في الجهات الحكومية" (20)

It infrastructure enhancement rfp template
It infrastructure enhancement rfp template It infrastructure enhancement rfp template
It infrastructure enhancement rfp template
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3
 
Software By Cloud
Software By CloudSoftware By Cloud
Software By Cloud
 
Board Deck Dashboard
Board Deck Dashboard Board Deck Dashboard
Board Deck Dashboard
 
Banketon
BanketonBanketon
Banketon
 
Exportincentiveswesc1265
Exportincentiveswesc1265Exportincentiveswesc1265
Exportincentiveswesc1265
 
Export incentives & Exemptions
Export incentives & ExemptionsExport incentives & Exemptions
Export incentives & Exemptions
 
Gs503 vcf lecture 7 innovation finance i 300315
Gs503 vcf lecture 7 innovation finance i 300315Gs503 vcf lecture 7 innovation finance i 300315
Gs503 vcf lecture 7 innovation finance i 300315
 
Maximo overview
Maximo overviewMaximo overview
Maximo overview
 
Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009Savanna Energy Services Corporate Presentation September 2009
Savanna Energy Services Corporate Presentation September 2009
 
Open Source Industry Promotion Project in Taiwan
Open Source Industry Promotion Project in TaiwanOpen Source Industry Promotion Project in Taiwan
Open Source Industry Promotion Project in Taiwan
 
Gs503 vcf lecture 3 valuation i 020215
Gs503 vcf lecture 3 valuation i  020215Gs503 vcf lecture 3 valuation i  020215
Gs503 vcf lecture 3 valuation i 020215
 
Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...
 
Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...Technical requirements for frequency containment reserve provision in the nor...
Technical requirements for frequency containment reserve provision in the nor...
 
High-Frequency Trading and 2010 Flash Crash
High-Frequency Trading and 2010 Flash CrashHigh-Frequency Trading and 2010 Flash Crash
High-Frequency Trading and 2010 Flash Crash
 
ASEI Valuation
ASEI ValuationASEI Valuation
ASEI Valuation
 
Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016
Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016
Alchemy OTC Markets Direct Public Listing optional Crowdfunding Campaign 2016
 
wcdma-paging-problem-analysis
wcdma-paging-problem-analysiswcdma-paging-problem-analysis
wcdma-paging-problem-analysis
 
A Flash Crash Simulator: Analyzing HFT's Impact on Market Quality
A Flash Crash Simulator: Analyzing HFT's Impact on Market QualityA Flash Crash Simulator: Analyzing HFT's Impact on Market Quality
A Flash Crash Simulator: Analyzing HFT's Impact on Market Quality
 

Plus de YesserProgram

تقرير مؤشر نضج الخدمات لعام 2017م
تقرير مؤشر نضج الخدمات لعام 2017متقرير مؤشر نضج الخدمات لعام 2017م
تقرير مؤشر نضج الخدمات لعام 2017مYesserProgram
 
Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​
Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​
Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​YesserProgram
 
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...YesserProgram
 
تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016
تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016
تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016YesserProgram
 
كيفية الظهور الأمثل على قنوات التواصل الاجتماعي
كيفية الظهور الأمثل على قنوات التواصل الاجتماعيكيفية الظهور الأمثل على قنوات التواصل الاجتماعي
كيفية الظهور الأمثل على قنوات التواصل الاجتماعيYesserProgram
 
قائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونية
قائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونيةقائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونية
قائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونيةYesserProgram
 
برنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتك
برنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتكبرنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتك
برنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتكYesserProgram
 
انجاز عالمي لحساب تويتر التابع لبوابة سعودي
انجاز عالمي لحساب تويتر التابع لبوابة سعوديانجاز عالمي لحساب تويتر التابع لبوابة سعودي
انجاز عالمي لحساب تويتر التابع لبوابة سعوديYesserProgram
 
نموذج الترشيح الخاص بالإسهام الالكتروني للأفراد
نموذج الترشيح الخاص بالإسهام الالكتروني للأفرادنموذج الترشيح الخاص بالإسهام الالكتروني للأفراد
نموذج الترشيح الخاص بالإسهام الالكتروني للأفرادYesserProgram
 
النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية YesserProgram
 
الرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكومية
الرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكوميةالرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكومية
الرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكوميةYesserProgram
 
نموذج استبيان "مرحلة التميز والتحسين "
نموذج استبيان "مرحلة التميز والتحسين "نموذج استبيان "مرحلة التميز والتحسين "
نموذج استبيان "مرحلة التميز والتحسين "YesserProgram
 
النشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكوميةالنشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكوميةYesserProgram
 
نموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونية
نموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونيةنموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونية
نموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونيةYesserProgram
 

Plus de YesserProgram (14)

تقرير مؤشر نضج الخدمات لعام 2017م
تقرير مؤشر نضج الخدمات لعام 2017متقرير مؤشر نضج الخدمات لعام 2017م
تقرير مؤشر نضج الخدمات لعام 2017م
 
Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​
Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​
Nora booklet الدليل السريع للمنهجية الوطنية للبنية المؤسسية​
 
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
 
تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016
تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016
تقرير الامم المتحدة لتطور الحكومة الالكترونية لعام 2016
 
كيفية الظهور الأمثل على قنوات التواصل الاجتماعي
كيفية الظهور الأمثل على قنوات التواصل الاجتماعيكيفية الظهور الأمثل على قنوات التواصل الاجتماعي
كيفية الظهور الأمثل على قنوات التواصل الاجتماعي
 
قائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونية
قائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونيةقائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونية
قائمة الجهات الحكومية الأفضل تقديما للخدمات الالكترونية
 
برنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتك
برنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتكبرنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتك
برنامج المهارات الأساسية للحاسب الآلي والتعاملات الالكترونية - قدراتك
 
انجاز عالمي لحساب تويتر التابع لبوابة سعودي
انجاز عالمي لحساب تويتر التابع لبوابة سعوديانجاز عالمي لحساب تويتر التابع لبوابة سعودي
انجاز عالمي لحساب تويتر التابع لبوابة سعودي
 
نموذج الترشيح الخاص بالإسهام الالكتروني للأفراد
نموذج الترشيح الخاص بالإسهام الالكتروني للأفرادنموذج الترشيح الخاص بالإسهام الالكتروني للأفراد
نموذج الترشيح الخاص بالإسهام الالكتروني للأفراد
 
النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - عدد 82- لبرنامج يسر للتعاملات الالكترونية الحكومية
 
الرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكومية
الرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكوميةالرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكومية
الرصد الصحفي لـأخيار ورشة عمل #قياس_التحول السادس للتعاملات الالكترونية الحكومية
 
نموذج استبيان "مرحلة التميز والتحسين "
نموذج استبيان "مرحلة التميز والتحسين "نموذج استبيان "مرحلة التميز والتحسين "
نموذج استبيان "مرحلة التميز والتحسين "
 
النشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكوميةالنشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكومية
النشرة الالكترونية - العدد 81 - لبرنامج يسر للتعاملات الالكترونية الحكومية
 
نموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونية
نموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونيةنموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونية
نموذج تقييم جاهزية الجهة الحكومية للمشاركة الالكترونية
 

Dernier

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 

Dernier (20)

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 

نموذج كراسة الشروط والمواصفات لمشروع "تأمين الاتاحة العالية لمراكز البيانات في الجهات الحكومية"

  • 1. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 1 of 42 ‫السعودي‬ ‫العربية‬ ‫المملكة‬‫ة‬ ‫قالب‬‫اسة‬‫ر‬‫ك‬‫عروض‬ ‫طلب‬‫مشر‬‫و‬‫ع‬ "( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬High Availability)‫معلومات‬ ‫كز‬‫لمر‬------------" Data Center)---------------(Providing a High Availability for Put the Logo of the Government Entity Here ( ‫قم‬‫ر‬ ‫عامة‬ ‫منافسة‬--/----) )‫هامة‬ ‫اريخ‬‫و‬‫(ت‬ ‫المتطلبات‬‫اليوم‬‫التاريخ‬ ‫العروض‬ ‫لتقديم‬ ‫موعد‬ ‫آخر‬__/__/_341‫ـ‬‫ه‬__/__/_103‫م‬ ‫األسئلة‬ ‫لتقديم‬ ‫موعد‬ ‫آخر‬ ‫ا‬‫ر‬‫االستفسا‬‫و‬‫ت‬ __/__/_341‫ـ‬‫ه‬__/__/_103‫م‬ ‫المظاريف‬ ‫فتح‬ ‫موعد‬__/__/_341‫ـ‬‫ه‬__/__/_103‫م‬ ‫العروض‬ ‫وتقديم‬ ‫النسخ‬ ‫بيع‬ ‫مكان‬ :‫طريق‬ ‫عن‬ ‫الوثيقة‬ ‫هذه‬ ‫بخصوص‬ ‫ات‬‫ر‬‫استفسا‬ ‫أي‬ ‫أو‬ ‫أسئلة‬ ‫أي‬ ‫ح‬‫طر‬ ‫يمكن‬ :‫إلكتروني‬ ‫بريد‬.gov.sa---XYZ_RFP@ ( ‫النسخة‬ ‫قيمة‬####)<‫المبلغ‬‫كتابة‬>‫سعودي‬ ‫لاير‬ ‫وتاريخ‬ ) ( ‫رقم‬ ‫بإيصال‬ ‫مستندة‬__/__/_341‫ـ‬‫ه‬
  • 2. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 2 of 42 ‫ة‬‫ة‬‫مقدم‬:‫ة‬‫ة‬‫كراس‬‫ةر‬‫ة‬‫مش‬"‫ة‬‫ة‬ ‫ايةةي‬ ‫ة‬‫ة‬ ‫ااتة‬ ‫ا‬ ‫ةيم‬‫ة‬‫ت‬High Availability)‫ة‬‫ة‬‫يمرك‬ ‫مةلومةت‬---------------" ‫يهـدف‬‫هـاا‬‫المشـدرع‬‫إلـ‬‫تشـيدددـدف‬ ‫عةـيمـة‬ ‫هدـدمة‬ ‫عة‬ ‫تعـدفاـ‬ ‫عةـيعـة‬ ‫وـي‬ ‫ع‬ ‫عتشـيددـدف‬ ‫عترييدددـدو‬ ‫توريدددـدف‬ ‫حعسوبيـــدة‬(InfrastructureIT‫لمريـــم‬ )‫ـــعـ‬‫ـ‬‫تعلوت‬-----------‫ـــ‬‫ـ‬‫عذل‬‫تي‬ ‫ـــ‬‫ـ‬‫لت‬‫االتعحـــة‬‫ـــة‬‫ـ‬‫الععلي‬(High Availability)‫للبوابــة‬‫االلكترعـيــة‬‫عالخــفتعـ‬‫المقفتــة‬‫تــ‬‫ــع‬‫ـ‬‫خالله‬.‫علتوقيــ‬‫ذلــ‬‫تــ‬‫توضــير‬‫ــرع‬‫ـ‬‫الش‬ ‫يراســة‬ ‫هاه‬ ‫عالمواةفعـ‬‫لتقف‬‫عةف‬ ‫ي‬‫المشـرع‬ ‫هاا‬ ‫خالل‬ ‫ت‬ ‫توقيقهع‬ ‫المطلوب‬ ‫عاألهفا‬ ‫للمتطلبعـ‬‫يمـع‬‫ةــ‬‫تففيـا‬ ‫سـيت‬ ‫ه‬ ‫حيــ‬ ‫ـرحلتي‬‫ـ‬‫ت‬ ‫ىلــ‬ ‫ـرع‬‫ـ‬‫المش‬‫ـتمف‬‫ـ‬‫ستش‬‫ـي‬‫ـ‬‫التخط‬ ‫ىلــ‬ ‫ـ‬‫ـ‬‫االعل‬ ‫المرحلــة‬‫يــة‬ ‫الفهع‬ ‫ـعتي‬‫ـ‬‫التم‬ ‫عاىــفاد‬‫عال‬‫توريدددــدف‬ ‫ع‬‫ال‬‫ترييددددو‬‫ع‬‫ال‬‫تشـيدددف‬‫عالفوي‬‫ـة‬ ‫المعر‬ ‫عـقف‬ ‫عالتفريو‬‫مة‬‫ضةمة‬‫عةد‬‫توقة‬‫ايبوابة‬‫ة‬ ‫ن‬ ‫اإليكتر‬‫ايخةدمةت‬ ‫ايمقدم‬‫ما‬‫خاليهة‬‫أثنةء‬‫ب‬ ‫ايترك‬‫ل‬ ‫ايتشغ‬‫ئ‬ ‫يلب‬‫ايجديدة‬‫عتشتمف‬‫ع‬ ‫الضـمع‬ ‫ىلـ‬ ‫الثعـيـة‬ ‫المرحلة‬‫خـفتعـ‬‫الـفى‬ .‫عالميعـة‬ ‫الففي‬ ‫ا‬‫ا‬ ‫أ‬:‫نطةق‬‫ايةمل‬: ‫ىل‬‫الشريعـ‬‫التي‬‫لفيهع‬‫خبرة‬‫ي‬‫توريف‬‫عترييو‬‫عتشـيف‬‫ال‬ ‫وـي‬ ‫ع‬‫معـفاـ‬‫ع‬‫األ‬‫هـمة‬‫عةـيمـة‬‫ال‬‫تشــيف‬‫ال‬‫وعسـوبية‬ ‫لمر‬‫ا‬‫يـم‬‫ال‬‫ـعـ‬‫ـ‬‫معلوت‬‫ت‬ ‫تـ‬ ‫ـي‬‫ـ‬‫عالت‬ ‫ـة‬‫ـ‬‫الوكوتي‬‫ـة‬‫ـ‬‫االتعح‬‫ـعـ‬‫ـ‬‫للبواب‬ ‫ـة‬‫ـ‬‫الععلي‬‫ا‬‫اللكترعـيـة‬‫ـفتعـ‬‫ـ‬‫عالخ‬‫ـة‬‫ـ‬‫المقفت‬‫ـ‬‫ـ‬‫ت‬‫ـع‬‫ـ‬‫خالله‬‫ة‬ ‫تتقفم‬‫بعرعضهع‬‫عذل‬‫حسو‬‫المواةـفعـ‬‫الـواردة‬‫ـي‬‫عثيقـة‬‫لـو‬‫العـرع‬‫االسسـعم‬ ‫ـي‬‫رسـ‬‫ةربعـة‬‫ع‬‫عسـتة‬ ‫خمسـة‬ ‫عالملو‬(‫ة‬A-)‫ع‬‫الععتة‬ ‫الشرع‬‫عالخعةة‬‫ي‬‫الملو‬(‫ب‬B-)‫عيشمف‬‫ـطعق‬‫العمف‬‫المهعم‬‫التعلية‬: ‫م‬ ‫ايتصم‬ o‫للمشرع‬ ‫التخطي‬ o‫عة‬ ‫ترا‬‫ي‬ ‫الواردة‬ ‫عالمواةفعـ‬ ‫المتطلبعـ‬‫عثيقة‬‫لو‬‫العرع‬‫االسسـعم‬ ‫ـي‬‫رسـ‬‫ةربعـة‬‫ع‬‫عسـتة‬ ‫خمسـة‬ ‫التي‬‫ةىفتهع‬------------‫عالتوق‬.‫تفهع‬ o‫اىفاد‬‫ع‬‫ع‬‫التم‬ ‫ضع‬‫عتي‬‫التفميل‬‫ية‬‫ية‬ ‫الفهع‬‫للمشرع‬ o‫ف‬ ‫اىفاد‬‫ا‬‫عل‬‫ي‬ ‫الفهع‬ ‫الكميعـ‬‫ة‬‫للمشرع‬ ‫ايبنةء‬ o‫عترييـو‬ ‫ـف‬‫ـ‬‫عتوري‬ ‫شـرا‬‫ــيف‬‫ـ‬‫عتش‬‫ـمة‬‫ـ‬‫ه‬ ‫األ‬ ‫ميـع‬‫عالبـرات‬‫ة‬‫ة‬‫ئ‬ ‫يلب‬‫ة‬‫ة‬ ‫ايةةي‬ ‫ة‬‫ة‬ ‫ااتة‬ ‫قةت‬ ‫ت‬ ‫ةح‬‫ة‬‫ايت‬ ‫ايجديةدة‬ ‫تشمل‬: ‫الكهربع‬ ‫(ةـيمة‬ ‫البيعـعـ‬ ‫تريم‬ ‫توسع‬)‫عالمراسبة‬ ‫عاألت‬ ‫عالوري‬ ‫عالتكييف‬ ‫البيعـع‬ ‫شبكة‬‫المعلوتعـ‬ ‫عحمعية‬ ‫عةت‬ ‫ـ‬ ‫همة‬ ‫ة‬‫الخوادم‬‫التخميفية‬ ‫عالوسع‬ ‫ي‬ ‫االحتيع‬ ‫الفسخ‬ ‫ـيعم‬ ‫عالتوك‬ ‫المراسبة‬ ‫ـيعم‬ o‫ـف‬‫ـ‬‫ـق‬‫االتعحــة‬ ‫ذاـ‬ ‫ـفة‬‫ـ‬‫الافي‬ ‫ـة‬‫ـ‬‫البيل‬ ‫ـ‬‫ـ‬‫ال‬ ‫ـة‬‫ـ‬‫الوعلي‬ ‫ـة‬‫ـ‬‫البيل‬ ‫تــ‬ ‫ـعـ‬‫ـ‬‫عالبيعـ‬ ‫ـعـ‬‫ـ‬‫عالبرتاي‬ ‫ـة‬‫ـ‬‫االـيم‬ ‫ـع‬‫ـ‬‫مي‬ ‫ــيف‬‫ـ‬‫عتش‬ .‫الععلية‬ o. ‫عالبرات‬ ‫همة‬ ‫لأل‬ ‫الالزتة‬ ‫االختبعراـ‬ ‫ميع‬ ‫را‬ ‫إ‬ o. ‫المشرع‬ ‫لوثع‬ ‫يعتلة‬ ‫تاموىة‬ ‫تقفي‬
  • 3. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 3 of 42 ‫م‬ ‫ايتسل‬ o‫ـف‬‫ـ‬‫بع‬‫ترحلــة‬‫ـا‬‫ـ‬‫التففي‬‫ي‬‫اــو‬‫ىلــ‬‫ـورد‬‫ـ‬‫الم‬‫ضــمع‬‫ـعل‬‫ـ‬‫اـتق‬‫ا‬‫لمعــعر‬‫عالمهــعراـ‬‫ـة‬‫ـ‬‫الالزت‬‫الــفعراـ‬ ‫عتففيــا‬ ‫التفريبية‬‫ل‬----------------‫ةع‬‫ةي‬‫ر‬‫آخر‬‫توفده‬------------------. ‫خدمةت‬‫ايدعم‬‫ةن‬ ‫ايص‬ o‫تقفي‬‫خـفتعـ‬‫هـمة‬ ‫عة‬ ‫سطـع‬ ‫لاميـع‬ ‫المطلوبـة‬ ‫عالمـيعـة‬ ‫الـفى‬‫الافيـفة‬ ‫البيلـة‬ ‫عةـيمـة‬‫سـفواـ‬ ‫ثـالس‬ ‫لمـفة‬ ‫تع‬‫تقفي‬‫خيعر‬‫لمفة‬ ‫عالميعـة‬ ‫الفى‬ ‫ىل‬ ‫يشتمف‬ ‫تستقف‬. ‫يتع‬ ‫إضع‬ ‫سفتع‬ ‫ا‬‫ة‬ ‫ثةن‬:‫ذ‬ ‫ايتنف‬ ‫مدة‬: ‫س‬‫تشـ‬ ‫االعلـ‬ ‫المرحلـة‬ ‫ة‬ ‫حيـ‬ ‫تـرحلتي‬ ‫ىلـ‬ ‫المشـرع‬ ‫هـاا‬ ‫تففيا‬ ‫يت‬‫التخطـي‬ ‫ىلـ‬ ‫تمف‬‫يـة‬ ‫الفهع‬ ‫التمـعتي‬ ‫عاىـفاد‬ ‫عال‬‫توريدددـدف‬‫ع‬‫ال‬‫ـدو‬‫ـ‬‫ترييددد‬‫ع‬‫ال‬‫ـدف‬‫ـ‬‫تشـيدد‬‫ـي‬‫ـ‬‫عالفو‬‫ـة‬ ‫المعر‬ ‫ـف‬‫ـ‬‫عـق‬ ‫ـفريو‬‫ـ‬‫عالت‬‫ـلي‬‫ـ‬‫عالتس‬‫ى‬ ‫ـة‬‫ـ‬‫الثعـي‬ ‫ـة‬‫ـ‬‫المرحل‬ ‫ـوي‬‫ـ‬‫عتوت‬‫ـ‬‫ـ‬‫ل‬ ‫الضمع‬‫الففي‬ ‫عالفى‬ ‫عالميعـة‬. ‫يى‬ ‫اا‬ ‫ل‬ ‫ايمر‬ ‫ذ‬ ‫تنف‬ ‫مدة‬: o‫المرحلة‬ ‫هاه‬ ‫لتففيا‬ ‫الموفدة‬ ‫المفة‬‫هي‬14‫ةسبوىع‬‫العقف‬ ‫عتوسيع‬ ‫التعميف‬ ‫تعريخ‬ ‫ت‬ ‫تبفة‬ ‫ايثةن‬ ‫ل‬ ‫ايمر‬ ‫ذ‬ ‫تنف‬ ‫مدة‬: o‫المفة‬. ‫االعل‬ ‫المرحلة‬ ‫استالم‬ ‫تعريخ‬ ‫ت‬ ‫تبفة‬ ‫الماتية‬ ‫سفواـ‬ ‫ثالس‬ ‫هي‬ ‫المرحلة‬ ‫هاه‬ ‫لتففيا‬ ‫الموفدة‬ o.‫اختيعرية‬ ‫سفتع‬ ‫عتوتوي‬‫هاه‬‫الوثيقة‬‫ىل‬‫المالح‬‫التعلية‬‫(ةفوة‬ ‫تفهع‬ ‫الثعت‬ ‫البفف‬ ‫ي‬41):- ‫رقم‬‫عنوا‬‫ت‬ ‫ايمل‬ 3‫تلو‬:‫ة‬‫تعليمعـ‬‫تقفي‬‫العر‬‫عالتقيي‬ 1‫تلو‬‫ب‬:‫الشرع‬‫الععتة‬ 1‫تلو‬:‫ج‬‫تععيير‬‫المطعبقة‬ 4‫تلو‬‫د‬:‫فاعل‬‫الكميعـ‬‫للعر‬‫الففي‬ 5‫تلو‬‫هد‬:‫مة‬ ‫سع‬‫المشعريع‬‫عالخبراـ‬‫السعبقة‬ 6‫تلو‬:‫ع‬‫فاعل‬‫الكميعـ‬‫عاألسععر‬(‫العر‬‫المعلي‬) 7‫تلو‬:‫ز‬‫تعلوتعـ‬‫هالـ‬ ‫عت‬‫تقفتي‬‫العرع‬
  • 4. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 4 of 42 Table of Contents Table of Contents ......................................................................................................................... 4 List of Figures .............................................................................................................................. 5 1 Introduction .......................................................................................................................... 7 1.1 Background .................................................................................................................... 7 1.2 Purpose........................................................................................................................... 7 1.3 RFP Organization............................................................................................................ 7 1.3.1 Section 2: Current Situation...................................................................................... 7 1.3.2 Section 3: Project Objectives.................................................................................... 7 1.3.3 Section 4: Scope of Work......................................................................................... 8 1.3.4 Section 5: Infrastructure High Availability Enhancement Requirements ...................... 8 1.3.5 Section 6: Proposal Format....................................................................................... 8 1.3.6 Section 7: Appendices.............................................................................................. 8 1.4 Requirements Numbering Scheme.................................................................................... 8 1.5 Definitions ...................................................................................................................... 8 2 Current Situation ................................................................................................................... 9 2.1 Current Infrastructure Architecture................................................................................... 9 2.1.1 Current Servers & Storage........................................................................................ 9 2.1.2 Current Portal applications Architecture.................................................................. 10 2.1.3 Current IT Services................................................................................................ 10 2.1.4 Current Networking & security............................................................................... 11 3 Project Objectives ............................................................................................................... 12 4 Scope of Work.................................................................................................................... 13 5 Infrastructure High Availability Enhancement Requirements.................................................. 15 5.1 General Requirements ................................................................................................... 15 5.2 Technical Solution Architecture Requirements ................................................................ 15 5.2.1 Servers, Storage and Portal Servers Technical Requirements .................................... 15 5.2.2 Network & Security Technical Requirements .......................................................... 15 5.2.3 Data Center Area Technical Requirements .............................................................. 16 5.3 Hardware Architecture Requirements ............................................................................. 16 5.4 Network Architecture Requirements ............................................................................... 17
  • 5. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 5 of 42 5.5 Hardware Requirements................................................................................................. 17 5.5.1 Hardware Generic Requirements ............................................................................ 17 5.5.2 Servers, Storage, and Backup Hardware Requirements............................................. 17 5.5.3 Network & Security Hardware Requirements .......................................................... 18 5.5.4 Data Center Area Hardware Requirements .............................................................. 20 5.6 Implementation Requirements........................................................................................ 26 5.6.1 Project Management Requirements= ...................................................................... 27 5.6.2 Project Documentation Requirements ..................................................................... 30 5.6.3 Project Organization Requirements......................................................................... 30 5.6.4 Warranty Requirements ......................................................................................... 32 5.6.5 Quality Assurance and Acceptance Requirements.................................................... 33 6 Proposal Format.................................................................................................................. 34 6.1 General Instructions....................................................................................................... 34 6.2 Proposal Preparation...................................................................................................... 35 6.3 Technical Proposal Instructions ...................................................................................... 35 6.3.1 Mandatory and Optional Requirements ................................................................... 36 6.3.2 Required Sections .................................................................................................. 36 6.4 Financial Proposal Instructions....................................................................................... 39 7 Overview of appendices....................................................................................................... 40 8 The Appendices(‫)المالحق‬ ...................................................................................................... 42 List of Figures Figure 1: --------------------------Current Server & Storage landscape.................................9 Figure 2: --------------------------Current Server & Storage Rack Layout.......................... 10 Figure 3: ---------------------------Current Portal Architecture................................................ 10 Figure 4: --------------------------Current Network & Security Architecture...................... 11 Figure 5: --------------------------Data Centre Room Layout .............................................. 11
  • 6. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 6 of 42 DISCLAIMER THIS DOCUMENT IS A REQUEST FOR PROPOSAL (RFP), AND SHALL NOT CONSTRUED IN WHOLE OR PART AS A DIRECT OR INDIRECT ORDER. IT SHALL NOT CONSTRUED AS A REQUEST OR AUTHORIZATION TO PERFORM WORK AT THE EXPENSE OF --------------. THE INFORMATION IN THIS RFP IS INTENDED TO ENABLE THE RECIPIENT TO FORMULATE A PROPOSAL IN RESPONSE TO THE PROJECT REQUIREMENTS SET FORTH. ALTHOUGH THIS RFP CONTAINS SUCH ENABLING INFORMATION, BIDDERS MUST MAKE THEIR OWN INDEPENDENT ASSESSMENTS AND INVESTIGATIONS REGARDING THIS RFP’S SUBJECT MATTER. THE ------------- DOES NOT GUARANTEE THE ACCURACY, RELIABILITY, CORRECTNESS OR COMPLETENESS OF THE INFORMATION IN THIS RFP. THE BIDDER REMAINS RESPONSIBLE FOR IDENTIFYING ANY FURTHER INFORMATION THAT IT REQUIRES TO PREPARE THE PROPOSAL. THIS RFP SHALL CONSTITUTE PART OF THE CONTRACT THAT --------------- WILL SIGN WITH THE SUCCESSFUL BIDDER.
  • 7. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 7 of 42 1 Introduction 1.1 Background --------------- is planning to procure install configure operate and test equipment including servers networking & security and system software for its Data Center to provide a high availability solution of IT Infrastructure for ---------------- Portal and the services offered through the Portal. This Request for Proposal (RFP) is prepared by ------------------, and the main goal of this RFP is to provide Bidders with a description of the requirements and objectives to be achieved by this project. This Request for Proposal (RFP) issued for ---------------------. The Issuing Officer ---- ----------------- requires all technical questions be submitted by e-mail to XYZ_RFP@- ----.gov.sa within two weeks of the RFP publish date. For all other issues related to this RFP, the sole point of contact is -------------------- (via e-mail or see contact information in invitation letter). 1.2 Purpose This Request for Proposal (RFP) provides interested Bidders with the information needed to prepare and submit their proposals that satisfy ----------------------- Infrastructure High Availability Enhancement Project’s requirements. Information provided herein is solely intended to assist Bidders in the preparation of their proposals. According to ----------------- and its partners' knowledge, the information provided is accurate. However, ----------------------- and its partners do not warrant such accuracy, and any variations subsequently determined shall not be construed as a basis for invalidating this RFP. ------------------ Management reserves the right to cancel this RFP at any time. 1.3 RFP Organization 1.3.1 Section 2: Current Situation This section provides an executive-level overview of the current situation from perspectives of ---------------- infrastructure domains including Servers, Storage, Portal, Network, Security, and Data Center Area. This section discusses the ------------ infrastructure and associated components such as Portal, and IT services. 1.3.2 Section 3: Project Objectives This section presents the -------------------- Infrastructure High Availability Enhancement Project Objectives.
  • 8. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 8 of 42 1.3.3 Section 4: Scope of Work This section details the project’s scope of work. For the project to be complete and close, the Bidder must complete all items within the scope of work. 1.3.4 Section 5: Infrastructure High Availability Enhancement Requirements This section provides the High Availability Infrastructure enhancement requirements. 1.3.5 Section 6: Proposal Format This section provides the requirements for the Bidder’s proposal content and submission. 1.3.6 Section 7: Appendices This section lists the appendices in support of the RFP. 1.4 Requirements Numbering Scheme The Requirements’ Numbering Scheme will facilitate referencing a specific functionality throughout the project’s different phases. Bidders are encouraged to adopt the numbering scheme when compiling their proposals. The recommended requirements’ numbering scheme has the following format: Requirement Type “” Number- Description Where: Requirement Type is either “Req” for requirements concerning what the Bidder is required to deliver, or “Info” additional information associated with certain requirement(s) to aid the Bidder in their proposals. Number is a sequence number starting from 1 (one) up to the total number of compiled requirements; Description is the part of the requirement (regardless of the type) describing the requirement in more detail. Therefore, bidders must comply with the requirement and its description. 1.5 Definitions Capitalized terms and all capitalized acronyms used in this document will have the following meaning: Term Definition Bidder A Bidder officially responding to the Request for Proposal by submitting a bid proposal BoQ Bill of Quantity The Solution The total set of deliverables within the scope of the Request for Proposal that the Bidder must deliver, whether Information Technology, documentation, intangible deliverables such as
  • 9. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 9 of 42 knowledge transfer, or any other deliverable included in the scope HA High Availability RFP Request for Proposal Table 1- Definitions 2 Current Situation This section provides general information about the existing solutions and services within ---------------- that are relevant to the RFP scope of work. Bidders should analyze the information within this section as an input to understand the current set up at -------------- Data Center and need to propose new design in order to come up with the best design that meets updated international best practices and capitalize on the use of existing equipment. 2.1 Current Infrastructure Architecture 2.1.1 Current Servers & Storage Describe Here the Government Entity infrastructure in terms of Servers & Storage. Put Infrastructure Diagram here Figure 1: ---------------------------------Current Server & Storage landscape
  • 10. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 10 of 42 Put Server & Storage Physical Rack Layout here Figure 2: --------------------------Current Server & Storage Rack Layout 2.1.2 Current Portal applications Architecture Describe the current Portal Application Architecture in terms of Applications Servers, Database Servers, Web Servers, Storage and networking The figure below shows the existing portal application architecture at ----------------------. Figure 3: ----------------------------Current Portal Architecture 2.1.3 Current IT Services IT Services available at ------------------------ are listed below: SL No. Host (Server) Name Location Application 1 SPSRV1 DC-LAN Rack1 SharePoint Intranet & Application Server 2 3 4 5 6 7 8 APPSERVER2-21 DC-LAN Rack2 Dataflow & Doc Archiving application 9 SRV1 DC-LAN Rack2 SQL2008 DB Server Table 2- IT Services available in --------------------------------
  • 11. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 11 of 42 2.1.4 Current Networking & security 2.1.4.1 Current Networking & Security Infrastructure Describe Current Network & Security infrastructure details at this table. SL No. Components Products 1 Proxy TMG 2010 Firewall is acting also as a Proxy Server. 2 Firewall Cisco ASA 5520 is the Internet perimeter Firewall. 3 Antispam Symantec Antivirus Server for antispam protection and Symantec Antivirus client on all PC's. Table 3- Network & Security Current Infrastructure 2.1.4.2 Existing Networking Architecture Diagram Diagram below shows a high-level view of the current network Infrastructure Figure 4: ---------------------------Current Network & Security Architecture Data Center Area The overall current infrastructure is based on below mentioned architecture. Figure 5: ----------------------------Data Centre Room Layout The existing set up have the following infrastructure equipment,  UPS : 40 KVA APC modular UPP  Access control system  Backbone entry from entrance room at ground floor. 
  • 12. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 12 of 42 3 ProjectObjectives The main objectives of --------------------- Infrastructure High Availability Enhancement Procurement and Implementation Project are to achieve the following:  Provide a high availability solution of IT Infrastructure for ---------------------- Portal application and the services offered through the Portal in the following domains: o Servers & Storage o Backup system o Network & Security o Data Center Area  Provide Hardware & Software Monitoring Tools  Enhance the performance of the Portal application and the services offered through the Portal  Build a reliable infrastructure which meets future requirements  Increase operational efficiencies  Enhance the network and secure infrastructure design
  • 13. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 13 of 42 4 Scope of Work This section documents the project’s scope of work. It outlines what will be required from interested Bidders to successfully implementing the project. The Infrastructure High Availability Enhancement Procurement and Implementation Project scope of work will include the following: 1) Migrate all existing environment Hardware, Software, applications, and data to new high available environment 2) Build new development & test environments This includes the following infrastructure components:  Data Center Area (Electrical system, Cooling system, Fire system, Security and monitoring system etc.)  Network & Security Infrastructure (Internet Routers, Firewalls, Switches etc.)  Hardware Servers & Storage (Severs distribution cross Racks, SAN Switches, Storage upgrade, Cluster implementation etc.)  Applications (Web Portal & Services, backup, Microsoft etc.)  Operating Systems (Windows)  Hardware & software Monitoring Tools  Backup Solution (backup management software) In summary, the scope requires interested Bidders to deliver a turnkey solution for procurement and implementation of --------------------------- High Availability Enhancement Infrastructure. The Bidder is required to design, test and deploy the Solution based on the following phased approach: I. Phase 1: Design  Perform project management planning.  Review, verify and confirm the requirements included in this RFP document  Prepare the detailed final design document (high and Low level) for the required solution components (Data Center, Servers, storage & backup system, Network & Security Infrastructure) along with its final BoQ  Provide high availability for ---------------- portal and electronic services. II. Phase 2: Build  Provide all necessary hardware and software procurement, delivery and installation (configuration) for the Solution.  Implement and test all the Solution’s hardware and software components.  Migrate & operate the systems, software, and data from the existing environment to the new high available environment.
  • 14. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 14 of 42  Develop and deliver a complete set of the Solution’s documentation; which includes the installation and configuration settings, acceptance test procedure and operations procedures. III. Phase 3: Handover  After the Implementation phase, the Vendor shall ensure smooth transfer of knowledge and skills to ---------------- or any another party. IV. Phase 4: Support & Maintenance  Provide the required support and maintenance for all parts and systems of the installed solution for three (3) years, with two (2) additional option years.
  • 15. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 15 of 42 5 Infrastructure High Availability Enhancement Requirements This section lists additional requirements to be included in The Bidder’s proposal. 5.1 General Requirements Info 1.The Solution will hosted in -------------------- Datacenter in. Req 1. Req 2. 5.2 Technical SolutionArchitecture Requirements The Solution should built on sound architectural principles enabling fault-tolerance, high availability, high-performance, and scalability. The solution architecture should meet the following Requirements: 5.2.1 Servers, Storage and Portal Servers Technical Requirements Req 3. The bidder should propose infrastructure solution free of any single point of failure, and should provide Hardware & Software Monitoring tools with the following requirements:  The Bidder should provide a solution for hardware and software monitoring  Req 4. Req 5. Req 6. Req 7. 5.2.2 Network & Security Technical Requirements Req 8. The Bidder should provide ISP redundancy for public IP routing Req 9. Req 10. Req 11. Req 12. Req 13. Req 14. Req 15. Req 16.
  • 16. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 16 of 42 5.2.3 Data Center Area Technical Requirements 5.2.3.1 Data Center Layout Requirements Req 17.The Bidder should provide rack placement as per standard practice of cold aisle and hot aisle Req 18.The Bidder should seal the false ceiling to prevent dust from entering the server halls 5.2.3.2 Electrical System Requirements Req 19. Req 20. Req 21. Req 22. Req 23. Req 24. Req 25. Req 26. 5.2.3.3 Cooling System Requirements Req 27.The Bidder should provide redundancy for PAC Req 28. 5.2.3.4 Fire, Security and Monitoring Requirements Req 29.The fire alarm and fire suppression system should be teste regularly for its proper operations. Req 30.CCTV surveillance system needs to installed for monitoring the entry and exit of the Server room and the aisle. Req 31. Req 32. Req 33. Req 34. Req 35. 5.3 Hardware Architecture Requirements Bidder should provide a hardware solution architecture that responds to the following requirements:
  • 17. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 17 of 42 Req 36. Req 37. Req 38. Req 39. Req 40. Req 41. 5.4 Network Architecture Requirements Req 42. Req 43. Req 44. Req 45.The Bidder’s proposed solution should have sufficient Management & Administration Systems for service-level monitoring and problem diagnosis. Req 46.The Bidder’s proposed solution should be modular based as the following: o Core & Server Farm Network o Access Network (which includes access switches for LAN users) 5.5 Hardware Requirements The Bidder should provide all the hardware and infrastructure components needed to deliver and operate the Solution, including servers, storage, backup, network components & security devices, and data center hardware area. The Bidders will be also responsible for the procurement of any extra component(s) they provide in their architecture. 5.5.1 Hardware Generic Requirements Req 47. Req 48. Req 49. 5.5.2 Servers, Storage, and Backup Hardware Requirements 5.5.2.1 Blade Chassis Requirements Req 50. Blade Chassis shall accommodate the specified maximum number of Blade Servers with hot swappable HDD, Interconnect Modules, Power supplies, Fans and Management Modules.
  • 18. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 18 of 42 Req 51. Req 52. Req 53. Req 54. 5.5.2.2 Standalone Blade Servers Requirements Req 55. CPU: 1 x 3.0 GHz or above Hex-core Intel Xeon processor 12 MB shared cache. Processor being quote should be of latest generation with latest Processor speed. Server Blade should support maximum of Two physical processors Req 56. Req 57. 5.5.2.3 SAN Switch Requirements Req 58. Number of FC Ports-Minimum 24 Req 59. Req 60. 5.5.2.4 Storage Upgrade Requirements Req 61.Number of Hard disks- 24* 600GB FC 15K RPM Req 62. Req 63. Req 64.Number of Fiber Channel Enclosure Modules-2 5.5.2.5 Backup System Requirements Req 65. Should have data Transfer Rate of 800GB/hour Req 66. Should have minimum of 9TB usable capacity Req 67. Req 68. Req 69. 5.5.3 Network & Security Hardware Requirements 5.5.3.1 Perimeter Zone and Extranet DMZ Router Requirements Req 70.Minimum 3 integrated 10/100/1000 Ethernet ports Req 71. Req 72.
  • 19. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 19 of 42 5.5.3.2 DMZ Switch Requirements Req 73.4 One Gigabit Ethernet SFP ports Req 74.24 Req 75. Req 76. 5.5.3.3 Perimeter Zone Firewall Requirements Req 77.Minimum Firewall Throughput of at least 450Mbps Req 78. Req 79. Req 80. 5.5.3.4 Fire Wall SSL VPN License Requirements Req 81. Req 82. Req 83. Req 84.Minimum 50 license for SSL based VPN and to be used with the proposed security appliance. 5.5.3.5 AAA Server Requirements Req 85.Ability to offer a centralized identity and access policy solution. Req 86. Req 87. Req 88. 5.5.3.6 Perimeter Zone Switch Requirements Req 89.4 One Gigabit Ethernet SFP ports Req 90.24 Req 91. 5.5.3.7 Aggregation and Access Switch Requirements Req 92.Layer 2 hardware forwarding at 960 Gbps or 714.24 mpps; Layer 3 performance of up to 160 Gbps or 240 mpps Req 93. Req 94. 5.5.3.8 Data Center UTM Requirements
  • 20. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 20 of 42 Req 95.Wire-speed firewall performance for any size packets Req 96. Req 97. 5.5.3.9 SMTP Gateway Requirements Req 98.Minimum 4 10/100/1000 Interfaces (Copper, RJ-45) Req 99. Req 100. 5.5.3.10 Load Balancer Requirements Req 101. Static and dynamic load balancing methods, including Dynamic Ratio- Least Connections, and Observed Load Balancing, which track dynamic performance levels of servers in a group Req 102. Req 103. 5.5.4 Data Center Area Hardware Requirements 5.5.4.1 Electrical System Requirements 5.5.4.1.1 DistributionBoards: Req 104. Distribution boards shall be of standard make with MCB’s (Miniature Circuit Breakers) per approved make given and factory assembled with latching covers flush lock. Req 105. Req 106. Req 107. Req 108. 5.5.4.1.2 MCB/RCCB(Residual-CurrentCircuitBreaker): Req 109. MCB shall fully comply with latest standard IS 8828 – 1996 & relevant test certificate shall be furnished. Req 110. Req 111. Req 112. Req 113. 5.5.4.1.3 Earthing:
  • 21. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 21 of 42 Req 114. Req 115. Req 116. All electrical equipment is to be earthen by connecting two earth tapes from the frame of the equipment ring will be connect via several earth electrodes. Req 117. The cable arm our will be earthen through the cable glands. 5.5.4.2 UPS System Requirements 5.5.4.2.1 UPS SystemConnectedto Critical Area Req 118. The UPS connected to the Critical Area shall be use to power critical servers and other equipment installed in the critical section of the Data Center. Req 119. Req 120. Req 121. 5.5.4.2.2 UPS SystemConnectedto Non-Critical Area Req 122. Req 123. Req 124. The Non- Critical area UPS shall be use to provide power to workstations and other equipment installed in the non-critical section of the Data Center. 5.5.4.3 HVAC System Requirements 5.5.4.3.1 Purpose Req 125. The Air conditioning system shall be deploy with the objective of cooling the respective areas based on the application requirement. Req 126. Req 127. 5.5.4.3.2 PrecisionAirConditioningSystem Req 128. Req 129. Req 130. The computer room air conditioning equipment shall be design specifically for precision temperature and humidity control applications. It shall automatically monitor and control cooling, heating, humidification, de- humidification and filtering functions for the conditioned space. The system should
  • 22. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 22 of 42 build to the highest quality engineering and manufacturing standards, and shall be subject to a functional test prior to leaving the factory. 5.5.4.3.1 Features 5.5.4.3.1.1 Construction Req 131. The Unit cabinets shall be manufacture from 0.9mm galvanized sheet steel, Z2 G275N (BS2989) coated with epoxy baked powder paint to provide a durable finish. Req 132. Req 133. 5.5.4.3.1.2 Evaporator Req 134. Req 135. Req 136. Large surface area coil(s) should ideally positioned to optimize airflow and heat transfer; they shall be manufactured from refrigeration quality copper tubes with mechanically bonded aluminum fins. The factory test pressure shall be not less than 40bar. 5.5.4.3.1.3 Condenser Req 137. Req 138. Req 139. Shall be stainless steel high efficiency brazed plate heat exchanger(s) shall allow optimum heat transfer between media and ensures low water/glycol pressure drops. 5.5.4.3.1.4 Fan& Motor Assembly Req 140. Req 141. Req 142. Units utilize a double inlet, forward curved, direct drive centrifugal fan with integral shaft mounted motor, which statically and dynamically balanced for quiet operation. Req 143. Impellers and casings shall be galvanized for protection against corrosion. Req 144. The integral motor runs in sealed for life, lubricated bearings and features automatic thermal overload protection. Req 145. Fan speed, airflow and external static pressure should controlled by the use of a voltage controller via the microprocessor display keypad, which maintains optimum performance and offers easy on site adjustment.
  • 23. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 23 of 42 Req 146. Direct drive fan assemblies require minimal maintenance unlike the traditional belt and pulley type in areas such as belt dust, slippage/realignment and replacement 5.5.4.4 Access Control System Requirements 5.5.4.4.1 Purpose Req 147. The Access Control System shall be deploy with the objective of allowing entry and exit to and from the premises to authorized personnel only. Req 148. Req 149. Req 150. 5.5.4.4.2 Complianceto Specification 5.5.4.4.2.1 ControllerServer Req 151. The network server shall mean the access control system server. Req 152. Req 153. Req 154. 5.5.4.4.2.2 ApplicationSoftware Req 155. Req 156. Req 157. 5.5.4.4.2.3 DoorController Req 158. The door controller shall mean the intelligent control unit that shall be used to process & manage the entry & exit transactions through each of the access controlled points, which may be doors (with electromagnetic locks). Req 159. Req 160. Req 161. Req 162. Req 163. 5.5.4.4.2.4 Reader(FingerPrint) Req 164. The finger print reader (FPR) shall mean a device, which shall be capable of reading a fingerprint & comparing the same with a stored template based on optic sensors.
  • 24. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 24 of 42 Req 165. Req 166. Req 167. 5.5.4.4.2.5 Proximity/Smartcardreader Req 168. The proximity/Smart card reader shall mean the card-reading device, connected to the door controller. Req 169. Req 170. 5.5.4.4.2.6 Proximity/Smartcard Req 171. The proximity/Smart card shall mean the access card that is capable of being read without a direct contact by the proximity card reader. Req 172. Req 173. Req 174. 5.5.4.4.2.7 Electro MagneticLock Req 175. The Electro Magnetic Lock (EML) shall mean a locking mechanism that works on the principle of electromagnetic attraction. Req 176. Req 177. Req 178. 5.5.4.4.2.8 Cables Req 179. The cables shall mean appropriate data cables required for connecting the door controllers to the PC. It shall also mean appropriate data & power cables to connect the card readers, locks to the door controllers. Req 180. Req 181. 5.5.4.5 CCTV System Requirements 5.5.4.5.1 PurposeandCC CameraLocations Req 182. The Critical Data Centre along with the Non Critical area needs to be under constant video surveillance. Req 183. Req 184.
  • 25. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 25 of 42 Req 185. Req 186. Req 187. 5.5.4.5.2 ApplicationSoftware Req 188. The application software shall mean the Video management software that should supplied together with the system in order to provide a User Interface (UI) for man machine interface. Req 189. Req 190. 5.5.4.5.3 DomeCamerawithAuto Iris, vari-focal lens. Req 191. The proposed Camera shall have a 1/3” CCD Pickup device & be of high resolution of 330 TVL and minimum lux level of 1.0 lux f1.4. Req 192. Req 193. Req 194. 5.5.4.5.4 Monitor Req 195. The monitor shall be suitable with the standards of the selected cameras. Req 196. Req 197. Req 198. 5.5.4.5.5 Keyboard Req 199. Req 200. Req 201. . 5.5.4.5.6 CCTV MonitoringWorkstation Req 202. Req 203. 5.5.4.6 Water Leak Detection System Requirements The water leak detector should installed to detect any seepage of water into the critical area. It shall consist of water leak detection cable and an alarm module. The cable should installed in the ceiling & floor areas around the periphery.
  • 26. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 26 of 42 5.5.4.6.1 Water leakagedetectioncable Req 204. The Water leak detection cable shall the sensor cable typically used to detect water leaks in the sub floor and above false ceiling areas. Req 205. Req 206. 5.5.4.6.2 Control Panel Req 207. The control panel shall be computerized multi zone multiplex controller. The system should programmed, armed or disarmed through a control key pad. Req 208. Req 209. Req 210. Req 211. 5.5.4.6.3 Water Leak DetectionSensors Req 212. Water Leak Detection sensors should mounted, where localized leak detection is required. Req 213. Req 214. 5.5.4.6.4 Sounder Req 215. The sounder shall give audible alarm when any sensor operates. Req 216. 5.6 Implementation Requirements The Solution implementation will require a highly qualified Bidder to undertake the configuration, testing and deployment of all hardware, software, components and tools to ensure successful delivery that meets the requirements within various functional and technical areas. Given the Solution’s importance in terms of its objectives to -------------, the following are the general implementation guidelines and requirements: Req 217. The Bidder should perform the Solution’s complete implementation and deployment within (6) months of the project’s contract start date. The Bidder can propose alternative project implementation phases and timelines that would enable it to guarantee the Solution’s successful and complete implementation and deployment.
  • 27. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 27 of 42 Req 218. The Bidder should perform required migration/upgrade for current infrastructure (server, application, network HW, Security HW). Req 219. The Bidder should develop the design (high level & low level) and migration through technology vendor services. Req 220. The Bidder should perform required knowledge transfer and handover for the propose solution. Req 221. The Bidder’s proposed knowledge transfer shouldn’t be less than one week per component. Req 222. The Bidder’s proposed knowledge transfer shouldn’t be less than 2 person per component and not necessarily at the same time. Req 223. The Bidder’s proposed knowledge transfer should include all Hardware (network, security, servers, storage, backup, data center). Req 224. The Bidder should explain how they can be able to deliver the solution successfully during the required (6) months period. 5.6.1 Project Management Requirements= Req 225. The Bidder should provide an implementation plan illustrating all development, testing, deployment, and transition activities. Transition activities should at least include operational readiness review, operation model and procedures. In addition, the Bidder should specify and describe its deliverables. Req 226. The Bidder should comprehensively specify and describe the project’s different phases and activities, etc. It is very important that the Bidder provide a quality implementation plan covering all project aspects. The plan shall clearly specify the start and end dates (relative to contract signing) for each of the project phases and key milestones to increase visibility of the project progress. The table below, Table 4, demonstrates the minimum stages implementation Requirements Phase Stage Activities Duration Design Planning Conduct a Kick-off meeting Define the project stages, milestones and needed resources Develop project control deliverables Contract signature Date + 1 week Requirements & Analysis Review, verify and confirm the requirements included in this RFP document. Contract signature Date + 2 week
  • 28. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 28 of 42 Architecture Analysis Define all architecture deliverables Contract signature Date + 3 week Design Propose solution design. Produce Data center, servers, storage, backup, network, security, monitoring tools final High Level & Low level design. Produce The Solution Final Bill of Quantity. Prepare procurement documents (Documents to verify that the equipment, devices, and licenses are ordered or purchased). Produce installation, configuration migration and upgrade plan & procedure. Contract signature Date + 4 weeks Build Supply Supply equipment, devices, servers, storage, and all required licenses Contract signature Date + 12 weeks Implement data center high availability solution Conduct electrical system installation, configuration and running. Conduct cooling system installation, configuration and running. Conduct fire, security, and monitoring systems installation, configuration and running. Contract signature Date + 16 weeks Implement network & security high availability solution Conduct network & security installation, configuration and running. Contract signature Date + 18 weeks Implement servers, storage,backup systems high availability solution Implement Hardware & Software Monitoring Tools Conduct servers,storage and backup systeminstallation, configuration and running. Conduct hardware & software monitoring tools installation, configuration and running. Contract signature Date + 20 weeks
  • 29. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 29 of 42 Migrate & operate the systems, software, and data from the existing environment to the new high available environment. Conduct systems,software, and data migration and operation from the existing environment to the new high available environment. Contract signature Date + 20 weeks Documentation Document all procedures,system documentations Contract signature Date + 24 weeks Testing Perform System Testing. Perform Stress Testing. Ensure completeness of User Acceptance Test. Contract signature Date + 24 weeks Handover Handover Provide knowledge transfer. Handover implemented and updated systems. Start maintenance & support period Contract signature Date + 24 weeks Table 4 The Minimum Project Stages The Bidder should follow an internationally recognized project management methodology. For each of the items listed below, bidders must describe their approach to project management during the project phases in their proposals: Req 227. Provide a comprehensive project implementation plan covering, but not limited to, tasks estimation, project planning, work allocation, progress tracking, monitoring and reporting to ------------. Req 228. Describe the project’s management team structure, along with roles and responsibilities of all team members. Req 229. Describe, in detail, project management processes, methodologies and procedures. Req 230. Describe ------------ resources necessary for the project to succeed. Req 231. Describe how ----------- management will receive up-to-date reports on project status. Req 232. Describe the change management procedures to handle risks, such as “out-of-scope” requests or change in ------------ business needs while the project is underway.
  • 30. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 30 of 42 Req 233. Describe what procedures will be use to keep the project on track and what escalation procedures will be employed to address any problems encountered with the project progress. Req 234. Describe what quality assurance processes, procedures, formal reviews, etc. will be in place. Req 235. Describe the proposed conflict resolution / escalation process between the Bidder and ------------ to handle project or contractual disputes. 5.6.2 Project Documentation Requirements Req 236. The Bidder should provide documentations for each phase as per the following table: Phase Deliverables Design Detailed project management plan Project charter Detailed Scope of Work Work Breakdown Structure Project schedule Design verification document High level final design document Low level final design document The solution Bill of Quantity document Failover and fail back methodology document Build Deployment documentation Operations Plan Operations Policies and Procedures System documentations Test Plan. User Acceptance Criteria Problem reporting Problem resolution testing Operation Produce daily, weekly & monthly reports. Handover Provide final versions of all documentations. Provide full knowledge transfer documentation. Table 5 Sample Phases Documentation 5.6.3 Project Organization Requirements Req 237. The Bidder should describe the proposed project structure, identifying all project individuals including senior project manager, QA engineers, hardware / network engineers, administrators and others.
  • 31. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 31 of 42 Req 238. The Bidder should specify roles and qualifications of various team members proposed for the project as well as identify the key roles ------------ technical staff is expected to play. Bidders should provide details of any sub- contractors likely to be involved. Req 239. The Bidder should indicate the number of full time staff that will be required. ------------ requires that a strong technical team include a fulltime senior project manager assigned to manage the entire project, technical team and contract, including the performance of subcontractor(s) personnel if any. The following are the requirements for the senior project manager: Req 240. The senior project manager must be available full-time throughout the project implementation duration. Req 241. The senior project manager must ‘not reassigned during the implementation period without ------------ written consent. Req 242. The project manager will function as the Bidder’s authorized point of contact with ------------ and must be available to respond promptly and fully to all project requirements. Req 243. The senior project manager’s responsibilities will include, but are not limited to, providing administrative, supervisory and technical direction to project personnel, monitoring work performance for accuracy, timeliness, efficiency and adherence to contract requirements, coordinating the resolution of contract problems as well as implementing and enforcing problem escalation procedures. Req 244. The senior project manager must be a bidder’s employee and must authorized to make decisions on behalf of the Bidder and all subcontractors; if any. Req 245. The senior project manager shall have a minimum of (8) years’ experience managing similar projects (both in nature and scale) involving IT deployment in the government sector, and application integration operations for accounts similar in scope and complexity to this project. Furthermore, he must have demonstrated effective oral and written communication skills. Req 246. The senior project manager should be available on-site upon request at ------------ facility in Jeddah. Req 247. For the senior project manager, the Bidder must provide a reference for his last two (2) projects including company name, address, phone number and contact person. In addition to the senior project manager, ----------- requires the assignment of a strong technical support team to the project. The technical team’s members must
  • 32. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 32 of 42 have demonstrated sound experience in implementing similar projects. ----------- will review and approve the Bidder’s selected personnel for project assignment. --- ------- reserves the right to interview and approve the technical team members. In addition, -------------- has the right to require replacement of the Bidder’s personnel if dissatisfied with their performance. Req 248. The Bidder should provide an organizational chart for the assigned project team, resumes / CVs for all technical team members and a brief, one-half page biography for each key employee assigned to the project. The information provided shall include the following: name, classification, employment period with the company, previous related experience (last three years), and reason for assigning the individuals to the project and their responsibilities. 5.6.4 Warranty Requirements Req 249. The Bidder should provide a comprehensive warranty that covers all components it will provide (hardware and software) after the implementation acceptance test. The warranty should cover all materials, licenses, services and support for both hardware and software. Req 250. The Bidder should provide SLA with (hardware & software) venders on a 4 hours response time 24x7 & spare part delivery. Req 251. The Bidder should administer warranties with serial number and warranty period. Upon final acceptance of the solution, any OEM warranties will transferred to --------- at no additional charge. All warranty documentation (whether expired or not) will be delivered to -------- at the issuance of the final acceptance certificate. Req 252. The Bidder should provide the technology vendor’s Premium Level warranty and support for all hardware and software used in The Solution. Req 253. The Bidders’ warranty must cover all equipment and work activities contained in the contract against all design, manufacturing, and environment faults until issuance of final acceptance. Req 254. The warranty’s/support duration shall be mandatory for three years and shall be optional for the 4th and 5th years from the solution’s final acceptance date. Req 255. The warranty shall include the Bidder’s repair or replacement of the products / components during the warranty period. The replacement products / components shall meet the related specifications without further repair or modification.
  • 33. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 33 of 42 Req 256. The Bidder shall be liable for all costs including, but not limited to, the costs of material, labor, travel, transport and living expenses associated with the collection and return of the units covered by the warranty. Req 257. The date of manufacture or assembly of any equipment, parts or consumables, shall not be more than six months before delivery. Req 258. -------- has the right to require a replacement if the repair is deemed to be impractical. Req 259. The Bidder must ensure the replacement components are available for any failed component during the warranty period. Req 260. The Bidder should guarantee availability of spare parts and technical assistance for all components (or appropriate alternatives) to ensure the equipment would run for at least five (5) years, without major changes, at the completion of final acceptance. Six months advance notice is required for any discontinued part(s) with a suggestion for alternatives. Req 261. The Bidder should provide repair data and corresponding courses of failure, which will kept in ------------ historical database system. Req 262. The Bidder should define the maximum response time by which engineers shall respond to a failure incident and the maximum time of resolving the failure in their proposal 5.6.5 Quality Assurance and Acceptance Requirements The QA control mechanism is the testing process that validates all claims made by the team and proves that The Solution maps to the requirements and any other approved change requests. Req 263. The Bidder’s quality control framework must base on the best practices and international standards to conform to all the solution’s requirements; including functional and technical requirements, user requirements. It will also provide the basis for the solution’s testing, validation and acceptance. Req 264. The Bidder should perform System Testing: Validation of the solution’s functional and technical requirements. Req 265. The Bidder should generate User Acceptance Testing (UAT) test cases. Req 266. The Bidder should describe the methods and procedures used to secure the solution data integrity and consistency.
  • 34. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 34 of 42 Req 267. The Bidder should perform stress and performance testing: Load testing enables the understanding of the solution’s performance and behavior under large number of users and high-load conditions. Req 268. The Bidder should perform security audit and system penetration testing for the solution. Req 269. The Bidder should describe their QA, testing approaches and procedures as well as testing tools for conducting various tests in support of the solution’s acceptance. 6 ProposalFormat 6.1 General Instructions This section provides the requirements Bidders must abide by in preparing and submitting their proposals, including the expected proposal content structures. Bidders must comply with all items listed in Appendix A: “Instructions to Bidders”: 1. TECHNICAL PROPOSAL 2. FINANCIAL PROPOSAL Each bidder’s proposal packages must contain the following information, as outlined in table 5 below, to qualify for evaluation. Technical Proposal Package Financial Proposal Package Cover Letter Technical Proposal Response Appendix C Appendix D Appendix E Appendix G Curriculum Vitas Cover Letter Financial Proposal Response Appendix F Security Bond Saudi Ministry of Commerce registration certificate and any International identification/registration Chamber of Commerce Certificate Certificate from Department of Zakat and Income Tax (DZIT) outlining Zakat and income tax payments Social Insurance Certificate (GOSI) Saudization Certificate Table 6 Proposal Packages Content Proposals shall be simple, providing a straightforward concise description of the Bidder’s ability to meet this RFP’s requirements. Proposals should only address those requirements specified in this RFP. Unnecessary marketing information, provided in the response to this RFP, will unfavorably viewed, and could affect the Bidder’s response evaluation.
  • 35. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 35 of 42 6.2 Proposal Preparation Req 270. Bidders must conform to the following requirements. Failure to adhere to these requirements will result in immediate elimination of the proposal. Req 271. The Bidders’ proposals must contain a cover letter on company letterhead with original signature(s) of an Authorized Signatory to bind Bidders to the RFP provisions. Req 272. The Bidders must confirm that their proposals will remain valid for 90 days after the submission date. Req 273. The Technical proposal must be less than one hundred (100) A4 pages, using 11 size Calibri or Arial font to be considered for evaluation Req 274. The Technical Proposals must contain a completed “Requirements Compliance Matrix” according to the format shown in Appendix C. Req 275. The completed “Requirements Compliance Matrix” and other required information must attached as appendices to the Technical Proposal as specified in the table above. Req 276. The Bidders can provide additional information as appendices, but it is not guaranteed that these appendices will be considered for the purpose of proposal's evaluation. Req 277. No financial information should be included in the Technical Proposal. Req 278. The Financial Proposal will have “Bill of Material & Pricing Tables” according to the format specified in Appendix F; it should written in Arabic and English with all the prices. Req 279. The Financial information must be bound, sealed, identified as “Financial Proposal”, and must be separate from the Technical Proposal. Req 280. All copies of the Bidders’ proposal(s) must arrive at the Issuing Office on or before the date and time specified in the RFP Terms and Conditions. Req 281. The Bidders must acknowledge their attendance at the pre-contract presentations when requested by ------------. 6.3 Technical Proposal Instructions This section provides the detailed information that must be included in the Bidder’s Technical Proposal. The Bidder must comply with all items listed in Appendix D. This section of the Bidder’s proposal should identified as Technical Proposal and must be bound and sealed separately. It must NOT include any financial data or information. Financial data or information is defined as any information related, directly or indirectly, to the Bidder’s proposed charges for products, services and deliverables.
  • 36. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 36 of 42 6.3.1 Mandatory and Optional Requirements Bidders must confirm that their proposal(s) meets all the mandatory and optional requirements. Non-acceptance of or noncompliance with any mandatory requirement, or modification of, or the placing of conditions on acceptance or compliance with any of the mandatory requirements in whole or in part, may result in immediate disqualification. 6.3.2 Required Sections The Technical Proposal should structure as follows: 6.3.2.1 Section 1: Executive Summary This section should include a succinct statement and executive summary where the Bidder highlights the technical proposal’s key aspects. 6.3.2.2 Section 2: Bidder’s Profile & Qualifications This section should cover the Bidder’s profile including credentials and capabilities, local presence, the project team composition and relevant experience and the tools and products the vendors selected to deliver the proposed solution.  Bidder’s credentials and capabilities: Bidders will evaluated based on their commercial viability, market presence, stability and experience in the project technical areas. Bidders should supplement this section with the information requested as outlined in Appendix G General Bidder Information and Qualifications.  Local Presence Although the bidding is open to bidders from any country, due to the project’s critical nature, preference shall give to Bidders with active work and staff presence in KSA.  Bidder References Bidders must submit the latest three project references where work similar to ----- ------- solution in scope and technical nature has implemented. ------------ will evaluate these references, based on the above criteria as well as client satisfaction and project success. Bidders should use the project references table provided in Appendix E “Bidder Projects References” to list their project references.  Product Supplier Bidders will be evaluated based on criteria related the Bidder’s product(s) supplier’s profile, stability, financial and product viability. The key determinant factor is for the Bidder to demonstrate that the product and products combinations had successfully deployed in a similar environment preferably in government entities or large organizations.
  • 37. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 37 of 42  Project Team Bidders will be evaluated based on the team overall capabilities, knowledge and experience as demonstrated in the RFP. Bidders should list all companies or subcontractors involved in delivering the RFP requirements. The overall team must possess all the success factors for smooth project delivery and execution, including a record of accomplishment within senior project management, architecture, development and system administration. The team should clearly demonstrate prior experience of senior project management and architecture. 6.3.2.3 Section 3: Technical Solution Architecture This section should present the Bidders’ technical architecture solution meeting all functional and technical requirements outlined in this RFP. The Bidders should present sound, complete, and competent technical architecture solution in details. The Bidders are expected to address the following technical architecture aspects:  Solution Architecture Overview  Physical model overview  Integration of Infrastructure and Security Architecture between ------- and the Solution  Monitoring and management of Solution  Architecture scalability and performance 6.3.2.4 Section 4: Architecture Performance and Scalability This section should present the sizing exercise results for the Solution’s performance and scalability in accordance to the requirements outlined in the RFP. Bidders should explain their sizing approach in determining the required hardware and software. 6.3.2.5 Section 5: Project Administration and Management This section should present the Bidders’ detailed implementation plan outlining their proposal’s different deliverables including the period each deliverable requires. Bidders should respond to the requirements as outlined in the RFP. Req 282. The Bidders should develop project work plans for ------------, that include activities that will be undertaken to achieve the project objectives and deliverables within the required time scales. The work plan shall clearly show who will undertake the activity and the scheduled dates to start and complete each activity. Req 283. The Bidders should discuss their Quality Assurance framework and testing plans in detail.
  • 38. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 38 of 42 Req 284. The Bidders should provide details on the required team that will be involved in project management including structure, members and expertise. Req 285. The Bidders should include CVs of the proposed implementation team in Curricular Vitae document and provide description of the Bidder's ability to mobilize the assigned resources. Req 286. The Bidders should show the experiences required for this project in the CVs, such as project management, quality assurance, DRP expertise, database design and development, SOA architecture and design, integration architecture and development, virtualization architect and configuration and configuration management. 6.3.2.6 Section 7: Maintenance & Support This section should present the Bidder’s detailed maintenance and support plan for software and hardware including detailed information on these plans. Bidders should respond to the requirements as outlined in this RFP. 6.3.2.7 Section 8: Operations This section should present the Bidder’s detailed operations approach and plan to operate the proposed solution. The Bidders should respond to the requirements outlined in this RFP. Req 287. The Bidders should submit CVs of the proposed operations team in Curricular Vitae Proposal document. 6.3.3 RequiredAppendices 6.3.3.1 Appendix C: Bidder’sResponse to Compliance Matrix This appendix should present the Bidders’ compliance to the “Requirements Compliance Matrix” in Appendix C of this RFP. Bidders should follow the instructions to provide accurate and detailed answers. 6.3.3.2 Appendix D: Solution Bill of Materials and Information Tables for Technical Proposal This appendix should list all software and hardware products, components and tools that implement the proposed technical architecture solution meeting all functional and technical requirements outlined in this RFP. Bidders should use table formats in Appendix D and must make sure that no financial information is included. 6.3.3.3 Appendix F: Solution Bill of Materials and Information Tables for Financial Proposal This appendix should list all software and hardware products, components and tools that will use to implement the proposed technical architecture solution meeting all functional and technical requirements outlined in this RFP. Bidders should use table formats in Appendix F and must make sure that no financial information is included. 6.3.3.4 Appendix E: Bidder References
  • 39. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 39 of 42 Bidders should use the Bidder references template, provided in Appendix E, to provide information on three relevant successfully completed projects with similar scope and size to the one requested in this RFP. 6.3.3.5 Appendix G General Bidder Information and Qualifications The Bidder must include the following required information in this appendix to help assess the Bidder’s credentials and qualifications; 1. Short narrative description of the company’s organization, including organizational charts, and indicating company officers where applicable. 2. Complete name and address. 3. Principal type of business. 4. Total number of years in business. 5. Total number of employees. 6. Number of years providing services similar to those requested in this RFP. 7. Total revenues received from similar engagement(s) during each of the last three (3) fiscal years. 8. Audited profit and loss statement and balance sheet for the Bidder’s last three (3) fiscal years. -------- will keep this information confidential during the evaluation process. 9. Bidder’s copy of the company’s Articles of Association. 10. Representations and warranties that the Bidder: (i) is a legal entity duly established and validly existing under the laws and regulations of the Kingdom of Saudi Arabia; (ii) has the power to enter into and perform all transactions contemplated hereby; (iii) is not currently under suspension or debarment by any governmental body. 11. Acknowledgement stating that if the Bidder is currently under suspension, debarment or has legal suit, then its proposal may not be considered. 12. Signed formal agreement (e.g. teaming agreement or any other legally binding document) between the Bidder and each proposed subcontractor. These formal agreements must be contained in a separate volume (Appendices supporting the Technical Proposal.) 6.4 Financial Proposal Instructions This section provides the detailed information required in the Bidder’s Financial Proposal. Bidders must comply with all items specified in Appendix A: Instructions to Bidder and Proposal Submission and Evaluation and Appendix B: Standard Terms & Conditions. This section of the Bidder’s proposal must identified as Financial Proposal and must be bound and sealed separately from the Technical Proposal. Financial Data is defined as any information related, directly or indirectly, to the Bidder’s proposed charges for products, services and deliverables. The Bidder must
  • 40. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 40 of 42 use and complete the tables in Appendix F as part of its Financial Proposal to provide the following: 1. Financial data or information must not presented in any portion of the Technical Proposal. Financial data or information consists of, but is not limited to, costs, fees, prices, rates, bonuses, discounts, rebates, or the identification of free services, labor or materials. 2. All prices must be in Saudi Riyals (SAR). 3. All prices shall include all costs including procurement and on site delivery. 4. Pricing should also include software, hardware, implementation, training, maintenance and support, and operations. 5. Itemized list for each of the required services: hardware, software, licenses, customization, implementation, operations / management and training components in support of their proposed solution. 6. Bidders must use tables provided in Appendix F to list and itemize their solution cost including mandatory and optional items. 7. Financial Proposal envelope shall contain all required items as outlined in the Financial Proposal Packages Content. 8. Bidders must abide by all requirements in this RFP. 7 Overview of appendices The following are the appendices for supporting the RFP. Appendix A: Instructions to Bidder, Proposal Submission and Evaluation Appendix A provides Bidders with information regarding proposal review process, content, format, evaluation, and communications. Appendix B: Standard Terms & Conditions Appendix B provides standard terms and conditions in Arabic. Appendix C: Requirements Compliance Matrix for Technical Proposal Bidders should fill-in this sheet in its entirety; this table will use to guide the technical proposal’s evaluation process. Appendix D: Bill ofMaterials & Information Tables for Technical Proposal Appendix D provides all the software and hardware information tables that Bidders must provide for the Technical Proposal. Appendix E: Bidder Project References Templates for Technical Proposal Appendix E provides the templates for Bidders’ references in support of their Technical Proposals.
  • 41. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 41 of 42 Appendix F: Bill ofMaterials & Pricing Tables for Financial Proposal Appendix F provides all the pricing table templates that Bidders should complete with all required financial data and information for the Financial Proposal. Appendix G: Bidders Qualifications Appendix G provides the Bidders qualifications.
  • 42. ‫اسة‬‫ر‬‫ك‬‫ع‬‫مشرو‬ ‫عروض‬ ‫طلب‬( ‫العالية‬ ‫االتاحة‬ ‫تأمين‬AvailabilityHigh)‫كز‬‫لمر‬‫معلومات‬--------------- Page 42 of 42 8 The Appendices (‫ت‬ ‫)ايمال‬ ‫تلو‬:‫ة‬‫تعليمعـ‬‫تقفي‬‫العر‬‫عالتقيي‬ AppendixA - Instructions to Bidder and Proposal Submission and Evaluation v04.rar ‫تلو‬‫ب‬:‫الشرع‬‫الععتة‬ Appendix B - Standard Terms and Conditions v0.3.rar ‫تلو‬:‫ج‬‫تععيير‬‫المطعبقة‬ Appendix C - Compliance Matrix v0.4.rar ‫تلو‬‫د‬:‫فاعل‬‫الكميعـ‬‫للعر‬‫الففي‬ Appendix D - Bill of Materials Information Tables for Technical Proposal V0.1.rar ‫تلو‬‫هد‬:‫مة‬ ‫سع‬‫المشعريع‬‫عالخبراـ‬‫السعبقة‬ Appendix E - Bidders References Template v0.2.rar ‫تلو‬:‫ع‬‫فاعل‬‫الكميعـ‬‫عاألسععر‬(‫العر‬‫المعلي‬) Appendix F- Bill of Materials and Pricing Tables for Financial Proposal V 4.rar ‫تلو‬:‫ز‬‫تعلوتعـ‬‫هالـ‬ ‫عت‬‫تقفتي‬‫العرع‬ Appendix G- Bidders Qualifications and Information v0.2.rar